1. CURRICULUM VITAE
A.JAYASEELAN
EMAIL : a. jeyaseelandj88@gmail.com
Mobile No : +91-8056960730
Objective:
A self disciplined, creative, challenging, professional Electrical Engineer seeking a
good career growth that can be utilized in the growth of the organization.
Educational Qualification:
First Class Diploma in Electrical and Electronics from State Board of Technical
Education, Tamil Nadu - April 2009.
Experience summary:
6 Years of Experience in the field of Electrical System at Power Plant Projects.
Erection HT,LT Transformers, MV,LV Switchgears, Power and Control Panels, Junction
boxes, Cabinets, Distribution boxes, Primary and Secondary cable tray works, MV,LV
Power, control, instrument Cable Laying ,Termination and Testing works, Installation of
Field Instruments & hookup and Automatic Fire protection System components.
Excellent Technical Skills to interact with Client, Sub contractors and Suppliers.
Erection, Testing, Commissioning Experience and related Documentation preparation in
the developed prototype actual unit in Atomic Power Plant Projects and Super Critical
Thermal Power Plant Projects.
Employment History :
Period : September 2014 to September 2015
Employer : Equator Engineering SDN. BHD, Malaysia
Client : TANJUNG BIN ENERGY ISSUER BHD
Main Contractor : ALSTOM
Project : 1X 1000MW TANJUNG BIN 4 Coal Fired Power Plant Project ,Malaysia
Consultant : FICHTNER GMBH & CO.KG
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation.
• MV,LV and DCS Panel Erection testing and Commissioning .
2. • HT,LT Power, Control and Instrumentation and Fiber Optic Cable laying and End
termination works.
• Distribution Board and Junction Boxes Installation.
• Planning and Execution of works.
• Quantity surveying of material for all the Site Erection activities.
• Making the work Execution Program, Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Coordinating with client and Subcontractor for all the Site Erection works.
• Athena Updation
• As built drawing Preparation and documentation.
Period : November 2013 to August 2014
Employer : Equator Engineering SDN. BHD, Malaysia
Client : TNB JANAMANJUNG
Main Contractor : ALSTOM
Project : 1X 1000MW MANJUNG 4 Coal Fired Power Plant Project ,Malaysia
Consultant : TEPSCO
Job Responsibility :-
• HT,LT Power, Control and Instrumentation and Fiber Optic Cable Laying, End
termination and Testing works .
• Planning the Execution of Work.
• Quantity surveying of material.
• Making the Work Execution Program,Work allocation of Manpower and Follow up.
• Arranging the Materials for the allocated Man Power.
• Coordinating with client for all the Site Erection works.
• Coordinating with Subcontractor for Site activities.
• Athena Updation
• As buit drawings Preparation And documentation
Period : February 2013 to October 2013
Employer : Microtec Engineers
Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL
Project : 2X 1000MW Nuclear Power Plant Project
KudanKulam, Tamilnadu ,India
Consultant : Electronics Corporation of India Ltd
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation .
• MV,LV and DCS Panel Erection and testing Commissioning .
3. • HT,LT Power, Control and Instrumentation Cable laying & End termination works.
• Distribution Board Installation & Dressing.
• Testing & Commissioning of Internal & External Works.
• Erection of all type of Light Fitting.
• Lux level Calculation for Internal & external Lighting Electrical Works.
• Planning the Execution of works.
• Quantity Surveying of material for all MEP Services.
• Making the work Execution Program,Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Preparing the Client Bills And Getting the Certification.
• As built drawing Preparation and documentation.
Period : January 2012 to December 2012
Employer : JEL Maintenance Pte Ltd
Client : TUAS POWER Utilities Pte.Ltd
Main Contractor : Marubeni Corporation.
Project : Tembusu Multi-Utilities Complex
120 MW Biomass & Coal Co-Firing Co-Generation Plant
(BMCC Project, Jurong Island, Singapore)
Consultant : Worley Parsons
Job Responsibility :-
• Erection of HT,LT Transformer, LV,MV Switchgears, junction boxes, cabinets,
control panels, distribution boxes, cable tray.
• Installation of cable Ladder and tray.
• Instrument installation (Transmitter, Valves, Thermocouples) .
• Coordinated with client for joint site survey and obtained field work clearance for
Electrical and Instrumentation erection activities.
• Coordinated with client for acceptance of completed works, as built drawings &
measurement for billing.
• Coordinated with sub-contractors for smooth execution of works as per client &
relevant Indian /Russian Standard requirements.
• Involved in testing, Calibration of field instruments.
• In charge for Power, Control and instrument cabling and termination works.
• Multicore and control cable testing and loop Check.
• MOV Installation and testing.
• Transformer Installation and testing.
• Earth testing.
• Lux Testing.
• HT/LT cable installation and testing.
4. • Punch list clearance.
Period : July 2009 to Dec 2011
Employer : Microtec Engineers
Client : KUDANKULAM NUCLEAR POWER PROJECT, NPCIL
Project : 2X 1000MW Nuclear Power Plant Project
KudanKulam, Tamilnadu ,India
Consultant : Electronics Corporation of India Ltd
Job Responsibility :-
• Primary and secondary Cable tray and Support Fabrication and Installation .
• MV,LV and DCS Panel Erection and testing Commissioning .
• HT,LT Power, Control and Instrumentation Cable laying & End termination works.
• Distribution Board Installation & Dressing.
• Testing & Commissioning of Internal & External Works.
• Erection of all type of Light Fitting.
• Lux level Calculation for Internal & external Lighting Electrical Works.
• Planning the Execution of works.
• Quantity Surveying of material for all MEP Services.
• Making the work Execution Program ,Work allocation of Manpower and Follow up.
• Arranging the materials for the allocated Manpower.
• Coordination with Site and Head Office.
• Preparing the Client Bills And Getting the Certification.
• As built drawing Preparation and documentation.
PERSONAL DATA:
Date of birth : 01.07.1988
Gender : Male
Marital Status : Single
Father’s Name : Mr.I.Arul Raj
Nationality : Indian
Languages Known : Tamil, English & Hindi
Passport No. : J 6938055
Passport expiry : 12/07/2021
5. Address : 6/39, CSI Church Street,
Kudankulam (PO)
Tirunelveli Dist.,
Tamilnadu – 627106
Email ID : a.jeyaseelandj88@gmail.com
6. Address : 6/39, CSI Church Street,
Kudankulam (PO)
Tirunelveli Dist.,
Tamilnadu – 627106
Email ID : a.jeyaseelandj88@gmail.com