EDUCATION
Bachelor of Electrical Engineering, Technical University of Nova Scotia, Halifax, NS
PROFESSIONAL AFFILIATIONS
Registered Professional Engineer in Nova Scotia
SOFTWARE EXPERIENCE
Microsoft Office Suite, AutoCAD, PLS-CADD Lite, PLS-Pole, WinPCS, Orbit, Projects-On-Line
(POL)
PROFESSIONAL EXPERIENCE:
COMMISSIONING
Private Contractor
2015
Recently completed a 19 month contract as an Electrical Commissioning Specialist, Kearl Lake
Oil Sands Project (Phase 2) reporting to the Area Commissioning Lead. Supervision of all
Electrical Commissioning staff in the Extraction, Tank Farm, and Phase 1 to Phase 2
Interconnecting Pipe Rack areas of the plant (Silos). Overall construction budget for the capital
plant in these Silos would be approximately $1 Billion.
Interim Role (September 2013 to February 2014)
Employed as Electrical Commissioning Lead, Kearl Lake Oil Sands Project (Phase 2) reporting
to the Commissioning Manager for the Project. Technical responsibility for all Electrical
Commissioning activity in the Phase 2 Expansion. Overall construction budget for the capital
plant in the Phase 2 Project would be approximately $8 Billion.
2012/2013
Employed as an Electrical Commissioning Engineer, Kearl Lake Oil Sands Project. Reporting to
the Electrical Commissioning Lead for the Kearl Phase 1 Project. Providing engineering support
Page 2 of 6
site wide for all aspects of the commissioning and start up process. Liaising with engineering
design and construction through an RFI process. Coordination of vendor commissioning
activity. Developing switching procedures for energizing major substation facilities (E-Houses).
Material and equipment procurement for commissioning activity. Overall construction budget for
the capital plant in the Phase 1 Project would be approximately $14 Billion.
Cutler-Hammer Engineering Services – Field Service Engineer
Responsibilities included troubleshooting, commissioning and warranty repairs on
switchboards, transformers, MCC’s, transfer switches and variable frequency drives.
- Commissioned three diesel fire pump controllers on the Sable Project – two pumps on
the Thebaud Platform and one on the Venture Platform.
- South Korea - refurbishing Cutler-Hammer 4.16kV and 13.8kV switchgear on an FPSO
vessel being constructed for the Terra Nova Project.
- Hibernia Platform – performing thermal imaging on electrical and mechanical equipment.
- Goldboro Gas Plant – troubleshooting and warranty repairs on 4.16kV circuit breakers.
- Department of National Defence at CFB Halifax – upgrading trip units on 480V, 800
amp, shore power circuit breakers. Replaced trip units on Westinghouse DS breakers
with Cutler-Hammer solid state trip units.
- Halifax Casino – commissioning 20 Variable Frequency Drives that controlled fans, heat
wheels, and cooling water pumps associated with the building air handling and space
conditioning systems.
- Irving Paper, St. John, NB – Doble testing 138 – 13.8 kV Transformer
- USG Corporation, Electrical Maintenance Shutdown, Port Hawkesbury, Nova Scotia.
Electrical maintenance and testing of 25 kV and 600 Volt Switchgear and 25 kV – 600
Volt Padmount transformers.
- Industrial Facilities maintenance and testing experience included USG Port Hawkesbury,
Bowater Mersey, and various Irving Pulp and Paper Plants in Saint John.
Engineering Design
Oil and Gas
IOL, Dartmouth Refinery, Furnace Efficiency Upgrades (Project Manager)
Project responsibilities included design of combined O2
and COe analyzers, and
installation of automated combustion air and stack dampers on 17 process furnaces.
IOL, Dartmouth Refinery, Miscellaneous Projects (Electrical Lead)
Project responsibilities included miscellaneous electrical designs for pumps,
compressors, general power distribution and heat tracing.
Newfoundland Transshipment Limited (NTL)
Assessment of electrical maintenance practices at a marine transshipment facility in
Whiffen Head, Placentia Bay, Newfoundland
Page 3 of 6
Kentville Propane Storage Facility (Project Manager / Electrical Lead)
Provided detailed mechanical and electrical design and specifications for a propane
storage facility in Kentville, NS.
Power
Condition Assessment - Holyrood Generating Station, Holyrood, NL (Project Manager /
Principle Consultant)
Responsible for condition assessment on a 12 MW gas turbine (ancillary electrical
equipment), 600 volt motor control centers and 4.16 kV Switchgear.
Caribou Wind Farm (Project Manager, Electrical Lead – Collector System)
Civil, Structural and Electrical design of a 138 - 34.5 kV substation and 25.6 km of 34.5
kV overhead collector system to 33 @ 3 MW turbines in Caribou, NB.
Fermeuse Wind Farm (Electrical Lead – Collector Design)
Design of 5.5 km of 25 kV collector system to 9 @ 3 MW turbines in Fermeuse, Nfld.
30 MW Wind Farm – Transmission Line Routing Study, Digby, Nova Scotia (Electrical Lead)
Working as a sub-consultant to the Terrain Group, provided technical support for a 69 kV
transmission line route selection.
12 MW Wind Farm – Completions Report and Operations Review, Maryvale, Nova Scotia
(Project Manager, Electrical Lead)
Provided a comprehensive review of the installation and operation of the Maryvale Wind
Farm for a debt financing institution.
NB Power, Transmission Lines - Opinion of Probable Cost Studies (Principal Consultant)
Provided NB Power with Opinions of Probable Cost for various transmission line
extensions to wind farms in NB.
Nova Scotia Power (Project Manager / Principle Consultant)
Design of a four circuit Hendrix overhead distribution line consisting of 2 @ 25 kV circuits
and 2 @ 12.47 kV circuits using single pole construction.
Nova Scotia Power (Project Manager)
Structural analysis of existing Nova Scotia Power Distribution Design Standards and
Construction for potential retrofit with Hendrix spaced aerial cables.
Halifax Regional Municipality - Underground Common Trench Design (Project Manager /
Principle Consultant)
Project responsibilities included stakeholder consultation and development of an
underground common trench design to house power, telecom, and gas utilities in
residential developments.
Town of Lunenburg Electric Utility, System Operation Study (Project Manager / Principle
Consultant)
Provided a comprehensive Operations Study looking at all aspects of the utility including
long-term voltage conversion, manpower complement, construction standards,
equipment requirements, safety procedures and training.
Town of Antigonish Electric Utility, Utility Valuation Study (Project Manager / Principle
Consultant)
Page 4 of 6
Detailed field review of all utility assets in the Town of Antigonish Electric Utility.
Calculated the replacement cost of all utility assets and, using depreciation rates based
on years in service, provided an opinion on the utility rate base for regulatory purposes.
Markham Hydro – Project Manager / Principal Consultant
Conducted stakeholder interviews and research for an underground common trench
design to accommodate Power, Telecom and Gas utilities in residential developments.
Department of National Defence - CFB Aldershot, Kentville, NS (Electrical Design Engineer
Sub-Consultant)
Project responsibilities included detailed design and specifications for a 4.16 kV to 25 kV
distribution system voltage conversion at the CFB Aldershot Camp.
Manufacturing
Manufacturing Facility - Boiler House Expansion (Electrical Lead)
Project responsibilities included electrical design for 600 HP, 4160V compressors for two
new chillers, two 60 HP cooling tower fans, and several vertical pumps (up to 200 HP)
for chilling / cooling supply and return water.
Manufacturing Facility - Commissioning Engineer (Commissioning Engineer / Electrical
Lead)
Project responsibilities included electrical commissioning of a 4,160 volt starter for a 400
HP hydraulic pump, and supervising the commissioning of a replacement starter, as the
original starter failed during start up by plant personnel.
Manufacturing Facility - Diesel Fire Pump Controller (Electrical Lead)
Project responsibilities included preparing purchase and installation specifications to
rectify incompatibilities resulting from the grounding system employed on the
replacement of the diesel fire pump controller by plant personnel.
Manufacturing Facility - Expansion (Electrical Lead)
Project responsibilities included the installation of a new stearate dust collector and
hazardous area enclosure.
Manufacturing Facility - Expansion (Electrical Lead)
Project responsibilities included design of all process and power feeders for building
services and process equipment including low O2 monitoring, nitrogen leak detection and
alarm system, nitrogen generation and storage facility, and three dual cavity tire presses.
Manufacturing Facility - Expansion (Electrical Lead)
Project responsibilities included design for 800 amp process and building service feeder
layouts for the main process feeders and all building service functions (HID lighting,
emergency and exit lighting, receptacles, fire alarm, voice, and data equipment) for two
building extensions totaling 20,000 square feet.
Manufacturing Facility - Expansion (Electrical Lead)
Project responsibilities included detailed design for main process feeders, building
service functions (high bay fluorescent, HID lighting, emergency and exit lighting,
welding and maintenance receptacles, fire alarm, voice and data equipment) for three
building extensions totaling 50,000 square feet with a 2,000 kVA co-extruder, an MB2
tire
building machine and FSBT stacker, and a new press line with 12 McNeil dual cavity
presses.
Page 5 of 6
Commercial and Institutional
Poultry Research Facility, Truro, Nova Scotia (Electrical Lead)
Project responsibilities included detailed design, tender, and construction support for a
$9.8 million complex including offices, multi-purpose room, laboratories, live bird areas,
and a meat processing suite.
Halifax International Airport, Power Distribution Survey (Project Manager / Principle
Consultant)
Project responsibilities included review the 120/208 Volt power distribution system in the
airport terminal facility, inspecting approximately 175 - 120/208 volt distribution panels,
verifying circuit breaker and branch feeder compatibility, installing load survey equipment
to diagnose transient voltage and harmonics issue, identifying all code deficiencies, and
preparing a categorized priority repair report with associated cost estimates.
Halifax International Airport, Mechanical Room Upgrade (Electrical Lead)
Detailed design and specifications for new mechanical equipment in an existing
mechanical room above the departures lounge.
Dartmouth Crossing Limited (Electrical Lead)
Detailed design for underground power, telecom, street and traffic lighting for the
Dartmouth Crossing Project in Dartmouth, NS. This development was one of the largest
retail developments ever constructed in Nova Scotia. Two large retail buildings were
added to the project scope. Provided detailed design for the buildings excluding tenant
fit-ups.
Defence Construction Canada, CFB Halifax (Project Manager / Electrical Lead)
Provided detailed design, purchase specification and construction supervision for an
outdoor 4,160 Volt switchgear lineup.
Defence Construction Canada, CFB Halifax, Cape Scott Maintenance Facility (Electrical
Lead)
Provided detailed design for a reorganization of the Cape Scott Maintenance Facility to
make room for a Submarine Rescue (SUBSAR) facility.
Valley Regional Hospital (Project Manager / Electrical Lead)
Detailed design and specifications for a 2,000 kW standby generator installation.
Included integration of the emergency power into the main 600 Volt, 3,000 Amp
switchgear to provide 100% emergency power to the hospital.
Oland Breweries - Expansion, Halifax, Nova Scotia (Electrical Lead)
Project responsibilities included building service and process equipment design, lighting,
communication, fire alarm, CO2 exhaust, and HVAC systems for a new fermenting
building.
Public Works and Government Services Canada - RCMP Detachment Retrofits, Nova Scotia
(Project Manager / Electrical Lead)
Project responsibilities included electrical design for cell block retrofits in several new
RCMP detachments and a cell block addition at the Eskasoni Detachment.
Public Works and Government Services Canada - RCMP New Facilities, Halifax, Nova
Scotia (Project Manager / Electrical Lead)
Page 6 of 6
Project responsibilities included technical review of plans and specifications for several
new RCMP detachments in Nova Scotia and New Brunswick.
Public Works and Government Services Canada - RCMP New Facilities, Springdale, Nfld
(Electrical Lead)
Electrical design and specifications for a new RCMP detachment in Springdale, Nfld
Holyrood Generating Station, Emergency Egress Lighting, Holyrood, NL (Electrical Lead)
Detailed design of emergency lighting for exterior emergency ladder exits from the
various roof areas at the plant.
Miscellaneous Clients (Electrical Lead)
Detailed design for commercial building systems including power distribution, lighting,
fire alarm, security and telecommunications.
Electric Utilities
Kentville Electric Commission - Director (11 Years)
Transalta Utilities - Staff Engineer (4 Years)
Nova Scotia Power - Staff Engineer (7 Years)

More Related Content

What's hot

Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gas
Sam Mehta
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
Sam Mehta
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialistisbengineering
 
Resume
ResumeResume

What's hot (20)

0415 RECV
0415 RECV0415 RECV
0415 RECV
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gas
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
 
Nazh cv rev.2
Nazh cv  rev.2Nazh cv  rev.2
Nazh cv rev.2
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Resume-Murugan
Resume-MuruganResume-Murugan
Resume-Murugan
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 

Similar to Resume Dennis Kehoe 2015

Bret Miller's Resume 2015
Bret Miller's Resume  2015Bret Miller's Resume  2015
Bret Miller's Resume 2015Bret Miller
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
Sam Mehta
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
Sam Mehta
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017Dex Bugariu
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017Dex Bugariu
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017Dex Bugariu
 
TBResume 2016 update
TBResume 2016 updateTBResume 2016 update
TBResume 2016 updateTary Burritt
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016Lee Hanvey
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
Robert Bertrand
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
Michael Dunlap
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
Michael Dunlap
 

Similar to Resume Dennis Kehoe 2015 (20)

AdamEshkanian_EngProjects
AdamEshkanian_EngProjectsAdamEshkanian_EngProjects
AdamEshkanian_EngProjects
 
Bret Miller's Resume 2015
Bret Miller's Resume  2015Bret Miller's Resume  2015
Bret Miller's Resume 2015
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA Engineering
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017
 
BugariuDex Resume _ 2017
BugariuDex Resume _ 2017BugariuDex Resume _ 2017
BugariuDex Resume _ 2017
 
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
 
TBResume 2016 update
TBResume 2016 updateTBResume 2016 update
TBResume 2016 update
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 

Resume Dennis Kehoe 2015

  • 1. Page 1 of 6 Dennis J. Kehoe, P. Eng. 29 Alicia Blvd, Kentville Nova Scotia, Canada B4N 4Y7 EMail: kehoe@ns.sympatico.ca Cell Phone: (902) 670-3566 Home Phone: (902) 678-9686 EDUCATION Bachelor of Electrical Engineering, Technical University of Nova Scotia, Halifax, NS PROFESSIONAL AFFILIATIONS Registered Professional Engineer in Nova Scotia SOFTWARE EXPERIENCE Microsoft Office Suite, AutoCAD, PLS-CADD Lite, PLS-Pole, WinPCS, Orbit, Projects-On-Line (POL) PROFESSIONAL EXPERIENCE: COMMISSIONING Private Contractor 2015 Recently completed a 19 month contract as an Electrical Commissioning Specialist, Kearl Lake Oil Sands Project (Phase 2) reporting to the Area Commissioning Lead. Supervision of all Electrical Commissioning staff in the Extraction, Tank Farm, and Phase 1 to Phase 2 Interconnecting Pipe Rack areas of the plant (Silos). Overall construction budget for the capital plant in these Silos would be approximately $1 Billion. Interim Role (September 2013 to February 2014) Employed as Electrical Commissioning Lead, Kearl Lake Oil Sands Project (Phase 2) reporting to the Commissioning Manager for the Project. Technical responsibility for all Electrical Commissioning activity in the Phase 2 Expansion. Overall construction budget for the capital plant in the Phase 2 Project would be approximately $8 Billion. 2012/2013 Employed as an Electrical Commissioning Engineer, Kearl Lake Oil Sands Project. Reporting to the Electrical Commissioning Lead for the Kearl Phase 1 Project. Providing engineering support
  • 2. Page 2 of 6 site wide for all aspects of the commissioning and start up process. Liaising with engineering design and construction through an RFI process. Coordination of vendor commissioning activity. Developing switching procedures for energizing major substation facilities (E-Houses). Material and equipment procurement for commissioning activity. Overall construction budget for the capital plant in the Phase 1 Project would be approximately $14 Billion. Cutler-Hammer Engineering Services – Field Service Engineer Responsibilities included troubleshooting, commissioning and warranty repairs on switchboards, transformers, MCC’s, transfer switches and variable frequency drives. - Commissioned three diesel fire pump controllers on the Sable Project – two pumps on the Thebaud Platform and one on the Venture Platform. - South Korea - refurbishing Cutler-Hammer 4.16kV and 13.8kV switchgear on an FPSO vessel being constructed for the Terra Nova Project. - Hibernia Platform – performing thermal imaging on electrical and mechanical equipment. - Goldboro Gas Plant – troubleshooting and warranty repairs on 4.16kV circuit breakers. - Department of National Defence at CFB Halifax – upgrading trip units on 480V, 800 amp, shore power circuit breakers. Replaced trip units on Westinghouse DS breakers with Cutler-Hammer solid state trip units. - Halifax Casino – commissioning 20 Variable Frequency Drives that controlled fans, heat wheels, and cooling water pumps associated with the building air handling and space conditioning systems. - Irving Paper, St. John, NB – Doble testing 138 – 13.8 kV Transformer - USG Corporation, Electrical Maintenance Shutdown, Port Hawkesbury, Nova Scotia. Electrical maintenance and testing of 25 kV and 600 Volt Switchgear and 25 kV – 600 Volt Padmount transformers. - Industrial Facilities maintenance and testing experience included USG Port Hawkesbury, Bowater Mersey, and various Irving Pulp and Paper Plants in Saint John. Engineering Design Oil and Gas IOL, Dartmouth Refinery, Furnace Efficiency Upgrades (Project Manager) Project responsibilities included design of combined O2 and COe analyzers, and installation of automated combustion air and stack dampers on 17 process furnaces. IOL, Dartmouth Refinery, Miscellaneous Projects (Electrical Lead) Project responsibilities included miscellaneous electrical designs for pumps, compressors, general power distribution and heat tracing. Newfoundland Transshipment Limited (NTL) Assessment of electrical maintenance practices at a marine transshipment facility in Whiffen Head, Placentia Bay, Newfoundland
  • 3. Page 3 of 6 Kentville Propane Storage Facility (Project Manager / Electrical Lead) Provided detailed mechanical and electrical design and specifications for a propane storage facility in Kentville, NS. Power Condition Assessment - Holyrood Generating Station, Holyrood, NL (Project Manager / Principle Consultant) Responsible for condition assessment on a 12 MW gas turbine (ancillary electrical equipment), 600 volt motor control centers and 4.16 kV Switchgear. Caribou Wind Farm (Project Manager, Electrical Lead – Collector System) Civil, Structural and Electrical design of a 138 - 34.5 kV substation and 25.6 km of 34.5 kV overhead collector system to 33 @ 3 MW turbines in Caribou, NB. Fermeuse Wind Farm (Electrical Lead – Collector Design) Design of 5.5 km of 25 kV collector system to 9 @ 3 MW turbines in Fermeuse, Nfld. 30 MW Wind Farm – Transmission Line Routing Study, Digby, Nova Scotia (Electrical Lead) Working as a sub-consultant to the Terrain Group, provided technical support for a 69 kV transmission line route selection. 12 MW Wind Farm – Completions Report and Operations Review, Maryvale, Nova Scotia (Project Manager, Electrical Lead) Provided a comprehensive review of the installation and operation of the Maryvale Wind Farm for a debt financing institution. NB Power, Transmission Lines - Opinion of Probable Cost Studies (Principal Consultant) Provided NB Power with Opinions of Probable Cost for various transmission line extensions to wind farms in NB. Nova Scotia Power (Project Manager / Principle Consultant) Design of a four circuit Hendrix overhead distribution line consisting of 2 @ 25 kV circuits and 2 @ 12.47 kV circuits using single pole construction. Nova Scotia Power (Project Manager) Structural analysis of existing Nova Scotia Power Distribution Design Standards and Construction for potential retrofit with Hendrix spaced aerial cables. Halifax Regional Municipality - Underground Common Trench Design (Project Manager / Principle Consultant) Project responsibilities included stakeholder consultation and development of an underground common trench design to house power, telecom, and gas utilities in residential developments. Town of Lunenburg Electric Utility, System Operation Study (Project Manager / Principle Consultant) Provided a comprehensive Operations Study looking at all aspects of the utility including long-term voltage conversion, manpower complement, construction standards, equipment requirements, safety procedures and training. Town of Antigonish Electric Utility, Utility Valuation Study (Project Manager / Principle Consultant)
  • 4. Page 4 of 6 Detailed field review of all utility assets in the Town of Antigonish Electric Utility. Calculated the replacement cost of all utility assets and, using depreciation rates based on years in service, provided an opinion on the utility rate base for regulatory purposes. Markham Hydro – Project Manager / Principal Consultant Conducted stakeholder interviews and research for an underground common trench design to accommodate Power, Telecom and Gas utilities in residential developments. Department of National Defence - CFB Aldershot, Kentville, NS (Electrical Design Engineer Sub-Consultant) Project responsibilities included detailed design and specifications for a 4.16 kV to 25 kV distribution system voltage conversion at the CFB Aldershot Camp. Manufacturing Manufacturing Facility - Boiler House Expansion (Electrical Lead) Project responsibilities included electrical design for 600 HP, 4160V compressors for two new chillers, two 60 HP cooling tower fans, and several vertical pumps (up to 200 HP) for chilling / cooling supply and return water. Manufacturing Facility - Commissioning Engineer (Commissioning Engineer / Electrical Lead) Project responsibilities included electrical commissioning of a 4,160 volt starter for a 400 HP hydraulic pump, and supervising the commissioning of a replacement starter, as the original starter failed during start up by plant personnel. Manufacturing Facility - Diesel Fire Pump Controller (Electrical Lead) Project responsibilities included preparing purchase and installation specifications to rectify incompatibilities resulting from the grounding system employed on the replacement of the diesel fire pump controller by plant personnel. Manufacturing Facility - Expansion (Electrical Lead) Project responsibilities included the installation of a new stearate dust collector and hazardous area enclosure. Manufacturing Facility - Expansion (Electrical Lead) Project responsibilities included design of all process and power feeders for building services and process equipment including low O2 monitoring, nitrogen leak detection and alarm system, nitrogen generation and storage facility, and three dual cavity tire presses. Manufacturing Facility - Expansion (Electrical Lead) Project responsibilities included design for 800 amp process and building service feeder layouts for the main process feeders and all building service functions (HID lighting, emergency and exit lighting, receptacles, fire alarm, voice, and data equipment) for two building extensions totaling 20,000 square feet. Manufacturing Facility - Expansion (Electrical Lead) Project responsibilities included detailed design for main process feeders, building service functions (high bay fluorescent, HID lighting, emergency and exit lighting, welding and maintenance receptacles, fire alarm, voice and data equipment) for three building extensions totaling 50,000 square feet with a 2,000 kVA co-extruder, an MB2 tire building machine and FSBT stacker, and a new press line with 12 McNeil dual cavity presses.
  • 5. Page 5 of 6 Commercial and Institutional Poultry Research Facility, Truro, Nova Scotia (Electrical Lead) Project responsibilities included detailed design, tender, and construction support for a $9.8 million complex including offices, multi-purpose room, laboratories, live bird areas, and a meat processing suite. Halifax International Airport, Power Distribution Survey (Project Manager / Principle Consultant) Project responsibilities included review the 120/208 Volt power distribution system in the airport terminal facility, inspecting approximately 175 - 120/208 volt distribution panels, verifying circuit breaker and branch feeder compatibility, installing load survey equipment to diagnose transient voltage and harmonics issue, identifying all code deficiencies, and preparing a categorized priority repair report with associated cost estimates. Halifax International Airport, Mechanical Room Upgrade (Electrical Lead) Detailed design and specifications for new mechanical equipment in an existing mechanical room above the departures lounge. Dartmouth Crossing Limited (Electrical Lead) Detailed design for underground power, telecom, street and traffic lighting for the Dartmouth Crossing Project in Dartmouth, NS. This development was one of the largest retail developments ever constructed in Nova Scotia. Two large retail buildings were added to the project scope. Provided detailed design for the buildings excluding tenant fit-ups. Defence Construction Canada, CFB Halifax (Project Manager / Electrical Lead) Provided detailed design, purchase specification and construction supervision for an outdoor 4,160 Volt switchgear lineup. Defence Construction Canada, CFB Halifax, Cape Scott Maintenance Facility (Electrical Lead) Provided detailed design for a reorganization of the Cape Scott Maintenance Facility to make room for a Submarine Rescue (SUBSAR) facility. Valley Regional Hospital (Project Manager / Electrical Lead) Detailed design and specifications for a 2,000 kW standby generator installation. Included integration of the emergency power into the main 600 Volt, 3,000 Amp switchgear to provide 100% emergency power to the hospital. Oland Breweries - Expansion, Halifax, Nova Scotia (Electrical Lead) Project responsibilities included building service and process equipment design, lighting, communication, fire alarm, CO2 exhaust, and HVAC systems for a new fermenting building. Public Works and Government Services Canada - RCMP Detachment Retrofits, Nova Scotia (Project Manager / Electrical Lead) Project responsibilities included electrical design for cell block retrofits in several new RCMP detachments and a cell block addition at the Eskasoni Detachment. Public Works and Government Services Canada - RCMP New Facilities, Halifax, Nova Scotia (Project Manager / Electrical Lead)
  • 6. Page 6 of 6 Project responsibilities included technical review of plans and specifications for several new RCMP detachments in Nova Scotia and New Brunswick. Public Works and Government Services Canada - RCMP New Facilities, Springdale, Nfld (Electrical Lead) Electrical design and specifications for a new RCMP detachment in Springdale, Nfld Holyrood Generating Station, Emergency Egress Lighting, Holyrood, NL (Electrical Lead) Detailed design of emergency lighting for exterior emergency ladder exits from the various roof areas at the plant. Miscellaneous Clients (Electrical Lead) Detailed design for commercial building systems including power distribution, lighting, fire alarm, security and telecommunications. Electric Utilities Kentville Electric Commission - Director (11 Years) Transalta Utilities - Staff Engineer (4 Years) Nova Scotia Power - Staff Engineer (7 Years)