Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
Ristanto,
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jak-Tim
E-mail: ristanto_ui@yahoo.com
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
CURRICULUM VITAE
Name : Ristanto
Place of Birth: Cirebon
Date of Birth : 21 Aug 1983
Address : Jl. Kalisari LAPAN Gg. Sawi RT 02/01 No. 23B, Pekayon, Ps. Rebo
Jakarta Timur - 13710
Mobile : +62 857 16192971
Graduated : Mechanical Engineering, Engineering Faculty
University of Indonesia, Depok
Graduated 2004, GPA: 3,51
TRAININGS:
Complex problem solving training, by PQM, Bogor
Supervisory management training, by PQM, Bogor
War against waste training, by PQM, Bogor
Solidworks 2008 training, at ADS (certified), Jakarta
5R training by AKPI, Bogor
ISO 9001 training by AKPI, Bogor
HACCP commision by AKPI, Bogor
Kaizen Training by AKPI, Bogor
High Quality Management Seminar by KKM FTUI, Depok
Basic Computer Numerical Control (CNC) Training by Mech. Eng. FTUI, Depok
Student Skill and Leadership Training by FTUI, Depok
MANAGEMENT SKILLS:
I have experience on manage 24 suboordinate during work as Supervisor of Finishing
Section (Production Department) to implement & achieve some company target such
as: Operation Standard, Work Instruction, & Key Performance Indicator
Operation Management
Supply Chain (Lean Concept) for finishing (production dept.) to identify, eliminate
waste & optimize operation.
Implement operation & production management.
Set up budget of packaging cost in line with future sales projection.
Define key KPI to achieve operational excellent related with best practice for
operational efficiency.
Project Management
Project Management phasing or process
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
Project Governance
Established budget plan of packaging material in line with sales projection volume &
define strategy of execution.
Seek opportunity of improvement in each operation according company overall
strategy.
Project Reporting: Do regular update & provide board radar to the Project owner &
Project steering team related overall project in each department.
Technical Procurement
Prepare Tendering, Determine and Coordinate Vendor selection
Technology Selection
Supplier Relation Management
SPECIFIC SKILLS:
My management experience supported with specific skills for that require during set
up & implementation.
Engineering Skill:
Below some of engineering skills that support my competencies:
Basic Mechanical Engineering (Structure static analysis), packaging design &
Engineering Drawing
Computer:
MS Office, Open Office, SolidWorks, Autocad, & Internet Application.
Process Engineering Skills:
During work on various industry mostly with detail in finishing & packaging process
of manufacturing which produce flexible packaging OPP, PET, Metz, & CPP
WORKING EXPERIENCES:
June, 2011 – Current as Packaging Specialist in PT Indopoly Swakarsa Industry,
Tbk (Multinational company base in Indonesia): Company information can be
access on: www.kunlene-sz.com
Report to : R&D Section Head of Indopoly, Indonesia
Jobs Description:
ĂĽ Fulfill annual key tasks and KPIs agreed superior
ĂĽ Continuously look for ways to improvement of packaging design that focused
to esthetic, safety dan cost saving
ĂĽ Ensure that all packaging standard fully applicated in packaging process
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
ĂĽ Investigate variances related packaging material and package process time
within the regular packaging activity to identify areas of concern and propose
improvement actions for efficiency (both material and process time)
ĂĽ Analysis and define action of customer complaint due to packaging issue
ĂĽ Perform other task as assigned by management
ĂĽ Solve issues with other department which cannot be solved at our department
ĂĽ Liaise with HR on issues relating to train and induction of new packer
operators or employees.
ĂĽ Regularly provide report resume of packaging cost monthly to Finance and
packaging cost saving report to R & D Director
Achievement:
ĂĽ New design: steel pallet for returnable purpose, Investment 3 Billion Rupiah
been comissioning on time (with in budget, time line & good quality), BEP in
12 month, and estimate cost saving 200 Million Rupiah/month; Year 2012 -
2013
ĂĽ Improved design: change some of the more expensive packaging materials
with the cheaper one, estimate cost saving 350 Million Rupiah/month;Year
2012 - current
ĂĽ Standard specification of packaging model completed and published; Year
2012
ĂĽ Procedure supply chain of pallet for export purpose completed and published;
Year 2013
2007-2011 as Packaging Designer in PT Arghakarya Prima Industry, Tbk –
Starting at April 2006 to June 2011 (4 Year 2 month)
Report to : Development II Senior Manager
Jobs Description:
ĂĽ Fulfill annual key tasks and KPIs agreed superior
ĂĽ Continuously look for ways to improvement of packaging design that focused
to esthetic, safety dan cost saving
ĂĽ Ensure that all packaging standard fully applicated in packaging process
ĂĽ Investigate variances related packaging material and package process time
within the regular packaging activity to identify areas of concern and propose
improvement actions for efficiency (both material and process time)
ĂĽ Analysis and define action of customer complaint due to packaging issue
ĂĽ Perform other task as assigned by management
ĂĽ Solve issues with other department which cannot be solved at our department
ĂĽ Liaise with HR on issues relating to train and induction of new packer
operators or employees.
ĂĽ Regularly presentation resume of packaging cost monthly to Board of
Manager
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
Success Story:
ĂĽ Improved design: change some of the more expensive packaging materials
with the cheaper one, estimate cost saving 250 Million Rupiah/month;Year
2008 - 2011
ĂĽ Standard specification of packaging model completed and published; Year
2008
2006-2007 as Finishing Improvement Supervisor for BOPP Plant, PT Arghakarya
Prima Industry, Tbk - Starting from Mar 2005 to April 2006 (1 Year 1 Month)
Report to : Production Manager
Jobs Description :
ĂĽ Fulfill annual key tasks and KPIs agreed superior
ĂĽ Prepare and controlling project schedule
ĂĽ Prepare tendering, determine and coordinate sub-Cont
ĂĽ Coordinate implement Loss Prevention standard (with time motion study)
ĂĽ Analysis and define action of customer complaint due to slitter (finishing)
machine
ĂĽ Build system to minimize waste of slitter (finishing) machine, coordinating
with PPIC
ĂĽ As custodian of BOPP Slitter officer for Improvement & Standardization
Specific Project:
ĂĽ Minimize waste trim of slitter machine
ĂĽ Standardization of machine condition
2004-2006 as Finishing Operation Supervisor for BOPP Plant, PT Arghakarya
Prima Industry, Tbk – starting from Nov 2004 – Mar 2006 (1 Year 5 Month)
Report to: Production Assistant Manager
Operation
ĂĽ Manage and supervise 24 staff/subordinate
ĂĽ Fulfill annual key tasks and KPIs agreed superior
ĂĽ Recommend, discipline and motivate all staffs under his responsibility
ĂĽ Continuously look for ways to improvement productivity
ü Ensure that all staffs complies fully to company’s policies and guidelines,
in particularly in the area of Procedure (SOP) and Quality.
ĂĽ Investigate variances related material and productive time within the shifts
to identify areas of concern and propose corrective and preventive actions.
ĂĽ Motivate subordinate to ensure good 5S in the plant at all time
ĂĽ Perform other task as assigned by management
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
ĂĽ Ensure all corrective / preventive action resulting from NCR are
implemented correctly and timely
ĂĽ Resolve issues with other department which cannot be resolved at a lower
level
ĂĽ Plan & schedule of manpower to ensure all machines are sufficiently
manned to carry out productions as per machine utilization plans and
production plan from PPIC
ĂĽ Be the first line of contact in case of any machine breakdown and liaise
with staff to carry out repair immediately.
ĂĽ Make tactical decisions to adjust machine utilization plan in order to; be
more cost effective, achieve higher productivity, avoid delays or to meet
customer’s urgent needs
ĂĽ Ensure that all shifts are properly taken over properly at all level
ĂĽ Ensure standard material usage and set-up time defined in BOM and
routing is achieved.
ĂĽ Ensure production scrap are kept at or below the agreed level
ĂĽ Ensure proper upkeep and maintenance of production area, machines and
tooling
ĂĽ Ensure all staffs adhere to safety protocols and takes necessary steps to
prevent occurrence of accident
ĂĽ To identify training needs for staffs and make suggestion and justifications
for to management
ĂĽ Liaise with HR on issues relating to on boarding, induction of new
production operators or employees.
ĂĽ Coordinate with respective Shift foreman in preparing of machine
operation manual to facilitate training of operators (new employee, job
rotation, etc)
ĂĽ Supervise, develop and motivate production (finishing) peoples by setting
measurable target, identifying training needs and evaluate the
performances.
ĂĽ Prepare Non Conformance Product Report in case of defects and analyze
root cause and define correction & corrective action must be taken
Asset Management :
ĂĽ Responsible for developing strategies to improve asset efficiency.
ĂĽ Looks synergy across department to improve efficiency of operation
ĂĽ Provide tracking of schedule & budget
Success Story:
ĂĽ Output that targeted was accomplished
ĂĽ Work instruction for finishing completed
Organization
2000 – 2004 Ikatan Mahasiswa Mesin (IMM) – FTUI (Mechanical engineering
student society)
Ristanto,
+62 857 16192971
Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur
2002 – 2003 Vice of Student Prosperity Bureau at IMM FTUI
2001 – 2002 Vice of Assistance Bureau at IMM FTUI
2002 Mentor of University Academic System Introduction, Mechanical
Engineering Dept. FTUI
2001 & 2002 Consumption’s coordinator of “Pelepasan Sarjana Baru Mesin”
2001 Team Chief of Mechanical Student “Diktat”
Personnel Data
Marital Status : Single

CV Rist 2014 dr email

  • 1.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur Ristanto, Jl. Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jak-Tim E-mail: ristanto_ui@yahoo.com
  • 2.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur CURRICULUM VITAE Name : Ristanto Place of Birth: Cirebon Date of Birth : 21 Aug 1983 Address : Jl. Kalisari LAPAN Gg. Sawi RT 02/01 No. 23B, Pekayon, Ps. Rebo Jakarta Timur - 13710 Mobile : +62 857 16192971 Graduated : Mechanical Engineering, Engineering Faculty University of Indonesia, Depok Graduated 2004, GPA: 3,51 TRAININGS: Complex problem solving training, by PQM, Bogor Supervisory management training, by PQM, Bogor War against waste training, by PQM, Bogor Solidworks 2008 training, at ADS (certified), Jakarta 5R training by AKPI, Bogor ISO 9001 training by AKPI, Bogor HACCP commision by AKPI, Bogor Kaizen Training by AKPI, Bogor High Quality Management Seminar by KKM FTUI, Depok Basic Computer Numerical Control (CNC) Training by Mech. Eng. FTUI, Depok Student Skill and Leadership Training by FTUI, Depok MANAGEMENT SKILLS: I have experience on manage 24 suboordinate during work as Supervisor of Finishing Section (Production Department) to implement & achieve some company target such as: Operation Standard, Work Instruction, & Key Performance Indicator Operation Management Supply Chain (Lean Concept) for finishing (production dept.) to identify, eliminate waste & optimize operation. Implement operation & production management. Set up budget of packaging cost in line with future sales projection. Define key KPI to achieve operational excellent related with best practice for operational efficiency. Project Management Project Management phasing or process
  • 3.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur Project Governance Established budget plan of packaging material in line with sales projection volume & define strategy of execution. Seek opportunity of improvement in each operation according company overall strategy. Project Reporting: Do regular update & provide board radar to the Project owner & Project steering team related overall project in each department. Technical Procurement Prepare Tendering, Determine and Coordinate Vendor selection Technology Selection Supplier Relation Management SPECIFIC SKILLS: My management experience supported with specific skills for that require during set up & implementation. Engineering Skill: Below some of engineering skills that support my competencies: Basic Mechanical Engineering (Structure static analysis), packaging design & Engineering Drawing Computer: MS Office, Open Office, SolidWorks, Autocad, & Internet Application. Process Engineering Skills: During work on various industry mostly with detail in finishing & packaging process of manufacturing which produce flexible packaging OPP, PET, Metz, & CPP WORKING EXPERIENCES: June, 2011 – Current as Packaging Specialist in PT Indopoly Swakarsa Industry, Tbk (Multinational company base in Indonesia): Company information can be access on: www.kunlene-sz.com Report to : R&D Section Head of Indopoly, Indonesia Jobs Description: ü Fulfill annual key tasks and KPIs agreed superior ü Continuously look for ways to improvement of packaging design that focused to esthetic, safety dan cost saving ü Ensure that all packaging standard fully applicated in packaging process
  • 4.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur ü Investigate variances related packaging material and package process time within the regular packaging activity to identify areas of concern and propose improvement actions for efficiency (both material and process time) ü Analysis and define action of customer complaint due to packaging issue ü Perform other task as assigned by management ü Solve issues with other department which cannot be solved at our department ü Liaise with HR on issues relating to train and induction of new packer operators or employees. ü Regularly provide report resume of packaging cost monthly to Finance and packaging cost saving report to R & D Director Achievement: ü New design: steel pallet for returnable purpose, Investment 3 Billion Rupiah been comissioning on time (with in budget, time line & good quality), BEP in 12 month, and estimate cost saving 200 Million Rupiah/month; Year 2012 - 2013 ü Improved design: change some of the more expensive packaging materials with the cheaper one, estimate cost saving 350 Million Rupiah/month;Year 2012 - current ü Standard specification of packaging model completed and published; Year 2012 ü Procedure supply chain of pallet for export purpose completed and published; Year 2013 2007-2011 as Packaging Designer in PT Arghakarya Prima Industry, Tbk – Starting at April 2006 to June 2011 (4 Year 2 month) Report to : Development II Senior Manager Jobs Description: ü Fulfill annual key tasks and KPIs agreed superior ü Continuously look for ways to improvement of packaging design that focused to esthetic, safety dan cost saving ü Ensure that all packaging standard fully applicated in packaging process ü Investigate variances related packaging material and package process time within the regular packaging activity to identify areas of concern and propose improvement actions for efficiency (both material and process time) ü Analysis and define action of customer complaint due to packaging issue ü Perform other task as assigned by management ü Solve issues with other department which cannot be solved at our department ü Liaise with HR on issues relating to train and induction of new packer operators or employees. ü Regularly presentation resume of packaging cost monthly to Board of Manager
  • 5.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur Success Story: ü Improved design: change some of the more expensive packaging materials with the cheaper one, estimate cost saving 250 Million Rupiah/month;Year 2008 - 2011 ü Standard specification of packaging model completed and published; Year 2008 2006-2007 as Finishing Improvement Supervisor for BOPP Plant, PT Arghakarya Prima Industry, Tbk - Starting from Mar 2005 to April 2006 (1 Year 1 Month) Report to : Production Manager Jobs Description : ü Fulfill annual key tasks and KPIs agreed superior ü Prepare and controlling project schedule ü Prepare tendering, determine and coordinate sub-Cont ü Coordinate implement Loss Prevention standard (with time motion study) ü Analysis and define action of customer complaint due to slitter (finishing) machine ü Build system to minimize waste of slitter (finishing) machine, coordinating with PPIC ü As custodian of BOPP Slitter officer for Improvement & Standardization Specific Project: ü Minimize waste trim of slitter machine ü Standardization of machine condition 2004-2006 as Finishing Operation Supervisor for BOPP Plant, PT Arghakarya Prima Industry, Tbk – starting from Nov 2004 – Mar 2006 (1 Year 5 Month) Report to: Production Assistant Manager Operation ü Manage and supervise 24 staff/subordinate ü Fulfill annual key tasks and KPIs agreed superior ü Recommend, discipline and motivate all staffs under his responsibility ü Continuously look for ways to improvement productivity ü Ensure that all staffs complies fully to company’s policies and guidelines, in particularly in the area of Procedure (SOP) and Quality. ü Investigate variances related material and productive time within the shifts to identify areas of concern and propose corrective and preventive actions. ü Motivate subordinate to ensure good 5S in the plant at all time ü Perform other task as assigned by management
  • 6.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur ü Ensure all corrective / preventive action resulting from NCR are implemented correctly and timely ü Resolve issues with other department which cannot be resolved at a lower level ü Plan & schedule of manpower to ensure all machines are sufficiently manned to carry out productions as per machine utilization plans and production plan from PPIC ü Be the first line of contact in case of any machine breakdown and liaise with staff to carry out repair immediately. ü Make tactical decisions to adjust machine utilization plan in order to; be more cost effective, achieve higher productivity, avoid delays or to meet customer’s urgent needs ü Ensure that all shifts are properly taken over properly at all level ü Ensure standard material usage and set-up time defined in BOM and routing is achieved. ü Ensure production scrap are kept at or below the agreed level ü Ensure proper upkeep and maintenance of production area, machines and tooling ü Ensure all staffs adhere to safety protocols and takes necessary steps to prevent occurrence of accident ü To identify training needs for staffs and make suggestion and justifications for to management ü Liaise with HR on issues relating to on boarding, induction of new production operators or employees. ü Coordinate with respective Shift foreman in preparing of machine operation manual to facilitate training of operators (new employee, job rotation, etc) ü Supervise, develop and motivate production (finishing) peoples by setting measurable target, identifying training needs and evaluate the performances. ü Prepare Non Conformance Product Report in case of defects and analyze root cause and define correction & corrective action must be taken Asset Management : ü Responsible for developing strategies to improve asset efficiency. ü Looks synergy across department to improve efficiency of operation ü Provide tracking of schedule & budget Success Story: ü Output that targeted was accomplished ü Work instruction for finishing completed Organization 2000 – 2004 Ikatan Mahasiswa Mesin (IMM) – FTUI (Mechanical engineering student society)
  • 7.
    Ristanto, +62 857 16192971 Jl.Kalisari LAPAN Gg. Sawi RT. 02/01 No. 23B Pekayon, Ps. Rebo, Jakarta Timur 2002 – 2003 Vice of Student Prosperity Bureau at IMM FTUI 2001 – 2002 Vice of Assistance Bureau at IMM FTUI 2002 Mentor of University Academic System Introduction, Mechanical Engineering Dept. FTUI 2001 & 2002 Consumption’s coordinator of “Pelepasan Sarjana Baru Mesin” 2001 Team Chief of Mechanical Student “Diktat” Personnel Data Marital Status : Single