COVER LETTER
Plant Head (Operation) Mobile: +91 8016272082 & 8250167918
Multi-disciplined in Engineering Development, Designing & Tool Room Head with over 18 years of progressive leadership experience
driving new product, process, and equipment development programs in world class manufacturing environments. I have Strong
background in the execution of objectives for achieving productivity and continuous improvement goals to meet operational challenges.
Recognized for business development skills, with keen engineering insight to collaborate with peer management, formulate strategic plans,
and manage resources with 'drive to completion' motivation. Am a strong understanding of corporate cultures and the critical relationships
that exist in companies between engineering, R&D, sales, marketing, delivery, employee development, operations, finance, and
customers. Cool under pressure, trustworthy, highly respected to interface positively and professionally at all levels.
Responsible for implementation of production processes and procedures, leading productivity improvements with project based activities,
including new product introduction and manufacturing cell design to reduce waste, improve quality and safety, and reduce operating costs.
Manage KPIs and ensure preventative actions are taken to maximize success. Work on many phases or sub-tasks of projects or entire
projects of moderate complexity, with results impacting on project completion. Work under general supervision, reviewed at project
milestones and/or on completion by Senior Management.
TEAM LEADERSHIP ~ COMMUNICATION ~ AUTOMOTIVE ~ INTERNATIONAL PROJECTS ~ DFM ~ DFA ~ 6 SIGMA ~ APQP ~
VOICE OF THE CUSTOMER ~ VALUE STREAM ANALYSIS ~ BUSINESS DESIGN ~ OUTSOURCING ~ PQI
PROFESSIONAL EXPERIENCE
• Dedicated to and actively involved in corporate operations strategic vision and development of goals and objectives, as a member
of the division business steering committee.
• Earned reputation as a results focused leader with distinctive ability to lead, motivate, and inspire efficient, goal-focused teams to
achieve timely completion of strategic projects with demanding deadlines.
• Superb balance of technical know-how with resource management and collaborative abilities to get project teams to function in
harmony.
• Managing team of 15-16 engineers and support associates, working cross-functionally to meet division objectives for
manufacturing productivity savings and introducing new product, capital investment programs.
• Managing effective partnerships, with external resources for large equipment build program, optimizing the implementation of
strategic plans towards accelerating corporate objectives ahead of schedule.
• Capital investment projects, Managed utilizing APQP methodologies, some on an international level with global
partners/suppliers. Ranging from new product introductions to capacity expansions.
• Managing Continuous Improvement activity to achieve manufacturing productivity savings goals. Averages 5% of cost of good
sold annually on mostly mature commodity based products.
• Responsible for establishing the Energy/Sustainability programs. Program exceeded corporate goals for savings with between
$750 and $1,000K of tangible benefit per year, over the past three years. Quarterly results presented to Management.
• Co-coordinator of the corporate 'GREEN TEAM' that includes members from all facilities. Recognized by corporate for providing a
companywide culture change towards improved sustainability and enhanced environmental responsibility.
• Developed in-house process engineering training program. Fully implemented program is in third round of 128 modules.
Academic performance is monitored and is job level impact based.
• Responsible for ISO/QS9000 certification and Total Cycle Time methodology implementation for project performance tracking.
• Design and debug of high speed, highly automated lines of manufacturing equipment for new products. Programs required me to
develop the use of new technologies to our facility, and implement them into the equipment.
General and Task Management
To developing, implementing, monitoring and maintaining the efficient manufacturing processes for assembly products
(PFMA).
• Responsible to Identifying the manufacturing needs for new products development and Implementation
• Full responsible to design new systems and processes and provide facilities & methodologies to ensure the cost effective
integration of new products or for the improvement of existing ones into manufacturing operations
• Responsible to ensure all product and system requirements are taken into account from the initial product conception to the
finished results, which supposed to assist with shop floor layout and cell designs as planned
• Full responsible to design the fixtures and tooling for assembly processes to reduce the talk time and product cost effectiveness
during the manufacturing process designing.
• Responsible to reduce variability in manufacturing process by providing standard work methods and work instructions, to ensure
the products and process quality meets the specifications as required
• Full responsible to installations of new machineries and equipments, as per the Process layout and activities
• Responsible to organizing the plant start-up and shut-down schedules to ensure the minimum losses of production downtimes
and breakdown activities, according to the Preventive Maintenance Plan
• Full responsible for continuous improvement, problem solving and process improvement activities in the Process
• Knowledge of undertaking the special projects as required and contribute to continuous improvement activities
• Responsible to making the Track records and presenting progress report at project meetings and to the clients
• Full responsible to achieve the goals within the budget & conducting the benchmark studies to determine best practices/designs
and future trends
• Responsible to plan projects or subtasks and managing the Key Performance Indicators (KPIs) during the projects along with
attending various types of meetings and action / communicate of instructions to the team
• To undertaking continuous improvements, training methodologies and developments, performing through the root cause analysis
and resolve the problems to ensure the quality products along with customer satisfaction
Skills and Attributes:
• Independently determines approach and assigned tasks along with understanding the manufacturing processes
Page 1 of 6
• Knowledge of engineering, scientific and other technical information, strong problem-solving skills and logical approach
• Expertise in Tool Designing, Tool Development and Tool Manufacturing along with U.G, Pro-E, Solid works, Del Cam & Solid
Cam etc.
• Expertise in lean manufacturing and ability to work in a diverse and dynamic environment’s for Hyper form, Auto form & Pam
stamps in Sheet Metal forming Processes.
• Planning and prioritizing activities, Excellent negotiation skills and ability to present data effectively
• Exercises latitude and technical judgment in deciding work methods of Process Engineering, Designing of Tools and
Manufacturing activities.
• Responsible to train the work group and lead teams within the work group and manage the group to achieve goals within budget
and timeline.
• Responsible for FMEA (Failure Mode Effects Analysis), Kaizen/A3 (continuous improvement and problem solving) process
improvement and Poka Yoke (error proofing) techniques
• Responsible for design and Process & production costs to include waste, downtime, scrap and re-work Activities
• Responsible to develop working instructions, workmanship standards and process documentations in the floor
• Responsible to Improve the existing operations, for increased quality, productivity, efficiency and cost saving analysis
• Knowledge of Investigating operational problems affecting production and reporting and recommending solutions
• Responsible to manage manufacturing documentation required for product manufacturing i.e. revise drawing, BOM, accurate work
instructions and workmanship standards and process procedures
• Responsible to Provide manufacturing data i.e. production control charts, reliability, process capability, to improve the process and
monitor and measure progress to target
• Full responsible to Identify the ways to reduce production costs through recommendations – i.e. new process equipment,
equipment justification to improve performance activities
• Knowledge of engineering design activities with Pro-E, UG NX, Solid Works, Dell/Cam and Solid Cam (design for excellence) to
include:
o Design for costing
o Design for testing
o Design for manufacturability
o Design for assembly
• Work with other relevant departments to determine estimated costs, run time, cost reduction and close the feedback loop
• Responsible to develop the suppliers to improve the Process Quality and Cost Effectiveness through Ideal activities
• Full responsible for new product development and New Process Implementation to effective performance.
• Knowledge of establishing as a training and quality culture in the floor to making the high profile environments.
• Responsible to monitoring of all cell custom build, lean Manufacturing, six sigma and ISO methodologies for better quality
• Responsible for Proven track record and working knowledge of manufacturing processes
• Full responsible for Plant layout and Modification in Existing Plant Layout and for new Plant Infrastructure and value stream
Mapping.
Training Undergone / Certification / Seminars:
Undergone 4 months training in M/s. MARUTI UDYOG Ltd., GGN, Tool Room and Die Shop as Automobile die machining from Oct. 2000
to Jan. 2001 for CNC Milling Machines of reputed Japanese make like SNK and Makino.
I have completed the ERP Course of SAP_PP (Functional Consultant), version – “IDES R/3 ENTERPRISE” and I have done job as a
Faculty with my last Company.
Completed another Certification Course of MS Project, Workshop for total Five Days, Is Recognized by BASCOM BRIDGE. Also
Completed the Business Communication Skills and Workshop, Conducted by Ms. Anita Shantaram and Dr. P.N. Singh (Center for HRD),
for seven Days full version. Also attend Six Days Seminar on Internal Auditing for ISO / TS – 16949:2009, Certified by TUV Rheinland
(India) Pvt. Ltd. And Four days Seminar I have participated for the Quality Consulting of ISO 14001:2004 awareness. And the following
Training Programs has been participated periodically, -
o Certified Internal Auditor for Quality system and 14001 Audit.
o Trained in 5S and TQM activities
o SPC, Communication and Presentation skills
o OHSAS, EMS awareness and the Leadership and Assertiveness
o Time Management and Change management
o Team working and group dynamics, Team Building
o Problem solving and decision making analysis
o Daily Work Management and Manufacturing Excellence
CURRICULUM VITEA
RAFIQUL ISLAM,
District Cooch Behar, Village & City Dinhata, MOBILE: +91 8016272082 & 8250167918
West Bengal (India) - 736135
Personal Briefings
Experience : - Total Experience 18 Years.
Page 2 of 6
Present CTC : - INR 21, 60, 000 P.A.
Expected CTC : - Negotiable
Current Industry working : - Sheetkraft India Pvt. Ltd.
Current Functional Area : - Operation (Manufacturing)
Current Designation : - Plant Head (Operation)
Current Location : - Ahmedabad (Gujarat)
Location Preference : - Any Where in India & Abroad.
Working Knowledge as Manager – Operation (Manufacturing):
Total 18 years of hardcore experienced, with High Professionalism and association of subject to knowledge in Engineering of
Production, Process Engineering and Hard Core of Three Stage Tool Room Operations system, Like Full phase of Engineering
activities, as Process Developing through rich experienced of Process Engineering Activities and High Profile Tool Room
Activities for Sheet Metal, Plastic Injection Molding and High Pressure Die Casting Tools, along with Designing, Processing,
analyzing, Procurements, Manufacturing, Assembly, developing also the Maintenance & Preventive Maintenance Activities.
Process Implementing for New Product Development along with High Profile Process Flow, Process Evaluation, Process
analysis, Reverse Engineering and Process Development. And acquired through the academic excellence and establishing the
efficient Professionalism and Productive process flow diagram. Full optimization of resources and capacities of utilizations, and
the Operational efficiencies leading to enhanced productivity and higher returns through the Competency analyzing of existing
Processes / Procedures, Capabilities and conducting the critical analysis for shortcoming Products and providing there Process
improvements Capabilities, as PPAP, APQP, Kaizens, Poka Yoke and SMED System. Full Exposure with CNC Programming –
Operating – Setting along with 2D & 3D Programming, Cad / Cam activities with Pro-E, Solid Works, UG & Del Cam Software’s.
Overall knowledge of metal forming, Aluminum Casting, Plastic Injection Molding, and Press Tool Designing, Process
Implementing, Reverse Engineering, Costing, Procurements and manufacturing activities. Successfully undertake the effective
outsourcing of vendor development for tool designing and manufacturing process of tools, tryout the Products, getting customer
approvals, outsourcing of Approved Products, finalizing the Costing and starting of commercial productions and successfully
implementing the Competitive Business Plan.
Technical & Engineering Skills:
• Process Engineering, Process Planning, Material Planning and Developing the Process Flow Diagram and Implementing
• Process Evaluation and Reverse Engineering along with Implementation of APQP & FMEA
• Process Cost analyzing and Process Talk Time analysis.
• Product Designing & Product Development along Process Development.
• Tool Designing (Press Tools, PIM Tools & HPDC Tools along with Fixtures & Jig Fixtures etc.)
• Tool Procurements, Tool Manufacturing & Tool Maintenance.
• CNC Programming (2D & 3D), Operating & Settings for CNC Milling, Lathe, Wire-Cut & EDM Machines.
• Knowledge of Cam programming & Modeling through PRO-E, DELCAM UG and Smart Cam and Making Manual CNC -
programmed with FANUK, HEIDENHAIN, Mitsubishi & Siemens, Dialog-11 & Haas, Wire Cut, EDM and CNC Turning Machines.
• Fixture & Jig Fixture Designing and Manufacturing for lean Manufacturing Processes
• Full Exposure with Project analysis, Project Planning, Project Budgeting, Project ROIs and analyzing, Project Implementation and
Technical Data analysis etc.
• Represented the CFT Team Building for Development activities through FMEA & PPAP System.
• Vendor Development, Supplier Evaluation and Cost Effective Project implementation.
• Preventive maintenance activities for all Respective Tools / Dies, fixtures / jigs and the deferent types of Machineries with day to
day Process and Periodically Monitoring.
• Knowledge of Technical writing, compilation and review of technical documentation including, procedures, work instructions, test
plans, test reports etc. And Reviewing customer specifications and compliance statements.
• QS Process and the Lean Manufacturing Process development with the QMS, TPM, QS & 7QC Tools etc.
• Tool and Machine Breakdown analysis and Corrective & Preventive Activities with cost effective Diagrams
• Estimation of cost effective new tool manufacturing for in-house & outsource manufacturing processes.
• The Performance Capabilities, to be effectuate for the Cost Saving Initiatives and to achieve cost reduction Targets through the
Value Engineering and the Process Flow Diagram, Trouble shooting Parameters and reducing the short coming breakdowns,
reworks, reduction in manpower and waste eliminations etc.
Skill sets of Sheet Metal / Press Tools Processes:
Total 18 years of excellent and high profile skill sets for The different types of press tool constructions leads to different
operations namely blanking, bending, piercing, forming, drawing, cutting off, parting off, embossing, coining, notching, shaving,
lancing, dinking, perforating, trimming, curling etc.
Responsible for Plans, directs and coordinates the development and design of press tools based on customer inputs. Making
sure the designed tools are consistent with standard tool configuration. Relies on extensive experience and judgment to plan and
accomplish goals.
A high degree of sheet metal processing knowledge, progressive die design knowledge, detailing know how and excellent
understanding of various Customer Requirements. The assessment for this responsibility is based on achievement of business
goals, consistent demonstration of on-time delivery and high level of quality performance.
• Design and monitoring method like, plan for design the press tools as per customer requirement.
• Develop the Blanking, Draw Die face and sheet metal tool Manufacturing and process implementation
• Development and generation of trim line estimating tool and product cost check sheet
• Development of various stages press tools and decide the process sequence of components according to the process
implementations
• Responsible for material planning, scheduling and procurement of sheet metal components and tubular
• Responsible to follow up with vendor for maintaining timely delivery of materials
• Full responsible for planning of raw materials, monthly new tooling / gauges, jigs, fixtures, machines, loading and off loading of
machines.
Page 3 of 6
Skill sets of Plastic injection molding / PIM Processes:
Total 14 Years of hard core expertise in Plastic injection molding processes. Full exposure is in the preferred process for
manufacturing plastic parts. During this tenure I used to develop the many things such as electronic housings, containers, bottle
caps, automotive interiors, combs, and most other plastic products available today. It is ideal for producing high volumes of plastic
parts due to the fact that several parts can be produced in each cycle by using multi-cavity injection molds. Some advantages I
have implemented of injection molding are high tolerance precision, repeatability, large material selection, low labor cost, minimal
scrap losses, and little need to finish parts after molding.
• Design plastics or injection-mold fabrication processes.
• Create and improve injection-mold machinery.
• Research and develop new manufacturing processes.
• Analyze manufacturing data and implement the error proofing system for improvements.
• Analyze production and machineries for productive process flow and lean manufacturing system
• Ensure quality output of molded components and products
• Develop and design engineered plastic parts, insert molded parts and assemblies.
• Interact with customers, suppliers, and internal resources for better processes
• Establish the parameters for an optimal molding environment and productivity
• Ensure environment to make plastics is appropriate and customer satisfied
• Analyze quality control and correct the process flow diagram according to the customer satisfaction
• Work with other team members and vendors to reduce the product cost and downtime
• Review existing validation reports and errors for improvements
• Analyze mold flow, part advisor analysis, finite element analysis, and stress/fatigue analysis on plastics.
• Design hot/cold runner molds for better performance
• Develop 3D solid mold designs to remove the designing errors and perfect tooling
• Create water diagrams and hot runner wiring schematics for better performance
• Prepare mold-filling simulations for zero defects and failures.
Skill sets of High Pressure Die Casting / HPDC Processes:
Leading an universal and skilled career culture for 17.5 Years, in the high profile environments and reach skilled engineering
process background with HPDC (High Pressure Die Casting). Responsible for the production of aluminium castings and about
70% of the castings are produced using conventional high-pressure die-casting process.
Expertise of High Integrity die-casting processes such as Squeeze casting, Local casting spot pressurizing, Ultrahigh vacuum
process, Massive vent process, Vacural process, Minimum fill time process, Controlled filling process, Vacuum high vac –V
process and Semi -solid casting processes
Keywords: Aluminium High pressure Die-casting, Turbulence, Air and gas blow holes, High integrity die casting Processes,
Ultra high vacuum process, Semi-solid casting processes, reduce casting weight, increase casting Quality, minimum casting wall
thickness, squeezes pins, suppress blow holes, pin holes.
Good Knowledge of Tool designing, Process designing and selection of machineries / equipments for, -
Local ‘casting- spot’ pressurizing process
Squeeze pin feedback control system
Local runner spots pressurizing process
• New Project Initializing & Implementation
• BOM Making & Designing along with Cost analyzing
• Process Designing and analyzing, Process Implementing along with Productive Talk time implementation
• Product Development, along with Prototype Sampling & Customer Satisfaction
• Tool Designing, Tooling Cost Evaluation, Tool process & Manufacturing Process flow Diagram Implementation and Executing
according the customer satisfaction
• Productive & efficient Manufacturing processes are actively implement along with successful Fixtures & Jig Fixtures designing
and Manufacturing for 100% Quality approved Products and Customer Satisfaction along with the following Documents, -
1. Six Sigma
2. Fish Bone Diagram Analysis
3. Pareto Diagram Analysis
4. FMEA analysis
5. Histogram & Scatter Plot Diagram Analysis
6. Process Map Review and analysis
7. 7QC Tools & Quality Management System
• Team Management Execution, Monitoring and Implementing
• Customer Satisfaction Training Session Planning, Monitoring and Executions of my Team Member
Skill sets of forging Processes:
Total 4.5 Years of hard core professional skill sets for Forging Industries like, Impression Die forging, Cold forging and Open Die forging
processes. During this period, am the responsible for, -
• The Design and Development of Forged Products along with Process Engineering
• Responsible for selecting the process of forging according to the Products
• RFQ Processes of all respective Products
• Forging Process analysis system
• Surplus forging stock details
• Energy efficiency and saving Tools activities
• Process analysis of Products and services
Page 4 of 6
• Design and Forging Tools Data base along with respective process flow diagrams
• Weekly and Monthly Failure analysis and preventive & Corrective action Plan
Working Experience:
Presently working with M/S. Sheetkraft India Pvt. Ltd. (A Joint Venture Manufacturer of VEEGEE Group) From Feb - 2017 to till date,
as a Plant Head (Operation). Company Profile is 100% Manufacturer for Maruti Suzuki and Honda for Sheet Metal Process. Faridabad
Base Group of Industries for Direct Manufacturer of Automotive Parts.
My Job responsibilities are as followed, -
• Fully responsible for Corporate level Communication, analyze & Interpret with general Business Plan and Documentations &
Technical Data Management, as for New Project Development
• Fully Responsible for New Product Development along with Customer Satisfactions for R&D Information’s and resound to clarify
the Required Queries with Customer Orientation.
• Taking Care of Reverse Engineering for all respective Processes, Product development, Engineering Processes
• Tool Room Activities, like Tools / Dies/ Fixtures Designing, analyzing, budgeting and Procurements, Tool Manufacturing and
Productive Tool Implementing.
• Fully Responsible for Production Planning for In house Manufacturing Processes in Press Shop and Spinning (Metal Shop) along
with high profile Executions & Monitoring.
• Project analysis, Project Planning, Project Budgeting, Executing and Implementation.
• Team Building, analyzing and making the high Profile Efficient Team.
• Responsible for equipment selection for Plant Utility, assembly etc.
• Responsible for installation & Commissioning of Plant Equipment’s.
• Responsible for Execute the Manpower Planning, Cycle time Calculation and setting the Process Talk Time.
• Responsible for Plant layout and Modification in Existing Plant Layout, Fully responsible for new Plant Infrastructure and value
stream Mapping.
• Fully responsible for APQP, PPAP & FMEA Systems and Implementations, also for APQP Time Plan.
• Responsible for effectively monitoring of Suppliers / Vendors development and Orientation and planning for Manufacturing Process
& Requirements.
• Responsible for NPD Process Flow & entire development Plan, designing and Orienting with Suppliers for ECN Implements to
meet the Project Timeline & Conducting with Responsible Team Meeting to follow the APQP Process & ensuring the effective daily
Work Management and Co-Ordinate with Plant for Line set up / Modification in the existing Layout.
Worked with M/S. Eglo India Production Pvt. Ltd. From Jun - 2014 to Jan - 2017, as a Manufacturing Technical Head. Company Profile
is 100% Export House for Corporate Level (Austria and German Base). We are Manufacturing Decorative & Modern Lights for all over
World base Customers. We have Total 75 Countries Warehouses and Manufacturing Plants in the World, out of 75 Countries we have 45
Countries are Manufacturing Plants.
Worked with M/S. Asia Motor Works Ltd., from July, 2008 to Aug. 2014, As a Manager Tool Room & Engineering Projects.
My Job Profile was, -
• Engineering Processes and Implementations
• Tool Room Activities likes Tool Maintenance and Tool Manufacturing Processes
• CNC Milling, Turning, and Wire Cut & EDM Processes, like CNC Programming, Setting & Operating along with Tool Designing,
Procurements, Manufacturing and Maintenance activities.
• New Product Development activities done by the organizing of CFT Team through the FMEA, PPAP processes.
• Vendor Development, Supplier Evaluation Processes.
• Product Designing, Product Development.
• Tool Designing, Manufacturing or Procurement for deferent Types of Press Tools, HPDC and Plastic Injection Molds along with
Fixtures and Jig Fixtures.
Worked with, M/S. Complete Surveying Technologies Pvt. Ltd., As a Manager Engineering & Tool Room. Company situated in Noida
(UP) – India, from February 2007 to Jun 2008.
My Job Responsibility was,-
Overall Tool Room – Tools Manufacturing and Maintenance activities with Job Planning & Concept to finalization the Costing &
Estimation of Budget and Planning to Development & Manufacturing, as well as Supply Chain Manufacturing of Production for
deferent types of Tools, Dies (HPDC), plastic injection moulds and Press Tools for Die Casting Machines and Injection Molding
Machine’s as for 50T, 60T, 80T, 100T, 110T & 120T etc. Capacities. Also Preventive Maintenance Activities Planned for Deferent
Types of Dies and Moulds for every Production Line.
Worked with Rico Auto Industries Ltd. is an O.E.M (Original Equipment Manufacturer) supplier of Auto Components for four years (July,
2004 to Jan, 2007). As a Deputy Manager Engineering & Tool Room,
My Job profile was, -
Fully Responsible for Programming Setting & Operating Processes for CNC Machines Like, CNC Milling, Lathe, EDM and Wire-
Cut Machines. I was responsible for 2D & 3D Programming along with Del/Cam Software and UG, and also responsible for
Designing for PIM Moulds and HPDC Dies through Pro-E and UG Software’s. I was fully responsible for deferent types of Tools
Manufacturing & Maintenance activities up to the sample Product development.
Worked with, M/s. Nagata India Ltd. (Tool Room & Die Manufacture), a group of Industries MNC (Japan) - ISO Certified 9001-2000
Company, IMT MANESAR, GURGAON, for Four years (Aug, 2000 to Jun, 2004), As a Tool Room Engineer.
My Job profile was Tool & Die Maintenance with Preventive activities and Tool & Die Manufacturing Process as, Programming-
Setting & Controlling, Full Possess thorough knowledge in Handling, Operating with generating deferent types Programs for all
Kinds of CNC Machines.
Personnel Details
Page 5 of 6
Educational Background:
oI have completed Four Year Engineering Diploma with Tool & Die Making, From CTTC.
oPursuing EMBA (Executive Management Business Administrator) with the Specialization of Operation & Production Managements,
with IIBMS, Mumbai
Computer Knowledge:
Having Knowledge of Computer as, Software like AutoCAD, Pro-E, UG, Solid Works, Del/Cam, Catia V5 and MS Office, MS Dos,
PowerPoint, CorelDraw and Tally9 etc. with Operating, Designing and Projecting as Required.
Full Exposure with SAP for PP Modules along with BOM Creating, Routing / Process Flow Diagram, Talk Time setting & analyzing,
Costing, Budgeting and Executing of daily activities for analyzing the effective Supply Chain Manufacturing Processes.
NAME : - RAFIQUL ISLAM
FATHER NAME : - NAZMUL HUSSAIN
DATE OF BIRTH : - 2ND.
OCTOBER 1978
PASSPORT NUMBER : - G1591904
RELIGION & NATIONALITY : - MUSLIM & INDIAN
MOBILE NUMBER : - +91 8016272082.
E-MAIL ADDRESS ` : - rafiq_qul@yahoo.co.in;
rislam2008@gmail.com
PRESENT LOCATION : - Delhi (NCR), INDIA.
Place:
Date:
RAFIQUL ISLAM
Page 6 of 6
Educational Background:
oI have completed Four Year Engineering Diploma with Tool & Die Making, From CTTC.
oPursuing EMBA (Executive Management Business Administrator) with the Specialization of Operation & Production Managements,
with IIBMS, Mumbai
Computer Knowledge:
Having Knowledge of Computer as, Software like AutoCAD, Pro-E, UG, Solid Works, Del/Cam, Catia V5 and MS Office, MS Dos,
PowerPoint, CorelDraw and Tally9 etc. with Operating, Designing and Projecting as Required.
Full Exposure with SAP for PP Modules along with BOM Creating, Routing / Process Flow Diagram, Talk Time setting & analyzing,
Costing, Budgeting and Executing of daily activities for analyzing the effective Supply Chain Manufacturing Processes.
NAME : - RAFIQUL ISLAM
FATHER NAME : - NAZMUL HUSSAIN
DATE OF BIRTH : - 2ND.
OCTOBER 1978
PASSPORT NUMBER : - G1591904
RELIGION & NATIONALITY : - MUSLIM & INDIAN
MOBILE NUMBER : - +91 8016272082.
E-MAIL ADDRESS ` : - rafiq_qul@yahoo.co.in;
rislam2008@gmail.com
PRESENT LOCATION : - Delhi (NCR), INDIA.
Place:
Date:
RAFIQUL ISLAM
Page 6 of 6

Plant head (operation)

  • 1.
    COVER LETTER Plant Head(Operation) Mobile: +91 8016272082 & 8250167918 Multi-disciplined in Engineering Development, Designing & Tool Room Head with over 18 years of progressive leadership experience driving new product, process, and equipment development programs in world class manufacturing environments. I have Strong background in the execution of objectives for achieving productivity and continuous improvement goals to meet operational challenges. Recognized for business development skills, with keen engineering insight to collaborate with peer management, formulate strategic plans, and manage resources with 'drive to completion' motivation. Am a strong understanding of corporate cultures and the critical relationships that exist in companies between engineering, R&D, sales, marketing, delivery, employee development, operations, finance, and customers. Cool under pressure, trustworthy, highly respected to interface positively and professionally at all levels. Responsible for implementation of production processes and procedures, leading productivity improvements with project based activities, including new product introduction and manufacturing cell design to reduce waste, improve quality and safety, and reduce operating costs. Manage KPIs and ensure preventative actions are taken to maximize success. Work on many phases or sub-tasks of projects or entire projects of moderate complexity, with results impacting on project completion. Work under general supervision, reviewed at project milestones and/or on completion by Senior Management. TEAM LEADERSHIP ~ COMMUNICATION ~ AUTOMOTIVE ~ INTERNATIONAL PROJECTS ~ DFM ~ DFA ~ 6 SIGMA ~ APQP ~ VOICE OF THE CUSTOMER ~ VALUE STREAM ANALYSIS ~ BUSINESS DESIGN ~ OUTSOURCING ~ PQI PROFESSIONAL EXPERIENCE • Dedicated to and actively involved in corporate operations strategic vision and development of goals and objectives, as a member of the division business steering committee. • Earned reputation as a results focused leader with distinctive ability to lead, motivate, and inspire efficient, goal-focused teams to achieve timely completion of strategic projects with demanding deadlines. • Superb balance of technical know-how with resource management and collaborative abilities to get project teams to function in harmony. • Managing team of 15-16 engineers and support associates, working cross-functionally to meet division objectives for manufacturing productivity savings and introducing new product, capital investment programs. • Managing effective partnerships, with external resources for large equipment build program, optimizing the implementation of strategic plans towards accelerating corporate objectives ahead of schedule. • Capital investment projects, Managed utilizing APQP methodologies, some on an international level with global partners/suppliers. Ranging from new product introductions to capacity expansions. • Managing Continuous Improvement activity to achieve manufacturing productivity savings goals. Averages 5% of cost of good sold annually on mostly mature commodity based products. • Responsible for establishing the Energy/Sustainability programs. Program exceeded corporate goals for savings with between $750 and $1,000K of tangible benefit per year, over the past three years. Quarterly results presented to Management. • Co-coordinator of the corporate 'GREEN TEAM' that includes members from all facilities. Recognized by corporate for providing a companywide culture change towards improved sustainability and enhanced environmental responsibility. • Developed in-house process engineering training program. Fully implemented program is in third round of 128 modules. Academic performance is monitored and is job level impact based. • Responsible for ISO/QS9000 certification and Total Cycle Time methodology implementation for project performance tracking. • Design and debug of high speed, highly automated lines of manufacturing equipment for new products. Programs required me to develop the use of new technologies to our facility, and implement them into the equipment. General and Task Management To developing, implementing, monitoring and maintaining the efficient manufacturing processes for assembly products (PFMA). • Responsible to Identifying the manufacturing needs for new products development and Implementation • Full responsible to design new systems and processes and provide facilities & methodologies to ensure the cost effective integration of new products or for the improvement of existing ones into manufacturing operations • Responsible to ensure all product and system requirements are taken into account from the initial product conception to the finished results, which supposed to assist with shop floor layout and cell designs as planned • Full responsible to design the fixtures and tooling for assembly processes to reduce the talk time and product cost effectiveness during the manufacturing process designing. • Responsible to reduce variability in manufacturing process by providing standard work methods and work instructions, to ensure the products and process quality meets the specifications as required • Full responsible to installations of new machineries and equipments, as per the Process layout and activities • Responsible to organizing the plant start-up and shut-down schedules to ensure the minimum losses of production downtimes and breakdown activities, according to the Preventive Maintenance Plan • Full responsible for continuous improvement, problem solving and process improvement activities in the Process • Knowledge of undertaking the special projects as required and contribute to continuous improvement activities • Responsible to making the Track records and presenting progress report at project meetings and to the clients • Full responsible to achieve the goals within the budget & conducting the benchmark studies to determine best practices/designs and future trends • Responsible to plan projects or subtasks and managing the Key Performance Indicators (KPIs) during the projects along with attending various types of meetings and action / communicate of instructions to the team • To undertaking continuous improvements, training methodologies and developments, performing through the root cause analysis and resolve the problems to ensure the quality products along with customer satisfaction Skills and Attributes: • Independently determines approach and assigned tasks along with understanding the manufacturing processes Page 1 of 6
  • 2.
    • Knowledge ofengineering, scientific and other technical information, strong problem-solving skills and logical approach • Expertise in Tool Designing, Tool Development and Tool Manufacturing along with U.G, Pro-E, Solid works, Del Cam & Solid Cam etc. • Expertise in lean manufacturing and ability to work in a diverse and dynamic environment’s for Hyper form, Auto form & Pam stamps in Sheet Metal forming Processes. • Planning and prioritizing activities, Excellent negotiation skills and ability to present data effectively • Exercises latitude and technical judgment in deciding work methods of Process Engineering, Designing of Tools and Manufacturing activities. • Responsible to train the work group and lead teams within the work group and manage the group to achieve goals within budget and timeline. • Responsible for FMEA (Failure Mode Effects Analysis), Kaizen/A3 (continuous improvement and problem solving) process improvement and Poka Yoke (error proofing) techniques • Responsible for design and Process & production costs to include waste, downtime, scrap and re-work Activities • Responsible to develop working instructions, workmanship standards and process documentations in the floor • Responsible to Improve the existing operations, for increased quality, productivity, efficiency and cost saving analysis • Knowledge of Investigating operational problems affecting production and reporting and recommending solutions • Responsible to manage manufacturing documentation required for product manufacturing i.e. revise drawing, BOM, accurate work instructions and workmanship standards and process procedures • Responsible to Provide manufacturing data i.e. production control charts, reliability, process capability, to improve the process and monitor and measure progress to target • Full responsible to Identify the ways to reduce production costs through recommendations – i.e. new process equipment, equipment justification to improve performance activities • Knowledge of engineering design activities with Pro-E, UG NX, Solid Works, Dell/Cam and Solid Cam (design for excellence) to include: o Design for costing o Design for testing o Design for manufacturability o Design for assembly • Work with other relevant departments to determine estimated costs, run time, cost reduction and close the feedback loop • Responsible to develop the suppliers to improve the Process Quality and Cost Effectiveness through Ideal activities • Full responsible for new product development and New Process Implementation to effective performance. • Knowledge of establishing as a training and quality culture in the floor to making the high profile environments. • Responsible to monitoring of all cell custom build, lean Manufacturing, six sigma and ISO methodologies for better quality • Responsible for Proven track record and working knowledge of manufacturing processes • Full responsible for Plant layout and Modification in Existing Plant Layout and for new Plant Infrastructure and value stream Mapping. Training Undergone / Certification / Seminars: Undergone 4 months training in M/s. MARUTI UDYOG Ltd., GGN, Tool Room and Die Shop as Automobile die machining from Oct. 2000 to Jan. 2001 for CNC Milling Machines of reputed Japanese make like SNK and Makino. I have completed the ERP Course of SAP_PP (Functional Consultant), version – “IDES R/3 ENTERPRISE” and I have done job as a Faculty with my last Company. Completed another Certification Course of MS Project, Workshop for total Five Days, Is Recognized by BASCOM BRIDGE. Also Completed the Business Communication Skills and Workshop, Conducted by Ms. Anita Shantaram and Dr. P.N. Singh (Center for HRD), for seven Days full version. Also attend Six Days Seminar on Internal Auditing for ISO / TS – 16949:2009, Certified by TUV Rheinland (India) Pvt. Ltd. And Four days Seminar I have participated for the Quality Consulting of ISO 14001:2004 awareness. And the following Training Programs has been participated periodically, - o Certified Internal Auditor for Quality system and 14001 Audit. o Trained in 5S and TQM activities o SPC, Communication and Presentation skills o OHSAS, EMS awareness and the Leadership and Assertiveness o Time Management and Change management o Team working and group dynamics, Team Building o Problem solving and decision making analysis o Daily Work Management and Manufacturing Excellence CURRICULUM VITEA RAFIQUL ISLAM, District Cooch Behar, Village & City Dinhata, MOBILE: +91 8016272082 & 8250167918 West Bengal (India) - 736135 Personal Briefings Experience : - Total Experience 18 Years. Page 2 of 6
  • 3.
    Present CTC :- INR 21, 60, 000 P.A. Expected CTC : - Negotiable Current Industry working : - Sheetkraft India Pvt. Ltd. Current Functional Area : - Operation (Manufacturing) Current Designation : - Plant Head (Operation) Current Location : - Ahmedabad (Gujarat) Location Preference : - Any Where in India & Abroad. Working Knowledge as Manager – Operation (Manufacturing): Total 18 years of hardcore experienced, with High Professionalism and association of subject to knowledge in Engineering of Production, Process Engineering and Hard Core of Three Stage Tool Room Operations system, Like Full phase of Engineering activities, as Process Developing through rich experienced of Process Engineering Activities and High Profile Tool Room Activities for Sheet Metal, Plastic Injection Molding and High Pressure Die Casting Tools, along with Designing, Processing, analyzing, Procurements, Manufacturing, Assembly, developing also the Maintenance & Preventive Maintenance Activities. Process Implementing for New Product Development along with High Profile Process Flow, Process Evaluation, Process analysis, Reverse Engineering and Process Development. And acquired through the academic excellence and establishing the efficient Professionalism and Productive process flow diagram. Full optimization of resources and capacities of utilizations, and the Operational efficiencies leading to enhanced productivity and higher returns through the Competency analyzing of existing Processes / Procedures, Capabilities and conducting the critical analysis for shortcoming Products and providing there Process improvements Capabilities, as PPAP, APQP, Kaizens, Poka Yoke and SMED System. Full Exposure with CNC Programming – Operating – Setting along with 2D & 3D Programming, Cad / Cam activities with Pro-E, Solid Works, UG & Del Cam Software’s. Overall knowledge of metal forming, Aluminum Casting, Plastic Injection Molding, and Press Tool Designing, Process Implementing, Reverse Engineering, Costing, Procurements and manufacturing activities. Successfully undertake the effective outsourcing of vendor development for tool designing and manufacturing process of tools, tryout the Products, getting customer approvals, outsourcing of Approved Products, finalizing the Costing and starting of commercial productions and successfully implementing the Competitive Business Plan. Technical & Engineering Skills: • Process Engineering, Process Planning, Material Planning and Developing the Process Flow Diagram and Implementing • Process Evaluation and Reverse Engineering along with Implementation of APQP & FMEA • Process Cost analyzing and Process Talk Time analysis. • Product Designing & Product Development along Process Development. • Tool Designing (Press Tools, PIM Tools & HPDC Tools along with Fixtures & Jig Fixtures etc.) • Tool Procurements, Tool Manufacturing & Tool Maintenance. • CNC Programming (2D & 3D), Operating & Settings for CNC Milling, Lathe, Wire-Cut & EDM Machines. • Knowledge of Cam programming & Modeling through PRO-E, DELCAM UG and Smart Cam and Making Manual CNC - programmed with FANUK, HEIDENHAIN, Mitsubishi & Siemens, Dialog-11 & Haas, Wire Cut, EDM and CNC Turning Machines. • Fixture & Jig Fixture Designing and Manufacturing for lean Manufacturing Processes • Full Exposure with Project analysis, Project Planning, Project Budgeting, Project ROIs and analyzing, Project Implementation and Technical Data analysis etc. • Represented the CFT Team Building for Development activities through FMEA & PPAP System. • Vendor Development, Supplier Evaluation and Cost Effective Project implementation. • Preventive maintenance activities for all Respective Tools / Dies, fixtures / jigs and the deferent types of Machineries with day to day Process and Periodically Monitoring. • Knowledge of Technical writing, compilation and review of technical documentation including, procedures, work instructions, test plans, test reports etc. And Reviewing customer specifications and compliance statements. • QS Process and the Lean Manufacturing Process development with the QMS, TPM, QS & 7QC Tools etc. • Tool and Machine Breakdown analysis and Corrective & Preventive Activities with cost effective Diagrams • Estimation of cost effective new tool manufacturing for in-house & outsource manufacturing processes. • The Performance Capabilities, to be effectuate for the Cost Saving Initiatives and to achieve cost reduction Targets through the Value Engineering and the Process Flow Diagram, Trouble shooting Parameters and reducing the short coming breakdowns, reworks, reduction in manpower and waste eliminations etc. Skill sets of Sheet Metal / Press Tools Processes: Total 18 years of excellent and high profile skill sets for The different types of press tool constructions leads to different operations namely blanking, bending, piercing, forming, drawing, cutting off, parting off, embossing, coining, notching, shaving, lancing, dinking, perforating, trimming, curling etc. Responsible for Plans, directs and coordinates the development and design of press tools based on customer inputs. Making sure the designed tools are consistent with standard tool configuration. Relies on extensive experience and judgment to plan and accomplish goals. A high degree of sheet metal processing knowledge, progressive die design knowledge, detailing know how and excellent understanding of various Customer Requirements. The assessment for this responsibility is based on achievement of business goals, consistent demonstration of on-time delivery and high level of quality performance. • Design and monitoring method like, plan for design the press tools as per customer requirement. • Develop the Blanking, Draw Die face and sheet metal tool Manufacturing and process implementation • Development and generation of trim line estimating tool and product cost check sheet • Development of various stages press tools and decide the process sequence of components according to the process implementations • Responsible for material planning, scheduling and procurement of sheet metal components and tubular • Responsible to follow up with vendor for maintaining timely delivery of materials • Full responsible for planning of raw materials, monthly new tooling / gauges, jigs, fixtures, machines, loading and off loading of machines. Page 3 of 6
  • 4.
    Skill sets ofPlastic injection molding / PIM Processes: Total 14 Years of hard core expertise in Plastic injection molding processes. Full exposure is in the preferred process for manufacturing plastic parts. During this tenure I used to develop the many things such as electronic housings, containers, bottle caps, automotive interiors, combs, and most other plastic products available today. It is ideal for producing high volumes of plastic parts due to the fact that several parts can be produced in each cycle by using multi-cavity injection molds. Some advantages I have implemented of injection molding are high tolerance precision, repeatability, large material selection, low labor cost, minimal scrap losses, and little need to finish parts after molding. • Design plastics or injection-mold fabrication processes. • Create and improve injection-mold machinery. • Research and develop new manufacturing processes. • Analyze manufacturing data and implement the error proofing system for improvements. • Analyze production and machineries for productive process flow and lean manufacturing system • Ensure quality output of molded components and products • Develop and design engineered plastic parts, insert molded parts and assemblies. • Interact with customers, suppliers, and internal resources for better processes • Establish the parameters for an optimal molding environment and productivity • Ensure environment to make plastics is appropriate and customer satisfied • Analyze quality control and correct the process flow diagram according to the customer satisfaction • Work with other team members and vendors to reduce the product cost and downtime • Review existing validation reports and errors for improvements • Analyze mold flow, part advisor analysis, finite element analysis, and stress/fatigue analysis on plastics. • Design hot/cold runner molds for better performance • Develop 3D solid mold designs to remove the designing errors and perfect tooling • Create water diagrams and hot runner wiring schematics for better performance • Prepare mold-filling simulations for zero defects and failures. Skill sets of High Pressure Die Casting / HPDC Processes: Leading an universal and skilled career culture for 17.5 Years, in the high profile environments and reach skilled engineering process background with HPDC (High Pressure Die Casting). Responsible for the production of aluminium castings and about 70% of the castings are produced using conventional high-pressure die-casting process. Expertise of High Integrity die-casting processes such as Squeeze casting, Local casting spot pressurizing, Ultrahigh vacuum process, Massive vent process, Vacural process, Minimum fill time process, Controlled filling process, Vacuum high vac –V process and Semi -solid casting processes Keywords: Aluminium High pressure Die-casting, Turbulence, Air and gas blow holes, High integrity die casting Processes, Ultra high vacuum process, Semi-solid casting processes, reduce casting weight, increase casting Quality, minimum casting wall thickness, squeezes pins, suppress blow holes, pin holes. Good Knowledge of Tool designing, Process designing and selection of machineries / equipments for, - Local ‘casting- spot’ pressurizing process Squeeze pin feedback control system Local runner spots pressurizing process • New Project Initializing & Implementation • BOM Making & Designing along with Cost analyzing • Process Designing and analyzing, Process Implementing along with Productive Talk time implementation • Product Development, along with Prototype Sampling & Customer Satisfaction • Tool Designing, Tooling Cost Evaluation, Tool process & Manufacturing Process flow Diagram Implementation and Executing according the customer satisfaction • Productive & efficient Manufacturing processes are actively implement along with successful Fixtures & Jig Fixtures designing and Manufacturing for 100% Quality approved Products and Customer Satisfaction along with the following Documents, - 1. Six Sigma 2. Fish Bone Diagram Analysis 3. Pareto Diagram Analysis 4. FMEA analysis 5. Histogram & Scatter Plot Diagram Analysis 6. Process Map Review and analysis 7. 7QC Tools & Quality Management System • Team Management Execution, Monitoring and Implementing • Customer Satisfaction Training Session Planning, Monitoring and Executions of my Team Member Skill sets of forging Processes: Total 4.5 Years of hard core professional skill sets for Forging Industries like, Impression Die forging, Cold forging and Open Die forging processes. During this period, am the responsible for, - • The Design and Development of Forged Products along with Process Engineering • Responsible for selecting the process of forging according to the Products • RFQ Processes of all respective Products • Forging Process analysis system • Surplus forging stock details • Energy efficiency and saving Tools activities • Process analysis of Products and services Page 4 of 6
  • 5.
    • Design andForging Tools Data base along with respective process flow diagrams • Weekly and Monthly Failure analysis and preventive & Corrective action Plan Working Experience: Presently working with M/S. Sheetkraft India Pvt. Ltd. (A Joint Venture Manufacturer of VEEGEE Group) From Feb - 2017 to till date, as a Plant Head (Operation). Company Profile is 100% Manufacturer for Maruti Suzuki and Honda for Sheet Metal Process. Faridabad Base Group of Industries for Direct Manufacturer of Automotive Parts. My Job responsibilities are as followed, - • Fully responsible for Corporate level Communication, analyze & Interpret with general Business Plan and Documentations & Technical Data Management, as for New Project Development • Fully Responsible for New Product Development along with Customer Satisfactions for R&D Information’s and resound to clarify the Required Queries with Customer Orientation. • Taking Care of Reverse Engineering for all respective Processes, Product development, Engineering Processes • Tool Room Activities, like Tools / Dies/ Fixtures Designing, analyzing, budgeting and Procurements, Tool Manufacturing and Productive Tool Implementing. • Fully Responsible for Production Planning for In house Manufacturing Processes in Press Shop and Spinning (Metal Shop) along with high profile Executions & Monitoring. • Project analysis, Project Planning, Project Budgeting, Executing and Implementation. • Team Building, analyzing and making the high Profile Efficient Team. • Responsible for equipment selection for Plant Utility, assembly etc. • Responsible for installation & Commissioning of Plant Equipment’s. • Responsible for Execute the Manpower Planning, Cycle time Calculation and setting the Process Talk Time. • Responsible for Plant layout and Modification in Existing Plant Layout, Fully responsible for new Plant Infrastructure and value stream Mapping. • Fully responsible for APQP, PPAP & FMEA Systems and Implementations, also for APQP Time Plan. • Responsible for effectively monitoring of Suppliers / Vendors development and Orientation and planning for Manufacturing Process & Requirements. • Responsible for NPD Process Flow & entire development Plan, designing and Orienting with Suppliers for ECN Implements to meet the Project Timeline & Conducting with Responsible Team Meeting to follow the APQP Process & ensuring the effective daily Work Management and Co-Ordinate with Plant for Line set up / Modification in the existing Layout. Worked with M/S. Eglo India Production Pvt. Ltd. From Jun - 2014 to Jan - 2017, as a Manufacturing Technical Head. Company Profile is 100% Export House for Corporate Level (Austria and German Base). We are Manufacturing Decorative & Modern Lights for all over World base Customers. We have Total 75 Countries Warehouses and Manufacturing Plants in the World, out of 75 Countries we have 45 Countries are Manufacturing Plants. Worked with M/S. Asia Motor Works Ltd., from July, 2008 to Aug. 2014, As a Manager Tool Room & Engineering Projects. My Job Profile was, - • Engineering Processes and Implementations • Tool Room Activities likes Tool Maintenance and Tool Manufacturing Processes • CNC Milling, Turning, and Wire Cut & EDM Processes, like CNC Programming, Setting & Operating along with Tool Designing, Procurements, Manufacturing and Maintenance activities. • New Product Development activities done by the organizing of CFT Team through the FMEA, PPAP processes. • Vendor Development, Supplier Evaluation Processes. • Product Designing, Product Development. • Tool Designing, Manufacturing or Procurement for deferent Types of Press Tools, HPDC and Plastic Injection Molds along with Fixtures and Jig Fixtures. Worked with, M/S. Complete Surveying Technologies Pvt. Ltd., As a Manager Engineering & Tool Room. Company situated in Noida (UP) – India, from February 2007 to Jun 2008. My Job Responsibility was,- Overall Tool Room – Tools Manufacturing and Maintenance activities with Job Planning & Concept to finalization the Costing & Estimation of Budget and Planning to Development & Manufacturing, as well as Supply Chain Manufacturing of Production for deferent types of Tools, Dies (HPDC), plastic injection moulds and Press Tools for Die Casting Machines and Injection Molding Machine’s as for 50T, 60T, 80T, 100T, 110T & 120T etc. Capacities. Also Preventive Maintenance Activities Planned for Deferent Types of Dies and Moulds for every Production Line. Worked with Rico Auto Industries Ltd. is an O.E.M (Original Equipment Manufacturer) supplier of Auto Components for four years (July, 2004 to Jan, 2007). As a Deputy Manager Engineering & Tool Room, My Job profile was, - Fully Responsible for Programming Setting & Operating Processes for CNC Machines Like, CNC Milling, Lathe, EDM and Wire- Cut Machines. I was responsible for 2D & 3D Programming along with Del/Cam Software and UG, and also responsible for Designing for PIM Moulds and HPDC Dies through Pro-E and UG Software’s. I was fully responsible for deferent types of Tools Manufacturing & Maintenance activities up to the sample Product development. Worked with, M/s. Nagata India Ltd. (Tool Room & Die Manufacture), a group of Industries MNC (Japan) - ISO Certified 9001-2000 Company, IMT MANESAR, GURGAON, for Four years (Aug, 2000 to Jun, 2004), As a Tool Room Engineer. My Job profile was Tool & Die Maintenance with Preventive activities and Tool & Die Manufacturing Process as, Programming- Setting & Controlling, Full Possess thorough knowledge in Handling, Operating with generating deferent types Programs for all Kinds of CNC Machines. Personnel Details Page 5 of 6
  • 6.
    Educational Background: oI havecompleted Four Year Engineering Diploma with Tool & Die Making, From CTTC. oPursuing EMBA (Executive Management Business Administrator) with the Specialization of Operation & Production Managements, with IIBMS, Mumbai Computer Knowledge: Having Knowledge of Computer as, Software like AutoCAD, Pro-E, UG, Solid Works, Del/Cam, Catia V5 and MS Office, MS Dos, PowerPoint, CorelDraw and Tally9 etc. with Operating, Designing and Projecting as Required. Full Exposure with SAP for PP Modules along with BOM Creating, Routing / Process Flow Diagram, Talk Time setting & analyzing, Costing, Budgeting and Executing of daily activities for analyzing the effective Supply Chain Manufacturing Processes. NAME : - RAFIQUL ISLAM FATHER NAME : - NAZMUL HUSSAIN DATE OF BIRTH : - 2ND. OCTOBER 1978 PASSPORT NUMBER : - G1591904 RELIGION & NATIONALITY : - MUSLIM & INDIAN MOBILE NUMBER : - +91 8016272082. E-MAIL ADDRESS ` : - rafiq_qul@yahoo.co.in; rislam2008@gmail.com PRESENT LOCATION : - Delhi (NCR), INDIA. Place: Date: RAFIQUL ISLAM Page 6 of 6
  • 7.
    Educational Background: oI havecompleted Four Year Engineering Diploma with Tool & Die Making, From CTTC. oPursuing EMBA (Executive Management Business Administrator) with the Specialization of Operation & Production Managements, with IIBMS, Mumbai Computer Knowledge: Having Knowledge of Computer as, Software like AutoCAD, Pro-E, UG, Solid Works, Del/Cam, Catia V5 and MS Office, MS Dos, PowerPoint, CorelDraw and Tally9 etc. with Operating, Designing and Projecting as Required. Full Exposure with SAP for PP Modules along with BOM Creating, Routing / Process Flow Diagram, Talk Time setting & analyzing, Costing, Budgeting and Executing of daily activities for analyzing the effective Supply Chain Manufacturing Processes. NAME : - RAFIQUL ISLAM FATHER NAME : - NAZMUL HUSSAIN DATE OF BIRTH : - 2ND. OCTOBER 1978 PASSPORT NUMBER : - G1591904 RELIGION & NATIONALITY : - MUSLIM & INDIAN MOBILE NUMBER : - +91 8016272082. E-MAIL ADDRESS ` : - rafiq_qul@yahoo.co.in; rislam2008@gmail.com PRESENT LOCATION : - Delhi (NCR), INDIA. Place: Date: RAFIQUL ISLAM Page 6 of 6