SlideShare a Scribd company logo
1
Mokhtar Ben Khalifa (TUNISIA)
30 years (Maried+2 Children)
Email: mokhtarbenkhalifa@hotmail.fr
Web: https://sites.google.com/site/projeteurtuyauterie/
Phone: 00216 23294968
Skype Id: mokhtar-1986
Piping CAD Designer & Supervisor
(7 years of experience in Oil & Gas)
February 2012: Training Part Tekla Structure (Bello Formation)
May 2011 : Training Part Iso 9001 (Conseil Performance)
2006/2009 : BTS (ISET de Sousse)
June 2009 : Technician Training at "Alpha-Engineering International"
June 2008 : Employee Training at "L’épi D’or"
2001/2005 : Bachelor Degree (technique
Plant Design System Experience:
 Preparing complete 3D Model For petrochemical plants Using CADWorx.
 Good understanding of Piping and Instrumentation diagram P&ID
 Preparing and reviewing piping specifications in accordance with the company standards and general codes.
 Familiar with international regulations, codes and standards used in the petroleum field (API, ASME, ANSI, ISO,
ASTM, MSS SP, TEMA, NFPA, BS, ISA, etc.)
 Highly experienced in using all CADWorx activities and modules including Plant Design, Equipment modeling,
PID's, Isogen Manager.
 Considering equipments spacing, accessibility, operation and maintenance requirements.
 Preparing automated material take-off and isometric drawings for check, bid, approval and for construction us-
ing CADWorx Isogen project manager.
 Complete design of piping general arrangement layouts, Piping isometrics, Supports Details, materials take off,
equipments location plans, plot plans, orientation drawings, Welding register, welding map.
 Continuously updated project drawings and documents to final As-built status.
 Review the plant 3D model (design, accessibility, Maintainability and constructability using ).
 Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports Details,MTOetc.).
Field Experience:
 High communication, presentation and coordination skills.
 Construction supervision on site activities for petrochemical and gas plants including: Providing redesign solu-
tions for the field Problems or changes (clashing mismatching lack of material item).
 Ensuring implementation and adherence to project specifications and procedures.
 Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary
actions to maintain satisfactory standards.
 Producing documentations required for field testing including hydrotest diagrams, test certificates mechanical
completion certificates.
 Witnessing all field tests including hydrotest (HT), dye Penetrante (PT), ultrasonic test (UT).
 Reviewing all site work and prepare the punch list for the construction contractor.
 Review & prioritize the piping activities and completion to meet the project schedule requirements.
 CADWorx Plant & Equipment (Advanced Level)
 CADWorx PID (Intermediate Level)
 Autocad (Advanced Level)
 Navisworks (Advanced Level)
 Autocad Plant 3D, Tekla, Solidworks (Beginner)
 Office Package (Intermediate Level)
Education & Training
Technical & Professional Skills
Computer Skills
Mise à Jour : 16/11/2015 Page 2/5
-----------------------------------------------------------------------------------------------------------------------------------------------
JUNE 2014 / OCTOBER 2016 (2 YEARS 4 MONTHS)
COMPANY: «PETROGAS SYSTEMS» (TUNISIA)
Web Site: http://www.petrogas-systems.com/
SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE
-----------------------------------------------------------------------------------------------------------------------------------------------
TASKS PERFORMED BY PROJECT:
" FOURNITURE DE 6 PASSERELLES RABATTABLES POUR CHARGEMENT CAMIONS EN DOME"
(CLIENT : VIVO ENERGY /SITE: AGADIR-MAROC)
- 3D Model
- Piping Arrangement Drawing
- Detailing Plans
- Supervision of execution
- Supervision of Test
" FOURNITURE D'UN SKID DE CHARGEMENT SOURCE POUR CAMION CITERNES"
(CLIENT: JORF PETROLEUM STORAGE/SITE: JORF LASFAR-MAROC)
- 3D Model
- General Arrangement Drawing
- Isometric Drawings
- Piping & Instrumentation Diagram "PID"
- Piping Bill of material
" FOURNITURE SKID DE COMPTAGE" (CLIENT : CFTP/ SITE: ZI SKHIRA-TUNISIA)
- 3D Model
- General Arrangement Drawing
- Isometric Drawings
- Piping & Instrumentation Diagram "PID"
- Piping Bill of material
" FOURNITURE DE 3 SKIDS DE CHARGEMENT POUR CAMIONS CITERNES" (CLIENT : VIVO ENERGY / SITE:
AGADIR-MAROC)
- 3D Model
- Piping Arrangement Drawing
- Isometric Drawings
- Loading Arms Clearance Plan
- Piping & Instrumentation Diagram "PID"
- Piping Bill of material
-----------------------------------------------------------------------------------------------------------------------------------------------
SEPTEMBER 2013 / JUNE 2014 (9 MONTHS)
COMPANY: EMCO «ENGINEERING MANAGEMENT & CONTRACTING» (TUNISIA)
SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE
-----------------------------------------------------------------------------------------------------------------------------------------------
TASKS PERFORMED BY PROJECT:
"INSTALLATION OF CARTRIDGE FILTER FOR 32INCH GAS PIPELINE"
(CLIENT: MELLITAH B.V LIBYAN BRANCH/ LIBIE)
- 3D Model
- Isometric Drawings
- Welding register
- Piping & Instrumentation Diagram "PID"
- Support Detailing Plan
" EZZAOUIA FACILITIE UPDATE" (CLIENT: MARETAP / SITE: EZZAOUIA FACILITIE)
- 3D Model
- Piping Arrangement Drawing
- General Arrangement Drawing
- Isometric Drawings
Professional Experience
Mise à Jour : 16/11/2015 Page 3/5
" FREELANCE" (CLIENT: PERENCO / SITE: BAGUEL, CPF OM CHIEH)
- 3D Model
- As built Drawings
- Piping Arrangement Drawing
- Isometric drawing
-----------------------------------------------------------------------------------------------------------------------------------------------
JANUARY 2013 / JULY 2013 (7 MONTHS)
COMPANY: «BOUCHAMAOUI INDUSTRIES S.A» (TUNISIA)
Web Site: http://www.bouchamaoui.net/
SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE
-----------------------------------------------------------------------------------------------------------------------------------------------
TASKS PERFORMED BY PROJECT:
" DEPOT DE STOCKAGE D’HYDROCARBURES LIQUEFIES GPL " (CLIENT : SNDP-TUNISIA/
SITE: Z.I GABÉS)
- Supervising Shop Fabrication of Fire water Network
- Elaborate Fire water Network Isometric drawings
- Generate Fire Water Bill of material
- Preparation Of test Pack
-----------------------------------------------------------------------------------------------------------------------------------------------
SEPTEMBER 2011 / DECEMBER 2012 (1 YEAR 4 MONTHS)
COMPANY: MERI «MONDIALE DES ETUDES ET REALISATIONS INDUSTRIELLES» (TUNISIA)
Web Site: http://www.meri.com.tn/
SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE
-----------------------------------------------------------------------------------------------------------------------------------------------
TASKS PERFORMED BY PROJECT:
" POSTE DE CHARGEMENT HYDROCARBURE " (CLIENT : SHELL / SITE : DEPOT RADES)
- 3D Model
- Isometric Drawings
- Piping Bill of material
- Mechanical Plan
- Piping Arrangement Drawing
- General Plot Plan
" TERMINAL DE CHARGEMENT CAMIONS EN PRODUIT RAFFINEES " (CLIENT : SHELL/SITE: DEPOT RADES)
- 3D Model
- Isometric Drawings
- Piping Bill of material
- Structural Bill of material
- Mechanical Plan
- Structural Detailing Plan
" TRAVAUX DE CONNECTION DU RESERVOIR R14 AUX LIGNES GASOIL" (CLIENT : SNDP / SITE: DEPOT
RADES)
- 3D Model
- Isometric drawing
- Piping Bill of material
- Structural Bill of material
" ADDITIVATION POSTE DE CHARGEMENT HYDROCARBURE" (CLIENT : VIVO ENERGY- / SITE: DEPOT RADES)
- 3D Model
- Piping Arrangement drawing of fire fighting
- Fire Fighting System Isometric drawing
- Piping Arrangement Drawing
- Isometric Drawings
- Piping Bill of material
" UNITE DE SUPPRESSION F4 " (CLIENT : 5EME SAISON / SITE : CHOTT EL FEJIJ)
- 3D Model
- Isometric Drawings
- Piping Bill of material
- Piping Arrangement drawing
Mise à Jour : 16/11/2015 Page 4/5
-----------------------------------------------------------------------------------------------------------------------------------------------
JULY 2009 / SEPTEMBER 2011 (2 YEARS 2 MONTHS)
COMPANY: AEI «ALPHA-ENGINEERING INTERNATIONAL» (TUNISIA)
Web Site: Http://Www.Alpha-Engineering.Com.Tn/
SECTOR: ETUDES OIL & GAS
-----------------------------------------------------------------------------------------------------------------------------------------------
TASKS PERFORMED BY PROJECT:
"REPLACEMENT TRAIN" (CLIENT: PIONEER / SITE: WAHA WELL SITE FACILITIE)
- 3D Model
- General plot plan
- Piping & Instrumentation Diagram "PID"
- Isometric Drawings
- Piping Bill of material
- Piping & Instrumentation Layout
- Lighting System Layout
- Junction Boxes Layout
- Cable routing layout
- Earthing System Layout
"GAS LIFT" (CLIENT: PIONEER-TUNISIA / SITE: WAHA WELL SITE FACILITIES)
- 3D Model
- Piping & Instrumentation Diagram P&ID’s
- Tie In List
- Line list
- Isometric drawings
- Piping Bill of material
- Piping Arrangement Layout
- Lighting System Layout
- Junction Boxes Layout
- Cable routing layout
- Earthing System Layout
- Supervision of construction works
" DJEBAL GROUZ OIL CENTER RELOCATION " (CLIENT : ENI / SITE : OUED ZAR)
- 3D Model
- Isometric drawings
- Piping Bill of material
- Piping Arrangement Layout
"SURGE TANK BLANKETING SYSTEM" (CLIENT: TPS / SITE: CERCINA SFAX)
- 3D Model
- Isometric drawings
- Piping Bill of material
- Piping Arrangement Layout
" TRIGENERATION POWER PLANT " (CLIENT : PARENIN / SITE: ENFIDHA AIRPORT)
- 3D Model
- Isometric drawings
- Piping Bill of material
- Piping Arrangement Layout
- Tie In List
- Line List
Français : Courant Sports
Anglais : Courant Pêche
Arabe : Langue Maternelle Documentaires
Langue Loisirs
Mise à Jour : 16/11/2015 Page 5/5
Captures Ecran

More Related Content

What's hot

Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
Dr Orhan Degermenci
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
cv
cvcv
Manimaran
ManimaranManimaran
Manimaran
Manimaran M
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
Michael J. Foreman
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
ahmed haridi
 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
Federico Mecarelli
 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
Stefano Rossi
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
Ali Khidr
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
salimon hassan
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
MO7SEN FAROUK.
MO7SEN FAROUK.MO7SEN FAROUK.
MO7SEN FAROUK.
mohsen farouk
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
Adeel Shaikh
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
Juber Loharia
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
Sudhakar Vallala
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
Joseph Bracic
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
Tushar Badhe
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD

What's hot (19)

Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
cv
cvcv
cv
 
Manimaran
ManimaranManimaran
Manimaran
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
MO7SEN FAROUK.
MO7SEN FAROUK.MO7SEN FAROUK.
MO7SEN FAROUK.
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 

Similar to CV Piping Designer & Supervisor

tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
Тαυѕιƒ ΑℓΑМ
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
Suprotim Dey
 
MCV
MCVMCV
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan
 
Application of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement IndustryApplication of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement Industry
theijes
 
Ahmed Fahmy_CV
Ahmed Fahmy_CVAhmed Fahmy_CV
Ahmed Fahmy_CV
Ahmed Fahmy
 
AF Resume Sept 2015
AF Resume Sept 2015AF Resume Sept 2015
AF Resume Sept 2015
Adrian Farfaglia
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
Salah Mohamed
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
mohamed ahmed
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
Vinoth Kumar
 
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
aladin ghaly
 
CNJ Career Path
CNJ Career PathCNJ Career Path
CNJ Career Path
Chainarong Th
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
Sougata Chatterjee
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
Talgat Turekulov
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015
Gideon Manthorp
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
Vijayakumar Kumar
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
Muhammad Yaseen
 

Similar to CV Piping Designer & Supervisor (20)

tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 
MCV
MCVMCV
MCV
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Application of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement IndustryApplication of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement Industry
 
Ahmed Fahmy_CV
Ahmed Fahmy_CVAhmed Fahmy_CV
Ahmed Fahmy_CV
 
AF Resume Sept 2015
AF Resume Sept 2015AF Resume Sept 2015
AF Resume Sept 2015
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical Engineer
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
CNJ Career Path
CNJ Career PathCNJ Career Path
CNJ Career Path
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 

CV Piping Designer & Supervisor

  • 1. 1 Mokhtar Ben Khalifa (TUNISIA) 30 years (Maried+2 Children) Email: mokhtarbenkhalifa@hotmail.fr Web: https://sites.google.com/site/projeteurtuyauterie/ Phone: 00216 23294968 Skype Id: mokhtar-1986 Piping CAD Designer & Supervisor (7 years of experience in Oil & Gas) February 2012: Training Part Tekla Structure (Bello Formation) May 2011 : Training Part Iso 9001 (Conseil Performance) 2006/2009 : BTS (ISET de Sousse) June 2009 : Technician Training at "Alpha-Engineering International" June 2008 : Employee Training at "L’épi D’or" 2001/2005 : Bachelor Degree (technique Plant Design System Experience:  Preparing complete 3D Model For petrochemical plants Using CADWorx.  Good understanding of Piping and Instrumentation diagram P&ID  Preparing and reviewing piping specifications in accordance with the company standards and general codes.  Familiar with international regulations, codes and standards used in the petroleum field (API, ASME, ANSI, ISO, ASTM, MSS SP, TEMA, NFPA, BS, ISA, etc.)  Highly experienced in using all CADWorx activities and modules including Plant Design, Equipment modeling, PID's, Isogen Manager.  Considering equipments spacing, accessibility, operation and maintenance requirements.  Preparing automated material take-off and isometric drawings for check, bid, approval and for construction us- ing CADWorx Isogen project manager.  Complete design of piping general arrangement layouts, Piping isometrics, Supports Details, materials take off, equipments location plans, plot plans, orientation drawings, Welding register, welding map.  Continuously updated project drawings and documents to final As-built status.  Review the plant 3D model (design, accessibility, Maintainability and constructability using ).  Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports Details,MTOetc.). Field Experience:  High communication, presentation and coordination skills.  Construction supervision on site activities for petrochemical and gas plants including: Providing redesign solu- tions for the field Problems or changes (clashing mismatching lack of material item).  Ensuring implementation and adherence to project specifications and procedures.  Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary actions to maintain satisfactory standards.  Producing documentations required for field testing including hydrotest diagrams, test certificates mechanical completion certificates.  Witnessing all field tests including hydrotest (HT), dye Penetrante (PT), ultrasonic test (UT).  Reviewing all site work and prepare the punch list for the construction contractor.  Review & prioritize the piping activities and completion to meet the project schedule requirements.  CADWorx Plant & Equipment (Advanced Level)  CADWorx PID (Intermediate Level)  Autocad (Advanced Level)  Navisworks (Advanced Level)  Autocad Plant 3D, Tekla, Solidworks (Beginner)  Office Package (Intermediate Level) Education & Training Technical & Professional Skills Computer Skills
  • 2. Mise à Jour : 16/11/2015 Page 2/5 ----------------------------------------------------------------------------------------------------------------------------------------------- JUNE 2014 / OCTOBER 2016 (2 YEARS 4 MONTHS) COMPANY: «PETROGAS SYSTEMS» (TUNISIA) Web Site: http://www.petrogas-systems.com/ SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE ----------------------------------------------------------------------------------------------------------------------------------------------- TASKS PERFORMED BY PROJECT: " FOURNITURE DE 6 PASSERELLES RABATTABLES POUR CHARGEMENT CAMIONS EN DOME" (CLIENT : VIVO ENERGY /SITE: AGADIR-MAROC) - 3D Model - Piping Arrangement Drawing - Detailing Plans - Supervision of execution - Supervision of Test " FOURNITURE D'UN SKID DE CHARGEMENT SOURCE POUR CAMION CITERNES" (CLIENT: JORF PETROLEUM STORAGE/SITE: JORF LASFAR-MAROC) - 3D Model - General Arrangement Drawing - Isometric Drawings - Piping & Instrumentation Diagram "PID" - Piping Bill of material " FOURNITURE SKID DE COMPTAGE" (CLIENT : CFTP/ SITE: ZI SKHIRA-TUNISIA) - 3D Model - General Arrangement Drawing - Isometric Drawings - Piping & Instrumentation Diagram "PID" - Piping Bill of material " FOURNITURE DE 3 SKIDS DE CHARGEMENT POUR CAMIONS CITERNES" (CLIENT : VIVO ENERGY / SITE: AGADIR-MAROC) - 3D Model - Piping Arrangement Drawing - Isometric Drawings - Loading Arms Clearance Plan - Piping & Instrumentation Diagram "PID" - Piping Bill of material ----------------------------------------------------------------------------------------------------------------------------------------------- SEPTEMBER 2013 / JUNE 2014 (9 MONTHS) COMPANY: EMCO «ENGINEERING MANAGEMENT & CONTRACTING» (TUNISIA) SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE ----------------------------------------------------------------------------------------------------------------------------------------------- TASKS PERFORMED BY PROJECT: "INSTALLATION OF CARTRIDGE FILTER FOR 32INCH GAS PIPELINE" (CLIENT: MELLITAH B.V LIBYAN BRANCH/ LIBIE) - 3D Model - Isometric Drawings - Welding register - Piping & Instrumentation Diagram "PID" - Support Detailing Plan " EZZAOUIA FACILITIE UPDATE" (CLIENT: MARETAP / SITE: EZZAOUIA FACILITIE) - 3D Model - Piping Arrangement Drawing - General Arrangement Drawing - Isometric Drawings Professional Experience
  • 3. Mise à Jour : 16/11/2015 Page 3/5 " FREELANCE" (CLIENT: PERENCO / SITE: BAGUEL, CPF OM CHIEH) - 3D Model - As built Drawings - Piping Arrangement Drawing - Isometric drawing ----------------------------------------------------------------------------------------------------------------------------------------------- JANUARY 2013 / JULY 2013 (7 MONTHS) COMPANY: «BOUCHAMAOUI INDUSTRIES S.A» (TUNISIA) Web Site: http://www.bouchamaoui.net/ SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE ----------------------------------------------------------------------------------------------------------------------------------------------- TASKS PERFORMED BY PROJECT: " DEPOT DE STOCKAGE D’HYDROCARBURES LIQUEFIES GPL " (CLIENT : SNDP-TUNISIA/ SITE: Z.I GABÉS) - Supervising Shop Fabrication of Fire water Network - Elaborate Fire water Network Isometric drawings - Generate Fire Water Bill of material - Preparation Of test Pack ----------------------------------------------------------------------------------------------------------------------------------------------- SEPTEMBER 2011 / DECEMBER 2012 (1 YEAR 4 MONTHS) COMPANY: MERI «MONDIALE DES ETUDES ET REALISATIONS INDUSTRIELLES» (TUNISIA) Web Site: http://www.meri.com.tn/ SECTOR: ETUDES ET CONSTRUCTION INDUSTRIELLE ----------------------------------------------------------------------------------------------------------------------------------------------- TASKS PERFORMED BY PROJECT: " POSTE DE CHARGEMENT HYDROCARBURE " (CLIENT : SHELL / SITE : DEPOT RADES) - 3D Model - Isometric Drawings - Piping Bill of material - Mechanical Plan - Piping Arrangement Drawing - General Plot Plan " TERMINAL DE CHARGEMENT CAMIONS EN PRODUIT RAFFINEES " (CLIENT : SHELL/SITE: DEPOT RADES) - 3D Model - Isometric Drawings - Piping Bill of material - Structural Bill of material - Mechanical Plan - Structural Detailing Plan " TRAVAUX DE CONNECTION DU RESERVOIR R14 AUX LIGNES GASOIL" (CLIENT : SNDP / SITE: DEPOT RADES) - 3D Model - Isometric drawing - Piping Bill of material - Structural Bill of material " ADDITIVATION POSTE DE CHARGEMENT HYDROCARBURE" (CLIENT : VIVO ENERGY- / SITE: DEPOT RADES) - 3D Model - Piping Arrangement drawing of fire fighting - Fire Fighting System Isometric drawing - Piping Arrangement Drawing - Isometric Drawings - Piping Bill of material " UNITE DE SUPPRESSION F4 " (CLIENT : 5EME SAISON / SITE : CHOTT EL FEJIJ) - 3D Model - Isometric Drawings - Piping Bill of material - Piping Arrangement drawing
  • 4. Mise à Jour : 16/11/2015 Page 4/5 ----------------------------------------------------------------------------------------------------------------------------------------------- JULY 2009 / SEPTEMBER 2011 (2 YEARS 2 MONTHS) COMPANY: AEI «ALPHA-ENGINEERING INTERNATIONAL» (TUNISIA) Web Site: Http://Www.Alpha-Engineering.Com.Tn/ SECTOR: ETUDES OIL & GAS ----------------------------------------------------------------------------------------------------------------------------------------------- TASKS PERFORMED BY PROJECT: "REPLACEMENT TRAIN" (CLIENT: PIONEER / SITE: WAHA WELL SITE FACILITIE) - 3D Model - General plot plan - Piping & Instrumentation Diagram "PID" - Isometric Drawings - Piping Bill of material - Piping & Instrumentation Layout - Lighting System Layout - Junction Boxes Layout - Cable routing layout - Earthing System Layout "GAS LIFT" (CLIENT: PIONEER-TUNISIA / SITE: WAHA WELL SITE FACILITIES) - 3D Model - Piping & Instrumentation Diagram P&ID’s - Tie In List - Line list - Isometric drawings - Piping Bill of material - Piping Arrangement Layout - Lighting System Layout - Junction Boxes Layout - Cable routing layout - Earthing System Layout - Supervision of construction works " DJEBAL GROUZ OIL CENTER RELOCATION " (CLIENT : ENI / SITE : OUED ZAR) - 3D Model - Isometric drawings - Piping Bill of material - Piping Arrangement Layout "SURGE TANK BLANKETING SYSTEM" (CLIENT: TPS / SITE: CERCINA SFAX) - 3D Model - Isometric drawings - Piping Bill of material - Piping Arrangement Layout " TRIGENERATION POWER PLANT " (CLIENT : PARENIN / SITE: ENFIDHA AIRPORT) - 3D Model - Isometric drawings - Piping Bill of material - Piping Arrangement Layout - Tie In List - Line List Français : Courant Sports Anglais : Courant Pêche Arabe : Langue Maternelle Documentaires Langue Loisirs
  • 5. Mise à Jour : 16/11/2015 Page 5/5 Captures Ecran