Page | 1 of 6
Michael John Foreman
Sr. Project Coordinator/Piping Designer/Checker/Supervisor
515 Whitecap Dr.
El Lago, TEXAS 77586 US
Phone:
Cell: (713) 876-7727
mike4man@outlook.com
EXECUTIVE SUMMARY
I have a Technical/Mechanical background with emphasis in Piping Design, Project Coordinator, and QA/QC
(checking). I work in the Industrial Engineering & design industry and my duties included working with
Plant/Industrial personnelto meet and maintain the requirements of their expectations along with following the
given scope of work to have the project finished in a timely and efficient manner. I have experience with the
following Design specialties, and aided in management of Pipe & Process Design aspects of as large as $125M
Projects and numerous small $10M Projects. I bring to a new opportunity 30+ years of heavy design experience and
management/supervision skills tailored to the Industrial Petrochemical/Olefin/Oil & Gas industry while
incorporating use of the most popular and current software titles.
• ASME/ANSI pipe, fittings and valves
• Modular Piping
• Up-Stream Design
• Mid-Stream Design & Storage Design
• Down-Stream (Facility) Design
• LNG & NGL
• Detailed Design
• Skid Units & Skid Piping Design
• Mechanical Design & Checking
• Piping Isometric Drawings
• Piping & Instrumentation Diagrams
• Piping Flexibility
• Olefins Process
• Petrochem/Refinery/Oil & Gas Process
• Cryogenic Piping and Support Design
• Man-hour estimates, Man loading, Proposals
• Engineering Change Orders & Request
• Field Engineering, Field Walk downs
• Containment systems
• Firewater systemdesign
• Refrigerant Units
• Water treatment systems
• Management of change (MOC's)
• Hazop and Process Safety Management

Sr. Project Coordinator / Piping Design Checker/ Piping Designer 3D
Strategy Engineering (Contract)
June, 2014 — February, 2016 (1 year 8 months)
Software: Cadworx/PDMS/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D
 Coordinated Upstream & Midstream Projects & personnel to stream-line operations with current industry standards.
 QA/QC checked complete construction/fabrication/skid packages pertaining to all piping/mechanical facets of the project
 Regions of Gulf of Mexico, Eagle Ford, Permian Basin, Barnett, Appalachian Basin, etc...
 Complete Upstream & Midstream facilities
 Cryogenic & LNG/NGL Facilities
 Offshore Platforms (all related aspects), treatment, scrubbing, separation
 Manifold design,Flow Lines, Ultra High Pressures,Skid designs,ship/boat loading & unloading
 Launching & Receiving (Pig/Scrubber) product diversion and automation

Page | 2 of 6
Sr. Piping Designer 3D / Checker / Project Coordinator
Audubon Engineering (Contract)
June, 2013 — June, 2014 (1 year)
Software: Cadworx//SmartPlant 3D/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D
 FEED & detailed design & checking of many on-going Oil & Gas Projects located in the Eagle Ford Shale
 Onsite P&ID Check for facilities located in the Eagle Ford Shale region
 Constructing of Template models using Cadworx
 QA/QC (Checking) of all piping & mechanical facets & P&ID’s of assigned projects
 Coordinating work with clients schedules
 3D design of Rack, Skid, Equipment & Inter-connecting piping
 Location and setting equipment
 Underground piping and locating existing underground pipe
 Maintaining deliverables, oversee drawing production of designers & engineers
Sr. Piping Designer 3D / Project Lead / Project Coordinator
Universal Pegasus International (Direct)
August,2012 — May, 2013 (10 months)
Software: Cadworx/PDMS/SmartPlant 3D/Navisworks/Bentley/Autodesk Plant 3D
 Lead Pipe Designer with Oil & Gas Projects located in the Eagle Ford Shale & Permian Basin
 Greenfield design of several Oil & Gas facilities
 FEED & Detailed Design
 Completed packages for fabrication construction of facilities to enhance output capabilities
 Upstream separation of Oil & Gas, sour crude treating & stripping gases
 Automation and metering of liquids and gasses
 Water extraction, storage and treatment
Sr. Piping Designer 3D / Project Lead / Coordinator
L-Con Engineering & Constructors (Direct)
March, 2011 — August,2012 (1 year 5 months)
Software: Cadworx/Bentley/SmartPlant 3D/AutodeskPlant 3D/ Navisworks
 Oil and Condensate gathering, manifold design, pumping, metering, tank storage,Bulk & Dockside loading
 LNG & NGL Spheres and all associated piping.
 Began the design the new 1.6 million barrel tank storage facility and dock loading directly connected to the Gulf of Mexico
 In-charge of all man-hours, staff, deliverables and design of this project
 Ship/Barge loading, Vapor Recovery, Maritime.
 Water Treatment/Collection & truck loading.

Page | 3 of 6
Sr. Project Coordinator / Piping Designer / Checker
Burns & McDonnell in St. Louis MO. (Temporary Contract)
May, 2010 — January, 2011 (8 months)
Software: Cadworx/PDS/Navisworks/Bentley
 3D Model creation using existing 2D pipe rack drawings and field survey for Conoco-Phillips Wood River Illinois facility
 Model produced with Cadworx & terminated at existing equipment/vessels previously modeled in PDS
 Survey & elevations of rack & equipment
 Structural integrity/feasibility studies
 Routing of several new lines in rack with challenging obstacles
 Squad checking all aspects ofcomplete deliverables package
Sr. Piping Designer / Checker
Ref-Chem Pasadena TX. (Contract)
October, 2009 — February, 2010 (4 months)
Software: PDS/SmartPlant Review/Flexcad
 Checked all piping, structural members and foundations related to this LNG/Gas project
 Establish new battery limit
 Set new equipment and moved/revamp existing equipment
 Routed piping to/from new equipment using existing & new pipe racks with the addition of miscellaneous new supports
 Designed to reduce field welding
 Establish new battery limit
Sr. Lead Piping Designer / Checker
Technip (Contract)
February, 2009 — October, 2009 (8 months)
Software: PDS/PDMS/AutoCAD/SmartPlant Review/Flexcad
Projects: Exxon Mobil Flare Gas Control Project: (Downstream) Beaumont Texas
Shell Na Kika: (Offshore Semi-Sub.) Gulf of Mexico, 140 miles southeast ofNew Orleans
BP ThunderHorse: (Offshore Semi-Sub) Gulf of Mexico, 150 miles southeast ofNew Orleans
Marine Energy Swordfish & Neptune Spar (Offshore Platform)
 Involved with design of modular piping
 Software used AutoCAD, and PDMS
 Replaced and upgraded all Flare Gas Headers throughout the refinery at Exxon Mobile Beaumont
 Duties include, field survey,gathering information to replace several thousand feet of large bore pipe
 Software used, AutoCAD, Microstation, SmartPlant, PDS, and LFM
 The use of laser maps to aid in the routing pipe

Page | 4 of 6
Sr. Piping Designer 3D / Checker
Shaw/Stone & Webster (Contract)
September, 2008 — February, 2009 (5 months)
Software: PDS/SmartPlant Review/FlexCad
 Yansab/Yanbu, Saudi Arabia Project – Grassroots project completed using PDS metric
 Checked the Isometric Drawings generated using SmartPlant Review to turnout accurate fabrication drawings
 Checked both pipe and steel until Mechanical Completion.
Sr. Piping Designer 3D / Checker
Shaw/Stone & Webster Port Arthur TX. (Contract)
August,2006 — December, 2007 (1 year 5 months)
Software: PDS/Flexcad/SmartPlant Review
 Huntsman Burnout Rebuild: Field verification of cold pipe supports,related piping, field change requests for work that wasn't in
the original scope of work.
 Unit damage was a result of a large scale fire in excess of $50M
 Updated several models and checked extracted Isometrics previously done by Stone & Webster
 Updated existing piping drawings to reflect present work.
Sr. Piping Designer 3D / Lead / Checker
CDI Engineering, Orange Texas (Direct)
January, 2008 — August,2008 (8 months)
Software: PDMS/ PlantSpace Software with Microstation V8
 Re-designed and redrew P&IDs to industry standards to remove years of drawing congestion
 Redraw 2 primary units at a total of 100+ P&IDs each
 The project was terminated for budgetary reasons to later be completed by others
Sr. Piping Designer / Checker / Project Lead
CDI Engineering, Beaumont TX. (Direct)
May, 2005 — August,2006 (1 year 3 months)
Software: PDS/PDMS/Cadworx/Bentley
 Involved in several small projects in-house including pipe design using FlexCad (in-office)
 PDMS & PDS certification training
 Maintenance work, management of change, equipment changes/upgrades,hydraulics,stress isometrics etc.
Goodyear Chemical Inc. (In-Plant) AutoCAD & ProCad
 Assigned to do all maintenance and aid in several capital projects with-in the Goodyear Beaumont facility
 P&IDs, piping plans, elevations, and field notes were used to create accurate fabrication isometric drawings
 Updated existing P&IDs, moved manual drawings to CAD, and designed standard structuralsupports
Sumotomo Rubber, Freeport Texas, PDMS/Flexcad used to make changes and add a new unit to increase efficiency in the isobutyl
unit.

Page | 5 of 6
Sr. Piping Designer
Levingston Engineering Sulphur LA. (Direct)
July, 2004 — April, 2005 (10 months) CITGO Refinery (In-Plant)
Software: AutoCAD/CadPipe/Flexcad
 Developed Engineering / Design package consisting of P&IDs, key plans, piping plans and isometrics
 Software used, AutoCAD, FlexCad, and an in-house developed program that was 3rd party to AutoCAD.
Sr. Staff Piping Designer 3D / Checker
RCR Engineering Dayton TX (Contract to Direct)
August,2003 — June, 2004 (11 months)
Software: AutoCAD/Flexcad/Cadworx
 Sr. Piping Designer for a facility in Phoenix Arizona
 Fire protection piping, tubing involving orbital welding for joint-less connections
 Provided the weld count and BOM for the stainless surgical steel tubing
 Staff Piping Designer/Checker/Department Lead, for several small projects located in the LaPorte/Baytown/Deer
Park/Pasadena/Mont Belvieu area
 Setting of 4 large spheres (NGL) and piping to and from them including over 1 mile of rack piping in the Enterprise Products
Facility.
Sr. Pipe Designer /Cad / Field Lead
Recon Engineering Lake Charles LA. (Direct)
October, 1995 — February, 2000 (4 years 4 months)
Software: AutoCAD/Flexcad/Cadworx
 Designed and checked several projects necessary for the completion of the 3 Citgo Petroleum Cat Cracker Upgrades
 Responsible for checking and running the drawings thru CAD-QC, a Citgo EDMS QC Program
 Coordinated work with Stone and Websterto accurately design and draw isometric drawings on CAD using an in-house developed
isometric program
 Software used, Staad, Caesar, AutoCAD, and in-house developed Isometric application, a library based P&ID library for Process
drawings, FlexCad used with several in-plant assignment.
 Conoco Petroleum: Lead the Design/Drafting group to do both Isometric Fabrication Drawings, and P&ID walk downs.
 Recon Office: Converted/Redrew existing hard copy/manual piping drawings to cad and maintained all piping related drawings for
several small projects in several local industrial facilities as well as larger projects, mainly at Citgo Petroleum
 These projects included Small Bore Piping of all of the Citgo Petroleum Cat-crackers, A thru C, and the construction of large
reserve petroleum tanks in the tank farm
 Coordinated thru the Department of Transportation (DOT) to design an underground pipeline consisting ofseveral large bore lines
under the near-by Interstate

Page | 6 of 6
Pipe/Designer / Drafter / Cad
Petrocon Engineering (Direct)
Software: FlexCad/AutoCAD
February, 1991 — October, 1995 (4 years 8 months)
 Process Safety Management, (PSM) Project - Walk-down of equipment, related piping, instruments, and valves to produce P&IDs
and utility drawings.
 Responsible Care Project - Produced P&IDs for the Power Plant, Flare Systems, off gas,Water Treatment, Nitrogen Storage, Plant
Air and process utility units.
Drafter / Sketcher
Various Lake Charles Louisiana Area Construction Companies
January, 1983 — December, 1990 (7 years 12 months)
 Employed by various Lake Charles Louisiana Area Construction companies (Mainly West-Cal Construction) as a field sketcherfor
spoolreplacement/fabrication/corrosion and hydraulic isometrics.
EDUCATION
Sowela Technical Institute
Associates, Drafting and Design Technology
December, 1989 — May, 1991
Degree date: 1991
 Sowela Technical Institute - Associates degree in Drafting and Design Technology
 Attended from December, 1989 to May, 1991 while maintaining a 3.25GPA, specialized in Mechanical/Pipe design.
Louisiana State University (Scholarship)
BSME, Mechanical Engineering (Unfinished)
September, 1984 — August,1986
 Louisiana State University - September, 1984 until August 1986
 Mechanical Engineering, "Unfinished BSME"
Sulphur High School: Diploma May 1983
Sulphur High School - Sulphur, LA
ASSOCIATIONS
 Louisiana State University - "L" Club member, Tiger Football at LSU in 1984 to 1986
 Houston Oilers Football Organization - 1 season.
 Society of Piping Engineers & Designers (SPED IV Certification)

M.foreman's resume'

  • 1.
    Page | 1of 6 Michael John Foreman Sr. Project Coordinator/Piping Designer/Checker/Supervisor 515 Whitecap Dr. El Lago, TEXAS 77586 US Phone: Cell: (713) 876-7727 mike4man@outlook.com EXECUTIVE SUMMARY I have a Technical/Mechanical background with emphasis in Piping Design, Project Coordinator, and QA/QC (checking). I work in the Industrial Engineering & design industry and my duties included working with Plant/Industrial personnelto meet and maintain the requirements of their expectations along with following the given scope of work to have the project finished in a timely and efficient manner. I have experience with the following Design specialties, and aided in management of Pipe & Process Design aspects of as large as $125M Projects and numerous small $10M Projects. I bring to a new opportunity 30+ years of heavy design experience and management/supervision skills tailored to the Industrial Petrochemical/Olefin/Oil & Gas industry while incorporating use of the most popular and current software titles. • ASME/ANSI pipe, fittings and valves • Modular Piping • Up-Stream Design • Mid-Stream Design & Storage Design • Down-Stream (Facility) Design • LNG & NGL • Detailed Design • Skid Units & Skid Piping Design • Mechanical Design & Checking • Piping Isometric Drawings • Piping & Instrumentation Diagrams • Piping Flexibility • Olefins Process • Petrochem/Refinery/Oil & Gas Process • Cryogenic Piping and Support Design • Man-hour estimates, Man loading, Proposals • Engineering Change Orders & Request • Field Engineering, Field Walk downs • Containment systems • Firewater systemdesign • Refrigerant Units • Water treatment systems • Management of change (MOC's) • Hazop and Process Safety Management  Sr. Project Coordinator / Piping Design Checker/ Piping Designer 3D Strategy Engineering (Contract) June, 2014 — February, 2016 (1 year 8 months) Software: Cadworx/PDMS/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D  Coordinated Upstream & Midstream Projects & personnel to stream-line operations with current industry standards.  QA/QC checked complete construction/fabrication/skid packages pertaining to all piping/mechanical facets of the project  Regions of Gulf of Mexico, Eagle Ford, Permian Basin, Barnett, Appalachian Basin, etc...  Complete Upstream & Midstream facilities  Cryogenic & LNG/NGL Facilities  Offshore Platforms (all related aspects), treatment, scrubbing, separation  Manifold design,Flow Lines, Ultra High Pressures,Skid designs,ship/boat loading & unloading  Launching & Receiving (Pig/Scrubber) product diversion and automation
  • 2.
     Page | 2of 6 Sr. Piping Designer 3D / Checker / Project Coordinator Audubon Engineering (Contract) June, 2013 — June, 2014 (1 year) Software: Cadworx//SmartPlant 3D/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D  FEED & detailed design & checking of many on-going Oil & Gas Projects located in the Eagle Ford Shale  Onsite P&ID Check for facilities located in the Eagle Ford Shale region  Constructing of Template models using Cadworx  QA/QC (Checking) of all piping & mechanical facets & P&ID’s of assigned projects  Coordinating work with clients schedules  3D design of Rack, Skid, Equipment & Inter-connecting piping  Location and setting equipment  Underground piping and locating existing underground pipe  Maintaining deliverables, oversee drawing production of designers & engineers Sr. Piping Designer 3D / Project Lead / Project Coordinator Universal Pegasus International (Direct) August,2012 — May, 2013 (10 months) Software: Cadworx/PDMS/SmartPlant 3D/Navisworks/Bentley/Autodesk Plant 3D  Lead Pipe Designer with Oil & Gas Projects located in the Eagle Ford Shale & Permian Basin  Greenfield design of several Oil & Gas facilities  FEED & Detailed Design  Completed packages for fabrication construction of facilities to enhance output capabilities  Upstream separation of Oil & Gas, sour crude treating & stripping gases  Automation and metering of liquids and gasses  Water extraction, storage and treatment Sr. Piping Designer 3D / Project Lead / Coordinator L-Con Engineering & Constructors (Direct) March, 2011 — August,2012 (1 year 5 months) Software: Cadworx/Bentley/SmartPlant 3D/AutodeskPlant 3D/ Navisworks  Oil and Condensate gathering, manifold design, pumping, metering, tank storage,Bulk & Dockside loading  LNG & NGL Spheres and all associated piping.  Began the design the new 1.6 million barrel tank storage facility and dock loading directly connected to the Gulf of Mexico  In-charge of all man-hours, staff, deliverables and design of this project  Ship/Barge loading, Vapor Recovery, Maritime.  Water Treatment/Collection & truck loading.
  • 3.
     Page | 3of 6 Sr. Project Coordinator / Piping Designer / Checker Burns & McDonnell in St. Louis MO. (Temporary Contract) May, 2010 — January, 2011 (8 months) Software: Cadworx/PDS/Navisworks/Bentley  3D Model creation using existing 2D pipe rack drawings and field survey for Conoco-Phillips Wood River Illinois facility  Model produced with Cadworx & terminated at existing equipment/vessels previously modeled in PDS  Survey & elevations of rack & equipment  Structural integrity/feasibility studies  Routing of several new lines in rack with challenging obstacles  Squad checking all aspects ofcomplete deliverables package Sr. Piping Designer / Checker Ref-Chem Pasadena TX. (Contract) October, 2009 — February, 2010 (4 months) Software: PDS/SmartPlant Review/Flexcad  Checked all piping, structural members and foundations related to this LNG/Gas project  Establish new battery limit  Set new equipment and moved/revamp existing equipment  Routed piping to/from new equipment using existing & new pipe racks with the addition of miscellaneous new supports  Designed to reduce field welding  Establish new battery limit Sr. Lead Piping Designer / Checker Technip (Contract) February, 2009 — October, 2009 (8 months) Software: PDS/PDMS/AutoCAD/SmartPlant Review/Flexcad Projects: Exxon Mobil Flare Gas Control Project: (Downstream) Beaumont Texas Shell Na Kika: (Offshore Semi-Sub.) Gulf of Mexico, 140 miles southeast ofNew Orleans BP ThunderHorse: (Offshore Semi-Sub) Gulf of Mexico, 150 miles southeast ofNew Orleans Marine Energy Swordfish & Neptune Spar (Offshore Platform)  Involved with design of modular piping  Software used AutoCAD, and PDMS  Replaced and upgraded all Flare Gas Headers throughout the refinery at Exxon Mobile Beaumont  Duties include, field survey,gathering information to replace several thousand feet of large bore pipe  Software used, AutoCAD, Microstation, SmartPlant, PDS, and LFM  The use of laser maps to aid in the routing pipe
  • 4.
     Page | 4of 6 Sr. Piping Designer 3D / Checker Shaw/Stone & Webster (Contract) September, 2008 — February, 2009 (5 months) Software: PDS/SmartPlant Review/FlexCad  Yansab/Yanbu, Saudi Arabia Project – Grassroots project completed using PDS metric  Checked the Isometric Drawings generated using SmartPlant Review to turnout accurate fabrication drawings  Checked both pipe and steel until Mechanical Completion. Sr. Piping Designer 3D / Checker Shaw/Stone & Webster Port Arthur TX. (Contract) August,2006 — December, 2007 (1 year 5 months) Software: PDS/Flexcad/SmartPlant Review  Huntsman Burnout Rebuild: Field verification of cold pipe supports,related piping, field change requests for work that wasn't in the original scope of work.  Unit damage was a result of a large scale fire in excess of $50M  Updated several models and checked extracted Isometrics previously done by Stone & Webster  Updated existing piping drawings to reflect present work. Sr. Piping Designer 3D / Lead / Checker CDI Engineering, Orange Texas (Direct) January, 2008 — August,2008 (8 months) Software: PDMS/ PlantSpace Software with Microstation V8  Re-designed and redrew P&IDs to industry standards to remove years of drawing congestion  Redraw 2 primary units at a total of 100+ P&IDs each  The project was terminated for budgetary reasons to later be completed by others Sr. Piping Designer / Checker / Project Lead CDI Engineering, Beaumont TX. (Direct) May, 2005 — August,2006 (1 year 3 months) Software: PDS/PDMS/Cadworx/Bentley  Involved in several small projects in-house including pipe design using FlexCad (in-office)  PDMS & PDS certification training  Maintenance work, management of change, equipment changes/upgrades,hydraulics,stress isometrics etc. Goodyear Chemical Inc. (In-Plant) AutoCAD & ProCad  Assigned to do all maintenance and aid in several capital projects with-in the Goodyear Beaumont facility  P&IDs, piping plans, elevations, and field notes were used to create accurate fabrication isometric drawings  Updated existing P&IDs, moved manual drawings to CAD, and designed standard structuralsupports Sumotomo Rubber, Freeport Texas, PDMS/Flexcad used to make changes and add a new unit to increase efficiency in the isobutyl unit.
  • 5.
     Page | 5of 6 Sr. Piping Designer Levingston Engineering Sulphur LA. (Direct) July, 2004 — April, 2005 (10 months) CITGO Refinery (In-Plant) Software: AutoCAD/CadPipe/Flexcad  Developed Engineering / Design package consisting of P&IDs, key plans, piping plans and isometrics  Software used, AutoCAD, FlexCad, and an in-house developed program that was 3rd party to AutoCAD. Sr. Staff Piping Designer 3D / Checker RCR Engineering Dayton TX (Contract to Direct) August,2003 — June, 2004 (11 months) Software: AutoCAD/Flexcad/Cadworx  Sr. Piping Designer for a facility in Phoenix Arizona  Fire protection piping, tubing involving orbital welding for joint-less connections  Provided the weld count and BOM for the stainless surgical steel tubing  Staff Piping Designer/Checker/Department Lead, for several small projects located in the LaPorte/Baytown/Deer Park/Pasadena/Mont Belvieu area  Setting of 4 large spheres (NGL) and piping to and from them including over 1 mile of rack piping in the Enterprise Products Facility. Sr. Pipe Designer /Cad / Field Lead Recon Engineering Lake Charles LA. (Direct) October, 1995 — February, 2000 (4 years 4 months) Software: AutoCAD/Flexcad/Cadworx  Designed and checked several projects necessary for the completion of the 3 Citgo Petroleum Cat Cracker Upgrades  Responsible for checking and running the drawings thru CAD-QC, a Citgo EDMS QC Program  Coordinated work with Stone and Websterto accurately design and draw isometric drawings on CAD using an in-house developed isometric program  Software used, Staad, Caesar, AutoCAD, and in-house developed Isometric application, a library based P&ID library for Process drawings, FlexCad used with several in-plant assignment.  Conoco Petroleum: Lead the Design/Drafting group to do both Isometric Fabrication Drawings, and P&ID walk downs.  Recon Office: Converted/Redrew existing hard copy/manual piping drawings to cad and maintained all piping related drawings for several small projects in several local industrial facilities as well as larger projects, mainly at Citgo Petroleum  These projects included Small Bore Piping of all of the Citgo Petroleum Cat-crackers, A thru C, and the construction of large reserve petroleum tanks in the tank farm  Coordinated thru the Department of Transportation (DOT) to design an underground pipeline consisting ofseveral large bore lines under the near-by Interstate
  • 6.
     Page | 6of 6 Pipe/Designer / Drafter / Cad Petrocon Engineering (Direct) Software: FlexCad/AutoCAD February, 1991 — October, 1995 (4 years 8 months)  Process Safety Management, (PSM) Project - Walk-down of equipment, related piping, instruments, and valves to produce P&IDs and utility drawings.  Responsible Care Project - Produced P&IDs for the Power Plant, Flare Systems, off gas,Water Treatment, Nitrogen Storage, Plant Air and process utility units. Drafter / Sketcher Various Lake Charles Louisiana Area Construction Companies January, 1983 — December, 1990 (7 years 12 months)  Employed by various Lake Charles Louisiana Area Construction companies (Mainly West-Cal Construction) as a field sketcherfor spoolreplacement/fabrication/corrosion and hydraulic isometrics. EDUCATION Sowela Technical Institute Associates, Drafting and Design Technology December, 1989 — May, 1991 Degree date: 1991  Sowela Technical Institute - Associates degree in Drafting and Design Technology  Attended from December, 1989 to May, 1991 while maintaining a 3.25GPA, specialized in Mechanical/Pipe design. Louisiana State University (Scholarship) BSME, Mechanical Engineering (Unfinished) September, 1984 — August,1986  Louisiana State University - September, 1984 until August 1986  Mechanical Engineering, "Unfinished BSME" Sulphur High School: Diploma May 1983 Sulphur High School - Sulphur, LA ASSOCIATIONS  Louisiana State University - "L" Club member, Tiger Football at LSU in 1984 to 1986  Houston Oilers Football Organization - 1 season.  Society of Piping Engineers & Designers (SPED IV Certification)