SlideShare a Scribd company logo
Page | 1 of 6
Michael John Foreman
Sr. Project Coordinator/Piping Designer/Checker/Supervisor
515 Whitecap Dr.
El Lago, TEXAS 77586 US
Phone:
Cell: (713) 876-7727
mike4man@outlook.com
EXECUTIVE SUMMARY
I have a Technical/Mechanical background with emphasis in Piping Design, Project Coordinator, and QA/QC
(checking). I work in the Industrial Engineering & design industry and my duties included working with
Plant/Industrial personnelto meet and maintain the requirements of their expectations along with following the
given scope of work to have the project finished in a timely and efficient manner. I have experience with the
following Design specialties, and aided in management of Pipe & Process Design aspects of as large as $125M
Projects and numerous small $10M Projects. I bring to a new opportunity 30+ years of heavy design experience and
management/supervision skills tailored to the Industrial Petrochemical/Olefin/Oil & Gas industry while
incorporating use of the most popular and current software titles.
• ASME/ANSI pipe, fittings and valves
• Modular Piping
• Up-Stream Design
• Mid-Stream Design & Storage Design
• Down-Stream (Facility) Design
• LNG & NGL
• Detailed Design
• Skid Units & Skid Piping Design
• Mechanical Design & Checking
• Piping Isometric Drawings
• Piping & Instrumentation Diagrams
• Piping Flexibility
• Olefins Process
• Petrochem/Refinery/Oil & Gas Process
• Cryogenic Piping and Support Design
• Man-hour estimates, Man loading, Proposals
• Engineering Change Orders & Request
• Field Engineering, Field Walk downs
• Containment systems
• Firewater systemdesign
• Refrigerant Units
• Water treatment systems
• Management of change (MOC's)
• Hazop and Process Safety Management

Sr. Project Coordinator / Piping Design Checker/ Piping Designer 3D
Strategy Engineering (Contract)
June, 2014 — February, 2016 (1 year 8 months)
Software: Cadworx/PDMS/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D
 Coordinated Upstream & Midstream Projects & personnel to stream-line operations with current industry standards.
 QA/QC checked complete construction/fabrication/skid packages pertaining to all piping/mechanical facets of the project
 Regions of Gulf of Mexico, Eagle Ford, Permian Basin, Barnett, Appalachian Basin, etc...
 Complete Upstream & Midstream facilities
 Cryogenic & LNG/NGL Facilities
 Offshore Platforms (all related aspects), treatment, scrubbing, separation
 Manifold design,Flow Lines, Ultra High Pressures,Skid designs,ship/boat loading & unloading
 Launching & Receiving (Pig/Scrubber) product diversion and automation

Page | 2 of 6
Sr. Piping Designer 3D / Checker / Project Coordinator
Audubon Engineering (Contract)
June, 2013 — June, 2014 (1 year)
Software: Cadworx//SmartPlant 3D/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D
 FEED & detailed design & checking of many on-going Oil & Gas Projects located in the Eagle Ford Shale
 Onsite P&ID Check for facilities located in the Eagle Ford Shale region
 Constructing of Template models using Cadworx
 QA/QC (Checking) of all piping & mechanical facets & P&ID’s of assigned projects
 Coordinating work with clients schedules
 3D design of Rack, Skid, Equipment & Inter-connecting piping
 Location and setting equipment
 Underground piping and locating existing underground pipe
 Maintaining deliverables, oversee drawing production of designers & engineers
Sr. Piping Designer 3D / Project Lead / Project Coordinator
Universal Pegasus International (Direct)
August,2012 — May, 2013 (10 months)
Software: Cadworx/PDMS/SmartPlant 3D/Navisworks/Bentley/Autodesk Plant 3D
 Lead Pipe Designer with Oil & Gas Projects located in the Eagle Ford Shale & Permian Basin
 Greenfield design of several Oil & Gas facilities
 FEED & Detailed Design
 Completed packages for fabrication construction of facilities to enhance output capabilities
 Upstream separation of Oil & Gas, sour crude treating & stripping gases
 Automation and metering of liquids and gasses
 Water extraction, storage and treatment
Sr. Piping Designer 3D / Project Lead / Coordinator
L-Con Engineering & Constructors (Direct)
March, 2011 — August,2012 (1 year 5 months)
Software: Cadworx/Bentley/SmartPlant 3D/AutodeskPlant 3D/ Navisworks
 Oil and Condensate gathering, manifold design, pumping, metering, tank storage,Bulk & Dockside loading
 LNG & NGL Spheres and all associated piping.
 Began the design the new 1.6 million barrel tank storage facility and dock loading directly connected to the Gulf of Mexico
 In-charge of all man-hours, staff, deliverables and design of this project
 Ship/Barge loading, Vapor Recovery, Maritime.
 Water Treatment/Collection & truck loading.

Page | 3 of 6
Sr. Project Coordinator / Piping Designer / Checker
Burns & McDonnell in St. Louis MO. (Temporary Contract)
May, 2010 — January, 2011 (8 months)
Software: Cadworx/PDS/Navisworks/Bentley
 3D Model creation using existing 2D pipe rack drawings and field survey for Conoco-Phillips Wood River Illinois facility
 Model produced with Cadworx & terminated at existing equipment/vessels previously modeled in PDS
 Survey & elevations of rack & equipment
 Structural integrity/feasibility studies
 Routing of several new lines in rack with challenging obstacles
 Squad checking all aspects ofcomplete deliverables package
Sr. Piping Designer / Checker
Ref-Chem Pasadena TX. (Contract)
October, 2009 — February, 2010 (4 months)
Software: PDS/SmartPlant Review/Flexcad
 Checked all piping, structural members and foundations related to this LNG/Gas project
 Establish new battery limit
 Set new equipment and moved/revamp existing equipment
 Routed piping to/from new equipment using existing & new pipe racks with the addition of miscellaneous new supports
 Designed to reduce field welding
 Establish new battery limit
Sr. Lead Piping Designer / Checker
Technip (Contract)
February, 2009 — October, 2009 (8 months)
Software: PDS/PDMS/AutoCAD/SmartPlant Review/Flexcad
Projects: Exxon Mobil Flare Gas Control Project: (Downstream) Beaumont Texas
Shell Na Kika: (Offshore Semi-Sub.) Gulf of Mexico, 140 miles southeast ofNew Orleans
BP ThunderHorse: (Offshore Semi-Sub) Gulf of Mexico, 150 miles southeast ofNew Orleans
Marine Energy Swordfish & Neptune Spar (Offshore Platform)
 Involved with design of modular piping
 Software used AutoCAD, and PDMS
 Replaced and upgraded all Flare Gas Headers throughout the refinery at Exxon Mobile Beaumont
 Duties include, field survey,gathering information to replace several thousand feet of large bore pipe
 Software used, AutoCAD, Microstation, SmartPlant, PDS, and LFM
 The use of laser maps to aid in the routing pipe

Page | 4 of 6
Sr. Piping Designer 3D / Checker
Shaw/Stone & Webster (Contract)
September, 2008 — February, 2009 (5 months)
Software: PDS/SmartPlant Review/FlexCad
 Yansab/Yanbu, Saudi Arabia Project – Grassroots project completed using PDS metric
 Checked the Isometric Drawings generated using SmartPlant Review to turnout accurate fabrication drawings
 Checked both pipe and steel until Mechanical Completion.
Sr. Piping Designer 3D / Checker
Shaw/Stone & Webster Port Arthur TX. (Contract)
August,2006 — December, 2007 (1 year 5 months)
Software: PDS/Flexcad/SmartPlant Review
 Huntsman Burnout Rebuild: Field verification of cold pipe supports,related piping, field change requests for work that wasn't in
the original scope of work.
 Unit damage was a result of a large scale fire in excess of $50M
 Updated several models and checked extracted Isometrics previously done by Stone & Webster
 Updated existing piping drawings to reflect present work.
Sr. Piping Designer 3D / Lead / Checker
CDI Engineering, Orange Texas (Direct)
January, 2008 — August,2008 (8 months)
Software: PDMS/ PlantSpace Software with Microstation V8
 Re-designed and redrew P&IDs to industry standards to remove years of drawing congestion
 Redraw 2 primary units at a total of 100+ P&IDs each
 The project was terminated for budgetary reasons to later be completed by others
Sr. Piping Designer / Checker / Project Lead
CDI Engineering, Beaumont TX. (Direct)
May, 2005 — August,2006 (1 year 3 months)
Software: PDS/PDMS/Cadworx/Bentley
 Involved in several small projects in-house including pipe design using FlexCad (in-office)
 PDMS & PDS certification training
 Maintenance work, management of change, equipment changes/upgrades,hydraulics,stress isometrics etc.
Goodyear Chemical Inc. (In-Plant) AutoCAD & ProCad
 Assigned to do all maintenance and aid in several capital projects with-in the Goodyear Beaumont facility
 P&IDs, piping plans, elevations, and field notes were used to create accurate fabrication isometric drawings
 Updated existing P&IDs, moved manual drawings to CAD, and designed standard structuralsupports
Sumotomo Rubber, Freeport Texas, PDMS/Flexcad used to make changes and add a new unit to increase efficiency in the isobutyl
unit.

Page | 5 of 6
Sr. Piping Designer
Levingston Engineering Sulphur LA. (Direct)
July, 2004 — April, 2005 (10 months) CITGO Refinery (In-Plant)
Software: AutoCAD/CadPipe/Flexcad
 Developed Engineering / Design package consisting of P&IDs, key plans, piping plans and isometrics
 Software used, AutoCAD, FlexCad, and an in-house developed program that was 3rd party to AutoCAD.
Sr. Staff Piping Designer 3D / Checker
RCR Engineering Dayton TX (Contract to Direct)
August,2003 — June, 2004 (11 months)
Software: AutoCAD/Flexcad/Cadworx
 Sr. Piping Designer for a facility in Phoenix Arizona
 Fire protection piping, tubing involving orbital welding for joint-less connections
 Provided the weld count and BOM for the stainless surgical steel tubing
 Staff Piping Designer/Checker/Department Lead, for several small projects located in the LaPorte/Baytown/Deer
Park/Pasadena/Mont Belvieu area
 Setting of 4 large spheres (NGL) and piping to and from them including over 1 mile of rack piping in the Enterprise Products
Facility.
Sr. Pipe Designer /Cad / Field Lead
Recon Engineering Lake Charles LA. (Direct)
October, 1995 — February, 2000 (4 years 4 months)
Software: AutoCAD/Flexcad/Cadworx
 Designed and checked several projects necessary for the completion of the 3 Citgo Petroleum Cat Cracker Upgrades
 Responsible for checking and running the drawings thru CAD-QC, a Citgo EDMS QC Program
 Coordinated work with Stone and Websterto accurately design and draw isometric drawings on CAD using an in-house developed
isometric program
 Software used, Staad, Caesar, AutoCAD, and in-house developed Isometric application, a library based P&ID library for Process
drawings, FlexCad used with several in-plant assignment.
 Conoco Petroleum: Lead the Design/Drafting group to do both Isometric Fabrication Drawings, and P&ID walk downs.
 Recon Office: Converted/Redrew existing hard copy/manual piping drawings to cad and maintained all piping related drawings for
several small projects in several local industrial facilities as well as larger projects, mainly at Citgo Petroleum
 These projects included Small Bore Piping of all of the Citgo Petroleum Cat-crackers, A thru C, and the construction of large
reserve petroleum tanks in the tank farm
 Coordinated thru the Department of Transportation (DOT) to design an underground pipeline consisting ofseveral large bore lines
under the near-by Interstate

Page | 6 of 6
Pipe/Designer / Drafter / Cad
Petrocon Engineering (Direct)
Software: FlexCad/AutoCAD
February, 1991 — October, 1995 (4 years 8 months)
 Process Safety Management, (PSM) Project - Walk-down of equipment, related piping, instruments, and valves to produce P&IDs
and utility drawings.
 Responsible Care Project - Produced P&IDs for the Power Plant, Flare Systems, off gas,Water Treatment, Nitrogen Storage, Plant
Air and process utility units.
Drafter / Sketcher
Various Lake Charles Louisiana Area Construction Companies
January, 1983 — December, 1990 (7 years 12 months)
 Employed by various Lake Charles Louisiana Area Construction companies (Mainly West-Cal Construction) as a field sketcherfor
spoolreplacement/fabrication/corrosion and hydraulic isometrics.
EDUCATION
Sowela Technical Institute
Associates, Drafting and Design Technology
December, 1989 — May, 1991
Degree date: 1991
 Sowela Technical Institute - Associates degree in Drafting and Design Technology
 Attended from December, 1989 to May, 1991 while maintaining a 3.25GPA, specialized in Mechanical/Pipe design.
Louisiana State University (Scholarship)
BSME, Mechanical Engineering (Unfinished)
September, 1984 — August,1986
 Louisiana State University - September, 1984 until August 1986
 Mechanical Engineering, "Unfinished BSME"
Sulphur High School: Diploma May 1983
Sulphur High School - Sulphur, LA
ASSOCIATIONS
 Louisiana State University - "L" Club member, Tiger Football at LSU in 1984 to 1986
 Houston Oilers Football Organization - 1 season.
 Society of Piping Engineers & Designers (SPED IV Certification)

More Related Content

What's hot

Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015aJohn Flores
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliZain Ali Syed
 
Cv career history
Cv   career historyCv   career history
Cv career history
Joseph Bracic
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss ResumeTroy Weiss
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 

What's hot (19)

Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
DURIO-RESUME
DURIO-RESUMEDURIO-RESUME
DURIO-RESUME
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
CV_RuchiraDas
CV_RuchiraDasCV_RuchiraDas
CV_RuchiraDas
 
DRF Resume
DRF ResumeDRF Resume
DRF Resume
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
Cv career history
Cv   career historyCv   career history
Cv career history
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss Resume
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 

Similar to M.foreman's resume'

Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
Karan Vinayak
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016Ron Mailhot
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
MohamedZidan85
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhilite
Troy D Holley
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
Ukeje Ev'rest
 
Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Ted Sabala
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 

Similar to M.foreman's resume' (20)

Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Heathman.Amanda resume
Heathman.Amanda resumeHeathman.Amanda resume
Heathman.Amanda resume
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
resume16 - Copy
resume16 - Copyresume16 - Copy
resume16 - Copy
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhilite
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
 
Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 

Recently uploaded

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 

Recently uploaded (20)

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 

M.foreman's resume'

  • 1. Page | 1 of 6 Michael John Foreman Sr. Project Coordinator/Piping Designer/Checker/Supervisor 515 Whitecap Dr. El Lago, TEXAS 77586 US Phone: Cell: (713) 876-7727 mike4man@outlook.com EXECUTIVE SUMMARY I have a Technical/Mechanical background with emphasis in Piping Design, Project Coordinator, and QA/QC (checking). I work in the Industrial Engineering & design industry and my duties included working with Plant/Industrial personnelto meet and maintain the requirements of their expectations along with following the given scope of work to have the project finished in a timely and efficient manner. I have experience with the following Design specialties, and aided in management of Pipe & Process Design aspects of as large as $125M Projects and numerous small $10M Projects. I bring to a new opportunity 30+ years of heavy design experience and management/supervision skills tailored to the Industrial Petrochemical/Olefin/Oil & Gas industry while incorporating use of the most popular and current software titles. • ASME/ANSI pipe, fittings and valves • Modular Piping • Up-Stream Design • Mid-Stream Design & Storage Design • Down-Stream (Facility) Design • LNG & NGL • Detailed Design • Skid Units & Skid Piping Design • Mechanical Design & Checking • Piping Isometric Drawings • Piping & Instrumentation Diagrams • Piping Flexibility • Olefins Process • Petrochem/Refinery/Oil & Gas Process • Cryogenic Piping and Support Design • Man-hour estimates, Man loading, Proposals • Engineering Change Orders & Request • Field Engineering, Field Walk downs • Containment systems • Firewater systemdesign • Refrigerant Units • Water treatment systems • Management of change (MOC's) • Hazop and Process Safety Management  Sr. Project Coordinator / Piping Design Checker/ Piping Designer 3D Strategy Engineering (Contract) June, 2014 — February, 2016 (1 year 8 months) Software: Cadworx/PDMS/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D  Coordinated Upstream & Midstream Projects & personnel to stream-line operations with current industry standards.  QA/QC checked complete construction/fabrication/skid packages pertaining to all piping/mechanical facets of the project  Regions of Gulf of Mexico, Eagle Ford, Permian Basin, Barnett, Appalachian Basin, etc...  Complete Upstream & Midstream facilities  Cryogenic & LNG/NGL Facilities  Offshore Platforms (all related aspects), treatment, scrubbing, separation  Manifold design,Flow Lines, Ultra High Pressures,Skid designs,ship/boat loading & unloading  Launching & Receiving (Pig/Scrubber) product diversion and automation
  • 2.  Page | 2 of 6 Sr. Piping Designer 3D / Checker / Project Coordinator Audubon Engineering (Contract) June, 2013 — June, 2014 (1 year) Software: Cadworx//SmartPlant 3D/Navisworks/SmartPlant 3D/Bentley/Autodesk Plant 3D  FEED & detailed design & checking of many on-going Oil & Gas Projects located in the Eagle Ford Shale  Onsite P&ID Check for facilities located in the Eagle Ford Shale region  Constructing of Template models using Cadworx  QA/QC (Checking) of all piping & mechanical facets & P&ID’s of assigned projects  Coordinating work with clients schedules  3D design of Rack, Skid, Equipment & Inter-connecting piping  Location and setting equipment  Underground piping and locating existing underground pipe  Maintaining deliverables, oversee drawing production of designers & engineers Sr. Piping Designer 3D / Project Lead / Project Coordinator Universal Pegasus International (Direct) August,2012 — May, 2013 (10 months) Software: Cadworx/PDMS/SmartPlant 3D/Navisworks/Bentley/Autodesk Plant 3D  Lead Pipe Designer with Oil & Gas Projects located in the Eagle Ford Shale & Permian Basin  Greenfield design of several Oil & Gas facilities  FEED & Detailed Design  Completed packages for fabrication construction of facilities to enhance output capabilities  Upstream separation of Oil & Gas, sour crude treating & stripping gases  Automation and metering of liquids and gasses  Water extraction, storage and treatment Sr. Piping Designer 3D / Project Lead / Coordinator L-Con Engineering & Constructors (Direct) March, 2011 — August,2012 (1 year 5 months) Software: Cadworx/Bentley/SmartPlant 3D/AutodeskPlant 3D/ Navisworks  Oil and Condensate gathering, manifold design, pumping, metering, tank storage,Bulk & Dockside loading  LNG & NGL Spheres and all associated piping.  Began the design the new 1.6 million barrel tank storage facility and dock loading directly connected to the Gulf of Mexico  In-charge of all man-hours, staff, deliverables and design of this project  Ship/Barge loading, Vapor Recovery, Maritime.  Water Treatment/Collection & truck loading.
  • 3.  Page | 3 of 6 Sr. Project Coordinator / Piping Designer / Checker Burns & McDonnell in St. Louis MO. (Temporary Contract) May, 2010 — January, 2011 (8 months) Software: Cadworx/PDS/Navisworks/Bentley  3D Model creation using existing 2D pipe rack drawings and field survey for Conoco-Phillips Wood River Illinois facility  Model produced with Cadworx & terminated at existing equipment/vessels previously modeled in PDS  Survey & elevations of rack & equipment  Structural integrity/feasibility studies  Routing of several new lines in rack with challenging obstacles  Squad checking all aspects ofcomplete deliverables package Sr. Piping Designer / Checker Ref-Chem Pasadena TX. (Contract) October, 2009 — February, 2010 (4 months) Software: PDS/SmartPlant Review/Flexcad  Checked all piping, structural members and foundations related to this LNG/Gas project  Establish new battery limit  Set new equipment and moved/revamp existing equipment  Routed piping to/from new equipment using existing & new pipe racks with the addition of miscellaneous new supports  Designed to reduce field welding  Establish new battery limit Sr. Lead Piping Designer / Checker Technip (Contract) February, 2009 — October, 2009 (8 months) Software: PDS/PDMS/AutoCAD/SmartPlant Review/Flexcad Projects: Exxon Mobil Flare Gas Control Project: (Downstream) Beaumont Texas Shell Na Kika: (Offshore Semi-Sub.) Gulf of Mexico, 140 miles southeast ofNew Orleans BP ThunderHorse: (Offshore Semi-Sub) Gulf of Mexico, 150 miles southeast ofNew Orleans Marine Energy Swordfish & Neptune Spar (Offshore Platform)  Involved with design of modular piping  Software used AutoCAD, and PDMS  Replaced and upgraded all Flare Gas Headers throughout the refinery at Exxon Mobile Beaumont  Duties include, field survey,gathering information to replace several thousand feet of large bore pipe  Software used, AutoCAD, Microstation, SmartPlant, PDS, and LFM  The use of laser maps to aid in the routing pipe
  • 4.  Page | 4 of 6 Sr. Piping Designer 3D / Checker Shaw/Stone & Webster (Contract) September, 2008 — February, 2009 (5 months) Software: PDS/SmartPlant Review/FlexCad  Yansab/Yanbu, Saudi Arabia Project – Grassroots project completed using PDS metric  Checked the Isometric Drawings generated using SmartPlant Review to turnout accurate fabrication drawings  Checked both pipe and steel until Mechanical Completion. Sr. Piping Designer 3D / Checker Shaw/Stone & Webster Port Arthur TX. (Contract) August,2006 — December, 2007 (1 year 5 months) Software: PDS/Flexcad/SmartPlant Review  Huntsman Burnout Rebuild: Field verification of cold pipe supports,related piping, field change requests for work that wasn't in the original scope of work.  Unit damage was a result of a large scale fire in excess of $50M  Updated several models and checked extracted Isometrics previously done by Stone & Webster  Updated existing piping drawings to reflect present work. Sr. Piping Designer 3D / Lead / Checker CDI Engineering, Orange Texas (Direct) January, 2008 — August,2008 (8 months) Software: PDMS/ PlantSpace Software with Microstation V8  Re-designed and redrew P&IDs to industry standards to remove years of drawing congestion  Redraw 2 primary units at a total of 100+ P&IDs each  The project was terminated for budgetary reasons to later be completed by others Sr. Piping Designer / Checker / Project Lead CDI Engineering, Beaumont TX. (Direct) May, 2005 — August,2006 (1 year 3 months) Software: PDS/PDMS/Cadworx/Bentley  Involved in several small projects in-house including pipe design using FlexCad (in-office)  PDMS & PDS certification training  Maintenance work, management of change, equipment changes/upgrades,hydraulics,stress isometrics etc. Goodyear Chemical Inc. (In-Plant) AutoCAD & ProCad  Assigned to do all maintenance and aid in several capital projects with-in the Goodyear Beaumont facility  P&IDs, piping plans, elevations, and field notes were used to create accurate fabrication isometric drawings  Updated existing P&IDs, moved manual drawings to CAD, and designed standard structuralsupports Sumotomo Rubber, Freeport Texas, PDMS/Flexcad used to make changes and add a new unit to increase efficiency in the isobutyl unit.
  • 5.  Page | 5 of 6 Sr. Piping Designer Levingston Engineering Sulphur LA. (Direct) July, 2004 — April, 2005 (10 months) CITGO Refinery (In-Plant) Software: AutoCAD/CadPipe/Flexcad  Developed Engineering / Design package consisting of P&IDs, key plans, piping plans and isometrics  Software used, AutoCAD, FlexCad, and an in-house developed program that was 3rd party to AutoCAD. Sr. Staff Piping Designer 3D / Checker RCR Engineering Dayton TX (Contract to Direct) August,2003 — June, 2004 (11 months) Software: AutoCAD/Flexcad/Cadworx  Sr. Piping Designer for a facility in Phoenix Arizona  Fire protection piping, tubing involving orbital welding for joint-less connections  Provided the weld count and BOM for the stainless surgical steel tubing  Staff Piping Designer/Checker/Department Lead, for several small projects located in the LaPorte/Baytown/Deer Park/Pasadena/Mont Belvieu area  Setting of 4 large spheres (NGL) and piping to and from them including over 1 mile of rack piping in the Enterprise Products Facility. Sr. Pipe Designer /Cad / Field Lead Recon Engineering Lake Charles LA. (Direct) October, 1995 — February, 2000 (4 years 4 months) Software: AutoCAD/Flexcad/Cadworx  Designed and checked several projects necessary for the completion of the 3 Citgo Petroleum Cat Cracker Upgrades  Responsible for checking and running the drawings thru CAD-QC, a Citgo EDMS QC Program  Coordinated work with Stone and Websterto accurately design and draw isometric drawings on CAD using an in-house developed isometric program  Software used, Staad, Caesar, AutoCAD, and in-house developed Isometric application, a library based P&ID library for Process drawings, FlexCad used with several in-plant assignment.  Conoco Petroleum: Lead the Design/Drafting group to do both Isometric Fabrication Drawings, and P&ID walk downs.  Recon Office: Converted/Redrew existing hard copy/manual piping drawings to cad and maintained all piping related drawings for several small projects in several local industrial facilities as well as larger projects, mainly at Citgo Petroleum  These projects included Small Bore Piping of all of the Citgo Petroleum Cat-crackers, A thru C, and the construction of large reserve petroleum tanks in the tank farm  Coordinated thru the Department of Transportation (DOT) to design an underground pipeline consisting ofseveral large bore lines under the near-by Interstate
  • 6.  Page | 6 of 6 Pipe/Designer / Drafter / Cad Petrocon Engineering (Direct) Software: FlexCad/AutoCAD February, 1991 — October, 1995 (4 years 8 months)  Process Safety Management, (PSM) Project - Walk-down of equipment, related piping, instruments, and valves to produce P&IDs and utility drawings.  Responsible Care Project - Produced P&IDs for the Power Plant, Flare Systems, off gas,Water Treatment, Nitrogen Storage, Plant Air and process utility units. Drafter / Sketcher Various Lake Charles Louisiana Area Construction Companies January, 1983 — December, 1990 (7 years 12 months)  Employed by various Lake Charles Louisiana Area Construction companies (Mainly West-Cal Construction) as a field sketcherfor spoolreplacement/fabrication/corrosion and hydraulic isometrics. EDUCATION Sowela Technical Institute Associates, Drafting and Design Technology December, 1989 — May, 1991 Degree date: 1991  Sowela Technical Institute - Associates degree in Drafting and Design Technology  Attended from December, 1989 to May, 1991 while maintaining a 3.25GPA, specialized in Mechanical/Pipe design. Louisiana State University (Scholarship) BSME, Mechanical Engineering (Unfinished) September, 1984 — August,1986  Louisiana State University - September, 1984 until August 1986  Mechanical Engineering, "Unfinished BSME" Sulphur High School: Diploma May 1983 Sulphur High School - Sulphur, LA ASSOCIATIONS  Louisiana State University - "L" Club member, Tiger Football at LSU in 1984 to 1986  Houston Oilers Football Organization - 1 season.  Society of Piping Engineers & Designers (SPED IV Certification)