1. Ahmed Mahmoud Fahmy Elgayed
64 Shahed Farg Seta St, Azizia.
Mina Elkamh, Sharkia, Egypt
Tel: +2-055 3693556
Mobi:+2-01112348684
Mobi:+2-01203802066
E-mail: am.gayed@gmail.com
E-mail: Ahmed.Fahmy@emceg.com
PERSONAL INFORMATION:-
Date of Birth :- 17/8/1985
Gender :- Male
Marital Status :- Married
Nationality :- Egyptian
Military Service :- Exempted
EDUCATION:-
University of Zagazig, Faculty of Engineering, Sharkia, Egypt
BSc in Electrical Engineering
Department :- Electric Power and Machine
Degree :- Very Good , 78.83 % (5912.5/7500)
Ranking :- Fifth of 150 students (5/150)
May 2007
Work EXPERIENCE: -
ENGINEER IN EGYPTIAN MAINTENANCE COMPANY [EMC]
(EGYPTIAN PETROLEUM SECTOR Co.)
Shareholding :-
- 50% Egyptian General Petroleum Corporation and
affiliates companies – EGPC
- 50% AIBEL Int.
EMC introduce support starting from engineering, procurement and
construction for your project expansion followed by commissioning
services and continues our support during operation from maintenance and
modification services with technical support We have flexible contractual
frames to introduce our services.
JUN 2008 Till
NOW
2. Projects in EMC
♦ Electrical and Instrument Engineer in upgrading of Indirect gas heater at belayim
power station
Client: - PTB (Belayim Petroleum Company. / ENI international )
Location:- Sinai fields ( Abu Redus )
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, on-off valves, cables, accessories datasheets
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install Control panel.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup for the heater.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Sour Three Phase
Production Separator (50,000 and 6000 barrel fluid)
Client: - QPC (Qarun Petroleum Company. / APACHI-Egypt )
Location:- central processing facility (CPF western desert)
The project divided in two separators
- ( 50000 BPD) with smart instruments integrated with exciting DCS
- ( 6000 BPD) Pneumatic separator
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, on-off valves, cables, accessories datasheets
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
JAN 2015
To
Now
JAN 2015
To
Now
2
3. Install Control panel.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup for the (2) Separators.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Three Phase
Production Separator (5,000 barrel fluid)
Client: - TPC (Tanmia Petroleum Company.)
Location:- To be rent for other production companies
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, on-off valves, cables, accessories datasheets
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install Control panel.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup for the (2) Separators.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Two Phase
Production And Test Separator (5,000 barrel fluid and 10,000 barrel fluid)
Client: - GPC (General Petroleum Company.)
Location:- Gharb fields ( Red sea on-shore)
The project is EPC type (Engineering,procurment and construction)
•Engineering and vessel fabrication done by Delta process engineering.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Transfer the Control panels from the skid to the control room.
Install new junction boxes.
Laying of control and instrument cables.
Installing the lighting and earth system for the two separators.
- Commissioning and Start up for the (2) Separators.
JAN 2014
To
JAN 2015
AUG 2014
To
SEP 2014
3
4. ♦ Electrical and Instrument Engineer in Installation of New Sound System
Client:- ASORC ( Assuit oil refining Company )
Location:- Assuit
- Installing the new system including but not limited to :-
Install, wiring and loop tests for all field instrument.
Install Control panel.
Install junction boxes.
Laying of sound cables and instrument cables.
- Commissioning for the all system (start-up by system supplier).
♦ Electrical and Instrument Engineer in Fabricate & Supply (6) Sour Three Phase
Production Separator (50,000 barrel fluid)
Client: - QPC ( Qarun Petroleum Company. / APACHI-Egypt )
Location:- Karama and East baharia fields (western desert)
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, on-off valves, cables, accessories datasheets
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review technical evaluations.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install Control panel.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Start up for the (6) Separators.
♦ Electrical and Instrument Engineer in Revamping of A/G Stabilizer Heater BMS
Client:- KPC (Khalda Petroleum Co. / APACHI-Egypt)
Location:- Abu el-Ghradig site (western desert)
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
JULY 2014
To
AUG 2014
AUG 2011
To
DEC 2013
MAR 2012
To
SEP 2013
4
5. Update and issue P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, on-off valves, cables, accessories datasheets
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review technical evaluations.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install new BMS panel.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup of the Heater
♦ Electrical and Instrument Engineer in Revamping of 2 boilers 30X331A&B,
Deareator and DCS upgrade for ASORC
Client:- ASORC ( Assuit oil refining Company )
Location:- Assuit
Capacity :- Each 25 Ton/Hr
The Project divided in two stages each one has a mechanical revamping followed
by instrument and control revamping
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update and issue P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, control valves, on-off valves, cables, accessories
specification.
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install new BMS and soot blower panels.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup for the boiler
First Stage :-
MAR 2011
To
MAY 2013
Second Stage:-
MAY 2013
Till
MAR 2015
5
6. ♦ Electrical and Instrument Engineer in Revamping of MINEL Boiler I for NPC
Client:- NPC ( Nasr petroleum Company )
Location:- SUZE
Capacity :- 50 Ton/Hr
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
Update and issue P&IDs.
Prepare and issue loop diagram.
Prepare and issue field instruments, control valves, on-off valves, cables, accessories
specification.
Prepare and issue cable schedule and cable list.
Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
Calibrate, Install, wiring, and loop tests for all field instrument.
Install new BMS/LCP and soot blower panels.
Install junction boxes.
Laying of control and instrument cables.
- Commissioning and Startup of the boiler
♦ Electrical and Instrument Engineer in commissioning and start-up of Heater for
PTB
Client: - PTB (Belayim Petroleum Company. / ENI international )
Location:- Abo redus
- Re-installing field instrument
- Burner maintenance
- Commissioning and start-up of the Heater 10.1
♦ Electrical and Instrument Engineer in automatic fire fighting system for ASORC
Client:- ASORC ( Assuit oil refining company )
Location:- Assuit
The system philosophy is based on automatic operation of fire fighting system of
each tank through detection system of each tank or manually (locally at foam
station deluge valve or remotely from control panel extinguishing module).
- Installing Field instruments
- Optimizing Cable routing
- Connection to PLC panel
MAR 2011
To
AUG 2013
JUN 2011
To
July 2011
JUN 2010
TO
MAR 2011
6
7. - Commissioning and start-up of the system
♦ Electrical Engineer in Qena main storage development project
Client:- COOP (Cooperation company)
Location:- Qena
- Installing Lighting system in the storage wall.
- Revamping of old buldings lighting system.
- Installing new Telephone system.
- Installing new fire alarm system C/W Fire alarm panel, manually call and bells.
- Installing new Network system for buldings C/w cables, face split, patch panel and
rack.
- Installing two Early Streamer Emission with radius 80 m.
♦ Electrical Engineer in Sokhna Port outside Infrastructure Ammonia Terminal
Project
Client:- SPDC “sokhna port development company”
Location:- Sokhna Port,SUZE
Consultative :- ATMS - Amiral Technical Management Services
- Installing of 1000 kVA MV/LV Transformer 22/0.4kV liquid-filled Pad mounted
transformer
- Installing, commissioning and startup of Medium voltage air interrupted 22kV
switchgear C/W battery/ charger unit
- Installing 400V MCC Low-voltage switchgears
- Installing 3 phase, 4 wire low impedance Busway
- Installing 8 m Lighting Poles C/W Lighting panels
- Installing direct burial Medium voltage and Low voltage Cables including
Excavation and backfilling according to IEC standard
MAY 2009
TO
JUN 2010
JUN 2008
To
MAY 2009
TRAINING:-
Scientific Trip to HIGH DAM & ASWAN DAM
Go with the department to a scientific trip for High dam and Aswan Dam
2006 Chosen By the Faculty to represent the electric power Department (with another 3
colleagues) in the visitation to AL ARABY Group
Abu Zaabal Company for Engineering Industries (Factory 100),
Training on different kind of Motors and Switch gears
2007
2006
2006
7
8. SKILLS: -
♦ LANGUAGE SKILLS
Arabic: fluent speaking, fluent writing
English: Medium speaking, fluent writing
♦ COMPUTER SKILLS
General computer skills.
MS Office: Word, Excel
CAD Programs: using AutoCAD
PLC ( SIMENES, ALLAN BRADLY)
General Internet skills.
♦ ADDITIONAL SKILLS
Communication skills. Report writing and presentation skills in both Arabic and
English
Ability to work under pressure and synchronize with the surrounding atmosphere.
Good researcher
Good problem solving skills
Organized and positive thinking
Good leadership skills
Good administrative skills
Physically fit for tough work
Able to work as a member in a team work
Self-motivated and self-learning.
Tendency to learn and teach.
8