SlideShare a Scribd company logo
1 of 8
Download to read offline
Ahmed Mahmoud Fahmy Elgayed
64 Shahed Farg Seta St, Azizia.
Mina Elkamh, Sharkia, Egypt
Tel: +2-055 3693556
Mobi:+2-01112348684
Mobi:+2-01203802066
E-mail: am.gayed@gmail.com
E-mail: Ahmed.Fahmy@emceg.com
 PERSONAL INFORMATION:-
Date of Birth :- 17/8/1985
Gender :- Male
Marital Status :- Married
Nationality :- Egyptian
Military Service :- Exempted
 EDUCATION:-
University of Zagazig, Faculty of Engineering, Sharkia, Egypt
BSc in Electrical Engineering
Department :- Electric Power and Machine
Degree :- Very Good , 78.83 % (5912.5/7500)
Ranking :- Fifth of 150 students (5/150)
May 2007
 Work EXPERIENCE: -
ENGINEER IN EGYPTIAN MAINTENANCE COMPANY [EMC]
(EGYPTIAN PETROLEUM SECTOR Co.)
Shareholding :-
- 50% Egyptian General Petroleum Corporation and
affiliates companies – EGPC
- 50% AIBEL Int.
EMC introduce support starting from engineering, procurement and
construction for your project expansion followed by commissioning
services and continues our support during operation from maintenance and
modification services with technical support We have flexible contractual
frames to introduce our services.
JUN 2008 Till
NOW
Projects in EMC
♦ Electrical and Instrument Engineer in upgrading of Indirect gas heater at belayim
power station
Client: - PTB (Belayim Petroleum Company. / ENI international )
Location:- Sinai fields ( Abu Redus )
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, on-off valves, cables, accessories datasheets
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install Control panel.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup for the heater.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Sour Three Phase
Production Separator (50,000 and 6000 barrel fluid)
Client: - QPC (Qarun Petroleum Company. / APACHI-Egypt )
Location:- central processing facility (CPF western desert)
The project divided in two separators
- ( 50000 BPD) with smart instruments integrated with exciting DCS
- ( 6000 BPD) Pneumatic separator
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, on-off valves, cables, accessories datasheets
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
JAN 2015
To
Now
JAN 2015
To
Now
2
 Install Control panel.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup for the (2) Separators.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Three Phase
Production Separator (5,000 barrel fluid)
Client: - TPC (Tanmia Petroleum Company.)
Location:- To be rent for other production companies
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, on-off valves, cables, accessories datasheets
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install Control panel.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup for the (2) Separators.
♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Two Phase
Production And Test Separator (5,000 barrel fluid and 10,000 barrel fluid)
Client: - GPC (General Petroleum Company.)
Location:- Gharb fields ( Red sea on-shore)
The project is EPC type (Engineering,procurment and construction)
•Engineering and vessel fabrication done by Delta process engineering.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Transfer the Control panels from the skid to the control room.
 Install new junction boxes.
 Laying of control and instrument cables.
 Installing the lighting and earth system for the two separators.
- Commissioning and Start up for the (2) Separators.
JAN 2014
To
JAN 2015
AUG 2014
To
SEP 2014
3
♦ Electrical and Instrument Engineer in Installation of New Sound System
Client:- ASORC ( Assuit oil refining Company )
Location:- Assuit
- Installing the new system including but not limited to :-
 Install, wiring and loop tests for all field instrument.
 Install Control panel.
 Install junction boxes.
 Laying of sound cables and instrument cables.
- Commissioning for the all system (start-up by system supplier).
♦ Electrical and Instrument Engineer in Fabricate & Supply (6) Sour Three Phase
Production Separator (50,000 barrel fluid)
Client: - QPC ( Qarun Petroleum Company. / APACHI-Egypt )
Location:- Karama and East baharia fields (western desert)
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, on-off valves, cables, accessories datasheets
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation and selection activities.
- Perform vendor's data and prints review technical evaluations.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install Control panel.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Start up for the (6) Separators.
♦ Electrical and Instrument Engineer in Revamping of A/G Stabilizer Heater BMS
Client:- KPC (Khalda Petroleum Co. / APACHI-Egypt)
Location:- Abu el-Ghradig site (western desert)
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
JULY 2014
To
AUG 2014
AUG 2011
To
DEC 2013
MAR 2012
To
SEP 2013
4
 Update and issue P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, on-off valves, cables, accessories datasheets
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review technical evaluations.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install new BMS panel.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup of the Heater
♦ Electrical and Instrument Engineer in Revamping of 2 boilers 30X331A&B,
Deareator and DCS upgrade for ASORC
Client:- ASORC ( Assuit oil refining Company )
Location:- Assuit
Capacity :- Each 25 Ton/Hr
The Project divided in two stages each one has a mechanical revamping followed
by instrument and control revamping
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update and issue P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, control valves, on-off valves, cables, accessories
specification.
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install new BMS and soot blower panels.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup for the boiler
First Stage :-
MAR 2011
To
MAY 2013
Second Stage:-
MAY 2013
Till
MAR 2015
5
♦ Electrical and Instrument Engineer in Revamping of MINEL Boiler I for NPC
Client:- NPC ( Nasr petroleum Company )
Location:- SUZE
Capacity :- 50 Ton/Hr
The project is EPC type (Engineering,procurment and construction)
- Preparing and issue engineering documents including but not limited to :-
 Update and issue P&IDs.
 Prepare and issue loop diagram.
 Prepare and issue field instruments, control valves, on-off valves, cables, accessories
specification.
 Prepare and issue cable schedule and cable list.
 Prepare and issue junction box wiring diagrams.
- Perform technical evaluation activities.
- Perform vendor's data and prints review.
- Installing the new system including but not limited to :-
 Calibrate, Install, wiring, and loop tests for all field instrument.
 Install new BMS/LCP and soot blower panels.
 Install junction boxes.
 Laying of control and instrument cables.
- Commissioning and Startup of the boiler
♦ Electrical and Instrument Engineer in commissioning and start-up of Heater for
PTB
Client: - PTB (Belayim Petroleum Company. / ENI international )
Location:- Abo redus
- Re-installing field instrument
- Burner maintenance
- Commissioning and start-up of the Heater 10.1
♦ Electrical and Instrument Engineer in automatic fire fighting system for ASORC
Client:- ASORC ( Assuit oil refining company )
Location:- Assuit
The system philosophy is based on automatic operation of fire fighting system of
each tank through detection system of each tank or manually (locally at foam
station deluge valve or remotely from control panel extinguishing module).
- Installing Field instruments
- Optimizing Cable routing
- Connection to PLC panel
MAR 2011
To
AUG 2013
JUN 2011
To
July 2011
JUN 2010
TO
MAR 2011
6
- Commissioning and start-up of the system
♦ Electrical Engineer in Qena main storage development project
Client:- COOP (Cooperation company)
Location:- Qena
- Installing Lighting system in the storage wall.
- Revamping of old buldings lighting system.
- Installing new Telephone system.
- Installing new fire alarm system C/W Fire alarm panel, manually call and bells.
- Installing new Network system for buldings C/w cables, face split, patch panel and
rack.
- Installing two Early Streamer Emission with radius 80 m.
♦ Electrical Engineer in Sokhna Port outside Infrastructure Ammonia Terminal
Project
Client:- SPDC “sokhna port development company”
Location:- Sokhna Port,SUZE
Consultative :- ATMS - Amiral Technical Management Services
- Installing of 1000 kVA MV/LV Transformer 22/0.4kV liquid-filled Pad mounted
transformer
- Installing, commissioning and startup of Medium voltage air interrupted 22kV
switchgear C/W battery/ charger unit
- Installing 400V MCC Low-voltage switchgears
- Installing 3 phase, 4 wire low impedance Busway
- Installing 8 m Lighting Poles C/W Lighting panels
- Installing direct burial Medium voltage and Low voltage Cables including
Excavation and backfilling according to IEC standard
MAY 2009
TO
JUN 2010
JUN 2008
To
MAY 2009
 TRAINING:-
Scientific Trip to HIGH DAM & ASWAN DAM
Go with the department to a scientific trip for High dam and Aswan Dam
2006 Chosen By the Faculty to represent the electric power Department (with another 3
colleagues) in the visitation to AL ARABY Group
Abu Zaabal Company for Engineering Industries (Factory 100),
Training on different kind of Motors and Switch gears
2007
2006
2006
7
 SKILLS: -
♦ LANGUAGE SKILLS
 Arabic: fluent speaking, fluent writing
 English: Medium speaking, fluent writing
♦ COMPUTER SKILLS
 General computer skills.
 MS Office: Word, Excel
 CAD Programs: using AutoCAD
 PLC ( SIMENES, ALLAN BRADLY)
 General Internet skills.
♦ ADDITIONAL SKILLS
 Communication skills. Report writing and presentation skills in both Arabic and
English
 Ability to work under pressure and synchronize with the surrounding atmosphere.
 Good researcher
 Good problem solving skills
 Organized and positive thinking
 Good leadership skills
 Good administrative skills
 Physically fit for tough work
 Able to work as a member in a team work
 Self-motivated and self-learning.
 Tendency to learn and teach.
8

More Related Content

What's hot

Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.docmohamed saleh
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen Barkwitch
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebMario Rey Rguieb_68
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 

What's hot (20)

Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 

Similar to Ahmed Fahmy_CV (20)

MCV
MCVMCV
MCV
 
Mohamed salem c.v
Mohamed  salem  c.vMohamed  salem  c.v
Mohamed salem c.v
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
eng.ahmad fathi C.V
eng.ahmad fathi C.Veng.ahmad fathi C.V
eng.ahmad fathi C.V
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
Sougata Chatterjee_Resume
Sougata Chatterjee_ResumeSougata Chatterjee_Resume
Sougata Chatterjee_Resume
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
bassim
bassimbassim
bassim
 
bassim
bassimbassim
bassim
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Resume Haris
Resume HarisResume Haris
Resume Haris
 

Ahmed Fahmy_CV

  • 1. Ahmed Mahmoud Fahmy Elgayed 64 Shahed Farg Seta St, Azizia. Mina Elkamh, Sharkia, Egypt Tel: +2-055 3693556 Mobi:+2-01112348684 Mobi:+2-01203802066 E-mail: am.gayed@gmail.com E-mail: Ahmed.Fahmy@emceg.com  PERSONAL INFORMATION:- Date of Birth :- 17/8/1985 Gender :- Male Marital Status :- Married Nationality :- Egyptian Military Service :- Exempted  EDUCATION:- University of Zagazig, Faculty of Engineering, Sharkia, Egypt BSc in Electrical Engineering Department :- Electric Power and Machine Degree :- Very Good , 78.83 % (5912.5/7500) Ranking :- Fifth of 150 students (5/150) May 2007  Work EXPERIENCE: - ENGINEER IN EGYPTIAN MAINTENANCE COMPANY [EMC] (EGYPTIAN PETROLEUM SECTOR Co.) Shareholding :- - 50% Egyptian General Petroleum Corporation and affiliates companies – EGPC - 50% AIBEL Int. EMC introduce support starting from engineering, procurement and construction for your project expansion followed by commissioning services and continues our support during operation from maintenance and modification services with technical support We have flexible contractual frames to introduce our services. JUN 2008 Till NOW
  • 2. Projects in EMC ♦ Electrical and Instrument Engineer in upgrading of Indirect gas heater at belayim power station Client: - PTB (Belayim Petroleum Company. / ENI international ) Location:- Sinai fields ( Abu Redus ) The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, on-off valves, cables, accessories datasheets  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation and selection activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install Control panel.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup for the heater. ♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Sour Three Phase Production Separator (50,000 and 6000 barrel fluid) Client: - QPC (Qarun Petroleum Company. / APACHI-Egypt ) Location:- central processing facility (CPF western desert) The project divided in two separators - ( 50000 BPD) with smart instruments integrated with exciting DCS - ( 6000 BPD) Pneumatic separator The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, on-off valves, cables, accessories datasheets  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation and selection activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument. JAN 2015 To Now JAN 2015 To Now 2
  • 3.  Install Control panel.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup for the (2) Separators. ♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Three Phase Production Separator (5,000 barrel fluid) Client: - TPC (Tanmia Petroleum Company.) Location:- To be rent for other production companies The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, on-off valves, cables, accessories datasheets  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation and selection activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install Control panel.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup for the (2) Separators. ♦ Electrical and Instrument Engineer in Fabricate & Supply (2) Two Phase Production And Test Separator (5,000 barrel fluid and 10,000 barrel fluid) Client: - GPC (General Petroleum Company.) Location:- Gharb fields ( Red sea on-shore) The project is EPC type (Engineering,procurment and construction) •Engineering and vessel fabrication done by Delta process engineering. - Perform technical evaluation and selection activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Transfer the Control panels from the skid to the control room.  Install new junction boxes.  Laying of control and instrument cables.  Installing the lighting and earth system for the two separators. - Commissioning and Start up for the (2) Separators. JAN 2014 To JAN 2015 AUG 2014 To SEP 2014 3
  • 4. ♦ Electrical and Instrument Engineer in Installation of New Sound System Client:- ASORC ( Assuit oil refining Company ) Location:- Assuit - Installing the new system including but not limited to :-  Install, wiring and loop tests for all field instrument.  Install Control panel.  Install junction boxes.  Laying of sound cables and instrument cables. - Commissioning for the all system (start-up by system supplier). ♦ Electrical and Instrument Engineer in Fabricate & Supply (6) Sour Three Phase Production Separator (50,000 barrel fluid) Client: - QPC ( Qarun Petroleum Company. / APACHI-Egypt ) Location:- Karama and East baharia fields (western desert) The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, on-off valves, cables, accessories datasheets  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation and selection activities. - Perform vendor's data and prints review technical evaluations. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install Control panel.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Start up for the (6) Separators. ♦ Electrical and Instrument Engineer in Revamping of A/G Stabilizer Heater BMS Client:- KPC (Khalda Petroleum Co. / APACHI-Egypt) Location:- Abu el-Ghradig site (western desert) The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :- JULY 2014 To AUG 2014 AUG 2011 To DEC 2013 MAR 2012 To SEP 2013 4
  • 5.  Update and issue P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, on-off valves, cables, accessories datasheets  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation activities. - Perform vendor's data and prints review technical evaluations. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install new BMS panel.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup of the Heater ♦ Electrical and Instrument Engineer in Revamping of 2 boilers 30X331A&B, Deareator and DCS upgrade for ASORC Client:- ASORC ( Assuit oil refining Company ) Location:- Assuit Capacity :- Each 25 Ton/Hr The Project divided in two stages each one has a mechanical revamping followed by instrument and control revamping The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update and issue P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, control valves, on-off valves, cables, accessories specification.  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install new BMS and soot blower panels.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup for the boiler First Stage :- MAR 2011 To MAY 2013 Second Stage:- MAY 2013 Till MAR 2015 5
  • 6. ♦ Electrical and Instrument Engineer in Revamping of MINEL Boiler I for NPC Client:- NPC ( Nasr petroleum Company ) Location:- SUZE Capacity :- 50 Ton/Hr The project is EPC type (Engineering,procurment and construction) - Preparing and issue engineering documents including but not limited to :-  Update and issue P&IDs.  Prepare and issue loop diagram.  Prepare and issue field instruments, control valves, on-off valves, cables, accessories specification.  Prepare and issue cable schedule and cable list.  Prepare and issue junction box wiring diagrams. - Perform technical evaluation activities. - Perform vendor's data and prints review. - Installing the new system including but not limited to :-  Calibrate, Install, wiring, and loop tests for all field instrument.  Install new BMS/LCP and soot blower panels.  Install junction boxes.  Laying of control and instrument cables. - Commissioning and Startup of the boiler ♦ Electrical and Instrument Engineer in commissioning and start-up of Heater for PTB Client: - PTB (Belayim Petroleum Company. / ENI international ) Location:- Abo redus - Re-installing field instrument - Burner maintenance - Commissioning and start-up of the Heater 10.1 ♦ Electrical and Instrument Engineer in automatic fire fighting system for ASORC Client:- ASORC ( Assuit oil refining company ) Location:- Assuit The system philosophy is based on automatic operation of fire fighting system of each tank through detection system of each tank or manually (locally at foam station deluge valve or remotely from control panel extinguishing module). - Installing Field instruments - Optimizing Cable routing - Connection to PLC panel MAR 2011 To AUG 2013 JUN 2011 To July 2011 JUN 2010 TO MAR 2011 6
  • 7. - Commissioning and start-up of the system ♦ Electrical Engineer in Qena main storage development project Client:- COOP (Cooperation company) Location:- Qena - Installing Lighting system in the storage wall. - Revamping of old buldings lighting system. - Installing new Telephone system. - Installing new fire alarm system C/W Fire alarm panel, manually call and bells. - Installing new Network system for buldings C/w cables, face split, patch panel and rack. - Installing two Early Streamer Emission with radius 80 m. ♦ Electrical Engineer in Sokhna Port outside Infrastructure Ammonia Terminal Project Client:- SPDC “sokhna port development company” Location:- Sokhna Port,SUZE Consultative :- ATMS - Amiral Technical Management Services - Installing of 1000 kVA MV/LV Transformer 22/0.4kV liquid-filled Pad mounted transformer - Installing, commissioning and startup of Medium voltage air interrupted 22kV switchgear C/W battery/ charger unit - Installing 400V MCC Low-voltage switchgears - Installing 3 phase, 4 wire low impedance Busway - Installing 8 m Lighting Poles C/W Lighting panels - Installing direct burial Medium voltage and Low voltage Cables including Excavation and backfilling according to IEC standard MAY 2009 TO JUN 2010 JUN 2008 To MAY 2009  TRAINING:- Scientific Trip to HIGH DAM & ASWAN DAM Go with the department to a scientific trip for High dam and Aswan Dam 2006 Chosen By the Faculty to represent the electric power Department (with another 3 colleagues) in the visitation to AL ARABY Group Abu Zaabal Company for Engineering Industries (Factory 100), Training on different kind of Motors and Switch gears 2007 2006 2006 7
  • 8.  SKILLS: - ♦ LANGUAGE SKILLS  Arabic: fluent speaking, fluent writing  English: Medium speaking, fluent writing ♦ COMPUTER SKILLS  General computer skills.  MS Office: Word, Excel  CAD Programs: using AutoCAD  PLC ( SIMENES, ALLAN BRADLY)  General Internet skills. ♦ ADDITIONAL SKILLS  Communication skills. Report writing and presentation skills in both Arabic and English  Ability to work under pressure and synchronize with the surrounding atmosphere.  Good researcher  Good problem solving skills  Organized and positive thinking  Good leadership skills  Good administrative skills  Physically fit for tough work  Able to work as a member in a team work  Self-motivated and self-learning.  Tendency to learn and teach. 8