1. RANGARAJAN. D.B
#10 South Park Street,
Venkatapuram, Ambattur
Chennai-600 053 Mobile : 91-9840843820
Tamilnadu, Email : rangarajandb@rediffmail.com
India rsundaravaradan@yahoo.com
PROFESSIONAL EXPERIENCE:
My Overall Experience is more than 15.10 years.
I am currently working with Barry-Wehmiller International, Chennai as Project Leader for
the past 9 years and 8 months.
Prior to this I had worked in TVS Sundaram Brake Linings, Chennai as a Senior Executive –
Automatic / Semi-automatic machine building Projects for 6 years and 3 months.
MAJOR STRENGTHS
Expertise in Design of various Automatic Machines
Expertise in Electrical & Instrumentation design and sizing calculations for Water
treatment and Oil & Gas plants
Good Project Management, Customer Management and Team Leading skills
Ability to build, lead & manage multi—disciplinary teams
Simultaneous management of multiple engineering design projects
Planning, Scheduling, Project execution and progress reporting
Delivery, Quality and resource control
Good troubleshooting skills on Mechanical and Electrical systems
Good working knowledge on Pneumatics and Hydraulics
Expertise in Industrial Automation and PLC / HMI Programming
Good knowledge on Electrical Panel layouts and Electrical Schematics
Proficient with AutoCAD and Promis-E electrical schematics development softwares
Good Programming skills in VB / VB.Net / C#.Net
Ability to adapt to new technologies quickly
ORGANIZATION EXPERIENCE:
Present Employer:
Company Name - Barry-Wehmiller International
Present Designation - Engineering Specialist
Present Role - Project Manager
Career Path - Senior Design Engineer/ Lead Design Engineer / Specialist
Period - Nov-2006 to Till date.
Page 1 of 8
2. Responsibilities:
Managing the complete electrical & instrumentation engineering design and detailing
process
Responsible for Project Planning, Budgeting and Resource planning
Study of project requirements, Estimation and Project Proposals
Co-ordination with end-client engineers for drawing approvals
Resolving issues, conflicts and managing on time delivery
Quality planning and executing using specific checklists and roles
Liaising with equipment / instrument vendors for engineering inputs
Weekly progress reporting and Milestone invoicing
Design Calculations for Transformer sizing, Generator sizing, LV & MV Cables, Earthing,
MV & MCC components sizing for Oil & Gas and Water treatment plants.
Design of Electrical control systems for Oil & Gas, Water Treatment plants, Paper
converting and Paper finishing machines.
Preparation of MCC schematics, Earthing & Lighting layouts.
Review of PLC I/O List, Architecture diagram, Instrument Index, Instrument loop &
Instrument hook-up diagrams, Power and Instrument cable schedules.
PLC programming for Allen-Bradley Compact Logix and Control Logix PLCs.
Development of HMI screens.
Design of Field communication system and Field Devices interconnect diagrams.
Travel to customer place based on project requirement for supporting and executing
their Engineering activities.
Preparation and maintenance of Project documents.
Previous Employer:
Company Name - Sundaram Brake Linings Ltd – TVS Group
Last Designation - Senior Executive - 2 (Projects)
Period - Aug-2000 to Oct-2006
Tenure - 6 Years & 3 Months.
Career Path - GET / Asst. Engineer / Engineer / Executive
Sr.Executive-1 / Sr. Executive-2
Responsibilities:
Project leader and Project coordinator
Preparation of initial feasibility report for the project
Page 2 of 8
3. Project Planning, Budgeting, Manufacturing tracking, Inspection, Erection, Testing,
Commissioning and Performance Tracking of machines
Preparing and updating Gantt Charts for projects, preparation of Gap Analysis
Design of Electrical control systems for machineries
Developing computer programs for machines using 'C' programming language
Introducing low cost automations for productivity improvement and retrofits
PROJECT DETAILS:
Project Name: Detailed Engineering support for Water treatment plant
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to design complete electrical system for installation of water
treatment plant. The project involves the following Electrical & Instrumentation activities:
Electrical and Instrument cable sizing calculations
Development of plant room electrical layout & cable tray routing layout
Lighting calculations and Lighting layout
Earthing & Lightning calculations and layouts
MCC room, Transformer yard and generator room layouts
Instrument loop diagrams
Instrument hook up drawings
PLC I/O list & Instrument Index
Role : Project Manager
Responsibilities:
Preparation of Project proposal and submission to customer
Responsible for Project Planning, Budgeting and Resource planning
Lead a team of electrical and instrumentation engineers to complete the design of
Electrical and Instrumentation deliverables
Liaising with equipment / instrument vendors for engineering inputs
Review of design documents and drawings prepared by the Engineers
Provide Technical consulting to customer
Participate in weekly review meetings with the customer
Preparation and reporting of project metrics to stake holders
Project Name: Detailed Engineering support for Chemical Injection skids
Project Process: Off-shore Engineering support
Project Description:
Page 3 of 8
4. The scope of the project is to design complete electrical system for manufacture of chemical
injection skids. The project involves the following Electrical & Instrumentation activities:
Design of PLC control panel with AB Compact Logix 5370 controller
Development of Single Line Diagram
Electrical Load calculations, Power dissipation calculation
Instrument loop diagrams, Instrument hook up drawings
Earthing layout design, Cable tray layout design
PLC I/O list, PLC Architecture diagram
Instrument Index
System Block diagram
Role : Project Manager
Responsibilities:
Preparation of Project proposal and submission to customer
Responsible for Project Planning, Budgeting and Resource planning
Lead a team of electrical and instrumentation engineers to complete the design of
Electrical and Instrumentation deliverables
Liaising with equipment / instrument vendors for engineering inputs
Review of design documents and drawings prepared by the Engineers
Provide Technical consulting to customer
Participate in weekly review meetings with the customer
Preparation and reporting of project metrics to stake holders
Project Name: Controls Engineering Support for Wastewater Treatment plant
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to provide Engineering support to a leading Wastewater
treatment equipment manufacturer for their projects.
Role : Project Manager
Responsibilities:
Preparation of Project proposal and submission to customer
Responsible for Project Planning, Budgeting and Resource planning
Responsible for Electrical design of the System
Lead a team of Engineers for completing the Electrical and Instrumentation tasks
Design calculations for Transformer sizing, Generator Sizing, MV & LV cable sizing,
MV and MCC components sizing and Earthing calculations
Design of MCC panel schematics and Earthing layouts
Review of PLC I/O List, Instrument Index, Network Architecture diagram, Instrument
loop and Hook-up diagrams, Cable and cable tray layouts, BOM for cable tray
Page 4 of 8
5. installation, Power and Instrument Cable schedule, Lighting calculations and Lighting
layouts
Project Management activities including Master schedule preparation, Weekly status
updation, Metrics preparation and reporting to stake holders
Project Name: Controls Engineering Support for Water Treatment equipment
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to provide Engineering support to a leading Water treatment
equipment manufacturer for their projects.
Role : Project Manager
Responsibilities:
Preparation of Project proposal and submission to customer
Responsible for Project Planning, Budgeting and Resource planning
Development of P&ID diagrams for Skid and Rack assemblies based on
Job Order and Standard P & ID practices
MCC panel sizing calculations
Design of Electrical control systems using AutoCAD electrical for Skid/Rack
assemblies
Development of PLC programs and HMI screens
Project Name: Automatic Gasket Winding System
Project Process: New Product development
Project Description:
This is for a Leading Hydraulic Pipeline Gasket Manufacturer based out of United States. The
machine is completely automatic winding machine with facility to wind steel gaskets.
Role : Project Leader
Responsibilities:
Design of electrical control systems for the system
Configuring and Tuning of Servo motors used in the System
Developed PLC program & HMI screens for the system
Carried out Testing & trials of the system including FAT
Project Name: FDA Validation of Coating Pan and Air Handling Unit
Project Process: FDA Validation of new medical equipments
Project Description:
Page 5 of 8
6. The scope of the project is to validate the Coating Pan and Air Handling Unit of the new
manufacturing unit to meet the FDA requirements.
Role : Team Member
Responsibilities:
Studied the Coating Pan and Air Handling Unit and their Engineering documents /
drawings
Prepared the Installation Qualification and Operational Qualification Protocol
documents for the Coating Pan and Air Handling Unit
Executed the IQ and OQ Protocols, prepared and submitted the final report
Project Name: Installation of dedicated Manufacturing unit for Heavy
Commercial vehicle brakes
Project Process: New Manufacturing Facility Setup
Project Description:
The scope of the project is to install a dedicated manufacturing unit for heavy commercial
vehicle brakes in Special Economic Zone for export order processing.
Role : Project Leader and Project co-coordinator
Responsibilities:
Developed internal ramp-up plan for the project to meet the customer requirement.
Calculation of machine cycle time, takt time and finishing line cycle time and arrive
at machine requirements
Preparation of project report and sanction for management approval
Preparation of Gantt chart for project tracking and periodic review with top
management for schedule, effort and project cost
Design Calculation for service equipment requirements - Transformer, Diesel
Generator, Thermopac, Cooling tower and Air compressor
Coordinated with Civil, Electrical, Thermic fluid, Air and Water line contractors for
building and utilities
Planning and procurement of various quality checking aides for product testing.
Procurement of standard machines for processing / testing after negotiating with
manufacturers and suppliers
Design of Electrical control systems for the machines & Cable sizing calculation
Project Name: Pressure Die Casting machine for Brake Shoe Manufacture
Project Process: New Product Development
Project Description:
This machine is built for in-house manufacture of brake shoe castings for 2-wheelers.
Page 6 of 8
7. Role : Project Leader
Responsibilities:
Responsible for design and development of the machine
Design of Electrical control systems for the machine
Developed PLC and HMI programs for pressure die casting machine operation
Troubleshooting of the equipment during trials and up to 6 months after installation
EDUCATIONAL QUALIFICATIONS:
Completed B.E (Electrical & Electronics) from University of Madras in 1998 with 66%.
Completed Higher secondary School Education (12th
Standard) from NMHSS
School, Chennai in 1994 with 75%.
Completed Secondary School Education (10th
Standard) from SRMHSS School,
Chennai in 1992 with 81%.
Completed Higher Diploma in Software Engineering from Aptech computer education
in 1997 with 71%.
COMPUTER PROFICIENCY:
DBMS / RDBMS : MS-Access, FoxPro, Oracle 8.0, MS-SQL Server 2005
GUIs : VB.Net, C#.Net, VB 6.0
Programming Languages : C, C++
Packages : MS-Office, Lotus SmartSuite, MS-Project
CAD/CAM Tools : AutoCAD Electrical, Promis-E (Adept-E), Solidworks Electrical
PLC Programming : RS-Logix 500, RS-Logix 5000, Baldor Motion Controller
HMI Programming : C-More Automation HMI, Panel View plus
Others : SKM Power analysis software, Dialux and Exposure to
Chamlite lighting design software.
PERSONAL INFORMATION:
Father's Name : D.B. Sundaravaradan
Date of Birth : 09-Oct-1976
Nationality : Indian
Marital Status : Married
Passport No : H2702786
Validity : Till 28-Jan-2019
Visa Detail : B1 visa for USA
Visa Validity : Till 30-Apr-2017
Notice Period : 3 Months
Present CTC : Rs. 10.40 Lakhs
Declaration
I hereby declare that the above information is true to the best of my knowledge.
Page 7 of 8