SlideShare a Scribd company logo
1 of 8
RANGARAJAN. D.B
#10 South Park Street,
Venkatapuram, Ambattur
Chennai-600 053 Mobile : 91-9840843820
Tamilnadu, Email : rangarajandb@rediffmail.com
India rsundaravaradan@yahoo.com
PROFESSIONAL EXPERIENCE:
My Overall Experience is more than 15.10 years.
I am currently working with Barry-Wehmiller International, Chennai as Project Leader for
the past 9 years and 8 months.
Prior to this I had worked in TVS Sundaram Brake Linings, Chennai as a Senior Executive –
Automatic / Semi-automatic machine building Projects for 6 years and 3 months.
MAJOR STRENGTHS
 Expertise in Design of various Automatic Machines
 Expertise in Electrical & Instrumentation design and sizing calculations for Water
treatment and Oil & Gas plants
 Good Project Management, Customer Management and Team Leading skills
 Ability to build, lead & manage multi—disciplinary teams
 Simultaneous management of multiple engineering design projects
 Planning, Scheduling, Project execution and progress reporting
 Delivery, Quality and resource control
 Good troubleshooting skills on Mechanical and Electrical systems
 Good working knowledge on Pneumatics and Hydraulics
 Expertise in Industrial Automation and PLC / HMI Programming
 Good knowledge on Electrical Panel layouts and Electrical Schematics
 Proficient with AutoCAD and Promis-E electrical schematics development softwares
 Good Programming skills in VB / VB.Net / C#.Net
 Ability to adapt to new technologies quickly
ORGANIZATION EXPERIENCE:
Present Employer:
Company Name - Barry-Wehmiller International
Present Designation - Engineering Specialist
Present Role - Project Manager
Career Path - Senior Design Engineer/ Lead Design Engineer / Specialist
Period - Nov-2006 to Till date.
Page 1 of 8
Responsibilities:
 Managing the complete electrical & instrumentation engineering design and detailing
process
 Responsible for Project Planning, Budgeting and Resource planning
 Study of project requirements, Estimation and Project Proposals
 Co-ordination with end-client engineers for drawing approvals
 Resolving issues, conflicts and managing on time delivery
 Quality planning and executing using specific checklists and roles
 Liaising with equipment / instrument vendors for engineering inputs
 Weekly progress reporting and Milestone invoicing
 Design Calculations for Transformer sizing, Generator sizing, LV & MV Cables, Earthing,
MV & MCC components sizing for Oil & Gas and Water treatment plants.
 Design of Electrical control systems for Oil & Gas, Water Treatment plants, Paper
converting and Paper finishing machines.
 Preparation of MCC schematics, Earthing & Lighting layouts.
 Review of PLC I/O List, Architecture diagram, Instrument Index, Instrument loop &
Instrument hook-up diagrams, Power and Instrument cable schedules.
 PLC programming for Allen-Bradley Compact Logix and Control Logix PLCs.
 Development of HMI screens.
 Design of Field communication system and Field Devices interconnect diagrams.
 Travel to customer place based on project requirement for supporting and executing
their Engineering activities.
 Preparation and maintenance of Project documents.
Previous Employer:
Company Name - Sundaram Brake Linings Ltd – TVS Group
Last Designation - Senior Executive - 2 (Projects)
Period - Aug-2000 to Oct-2006
Tenure - 6 Years & 3 Months.
Career Path - GET / Asst. Engineer / Engineer / Executive
Sr.Executive-1 / Sr. Executive-2
Responsibilities:
 Project leader and Project coordinator
 Preparation of initial feasibility report for the project
Page 2 of 8
 Project Planning, Budgeting, Manufacturing tracking, Inspection, Erection, Testing,
Commissioning and Performance Tracking of machines
 Preparing and updating Gantt Charts for projects, preparation of Gap Analysis
 Design of Electrical control systems for machineries
 Developing computer programs for machines using 'C' programming language
 Introducing low cost automations for productivity improvement and retrofits
PROJECT DETAILS:
Project Name: Detailed Engineering support for Water treatment plant
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to design complete electrical system for installation of water
treatment plant. The project involves the following Electrical & Instrumentation activities:
 Electrical and Instrument cable sizing calculations
 Development of plant room electrical layout & cable tray routing layout
 Lighting calculations and Lighting layout
 Earthing & Lightning calculations and layouts
 MCC room, Transformer yard and generator room layouts
 Instrument loop diagrams
 Instrument hook up drawings
 PLC I/O list & Instrument Index
Role : Project Manager
Responsibilities:
 Preparation of Project proposal and submission to customer
 Responsible for Project Planning, Budgeting and Resource planning
 Lead a team of electrical and instrumentation engineers to complete the design of
Electrical and Instrumentation deliverables
 Liaising with equipment / instrument vendors for engineering inputs
 Review of design documents and drawings prepared by the Engineers
 Provide Technical consulting to customer
 Participate in weekly review meetings with the customer
 Preparation and reporting of project metrics to stake holders
Project Name: Detailed Engineering support for Chemical Injection skids
Project Process: Off-shore Engineering support
Project Description:
Page 3 of 8
The scope of the project is to design complete electrical system for manufacture of chemical
injection skids. The project involves the following Electrical & Instrumentation activities:
 Design of PLC control panel with AB Compact Logix 5370 controller
 Development of Single Line Diagram
 Electrical Load calculations, Power dissipation calculation
 Instrument loop diagrams, Instrument hook up drawings
 Earthing layout design, Cable tray layout design
 PLC I/O list, PLC Architecture diagram
 Instrument Index
 System Block diagram
Role : Project Manager
Responsibilities:
 Preparation of Project proposal and submission to customer
 Responsible for Project Planning, Budgeting and Resource planning
 Lead a team of electrical and instrumentation engineers to complete the design of
Electrical and Instrumentation deliverables
 Liaising with equipment / instrument vendors for engineering inputs
 Review of design documents and drawings prepared by the Engineers
 Provide Technical consulting to customer
 Participate in weekly review meetings with the customer
 Preparation and reporting of project metrics to stake holders
Project Name: Controls Engineering Support for Wastewater Treatment plant
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to provide Engineering support to a leading Wastewater
treatment equipment manufacturer for their projects.
Role : Project Manager
Responsibilities:
 Preparation of Project proposal and submission to customer
 Responsible for Project Planning, Budgeting and Resource planning
 Responsible for Electrical design of the System
 Lead a team of Engineers for completing the Electrical and Instrumentation tasks
 Design calculations for Transformer sizing, Generator Sizing, MV & LV cable sizing,
MV and MCC components sizing and Earthing calculations
 Design of MCC panel schematics and Earthing layouts
 Review of PLC I/O List, Instrument Index, Network Architecture diagram, Instrument
loop and Hook-up diagrams, Cable and cable tray layouts, BOM for cable tray
Page 4 of 8
installation, Power and Instrument Cable schedule, Lighting calculations and Lighting
layouts
 Project Management activities including Master schedule preparation, Weekly status
updation, Metrics preparation and reporting to stake holders
Project Name: Controls Engineering Support for Water Treatment equipment
Project Process: Off-shore Engineering support
Project Description:
The scope of the project is to provide Engineering support to a leading Water treatment
equipment manufacturer for their projects.
Role : Project Manager
Responsibilities:
 Preparation of Project proposal and submission to customer
 Responsible for Project Planning, Budgeting and Resource planning
 Development of P&ID diagrams for Skid and Rack assemblies based on
Job Order and Standard P & ID practices
 MCC panel sizing calculations
 Design of Electrical control systems using AutoCAD electrical for Skid/Rack
assemblies
 Development of PLC programs and HMI screens
Project Name: Automatic Gasket Winding System
Project Process: New Product development
Project Description:
This is for a Leading Hydraulic Pipeline Gasket Manufacturer based out of United States. The
machine is completely automatic winding machine with facility to wind steel gaskets.
Role : Project Leader
Responsibilities:
 Design of electrical control systems for the system
 Configuring and Tuning of Servo motors used in the System
 Developed PLC program & HMI screens for the system
 Carried out Testing & trials of the system including FAT
Project Name: FDA Validation of Coating Pan and Air Handling Unit
Project Process: FDA Validation of new medical equipments
Project Description:
Page 5 of 8
The scope of the project is to validate the Coating Pan and Air Handling Unit of the new
manufacturing unit to meet the FDA requirements.
Role : Team Member
Responsibilities:
 Studied the Coating Pan and Air Handling Unit and their Engineering documents /
drawings
 Prepared the Installation Qualification and Operational Qualification Protocol
documents for the Coating Pan and Air Handling Unit
 Executed the IQ and OQ Protocols, prepared and submitted the final report
Project Name: Installation of dedicated Manufacturing unit for Heavy
Commercial vehicle brakes
Project Process: New Manufacturing Facility Setup
Project Description:
The scope of the project is to install a dedicated manufacturing unit for heavy commercial
vehicle brakes in Special Economic Zone for export order processing.
Role : Project Leader and Project co-coordinator
Responsibilities:
 Developed internal ramp-up plan for the project to meet the customer requirement.
 Calculation of machine cycle time, takt time and finishing line cycle time and arrive
at machine requirements
 Preparation of project report and sanction for management approval
 Preparation of Gantt chart for project tracking and periodic review with top
management for schedule, effort and project cost
 Design Calculation for service equipment requirements - Transformer, Diesel
Generator, Thermopac, Cooling tower and Air compressor
 Coordinated with Civil, Electrical, Thermic fluid, Air and Water line contractors for
building and utilities
 Planning and procurement of various quality checking aides for product testing.
 Procurement of standard machines for processing / testing after negotiating with
manufacturers and suppliers
 Design of Electrical control systems for the machines & Cable sizing calculation
Project Name: Pressure Die Casting machine for Brake Shoe Manufacture
Project Process: New Product Development
Project Description:
This machine is built for in-house manufacture of brake shoe castings for 2-wheelers.
Page 6 of 8
Role : Project Leader
Responsibilities:
 Responsible for design and development of the machine
 Design of Electrical control systems for the machine
 Developed PLC and HMI programs for pressure die casting machine operation
 Troubleshooting of the equipment during trials and up to 6 months after installation
EDUCATIONAL QUALIFICATIONS:
 Completed B.E (Electrical & Electronics) from University of Madras in 1998 with 66%.
 Completed Higher secondary School Education (12th
Standard) from NMHSS
School, Chennai in 1994 with 75%.
 Completed Secondary School Education (10th
Standard) from SRMHSS School,
Chennai in 1992 with 81%.
 Completed Higher Diploma in Software Engineering from Aptech computer education
in 1997 with 71%.
COMPUTER PROFICIENCY:
DBMS / RDBMS : MS-Access, FoxPro, Oracle 8.0, MS-SQL Server 2005
GUIs : VB.Net, C#.Net, VB 6.0
Programming Languages : C, C++
Packages : MS-Office, Lotus SmartSuite, MS-Project
CAD/CAM Tools : AutoCAD Electrical, Promis-E (Adept-E), Solidworks Electrical
PLC Programming : RS-Logix 500, RS-Logix 5000, Baldor Motion Controller
HMI Programming : C-More Automation HMI, Panel View plus
Others : SKM Power analysis software, Dialux and Exposure to
Chamlite lighting design software.
PERSONAL INFORMATION:
Father's Name : D.B. Sundaravaradan
Date of Birth : 09-Oct-1976
Nationality : Indian
Marital Status : Married
Passport No : H2702786
Validity : Till 28-Jan-2019
Visa Detail : B1 visa for USA
Visa Validity : Till 30-Apr-2017
Notice Period : 3 Months
Present CTC : Rs. 10.40 Lakhs
Declaration
I hereby declare that the above information is true to the best of my knowledge.
Page 7 of 8
RANGARAJAN. D.B
Page 8 of 8

More Related Content

What's hot

What's hot (20)

anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)Resume-Rajib Sharma(L)
Resume-Rajib Sharma(L)
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Resume of ECHeausler
Resume of ECHeausler Resume of ECHeausler
Resume of ECHeausler
 
RichmondApande PM
RichmondApande PMRichmondApande PM
RichmondApande PM
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
Pes profile
Pes profilePes profile
Pes profile
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
Al Mutim Resume
Al Mutim ResumeAl Mutim Resume
Al Mutim Resume
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 

Viewers also liked

ÁREA MATEMÁTICAS
ÁREA MATEMÁTICASÁREA MATEMÁTICAS
ÁREA MATEMÁTICAScgarmit952
 
IPcenter_In_Action
IPcenter_In_ActionIPcenter_In_Action
IPcenter_In_ActionJohn Isdell
 
Aplicación de las funciones trigonometricas en la arquitectura
Aplicación de las funciones trigonometricas en la arquitecturaAplicación de las funciones trigonometricas en la arquitectura
Aplicación de las funciones trigonometricas en la arquitecturaDaniel alejandro celi costa
 
Creating dialogue scenarios-3
Creating dialogue scenarios-3Creating dialogue scenarios-3
Creating dialogue scenarios-3Fay Amber Yaxley
 
Kela, Tarsalainen: finlands maternity package
Kela, Tarsalainen: finlands maternity packageKela, Tarsalainen: finlands maternity package
Kela, Tarsalainen: finlands maternity packageKela
 
Capt. persobi waldemar presentation print
Capt. persobi waldemar presentation  printCapt. persobi waldemar presentation  print
Capt. persobi waldemar presentation printCapt. Persobi Waldemar
 
Doc thu lop 7 tap 1
Doc thu   lop 7 tap 1Doc thu   lop 7 tap 1
Doc thu lop 7 tap 1mcbooksjsc
 
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise Kivimäki
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise KivimäkiKela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise Kivimäki
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise KivimäkiKela
 
Pages from ruột tu hoc tieng anh cap toc file chot chuyen dat in 6112015
Pages from ruột   tu hoc tieng anh cap toc file chot chuyen dat in 6112015Pages from ruột   tu hoc tieng anh cap toc file chot chuyen dat in 6112015
Pages from ruột tu hoc tieng anh cap toc file chot chuyen dat in 6112015mcbooksjsc
 

Viewers also liked (16)

ÁREA MATEMÁTICAS
ÁREA MATEMÁTICASÁREA MATEMÁTICAS
ÁREA MATEMÁTICAS
 
WPF_WebsitePreview
WPF_WebsitePreviewWPF_WebsitePreview
WPF_WebsitePreview
 
pschreiner_CV
pschreiner_CVpschreiner_CV
pschreiner_CV
 
cpc
cpccpc
cpc
 
MOSCOW_SMART_CITY
MOSCOW_SMART_CITYMOSCOW_SMART_CITY
MOSCOW_SMART_CITY
 
EVALUACIÓN
EVALUACIÓNEVALUACIÓN
EVALUACIÓN
 
IPcenter_In_Action
IPcenter_In_ActionIPcenter_In_Action
IPcenter_In_Action
 
Aplicación de las funciones trigonometricas en la arquitectura
Aplicación de las funciones trigonometricas en la arquitecturaAplicación de las funciones trigonometricas en la arquitectura
Aplicación de las funciones trigonometricas en la arquitectura
 
The types of briefs
The types of briefsThe types of briefs
The types of briefs
 
Hitchhiker
HitchhikerHitchhiker
Hitchhiker
 
Creating dialogue scenarios-3
Creating dialogue scenarios-3Creating dialogue scenarios-3
Creating dialogue scenarios-3
 
Kela, Tarsalainen: finlands maternity package
Kela, Tarsalainen: finlands maternity packageKela, Tarsalainen: finlands maternity package
Kela, Tarsalainen: finlands maternity package
 
Capt. persobi waldemar presentation print
Capt. persobi waldemar presentation  printCapt. persobi waldemar presentation  print
Capt. persobi waldemar presentation print
 
Doc thu lop 7 tap 1
Doc thu   lop 7 tap 1Doc thu   lop 7 tap 1
Doc thu lop 7 tap 1
 
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise Kivimäki
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise KivimäkiKela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise Kivimäki
Kela, Kuumat perunat 10.1.17, Ikäihmisten palvelut, Elise Kivimäki
 
Pages from ruột tu hoc tieng anh cap toc file chot chuyen dat in 6112015
Pages from ruột   tu hoc tieng anh cap toc file chot chuyen dat in 6112015Pages from ruột   tu hoc tieng anh cap toc file chot chuyen dat in 6112015
Pages from ruột tu hoc tieng anh cap toc file chot chuyen dat in 6112015
 

Similar to Resume_Rangarajan (1) (20)

sakthibalan_resume
sakthibalan_resumesakthibalan_resume
sakthibalan_resume
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Muralidhar
MuralidharMuralidhar
Muralidhar
 
Kumeresan resume
Kumeresan resumeKumeresan resume
Kumeresan resume
 
Anbazhagan_Resume
Anbazhagan_ResumeAnbazhagan_Resume
Anbazhagan_Resume
 
SSPATILCV
SSPATILCVSSPATILCV
SSPATILCV
 
Harshit Resume-Instrumentation
Harshit Resume-InstrumentationHarshit Resume-Instrumentation
Harshit Resume-Instrumentation
 
Resume
ResumeResume
Resume
 
cv new
cv newcv new
cv new
 
Dhruv patel resume
Dhruv patel resumeDhruv patel resume
Dhruv patel resume
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 

Resume_Rangarajan (1)

  • 1. RANGARAJAN. D.B #10 South Park Street, Venkatapuram, Ambattur Chennai-600 053 Mobile : 91-9840843820 Tamilnadu, Email : rangarajandb@rediffmail.com India rsundaravaradan@yahoo.com PROFESSIONAL EXPERIENCE: My Overall Experience is more than 15.10 years. I am currently working with Barry-Wehmiller International, Chennai as Project Leader for the past 9 years and 8 months. Prior to this I had worked in TVS Sundaram Brake Linings, Chennai as a Senior Executive – Automatic / Semi-automatic machine building Projects for 6 years and 3 months. MAJOR STRENGTHS  Expertise in Design of various Automatic Machines  Expertise in Electrical & Instrumentation design and sizing calculations for Water treatment and Oil & Gas plants  Good Project Management, Customer Management and Team Leading skills  Ability to build, lead & manage multi—disciplinary teams  Simultaneous management of multiple engineering design projects  Planning, Scheduling, Project execution and progress reporting  Delivery, Quality and resource control  Good troubleshooting skills on Mechanical and Electrical systems  Good working knowledge on Pneumatics and Hydraulics  Expertise in Industrial Automation and PLC / HMI Programming  Good knowledge on Electrical Panel layouts and Electrical Schematics  Proficient with AutoCAD and Promis-E electrical schematics development softwares  Good Programming skills in VB / VB.Net / C#.Net  Ability to adapt to new technologies quickly ORGANIZATION EXPERIENCE: Present Employer: Company Name - Barry-Wehmiller International Present Designation - Engineering Specialist Present Role - Project Manager Career Path - Senior Design Engineer/ Lead Design Engineer / Specialist Period - Nov-2006 to Till date. Page 1 of 8
  • 2. Responsibilities:  Managing the complete electrical & instrumentation engineering design and detailing process  Responsible for Project Planning, Budgeting and Resource planning  Study of project requirements, Estimation and Project Proposals  Co-ordination with end-client engineers for drawing approvals  Resolving issues, conflicts and managing on time delivery  Quality planning and executing using specific checklists and roles  Liaising with equipment / instrument vendors for engineering inputs  Weekly progress reporting and Milestone invoicing  Design Calculations for Transformer sizing, Generator sizing, LV & MV Cables, Earthing, MV & MCC components sizing for Oil & Gas and Water treatment plants.  Design of Electrical control systems for Oil & Gas, Water Treatment plants, Paper converting and Paper finishing machines.  Preparation of MCC schematics, Earthing & Lighting layouts.  Review of PLC I/O List, Architecture diagram, Instrument Index, Instrument loop & Instrument hook-up diagrams, Power and Instrument cable schedules.  PLC programming for Allen-Bradley Compact Logix and Control Logix PLCs.  Development of HMI screens.  Design of Field communication system and Field Devices interconnect diagrams.  Travel to customer place based on project requirement for supporting and executing their Engineering activities.  Preparation and maintenance of Project documents. Previous Employer: Company Name - Sundaram Brake Linings Ltd – TVS Group Last Designation - Senior Executive - 2 (Projects) Period - Aug-2000 to Oct-2006 Tenure - 6 Years & 3 Months. Career Path - GET / Asst. Engineer / Engineer / Executive Sr.Executive-1 / Sr. Executive-2 Responsibilities:  Project leader and Project coordinator  Preparation of initial feasibility report for the project Page 2 of 8
  • 3.  Project Planning, Budgeting, Manufacturing tracking, Inspection, Erection, Testing, Commissioning and Performance Tracking of machines  Preparing and updating Gantt Charts for projects, preparation of Gap Analysis  Design of Electrical control systems for machineries  Developing computer programs for machines using 'C' programming language  Introducing low cost automations for productivity improvement and retrofits PROJECT DETAILS: Project Name: Detailed Engineering support for Water treatment plant Project Process: Off-shore Engineering support Project Description: The scope of the project is to design complete electrical system for installation of water treatment plant. The project involves the following Electrical & Instrumentation activities:  Electrical and Instrument cable sizing calculations  Development of plant room electrical layout & cable tray routing layout  Lighting calculations and Lighting layout  Earthing & Lightning calculations and layouts  MCC room, Transformer yard and generator room layouts  Instrument loop diagrams  Instrument hook up drawings  PLC I/O list & Instrument Index Role : Project Manager Responsibilities:  Preparation of Project proposal and submission to customer  Responsible for Project Planning, Budgeting and Resource planning  Lead a team of electrical and instrumentation engineers to complete the design of Electrical and Instrumentation deliverables  Liaising with equipment / instrument vendors for engineering inputs  Review of design documents and drawings prepared by the Engineers  Provide Technical consulting to customer  Participate in weekly review meetings with the customer  Preparation and reporting of project metrics to stake holders Project Name: Detailed Engineering support for Chemical Injection skids Project Process: Off-shore Engineering support Project Description: Page 3 of 8
  • 4. The scope of the project is to design complete electrical system for manufacture of chemical injection skids. The project involves the following Electrical & Instrumentation activities:  Design of PLC control panel with AB Compact Logix 5370 controller  Development of Single Line Diagram  Electrical Load calculations, Power dissipation calculation  Instrument loop diagrams, Instrument hook up drawings  Earthing layout design, Cable tray layout design  PLC I/O list, PLC Architecture diagram  Instrument Index  System Block diagram Role : Project Manager Responsibilities:  Preparation of Project proposal and submission to customer  Responsible for Project Planning, Budgeting and Resource planning  Lead a team of electrical and instrumentation engineers to complete the design of Electrical and Instrumentation deliverables  Liaising with equipment / instrument vendors for engineering inputs  Review of design documents and drawings prepared by the Engineers  Provide Technical consulting to customer  Participate in weekly review meetings with the customer  Preparation and reporting of project metrics to stake holders Project Name: Controls Engineering Support for Wastewater Treatment plant Project Process: Off-shore Engineering support Project Description: The scope of the project is to provide Engineering support to a leading Wastewater treatment equipment manufacturer for their projects. Role : Project Manager Responsibilities:  Preparation of Project proposal and submission to customer  Responsible for Project Planning, Budgeting and Resource planning  Responsible for Electrical design of the System  Lead a team of Engineers for completing the Electrical and Instrumentation tasks  Design calculations for Transformer sizing, Generator Sizing, MV & LV cable sizing, MV and MCC components sizing and Earthing calculations  Design of MCC panel schematics and Earthing layouts  Review of PLC I/O List, Instrument Index, Network Architecture diagram, Instrument loop and Hook-up diagrams, Cable and cable tray layouts, BOM for cable tray Page 4 of 8
  • 5. installation, Power and Instrument Cable schedule, Lighting calculations and Lighting layouts  Project Management activities including Master schedule preparation, Weekly status updation, Metrics preparation and reporting to stake holders Project Name: Controls Engineering Support for Water Treatment equipment Project Process: Off-shore Engineering support Project Description: The scope of the project is to provide Engineering support to a leading Water treatment equipment manufacturer for their projects. Role : Project Manager Responsibilities:  Preparation of Project proposal and submission to customer  Responsible for Project Planning, Budgeting and Resource planning  Development of P&ID diagrams for Skid and Rack assemblies based on Job Order and Standard P & ID practices  MCC panel sizing calculations  Design of Electrical control systems using AutoCAD electrical for Skid/Rack assemblies  Development of PLC programs and HMI screens Project Name: Automatic Gasket Winding System Project Process: New Product development Project Description: This is for a Leading Hydraulic Pipeline Gasket Manufacturer based out of United States. The machine is completely automatic winding machine with facility to wind steel gaskets. Role : Project Leader Responsibilities:  Design of electrical control systems for the system  Configuring and Tuning of Servo motors used in the System  Developed PLC program & HMI screens for the system  Carried out Testing & trials of the system including FAT Project Name: FDA Validation of Coating Pan and Air Handling Unit Project Process: FDA Validation of new medical equipments Project Description: Page 5 of 8
  • 6. The scope of the project is to validate the Coating Pan and Air Handling Unit of the new manufacturing unit to meet the FDA requirements. Role : Team Member Responsibilities:  Studied the Coating Pan and Air Handling Unit and their Engineering documents / drawings  Prepared the Installation Qualification and Operational Qualification Protocol documents for the Coating Pan and Air Handling Unit  Executed the IQ and OQ Protocols, prepared and submitted the final report Project Name: Installation of dedicated Manufacturing unit for Heavy Commercial vehicle brakes Project Process: New Manufacturing Facility Setup Project Description: The scope of the project is to install a dedicated manufacturing unit for heavy commercial vehicle brakes in Special Economic Zone for export order processing. Role : Project Leader and Project co-coordinator Responsibilities:  Developed internal ramp-up plan for the project to meet the customer requirement.  Calculation of machine cycle time, takt time and finishing line cycle time and arrive at machine requirements  Preparation of project report and sanction for management approval  Preparation of Gantt chart for project tracking and periodic review with top management for schedule, effort and project cost  Design Calculation for service equipment requirements - Transformer, Diesel Generator, Thermopac, Cooling tower and Air compressor  Coordinated with Civil, Electrical, Thermic fluid, Air and Water line contractors for building and utilities  Planning and procurement of various quality checking aides for product testing.  Procurement of standard machines for processing / testing after negotiating with manufacturers and suppliers  Design of Electrical control systems for the machines & Cable sizing calculation Project Name: Pressure Die Casting machine for Brake Shoe Manufacture Project Process: New Product Development Project Description: This machine is built for in-house manufacture of brake shoe castings for 2-wheelers. Page 6 of 8
  • 7. Role : Project Leader Responsibilities:  Responsible for design and development of the machine  Design of Electrical control systems for the machine  Developed PLC and HMI programs for pressure die casting machine operation  Troubleshooting of the equipment during trials and up to 6 months after installation EDUCATIONAL QUALIFICATIONS:  Completed B.E (Electrical & Electronics) from University of Madras in 1998 with 66%.  Completed Higher secondary School Education (12th Standard) from NMHSS School, Chennai in 1994 with 75%.  Completed Secondary School Education (10th Standard) from SRMHSS School, Chennai in 1992 with 81%.  Completed Higher Diploma in Software Engineering from Aptech computer education in 1997 with 71%. COMPUTER PROFICIENCY: DBMS / RDBMS : MS-Access, FoxPro, Oracle 8.0, MS-SQL Server 2005 GUIs : VB.Net, C#.Net, VB 6.0 Programming Languages : C, C++ Packages : MS-Office, Lotus SmartSuite, MS-Project CAD/CAM Tools : AutoCAD Electrical, Promis-E (Adept-E), Solidworks Electrical PLC Programming : RS-Logix 500, RS-Logix 5000, Baldor Motion Controller HMI Programming : C-More Automation HMI, Panel View plus Others : SKM Power analysis software, Dialux and Exposure to Chamlite lighting design software. PERSONAL INFORMATION: Father's Name : D.B. Sundaravaradan Date of Birth : 09-Oct-1976 Nationality : Indian Marital Status : Married Passport No : H2702786 Validity : Till 28-Jan-2019 Visa Detail : B1 visa for USA Visa Validity : Till 30-Apr-2017 Notice Period : 3 Months Present CTC : Rs. 10.40 Lakhs Declaration I hereby declare that the above information is true to the best of my knowledge. Page 7 of 8