1. Stephen Brooks
Personal Details
Address: 11 Victoria Terrace
Hamsterley Colliery
NE177SJ
Mobile: 07773021741
Date of birth: 18.06.1962
Nationality: British
Email: sbrooks1863@gmail.com
Availability Immediately
Previous job roles; Piping engineer, piping works manager, piping
supervisor, pipe fitter, piping charge hand.
Professional profile
I am a multi discipline pipe line specialist, working across many industries from Oil and Gas
to nuclear, with over 15 years’ experience of project managing. I am fully capable of working
with a variety of materials, ranging from Carbon Steel to Chrome Alloy and many sizes of
pipe, whether it be small 1” and 2” Stainless to 72” Carbon. I have worked throughout the
world, in countries including; UK, USA, Norway, Netherlands and more, working with a mix
of nationalities. Most recent projects involved managing teams of Polish pipe-fitters, riggers
and welders. In these recent positions I have not only managed the team on site but also been
very client facing, dealing with companies such as Alstom, Essent and Copisa Industrial to
name a few. An example being, I would report to the client, providing information on the
progress we have made, as well as explaining the problems we have overcome, and any
possible future problems. Together with this, I would offer solutions to overcome the issues,
providing the most low cost yet safest answer, enabling the project to continue meeting
quality standards and deadlines.
2. Education: City and Guilds pt. 1, 2 & 3 pipe work
engineering
Longlends College, Middlesbrough 1978-1982
I.T.B Pipe & Tube Fabrication
D24 Advanced pipe work
F10 general welding & cutting
English, 2002
Level 1&2 O.C.R Mathematics, 2002
Abrasive Wheel Certifications
(All achieved between 1978-1982)
(All available on request)
Walbottle High School
7 C.S.E Passes
Certifications: CSCS Card
Flange Joint training & awareness (Doosan) – allows
me to train other employees around this.
LOKRING certified installer - 21/02/2017
ECITB Saftey Card
Doosan – Validation card – 06(TA)540 (making
gasketed joints)
Safety electrical working – 1000 vaults
Understand the petrochemicals procedure – SABIC
Pipe Skills: Worked with sizes; ½”, 1”, 2”, 3”, 4”, 6” up to 72”
Worked with: stainless steel, carbon steel, chrome alloy,
aluminium, copper, PVC, PE
Industries I have worked within; Oil and gas, pharmaceutical, petrochemical, food,
brewery, nuclear, power, ship yards, super tankers, LPG
ships, offshore (rigs, pipa-alpha 1&2, Bonga offshore
floating platform), commercial new builds, oil refinery,
Biogas, waste to energy, renewable, Solar
3. Experience:
April 2016 – Current Piping Supervisor
AHL
Installing chiller unit / ethanol lines / nitrogen lines and
4 skids at Proctor and Gamble pharmaceutical.
Currently coordinating piping, rigging, welding,
installation etc. Attend all progress and look ahead
meetings.
January 2016- March 2016 Mechanical Construction Manager
M+W Group
Phillipines
Working on a solar power plant, my role is to ensure the
project meets deadlines whilst working within a range
of skills. Turned the project around in three months.
Solar /renewable / power / electricity / project manager /
piping
March 2015 - AHL Pipework Specialists
October 2015 Jarrow
Piping Superintendent
Duties; I am charge of ensuring their latest project in
Leeming Bar is delivered on time. The project is a large
Biogas, waste to energy project on behalf of the client –
JFS. As can be seen by the press release -
http://jfsassociates.co.uk/leeming-bar-plant-has-gone-
live/.
When I joined the project in March it looked unlikely to
be delivered by this point, we have managed, as a team
to turn the project in to a success. We recently flowed
Bio-methane to the grid.
September 2014 SBV Fabrications
- December 2014 Middleborough
Piping Services Manager
Duties: I am in charge of the entire piping division of
SBV, recently working upon a major Steel site in Hull.
I am now based on site overseeing the fabricating
piping work for major projects. I am involved in tender
work, advising upon contractual issues and ensuring
that each client’s deliverables are on time.
4. May 2011- Doosan Power/oil refinery
August 2014 Grangemouth, Scotland
Area Supervisor / project manager
Duties: Duties include constructing a pipeline to
supply steam / power to other areas of the plant. I have
also been responsible for snagging work and punchout
work. I am frequently involved in some of the most
critical projects within our area / plant to ensure projects
are on time / on schedule.
I am also currently seconded across the country at a QA
inspector to ensure projects are completed to Doosan
standard. Currently at SABIC petrochemicals.
August 2010- Copisa Industrial/Alstom Power
February 2011 Maasbracht, Netherlands
Piping works manager
Duties: In charge of 40 pipe fitters, riggers,
electricians and welders, at Maasbracht power station.
My position was to delegate work to my
supervisors in charge of separate trades as
mentioned above.
June 2008-2010 Atlanco House
25 Quarry Park Close
Moulton Park
Northampton, NN3 6QB, UK
SITE: Langage Energy Centre
Piping works manager
In charge of 239 pipe fitters, riggers, electricians and
welders, at Langage PowerStation, Plymouth.
Delegation of work to my supervisors in charge of the
fore mentioned trades.
2004-june2008 Stainless Services North East Ltd
Piping engineer (supervisor)
Projects;
● Tait and Lyle Sugar Plant, London
● British Sugar Plant, Shrewsbury
● Proctor and Gamble, Northumberland
● Gas Plant, Mold, Norway
● Bonga, Floating oil rig
● Federation Breweries
● Glaxo SmithKline, Barnet
5. Duties;
Lay and closely supervise pipefitting, rigging
and pipe repairing operations.
Instruct helpers as to how and where to begin, and the
type of material to use.
Direct flushing of service lines following installation
and repair.
Complete inspection and operating tests of repairs.
Supervise safe and proper use of tools, and other
equipment;.
Plan jobs, estimating equipment, materials and labour.
Assume responsibility for a crew assigned to making
emergency repairs.
Direct safety measures for the protection of the labour
force and the public while work is in progress.
Keep records and prepare reports of labour, time,
accidents and service interruptions.
Monitored hours worked etc.
Report to general foreman or senior engineer.
Brake down full work plan to various teams of welders,
riggers, fitters, monitor progress and co-ordinate works.
Gain clearance for technical queries and implement any
changes needed.
2003- April 2004 Brewchem Ltd
Piping engineer (supervisor)
Canary Wharf, London.
2002 JDA Engineering
Piping engineer (supervisor)
British Sugar Plant Shrewsbury
2001 RedPaths Engineering Ltd
Piping engineer
Enron power plant Teeside
6. 2000 JDA Engineering
Piping Supervisor
Proctor and Gamble, Seaton Delval
1999 P.S.L Engineering
Pipe fitter
S&N Breweries, Newcastle
1998 McNaulty’s, South Shields
Pipe fitter
Ship repair
1996-1997 Amec
Piping (charge hand)
3 Onshores Rigg’s
1995 Ingersol RAND, Chicago, USA
Charge hand
Large Ford plant, Chicago
1994 Amec
Pipefitter
Nigg Bay Riggs, ST Fergus, Scotland
1993 P&L Engineering
Pipe fitter
Norsk Hydro chemical plant, Sedgefield
1992 P.S.L Engineering
Foreman
Proctor & Gamble, Fawdun
1991 Amec
Chargehand
Wallsend Yard Oil Rig
1990 Redpath Engineering Ltd
Foreman
Sellafield Power Plant
1989 AP/AOC
Chargehand
WYTCH Farm, Dorset
1982-1989 Various engineering companies and contractors
Pipe fitter
Ships, Power plants, Pharmaceutical plants ect.