B.Sc. in electrical engineering (Kuban university in Krasnodar- Russia 1994)
Intensive course in programming and installation of PLC (Siemens step 7)
Training in HAZARD Management and Annual Safety Planning by TUV.
SENIOR ELECTRICAL ENGINEER APRIL 2014 to PRESENT
RAFIC A.KREIDIE Engineers & Contractors
Responsibilities and achievements:
I Worked in the following low current/low voltage systems:
Design, Execution & and calculation of Power SLD, Low current systems SLD and load schedule.
Installation, Calculation &Selection of Transformers, RMU, Generators, Cables, Cable tray & Trunking, Voltage
drop, Short circuit And circuit breakers
Installation of MDB, EMDP, ATS, DP, LP, PP PANELS, Earthing & lightening systems.
Design & Installation of low current/voltage systems:
FIRE ALARM SYSTEM: Addressable FACP, intelligent, Laser smoke detector, beam smoke detector,
Loop isolators, control and monitor relays, tamper switches.
PUBLIC ADDRESS: Amplifiers, speakers, volume control, microphones.
VOICE &DATA SYSTEM: SYSTIMAX Solution product :Data Rack, Data outlets, Wireless Data points,
IP telephone & IP TV, Video& data show, CAT7 S/FTP, Patch panels, SM &MM fiber optic cables.
CCTV SYSTEM: NVR, switches, IP &PTZ cameras.
DOOR ACCESS CONTROL SYSTEM: prox. card readers, magnetic contacts, push button & door controllers.
CLOCK SYSTEM: wireless clock, Master clock, GPS, TWD.
BMS: controlling HVAC system, pressurizing & smoke removal fans and monitoring electrical panels’ status.
Installation of: VAV & FCU controllers, Projectors, Amplifiers, Motorized Screens, Disconnect Switches,
Floor boxes, Lighting Fixtures, wall and ceiling outlets (Power & Data).
Dealing with tenders, projects study and estimation.
CRCC (Chinese Railway Construction SEPTEMBER 2009 to MARCH 2014
Senior electrical
Responsibilities and achievements:
I Worked as a senior site engineer in MEP section in the following fields:
Follow-up the electrical works from installation to the final handover stage.
Testing, pre-commissioning and commissioning of electrical works.
Interface management between different subsystems.
Reviewing of submissions, drawings and technical reports& dealing with reliability, availability maintainability.
KHATIB & ALAMI (Saudi Consolidating Engineering Company) JULY 2008 to MARCH 2009
Senior electrical engineer
Responsibilities and achievements:
I Worked as a consultant in the following fields:
Supervising electrical work in the projects belonging to the municipality.
Studying electrical works and preparing the necessary documents for tenders including
KAUST(King Abdullah University of Science & Technology) (Saudi ARAMCO subcontractor) April 2009 to August2009
Senior electrical engineer
Responsibilities and achievements:
I Worked as a consultant I PM Team in the following fields:
Pre-commissioning & commissioning of substation units (Cutler Hammer).
Supervising the electrical installation work which was also including the installation of PLCs and
management System incubators buildings.
Arabian Gulf Contracting Company APRIL 2000 to NOV.2007
Site electrical engineer
Responsibilities and achievements:
I Worked as a site engineer in the following fields:
Installation of power, control, signaling, instrument & fiber optical cables, lugs, glands, Cable joints
Cable tray, duct banks and manholes.
Installation of MDB, MCC, transformers, switch gears, RMUs, generators, Lighting poles &Towers.
Installation& maintenance of control panels, motors, submersible pumps, actuators, calibration of electro-
Magnetic and Ultrasonic flow meters, Chart recorders, chlorination system.
Maintenance & repair of control panels & circuits
Testing, pre-commissioning and commissioning of electrical works.
Al-WATANIA Poultry MARCH 1999 to JUNE 2000
Site electrical engineer
Responsibilities and achievements:
I Worked as a site engineer mainly in maintenance field:
Supervised electrical division which included Rewinding, Troubleshooting & Electrical panels sections.
Designing &execution of electrical Panels, troubleshooting works and estimation of electrical works.
Al-HUDA Textile & Waves co. (Sudan) AUGUST 1994 to DECEMBER 1998
Site electrical engineer
Responsibilities and achievements:
I Worked as a site engineer in the field of maintenance:
Dealt with maintenance works in the various sections of the plant, which included:
Textile, chillers, boilers & control sections, installation & executing of electrical shop drawings.
Other skills
Possessing Computer knowledge, MS package, AutoCAD.
Capable of dealing with engineering consultants, main contractors & manufacturers.
Dealing with standards & projects’ technical specifications (NEC, IEC....)
Arabic & English (fluently spoken and written)
Worked in projects with consultants: ATKINS;DBI;SAUDI CONSULT;ALDAR,ZFP;ALSUGGAIR

Cv electrical engr. fathi

  • 1.
    CV Fathi Hussein ALSunni +966530997405 falsunni@yahoo.com PERSONAL PROFILE Sex Male / Birth date 1965 Nationality Sudanese Status Married EDUCATION B.Sc. in electrical engineering (Kuban university in Krasnodar- Russia 1994) Intensive course in programming and installation of PLC (Siemens step 7) Training in HAZARD Management and Annual Safety Planning by TUV. SENIOR ELECTRICAL ENGINEER APRIL 2014 to PRESENT RAFIC A.KREIDIE Engineers & Contractors Responsibilities and achievements: I Worked in the following low current/low voltage systems: Design, Execution & and calculation of Power SLD, Low current systems SLD and load schedule. Installation, Calculation &Selection of Transformers, RMU, Generators, Cables, Cable tray & Trunking, Voltage drop, Short circuit And circuit breakers Installation of MDB, EMDP, ATS, DP, LP, PP PANELS, Earthing & lightening systems. Design & Installation of low current/voltage systems: FIRE ALARM SYSTEM: Addressable FACP, intelligent, Laser smoke detector, beam smoke detector, Loop isolators, control and monitor relays, tamper switches. PUBLIC ADDRESS: Amplifiers, speakers, volume control, microphones. VOICE &DATA SYSTEM: SYSTIMAX Solution product :Data Rack, Data outlets, Wireless Data points, IP telephone & IP TV, Video& data show, CAT7 S/FTP, Patch panels, SM &MM fiber optic cables. CCTV SYSTEM: NVR, switches, IP &PTZ cameras. DOOR ACCESS CONTROL SYSTEM: prox. card readers, magnetic contacts, push button & door controllers. CLOCK SYSTEM: wireless clock, Master clock, GPS, TWD. BMS: controlling HVAC system, pressurizing & smoke removal fans and monitoring electrical panels’ status. Installation of: VAV & FCU controllers, Projectors, Amplifiers, Motorized Screens, Disconnect Switches, Floor boxes, Lighting Fixtures, wall and ceiling outlets (Power & Data). Dealing with tenders, projects study and estimation. CRCC (Chinese Railway Construction SEPTEMBER 2009 to MARCH 2014 Senior electrical Responsibilities and achievements: I Worked as a senior site engineer in MEP section in the following fields: Follow-up the electrical works from installation to the final handover stage. Testing, pre-commissioning and commissioning of electrical works. Interface management between different subsystems. Reviewing of submissions, drawings and technical reports& dealing with reliability, availability maintainability.
  • 2.
    KHATIB & ALAMI(Saudi Consolidating Engineering Company) JULY 2008 to MARCH 2009 Senior electrical engineer Responsibilities and achievements: I Worked as a consultant in the following fields: Supervising electrical work in the projects belonging to the municipality. Studying electrical works and preparing the necessary documents for tenders including KAUST(King Abdullah University of Science & Technology) (Saudi ARAMCO subcontractor) April 2009 to August2009 Senior electrical engineer Responsibilities and achievements: I Worked as a consultant I PM Team in the following fields: Pre-commissioning & commissioning of substation units (Cutler Hammer). Supervising the electrical installation work which was also including the installation of PLCs and management System incubators buildings. Arabian Gulf Contracting Company APRIL 2000 to NOV.2007 Site electrical engineer Responsibilities and achievements: I Worked as a site engineer in the following fields: Installation of power, control, signaling, instrument & fiber optical cables, lugs, glands, Cable joints Cable tray, duct banks and manholes. Installation of MDB, MCC, transformers, switch gears, RMUs, generators, Lighting poles &Towers. Installation& maintenance of control panels, motors, submersible pumps, actuators, calibration of electro- Magnetic and Ultrasonic flow meters, Chart recorders, chlorination system. Maintenance & repair of control panels & circuits Testing, pre-commissioning and commissioning of electrical works. Al-WATANIA Poultry MARCH 1999 to JUNE 2000 Site electrical engineer Responsibilities and achievements: I Worked as a site engineer mainly in maintenance field: Supervised electrical division which included Rewinding, Troubleshooting & Electrical panels sections. Designing &execution of electrical Panels, troubleshooting works and estimation of electrical works. Al-HUDA Textile & Waves co. (Sudan) AUGUST 1994 to DECEMBER 1998 Site electrical engineer Responsibilities and achievements: I Worked as a site engineer in the field of maintenance: Dealt with maintenance works in the various sections of the plant, which included: Textile, chillers, boilers & control sections, installation & executing of electrical shop drawings. Other skills Possessing Computer knowledge, MS package, AutoCAD. Capable of dealing with engineering consultants, main contractors & manufacturers. Dealing with standards & projects’ technical specifications (NEC, IEC....) Arabic & English (fluently spoken and written) Worked in projects with consultants: ATKINS;DBI;SAUDI CONSULT;ALDAR,ZFP;ALSUGGAIR