SAIF UL AMIN
E-mail: saifulameen0624@gmail.com
saifulameen@hotmail.com
Cell: +923205260402 +92 3458496355
- Professional Engineer with Pakistan Engineering Council 2004
- Professional Engineer with Engineer’s Australia 2010
- PMP 35 PDUs completed from COMSATS institute, Certification in Process 2014
- Best Performance award for first ever 2G to LTE swap project, deployment and MS
acceptance 2015
Work Experience (12 years)
 Ericsson Pakistan Jun 09 – To date
BSS and transmission Operations and Quality Specialist – Transmission and BSS North
(Asst. Manager North Region having more than 1400 Cell Site)-Managed Services Warid Telecom
(Pvt) Ltd.
- BSS and Transmission Network Deployment/ Transformation, Planning and
Management
- Power network swap and deployment
- Evaluating Proposals for LTE sites
- Studying the business case for new proposed sites
- Access solution preparation/evaluation
- BOQ Finalization
- Merging technique with existing 2G Network
- Managing LTE Deployment , MR sites for E-NodeB and Mix mode
- Managing Transmission Swap project from 2G to 4G
- LTE Transformation project in progress.
- Sub- Con Activities scheduling, follow up, audits and Management
- Network Asset Optimization
- Network Quality Audits
- Weekly meeting with Customer and vendor teams for settlement of Outages
- Transmission Swap Project NEC to Ericsson TN
- ATP conduction and snag follow ups for whole North region
- Transmission Network Audits and activity scheduling and Implementation
- Transmission Swap Project ML TN R3 to R4 and R5
- Marconi Deployment and cutovers
- Ericsson RBS 2000 and 6000 series Huawei BTS 3000 series, Huawei BSC 6000
Deployment
- Tellabs DXX Installation Commissioning cutover and acceptance
- Coordination with warehouse team for Rollout activities
- Deployment and Technical support
- SW up-gradation of BSS and TXN Nodes
- TXN Swap NEC to RTN620 and RTN980
- BTS Swap Project Huawei to Ericsson
- BTS Expansion Project
- DXX Expansion Project
Special Projects:
- LTE Transformation of Warid Network in North Region, 300 Cell sites swap from 2G to LTE with
Main Remote and Mix Mode solutions end to end planning,implementation acceptance
- Power consumption and optimisation to achieve costefficiency
- Flood resilienceplan and its implementation for Nowshera, Sawabi,Topi, Charsada districts.
- Yearly Monson Preparation projects for Transmission Microwavelinks since2011,Monson follow-
ups, planningcorrectiveand preventive activities in a proactiveway
- Annual Alarm free Network projectfor North region on Access side[Transmission and Radio side]
- OPEX reduction through optimal planningof PM and CM activities fuel checks,Coolingsystems
implementation, ID to OD swap candidates,Other Power savingtechniques
- Network strengthening fixation of installation issuesthrough vendor mor most effected links in
Inclement weather
- Maintainingand planningQuarterly BBS test cycles and replacements through vendor since2010
- SCO Project for TRX addition,EDGE enabling,Cabinet addition for 320 sites of North region
- SCO plan and Implementation on 17 TRX links X-PIC conversion and 36 linksupgradation
- Commercial roll-outof dismantled cabinets through Vendor
- TN upgradation from R3 to R4 [360 Nodes]
- Optimization and enabling Adaptive Modulation for LTE Links carrying 2G traffic
 Ericsson Pakistan Feb 05 – Jun 09
BSS & Transmission Engineer (Service Engineer II) - Managed Services Warid Telecom
(Pvt) Ltd.
- Ericsson RBS & Transmission
- Tellabs, NERA & Marconi
- O&M and Technical support
- Ericsson TN microwave, DXX Metro Fibre Network
- Deployment and Commissioning of Access Network, Rollout activities.
 Myson Engineering services Nov 04– Feb 05
BSS & Transmission System Engineer
- BSS & TXN Installation
- NEC, Ericsson Microwave installation and commissioning
- NEC SW-upgrade & visibility
End to End Supervisor for LTE Network rollout acceptance and operations in North Region
- Supervised, Monitored and Planned rollout activities for LTE Modernization
- Conducted the ATP visits from customer side and maintained issue trackers and
recti fication progress supervision
- Devel oped expertise on 4-G equipment
- Monitoringprogress and ensured quality in accordancewith the standards and targetset for
overall projects i.eensure the meeting of KPI and KQI’s set for Vendors
- Ensure smooth transformation and hitless cutovers from 2G to LTE
- Worked on RBS 6000 Family (E-NodeB 6102,6202,6301, 6601)
- Worked on Minilink TNR4 and R5
- Good Knowledge for FLM of CISCO routers ASR903
Team Leader RAN, BSS and Transmission FOPS (Warid Telecom (Pvt.) Ltd. Pakistan, GSM
Network with LTE Modernization in Progress)
- Monitoringprogress and ensured quality in accordance with the standards and target set for
overall projects i.e ensure the meeting of KPI and KQI’s set for Vendors.
- Over All Rolloutand upgrades activities on Multi-vendor Ericsson, Huawei, NEC and Marconi
Networks.
- Generating RCAs for Network Fluctuations based upon logs in OSS and Transmission Nodes
like TN, RTN, DXX, Marconi LH etc.
- Ensures that any related issue relating projects are followed up timely and in a professional
way.
- Prepared detailed, concise reports on routine basis to accurately reflect project activities,
progress and monitoring.
- Plan and implement the Preventive (PMR) and Corrective maintenance activities.
- Plan and implement PARs Planned Activities on live network.
- Weekly meetings with roll out teams to check the performance of existing network and to
provide the feedback regarding technical issues.
- Conducting Microwave link budget audits to verify the proper verification of standards.
- Coordination with subcontractors, verification of work performed, realization of contractors
invoices
- Coordination with different departments like civil, transmission, Core, RF for project related
activities in the project.
- Conduction and ensuringthe quality measures,quality audits of work relatingall activities in
my domain.
- Implementation of Proactiveand preventive approach on traffic channels availability and on
air network time.
- Advice Customer on Technical Matters related to Network stability and O&M.
- Maintain Outage Reports and build statistical charts, Sheets for the network availability /
Outage comparison.
- Attend weekly meetings with the customer to analyze the network related issues and
suggest solution to the identified problems.
- Update Daily, Weekly & Monthly Progress to the higher Management and the Customer.
- Arrange Technical Trainings & workshops for the network O&M Teams.
- Representing my organization in meetings and presentations with Pakistan
Telecommunication Authority (PTA) and Frequency Allocation Board (FAB).
- Plan and keep track of Sub-Con Teams for different activities.
TECHNICAL SKILLS
- RBS (OMT), DXX (Tellebs Extended Craft Terminal),NERA (City Link) NERA (Interlink),
- Good knowledge and hands on experience with OSS alarmmonitoringand RCA generation for
outages.
- MDRS (Marconi LMT maintenance Terminal),High Capacity,Traffic Node R3 Installation
- Monitoringof PDH and SDH Links,QA/QC controls Ericsson Links,TEMS investigation5.1
- Deployment., Operation and maintenance of fiber optic fiber metro ring, BSC (APG 40).
- BTS Manager, 2G EDGE/GSM BTS and BSC commissioning & Integration,
- Installation and Monitoring of PDH and SDH Links, QA/QC control for NSN & NEC Links, NEC
Microwave Systems i.e. Pasolink
- O&M at Huawei BSC and BTS sites
- O&M activities at PTCL
- Extension, Allocation and deployment activities at PTCL, Leased Media
- Extension of BTS sites
- Outdoor installation
- Micro Controller Programming
- Programmable Logic Control (PLC) SIEMENS
- Good Knowledge of RF Planning
- Network Roll out activities like PATs
- PLC programming
TECHNICAL EXPERIENCE INCLUDES:
TRANSMISSION EQUIPMENTS
- Installation,Commissioningand troubleshootingof Ericsson Microwave(MLE, MLTN) R3, R4
and R5
- Co-ordination with Transmission Planning for installation and Optimization.
- Leased Media verification at PTCL Exchanges.
- Implementation of software upgrade for Minilink Traffic Node
- Implementation of software upgrade for Minilink Classic Node
- Troubleshooting and SW upgrading the Mini-Link High Capacity
- Troubleshooting of PDH, SDH Nodes.
- Troubleshooting of BTS on Site using diagnostic tools and Anritsu Site Master.
- Troubleshooting of Microwave Links using Minilink Service manager MSM, involving Core
Transmission
- Troubleshooting and rectification on Leased Media at PTCL Exchanges.
- Commissioning, Operation and Maintenance for Tellabs Cross Connect (DXX) 8100, DXX
6320, DXX 6340, DXX 6345.
- Software upgrades of Tellabs Cross Connect (DXX) of different Versions.
- Implementation of optional transmission links for BTS (NERA City-Link and NERA Inter-Link).
- Troubleshooting of NERA City-Link and NERA Inter-Link using (NEW-NMS R8E00)
- Performed ATP for NERA City-Link and NERA Inter-Link.
- Site survey for the different departments for MDRS (Marconi Digital Radio Station) and OMS.
- Performed ATP of Marconi MDRS in different regions.
- Operation and Maintenance of MDRS (Marconi Digital Radio Station) 155.
- Having a good Theoretical Knowledge about BSC APG 40 Operation and Integration, data
transcript (DT)
- Conducting site surveys for Installation, optimization and Acceptance.
- Co-ordination with Civil Deptt. For issues related to installation and optimization.
- Site Health Checks with Call Path Trace to check for Path Balance, Overshoots, RF Coverage
and RF Quality involving RF team.
- Deployment, Operation and maintenance of optical fibre metro ring.
- Troubleshooting of RBS on Air Interface with the help of TEMS Investigation 5.1.
- Performing the Drive Test for the Effected sites by using TEMS investigation5.1
PERFORMANCE MEASURING STATES AND NETWORK AVAILABILITY
- Attend weekly meetings on KPI and KQI analysis with Operator
- Performed health checks for the maximum channel availability in the network
- Developed methods for better coverage and better customers support
- Worked on BSC states and implemented the best courseof action to achieve connectivity
- Performed links auditand produced desired resultfor better network sustainability
- WritingRCA for major outages and discussingwith customer the ways to reduce the outage
time
NON TELCO OPERATIONS ACTIVITIES:
- Fully involved in OPEX calculationsof Cell sites w.r.t fuel and CP expenditure and Traffic
trends
- Schedulingthe refuellingcyclefor Cell sites depending upon CP failuretrends
- Generator Operations monitoring through different alarmInputs
- Non Telco PM schedulingand monitoringexecution which includes Lube oil change
- Generators overhaulingschedules
- Planningfor VDTC and GEM3 installation athealthy BBS Sites
- FCU and Air con units Installation and issues escalation and followup with Vendors
- Ensuring 100% uninterruptedpower supply to overall telco equipments to maintain the network
availability up to the standard
- Non-Telcosuper- visioning includes the efficient workingof all Generators, ACs, UPS, Rectifiers, LCs and
HTs
- Evaluationof new vendor for DGandACmaintenance activities
- Overall managingmore than20 Staffmembers directlyincluding Executives and Team Leads for Macro
and Micro sites accumulatively.
BTS (Base Transceiver Stations)
- Working for customer support and radio access network in BSS GSM.
- Installation, Commissioning of BTS (RBS 2206,2207, 2106,2107,2116, 2216)
- Troubleshooting of RBS (2206, 2207, 2106, 2107, 2116, 2216) using Operation and
Maintenance terminal (OMT) R39_4, involving BSC.
- Upgrading and optimization of BTS (TRX and BTS Cabinets)
- Co-ordination with Third Party (NERA), PTCL for optional link for BTS.
- BTS Rectification and Site Acceptance in conjunction with the customer.
- Performed BTS internal and external alarms testing.
- Huawei BTS 312 and 3012 installation, commissioning, operations and maintenance.
- Huawei BSC6000 installation, commissioning, operations and maintenance.
NOKIA & NEC EQUIPMENTS
- Installation & Commissioningof NEC Equipments
- Installation and testingof Battery Banks
- Installation and commissioningof NSN BTS sites
- Various cablerootingand connecterization
- Checking RSL level duringAlignment of NSN PDH Links
- Testing and verifyingof all External and Internal Alarms generated in the Cell Site.
- VSWR & Power Measurement.
- TRX and Call testing
Administrative and Project Management Skills:
- Good knowledge of MS Project and hands on Experience
- Good knowledge of Primavera Ver. 3
- Have good administrativeskills and practically managingthe administrativeneeds of
Peshawar region for last6 years
- PMP in Progress
- Good knowledge of Managingteams and ASPs
COMPUTER & SW SKILLS
- Worked on DXX Craft Terminal (NMS) Tellabs Ericsson DXX
- Good Knowledge of PrimaVera and MS Project.
- Worked on OMS Marconi Transmission
- Marconi LMT NMS
- Worked on OMT software for RBS 2206, RBS2106(out door) & RBS 2207 by ERICSSON
- Worked on MSM software for MINILINK by ERICSSON
- Minilink HC O&M and commissioning
- Worked on ML Traffic Node IP network
- NEW NMS For NERA STM Links
- C language
- Assembly Language
- Office Automation
- Electronic Workbench
- PLC Programming for Siemens
- Worked on PNMT for NEC
PROFESSIONAL TRAINING ATTENDED
- WBL Training MSDP Ways of Working WBL from Ericsson Education Sweden 2013
- WBL Training ML TN R5 WBL from Ericsson Education Sweden 2013
- WBL Training RBS6000 Family WBL from Ericsson Education Sweden 2013
- WBL Training MSDP WFM Dispatcher WBL from Ericsson Education Sweden 2013
- WBL Training MSDP One TM Operator WBL from Ericsson Education Sweden 2013
- WBL Training MSDP Work Force Management WBL from Ericsson Education Sweden 2013
- WBL Training Effective Team Building Strategies WBL from Ericsson Education Sweden 2012
- WBL Training Leadership and the knowledge worker from Ericsson Education Sweden 2012
- WBL Training Leadership development for Technical Professionals from Ericsson Education
Sweden 2012
- WBL Training Team Interpersonal communication skills from Ericsson Education Sweden
2012
- WBL Training Enhancing listening skills from Ericsson Education Sweden 2012
- Attended a Training session on Huawei RTN 620 and RTN 980 Series at Huawei Lahore.
- Attended training Session on MDRS Marconi LH (long haul) at Ericsson education Sweden.
- Attended training on ML Traffic Node from Ericsson education Malaysia
- Attended training on Microwave Minilink E Classic from Ericsson education Malaysia
- Attended training Session on Microwave High Capacity STM link from Ericsson education
Malaysia
- Workshop on Transformational Leadership and Career development by Mr. Kamran Rizvi
arranged by Ericsson Pakistan.
- Human Skills for Project Managers by North West Research(Nuovo System Inc Company)
- OMS 1260 and OMS 1664 Commissioningand Maintenance from 15/08/07 to 20/08/07 from
Ericsson Education Pakistan.
- GSM RBS 2206,2207,2106,2107,2116,2117,2106,2107,2308,2309 Installations &
Maintenance from 11/20/06 to 11/22/06 from Ericsson Education Malaysia.
- Huawei GSM BSC6000, BTS 3012 and 312 installation, commissioning, operations and
maintenance.
- DXX Manager OPERATION & MAINTENANCE Tellabs from 10/17/06 to 10/21/06 from
Ericsson Education Malaysia.
- Attended ERICSSON internal Security Online Course
- Attended a training session on “NERA, SDH” equipment in WARID MSC Lahore, arranged by
Ericsson education
- Attended a training session on Network Project planning RAN.
- Attended a training session on Network Project planning Core.
- Attended a training session on Network Project Operation and Maintenance.
- Attended a training session on Bid Preparation & Proposal preparation.
- Online trainings on Security, Internal confidentialities, office keeping, organisational
behaviour
- Attended a seminar on GSM conducted by ZTE Corporation, arranged by UET Peshawar
- Attended a seminar on “DIGITAL DIVIDE AND ITS IMPACT ON GLOBAL PEACE” arranged by
UET Peshawar in collaboration with UNESCO, MICROSOFT & HEC
- Attended a seminar on “Radio Access Network & CHAIN MANAGEMENT” arranged by UET
Peshawar.
- Attended a seminar on “FIELD MAINTANANCE & CHAIN MANAGEMENT” arranged by UET
Peshawar in collaboration with FFC
ACADEMIC QUALIFICATIONS
- B.Sc. with Honours (Electrical & Electronic Engg) 2004
o Major in Communication
o Secured 83% aggregated marks with A-1 Grade.
o NWFP University of Engineering & Technology, Peshawar.
- H.S.S.C. 1999
o PAF Degree College, Risalpur.
- S.S.C. 1997
o F.G. Public High School, Nowshera Cantt.
INTERNSHIPS
- Worked as BSS Engineer in EO Deptt.Of ERICSSON PAKISTAN SinceFeb. 1st, 2005 to June
30th,2005
- PAKISTAN TOBACCO COMPANY LIMITED, Akora Khattak Factory.
- During my Internship at Pakistan Tobacco Company I performed following projects
- Study and Implementation of PLC Programming
- Study of Electricity tariffs comparison between old and new tariffs
- Devising the cost cutting policy for electricity and load calculation surveys
- Study of Tobacco Feeders and Its process of erection and commissioning
- Study report on Primary Manufacturing Department (P. M. D)
- MK-9 Repositioning
- Safety Procedures
- Studied and assisted the process of Environment Health and Safety (E. H. S) Audits, its
workgroups and their functions in EHS
UNDERGRADUATE PROJECTS
FINAL YEAR PROJECT:
- Optical Fibre Communication System & Hardware Design Considerations.
OTHER PROJECTS:
- Study the Comparison & Feasibility of Underground Vs Overhead Power
Transmission Lines.
- Study report on GSM
- Transmission interfaces at Optimization Nodes (cross connector) and E1 grooming

CV - Saif ul amIn-Mgmt

  • 1.
    SAIF UL AMIN E-mail:saifulameen0624@gmail.com saifulameen@hotmail.com Cell: +923205260402 +92 3458496355 - Professional Engineer with Pakistan Engineering Council 2004 - Professional Engineer with Engineer’s Australia 2010 - PMP 35 PDUs completed from COMSATS institute, Certification in Process 2014 - Best Performance award for first ever 2G to LTE swap project, deployment and MS acceptance 2015 Work Experience (12 years)  Ericsson Pakistan Jun 09 – To date BSS and transmission Operations and Quality Specialist – Transmission and BSS North (Asst. Manager North Region having more than 1400 Cell Site)-Managed Services Warid Telecom (Pvt) Ltd. - BSS and Transmission Network Deployment/ Transformation, Planning and Management - Power network swap and deployment - Evaluating Proposals for LTE sites - Studying the business case for new proposed sites - Access solution preparation/evaluation - BOQ Finalization - Merging technique with existing 2G Network - Managing LTE Deployment , MR sites for E-NodeB and Mix mode - Managing Transmission Swap project from 2G to 4G - LTE Transformation project in progress. - Sub- Con Activities scheduling, follow up, audits and Management - Network Asset Optimization - Network Quality Audits - Weekly meeting with Customer and vendor teams for settlement of Outages - Transmission Swap Project NEC to Ericsson TN - ATP conduction and snag follow ups for whole North region - Transmission Network Audits and activity scheduling and Implementation - Transmission Swap Project ML TN R3 to R4 and R5 - Marconi Deployment and cutovers - Ericsson RBS 2000 and 6000 series Huawei BTS 3000 series, Huawei BSC 6000 Deployment - Tellabs DXX Installation Commissioning cutover and acceptance - Coordination with warehouse team for Rollout activities - Deployment and Technical support - SW up-gradation of BSS and TXN Nodes - TXN Swap NEC to RTN620 and RTN980 - BTS Swap Project Huawei to Ericsson - BTS Expansion Project - DXX Expansion Project Special Projects: - LTE Transformation of Warid Network in North Region, 300 Cell sites swap from 2G to LTE with Main Remote and Mix Mode solutions end to end planning,implementation acceptance - Power consumption and optimisation to achieve costefficiency - Flood resilienceplan and its implementation for Nowshera, Sawabi,Topi, Charsada districts. - Yearly Monson Preparation projects for Transmission Microwavelinks since2011,Monson follow- ups, planningcorrectiveand preventive activities in a proactiveway
  • 2.
    - Annual Alarmfree Network projectfor North region on Access side[Transmission and Radio side] - OPEX reduction through optimal planningof PM and CM activities fuel checks,Coolingsystems implementation, ID to OD swap candidates,Other Power savingtechniques - Network strengthening fixation of installation issuesthrough vendor mor most effected links in Inclement weather - Maintainingand planningQuarterly BBS test cycles and replacements through vendor since2010 - SCO Project for TRX addition,EDGE enabling,Cabinet addition for 320 sites of North region - SCO plan and Implementation on 17 TRX links X-PIC conversion and 36 linksupgradation - Commercial roll-outof dismantled cabinets through Vendor - TN upgradation from R3 to R4 [360 Nodes] - Optimization and enabling Adaptive Modulation for LTE Links carrying 2G traffic  Ericsson Pakistan Feb 05 – Jun 09 BSS & Transmission Engineer (Service Engineer II) - Managed Services Warid Telecom (Pvt) Ltd. - Ericsson RBS & Transmission - Tellabs, NERA & Marconi - O&M and Technical support - Ericsson TN microwave, DXX Metro Fibre Network - Deployment and Commissioning of Access Network, Rollout activities.  Myson Engineering services Nov 04– Feb 05 BSS & Transmission System Engineer - BSS & TXN Installation - NEC, Ericsson Microwave installation and commissioning - NEC SW-upgrade & visibility End to End Supervisor for LTE Network rollout acceptance and operations in North Region - Supervised, Monitored and Planned rollout activities for LTE Modernization - Conducted the ATP visits from customer side and maintained issue trackers and recti fication progress supervision - Devel oped expertise on 4-G equipment - Monitoringprogress and ensured quality in accordancewith the standards and targetset for overall projects i.eensure the meeting of KPI and KQI’s set for Vendors - Ensure smooth transformation and hitless cutovers from 2G to LTE - Worked on RBS 6000 Family (E-NodeB 6102,6202,6301, 6601) - Worked on Minilink TNR4 and R5 - Good Knowledge for FLM of CISCO routers ASR903 Team Leader RAN, BSS and Transmission FOPS (Warid Telecom (Pvt.) Ltd. Pakistan, GSM Network with LTE Modernization in Progress) - Monitoringprogress and ensured quality in accordance with the standards and target set for overall projects i.e ensure the meeting of KPI and KQI’s set for Vendors. - Over All Rolloutand upgrades activities on Multi-vendor Ericsson, Huawei, NEC and Marconi Networks. - Generating RCAs for Network Fluctuations based upon logs in OSS and Transmission Nodes like TN, RTN, DXX, Marconi LH etc. - Ensures that any related issue relating projects are followed up timely and in a professional way. - Prepared detailed, concise reports on routine basis to accurately reflect project activities, progress and monitoring. - Plan and implement the Preventive (PMR) and Corrective maintenance activities. - Plan and implement PARs Planned Activities on live network. - Weekly meetings with roll out teams to check the performance of existing network and to provide the feedback regarding technical issues.
  • 3.
    - Conducting Microwavelink budget audits to verify the proper verification of standards. - Coordination with subcontractors, verification of work performed, realization of contractors invoices - Coordination with different departments like civil, transmission, Core, RF for project related activities in the project. - Conduction and ensuringthe quality measures,quality audits of work relatingall activities in my domain. - Implementation of Proactiveand preventive approach on traffic channels availability and on air network time. - Advice Customer on Technical Matters related to Network stability and O&M. - Maintain Outage Reports and build statistical charts, Sheets for the network availability / Outage comparison. - Attend weekly meetings with the customer to analyze the network related issues and suggest solution to the identified problems. - Update Daily, Weekly & Monthly Progress to the higher Management and the Customer. - Arrange Technical Trainings & workshops for the network O&M Teams. - Representing my organization in meetings and presentations with Pakistan Telecommunication Authority (PTA) and Frequency Allocation Board (FAB). - Plan and keep track of Sub-Con Teams for different activities. TECHNICAL SKILLS - RBS (OMT), DXX (Tellebs Extended Craft Terminal),NERA (City Link) NERA (Interlink), - Good knowledge and hands on experience with OSS alarmmonitoringand RCA generation for outages. - MDRS (Marconi LMT maintenance Terminal),High Capacity,Traffic Node R3 Installation - Monitoringof PDH and SDH Links,QA/QC controls Ericsson Links,TEMS investigation5.1 - Deployment., Operation and maintenance of fiber optic fiber metro ring, BSC (APG 40). - BTS Manager, 2G EDGE/GSM BTS and BSC commissioning & Integration, - Installation and Monitoring of PDH and SDH Links, QA/QC control for NSN & NEC Links, NEC Microwave Systems i.e. Pasolink - O&M at Huawei BSC and BTS sites - O&M activities at PTCL - Extension, Allocation and deployment activities at PTCL, Leased Media - Extension of BTS sites - Outdoor installation - Micro Controller Programming - Programmable Logic Control (PLC) SIEMENS - Good Knowledge of RF Planning - Network Roll out activities like PATs - PLC programming TECHNICAL EXPERIENCE INCLUDES: TRANSMISSION EQUIPMENTS - Installation,Commissioningand troubleshootingof Ericsson Microwave(MLE, MLTN) R3, R4 and R5 - Co-ordination with Transmission Planning for installation and Optimization. - Leased Media verification at PTCL Exchanges. - Implementation of software upgrade for Minilink Traffic Node - Implementation of software upgrade for Minilink Classic Node - Troubleshooting and SW upgrading the Mini-Link High Capacity - Troubleshooting of PDH, SDH Nodes. - Troubleshooting of BTS on Site using diagnostic tools and Anritsu Site Master. - Troubleshooting of Microwave Links using Minilink Service manager MSM, involving Core Transmission - Troubleshooting and rectification on Leased Media at PTCL Exchanges. - Commissioning, Operation and Maintenance for Tellabs Cross Connect (DXX) 8100, DXX 6320, DXX 6340, DXX 6345. - Software upgrades of Tellabs Cross Connect (DXX) of different Versions.
  • 4.
    - Implementation ofoptional transmission links for BTS (NERA City-Link and NERA Inter-Link). - Troubleshooting of NERA City-Link and NERA Inter-Link using (NEW-NMS R8E00) - Performed ATP for NERA City-Link and NERA Inter-Link. - Site survey for the different departments for MDRS (Marconi Digital Radio Station) and OMS. - Performed ATP of Marconi MDRS in different regions. - Operation and Maintenance of MDRS (Marconi Digital Radio Station) 155. - Having a good Theoretical Knowledge about BSC APG 40 Operation and Integration, data transcript (DT) - Conducting site surveys for Installation, optimization and Acceptance. - Co-ordination with Civil Deptt. For issues related to installation and optimization. - Site Health Checks with Call Path Trace to check for Path Balance, Overshoots, RF Coverage and RF Quality involving RF team. - Deployment, Operation and maintenance of optical fibre metro ring. - Troubleshooting of RBS on Air Interface with the help of TEMS Investigation 5.1. - Performing the Drive Test for the Effected sites by using TEMS investigation5.1 PERFORMANCE MEASURING STATES AND NETWORK AVAILABILITY - Attend weekly meetings on KPI and KQI analysis with Operator - Performed health checks for the maximum channel availability in the network - Developed methods for better coverage and better customers support - Worked on BSC states and implemented the best courseof action to achieve connectivity - Performed links auditand produced desired resultfor better network sustainability - WritingRCA for major outages and discussingwith customer the ways to reduce the outage time NON TELCO OPERATIONS ACTIVITIES: - Fully involved in OPEX calculationsof Cell sites w.r.t fuel and CP expenditure and Traffic trends - Schedulingthe refuellingcyclefor Cell sites depending upon CP failuretrends - Generator Operations monitoring through different alarmInputs - Non Telco PM schedulingand monitoringexecution which includes Lube oil change - Generators overhaulingschedules - Planningfor VDTC and GEM3 installation athealthy BBS Sites - FCU and Air con units Installation and issues escalation and followup with Vendors - Ensuring 100% uninterruptedpower supply to overall telco equipments to maintain the network availability up to the standard - Non-Telcosuper- visioning includes the efficient workingof all Generators, ACs, UPS, Rectifiers, LCs and HTs - Evaluationof new vendor for DGandACmaintenance activities - Overall managingmore than20 Staffmembers directlyincluding Executives and Team Leads for Macro and Micro sites accumulatively. BTS (Base Transceiver Stations) - Working for customer support and radio access network in BSS GSM. - Installation, Commissioning of BTS (RBS 2206,2207, 2106,2107,2116, 2216) - Troubleshooting of RBS (2206, 2207, 2106, 2107, 2116, 2216) using Operation and Maintenance terminal (OMT) R39_4, involving BSC. - Upgrading and optimization of BTS (TRX and BTS Cabinets) - Co-ordination with Third Party (NERA), PTCL for optional link for BTS. - BTS Rectification and Site Acceptance in conjunction with the customer. - Performed BTS internal and external alarms testing. - Huawei BTS 312 and 3012 installation, commissioning, operations and maintenance. - Huawei BSC6000 installation, commissioning, operations and maintenance. NOKIA & NEC EQUIPMENTS - Installation & Commissioningof NEC Equipments - Installation and testingof Battery Banks - Installation and commissioningof NSN BTS sites - Various cablerootingand connecterization - Checking RSL level duringAlignment of NSN PDH Links
  • 5.
    - Testing andverifyingof all External and Internal Alarms generated in the Cell Site. - VSWR & Power Measurement. - TRX and Call testing Administrative and Project Management Skills: - Good knowledge of MS Project and hands on Experience - Good knowledge of Primavera Ver. 3 - Have good administrativeskills and practically managingthe administrativeneeds of Peshawar region for last6 years - PMP in Progress - Good knowledge of Managingteams and ASPs COMPUTER & SW SKILLS - Worked on DXX Craft Terminal (NMS) Tellabs Ericsson DXX - Good Knowledge of PrimaVera and MS Project. - Worked on OMS Marconi Transmission - Marconi LMT NMS - Worked on OMT software for RBS 2206, RBS2106(out door) & RBS 2207 by ERICSSON - Worked on MSM software for MINILINK by ERICSSON - Minilink HC O&M and commissioning - Worked on ML Traffic Node IP network - NEW NMS For NERA STM Links - C language - Assembly Language - Office Automation - Electronic Workbench - PLC Programming for Siemens - Worked on PNMT for NEC PROFESSIONAL TRAINING ATTENDED - WBL Training MSDP Ways of Working WBL from Ericsson Education Sweden 2013 - WBL Training ML TN R5 WBL from Ericsson Education Sweden 2013 - WBL Training RBS6000 Family WBL from Ericsson Education Sweden 2013 - WBL Training MSDP WFM Dispatcher WBL from Ericsson Education Sweden 2013 - WBL Training MSDP One TM Operator WBL from Ericsson Education Sweden 2013 - WBL Training MSDP Work Force Management WBL from Ericsson Education Sweden 2013 - WBL Training Effective Team Building Strategies WBL from Ericsson Education Sweden 2012 - WBL Training Leadership and the knowledge worker from Ericsson Education Sweden 2012 - WBL Training Leadership development for Technical Professionals from Ericsson Education Sweden 2012 - WBL Training Team Interpersonal communication skills from Ericsson Education Sweden 2012 - WBL Training Enhancing listening skills from Ericsson Education Sweden 2012 - Attended a Training session on Huawei RTN 620 and RTN 980 Series at Huawei Lahore. - Attended training Session on MDRS Marconi LH (long haul) at Ericsson education Sweden. - Attended training on ML Traffic Node from Ericsson education Malaysia - Attended training on Microwave Minilink E Classic from Ericsson education Malaysia - Attended training Session on Microwave High Capacity STM link from Ericsson education Malaysia - Workshop on Transformational Leadership and Career development by Mr. Kamran Rizvi arranged by Ericsson Pakistan. - Human Skills for Project Managers by North West Research(Nuovo System Inc Company) - OMS 1260 and OMS 1664 Commissioningand Maintenance from 15/08/07 to 20/08/07 from Ericsson Education Pakistan. - GSM RBS 2206,2207,2106,2107,2116,2117,2106,2107,2308,2309 Installations & Maintenance from 11/20/06 to 11/22/06 from Ericsson Education Malaysia. - Huawei GSM BSC6000, BTS 3012 and 312 installation, commissioning, operations and maintenance. - DXX Manager OPERATION & MAINTENANCE Tellabs from 10/17/06 to 10/21/06 from Ericsson Education Malaysia.
  • 6.
    - Attended ERICSSONinternal Security Online Course - Attended a training session on “NERA, SDH” equipment in WARID MSC Lahore, arranged by Ericsson education - Attended a training session on Network Project planning RAN. - Attended a training session on Network Project planning Core. - Attended a training session on Network Project Operation and Maintenance. - Attended a training session on Bid Preparation & Proposal preparation. - Online trainings on Security, Internal confidentialities, office keeping, organisational behaviour - Attended a seminar on GSM conducted by ZTE Corporation, arranged by UET Peshawar - Attended a seminar on “DIGITAL DIVIDE AND ITS IMPACT ON GLOBAL PEACE” arranged by UET Peshawar in collaboration with UNESCO, MICROSOFT & HEC - Attended a seminar on “Radio Access Network & CHAIN MANAGEMENT” arranged by UET Peshawar. - Attended a seminar on “FIELD MAINTANANCE & CHAIN MANAGEMENT” arranged by UET Peshawar in collaboration with FFC ACADEMIC QUALIFICATIONS - B.Sc. with Honours (Electrical & Electronic Engg) 2004 o Major in Communication o Secured 83% aggregated marks with A-1 Grade. o NWFP University of Engineering & Technology, Peshawar. - H.S.S.C. 1999 o PAF Degree College, Risalpur. - S.S.C. 1997 o F.G. Public High School, Nowshera Cantt. INTERNSHIPS - Worked as BSS Engineer in EO Deptt.Of ERICSSON PAKISTAN SinceFeb. 1st, 2005 to June 30th,2005 - PAKISTAN TOBACCO COMPANY LIMITED, Akora Khattak Factory. - During my Internship at Pakistan Tobacco Company I performed following projects - Study and Implementation of PLC Programming - Study of Electricity tariffs comparison between old and new tariffs - Devising the cost cutting policy for electricity and load calculation surveys - Study of Tobacco Feeders and Its process of erection and commissioning - Study report on Primary Manufacturing Department (P. M. D) - MK-9 Repositioning - Safety Procedures - Studied and assisted the process of Environment Health and Safety (E. H. S) Audits, its workgroups and their functions in EHS UNDERGRADUATE PROJECTS FINAL YEAR PROJECT: - Optical Fibre Communication System & Hardware Design Considerations. OTHER PROJECTS: - Study the Comparison & Feasibility of Underground Vs Overhead Power Transmission Lines. - Study report on GSM - Transmission interfaces at Optimization Nodes (cross connector) and E1 grooming