Azlimi Bin Awang
Tel: +213661910682 (Algeria No)
Tel: +60194475797(Malaysia No)
+60194027242(Malaysia No)
E-mail: azlimi@gmail.com
PERSONAL DETAILS:
Age : 44 years Genders : Male Passport : A28740202
Marital Status : Married Nationality : Malaysian Date of Birth : 20th
April 1971
Religion : Muslim Race : Malay
Availability : Anytime Language : Malay , English
EDUCATIONAL BACKGROUND: Diploma of Electrical(Comm)
PERSONAL SKILL:
• Work with a range of people from different backgrounds and experiences and attitudes
• Acknowledge and respect different opinions and view points
• Experienced in performing Integration for RBS 6000 (WCDMA/LTE/GSM) and EMAS to upload/run
the scripts
• Over 15 years of experience in Operation and Maintenance of telecommunication networks,
specializing in low and high order capacity of transmission and radio networks and good
experiences in operation, maintenance, RBS integration and installation
• Good written and interpersonal communication skill in both Languages (English and Malay)
• Able to work independently with minimum supervision
• Able to adapt in different working environments
• Cultural and religious awareness
• Good collaboration in teamwork and human relation skills, able to work under pressure and
independently, self motivated, responsible, ambitious, fast learner and enthusiastic
• Hardworking, willing to learn any new technology, able to work independently with minimum
supervision.
• Survey of Existing Huawei and Siemens 2G 3G sites for the successful
• Implementation of Swap to Ericsson RBS.
• Analaysis of existing faults in sites and providing solution to overcome them.
• Testing of the Existing External Alarms and report the status to the
• Implementation head.
• Sweep test to find the VSWR in the feeders and connector faults
• Verifying the distance to Fault.
• Conducting Acceptance test of the sites after the swap and successfully
• handing over the site to the Omantel MS team.
• GSM (RBS6000 series) integration and troubleshooting and
Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301)
• WCDMA (RBS6000 series) integration and troubleshooting and
Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301)
• LTE eNodeB (RBS62016601/RBS/DUL/DUS) integration and troubleshooting and
Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301)
• Expertise in Ericsson RBS 6000 2G and 3G and LTE
• Verifying the transmission path before swap
• Snag clearance and quality assurance of swapped sites
• Configuration of ports and VLANs for 3G and LTE
• Experienced in performing Integration for RBS 6000, SIU, performing MOSHELL/AMOS that
running on Unix Shell platform and EMAS to upload/run the scripts
• Operation and Maintenance OSS RC11 (Create, Delete, and Modify configuration RNC or Node-B
using Network Explorer), and perform upgrade activity using Software Management Organizer
(SMO)
• Experienced in performing carrier expansion and RBS SW UP
• Experienced in testing and commissioning of the new wave RBS 6000
• Responsible in preparing Method of Procedure for Installation and Commissioning for GSM,
WCDMA and LTE RBS6000
• Load Siu script using winfiol/putty/total comd
• To perform Auto Integration LTE enodeB
• To perform LTE enodeB software upgrade from L11B to L12A.
• Familiar with thin client software Moshell, EMAS, FTP and CLI
• Good understanding of System RNC and RBS configurations and system integration.
• Good understanding and working experience with UTRAN Software & License upgrades and
troubleshooting upgrade faults.
• Good understanding and working experienced with RANOS/OSS-RC.
• Good understanding and working experienced with WRAN Integration, SW upgrade, upload script
.xml and run mo and activate the site.
• Experienced using EMAS and Moshell for WRAN Integration.
• Good understanding for WRAN Transport and Radio Network.
Solid skills and working experience involved in carrying out all hands on installation,
testing, commissioning & troubleshooting activities regarding WRAN nodes.SOFTWARE
TOOL AND EXPERIENCE
• Competence in RNC Integration and Support level in OSS-RC, AMOS, MOshell and SMO for
Integration Node B, Carrier expansion and RBS SW UP.
• Competence in EMAS, MOshell, FTP and CLI SW for Integration and O&M Node B and eNode B.
• Ericsson UTRAN RNC P5/P6/P7/W10 3810, 3820 O&M Support, MOSHELL scripting, CCR &
Integration.
• RNC and RBS software upgrade, Hardware upgrade & replacement, License/Features loading.
• Installation, Commissioning & Testing Ericsson Node B/ RBS 6000 series(6102,6101,6201,6601)
• Installation, Commissioning & Testing Ericsson Node B/ RBS 3000
series(3102,3106,3206,3518,3418)
• Installation, Commissioning & Testing Ericsson Node B/ RBS 2000
series(2116,2106,2206,2202,2308)
• Intermediate Installation, Commissioning & Testing Ericsson Mini Link Traffic Node & Ethernet
over IP
• Intermediate Installation, Commissioning & Testing Ericsson Mini Link E
• Competence site Installation, Commissioning & Testing Ericsson Mini Link Traffic Node & Ethernet
over IP
• Competence site Installation, Commissioning & Testing Ericsson Mini Link E
• Site Master Anritsu Model 331A, B, C and D HHST version 6_47 , 6.57 and 6.58
• Bird (Power Meter)
• Perform PAT acceptance test
• Supervise Installation Civil/CME
• Element Manager (EMAS) Java Version 1.3.1_06, 1.3.1_07 , 1.3.1_09, 6 update 5,Emas P7
• OMT R14, 19, R23_9, R26_5, 29_2, 30_4, 31_9 ,32_6,34_9, R43A and R50J
• RBS Terminal B8 , B9 and B10 (Alcatel Tool)
• MSM and TN Tool-Mini Link Craft V1.1,V2.5 , TN R4.2 ML Craft 2.8
SEMI AND PROFESSIONAL TRAINING
• WCDMA NodeB Integration LZU 108 6118 (Ericsson Education Malaysia)
• Radio Network Tuning LZU 108 3298 (Ericsson Education Malaysia)
• Testing and Commissioning Ericsson RBS 6102 (GSM/WCDMA) – Ericsson Singapore
• Testing and Commissioning LTE RBS 6000 – Ericsson Singapore
• RNC 3820/3810 Integration and O&M for RBS 6000 Rollout – MAXIS Broadband Sdn. Bhd.
• Testing and Commissioning Ericsson Node B Expanding 3206/W2100/W900 - Ericsson Malaysia
Cyberjaya.
Employment History
February 2016 – May 2016
Ericsson Algeria
FMO Engineer 3G
• Lead the Implementation Team for Performing Rollout for 3G network for Mobilis Algeria
and for KPI
• Support new 3G modernization, troubleshooting and BO support for RBS6000
• 2G 900 & 1800 on Site Integration (Single & Mixed Mode with 3G)
• Link upgrade MLTN for Ethernet packet link and configuring native ethernet RL-IME for
3G E2E
• Configuring TCU for Abis over IP, 3G Network Transport
• Preparing Site Material Request for Link Upgrade/modernization activity
• Clearing alarms onsite/remote for mixed mode system in RBS6000 (2G+3G)
• Support for Optimizing Network KPI concerning antenna/feeder installation and
configuration issue
• Provide support and guide local engineer on site concerning site configuration and
troubleshooting
• Coordinate with customer and subcontractor concerning site installation and
configuration on site
• Provide solution for site peformance degration problem concerning hardware and
configuration issue mainly for RBS6102, RBS6301
• Solving issue on site concerning transmission packet link and RBS fault
• Activating PW RET, TMA and load configuration for RET devices
• Provide FO, BO and FLM support for regional RBS6000 modernization project
• handling CCR tool for site configuration scripts
• Integrated 6601,6301 on DUW30 and DUL.
• Commissioning and integration of RBS6000 on IP networks.
• Software upgrade of NodeB
• Experience in Site Supervisor, node commissioning RBS & TRM, remote RAN integration
and support
• Experience in 2G, 3G and LTE configuration and integration
• Able to configure Ericsson’s RAN product line such RBS2000, RBS3000 and RBS6000
• Able to integrate and commissioning multi-system 2G,3G and LTE into service for
RBS6000
August 2014 – Sept 2015
Naghsh Aval Keyfiat(NAK)
Tehran, Iran
RAN Engineer 3G/LTE
• Lead the Implementation Team for Performing Rollout for 3G/LTE network for MCI Iran
and for KPI
• Support new 3G modernization, troubleshooting and BO support for RBS6000
• Support Transmission Configuration, SBL upgrade to R5 and troubleshooting E2E from
BSC to End site
• LTE FDD on Site Integration mixed mode 1800
• Preparing Integration scripts for 3G and LTE FDD
• 2G 900 & 1800 on Site Integration (Single & Mixed Mode with LTE)
• Link upgrade MLTN for Ethernet packet link and configuring native ethernet RL-IME for
3G and LTE E2E
• Configuring TCU for Abis over IP, 3G and LTE Network Transport
• Preparing Site Material Request for Link Upgrade/modernization activity
• Clearing alarms onsite/remote for mixed mode system in RBS6000 (3G+LTE)
• Support for Optimizing Network KPI concerning antenna/feeder installation and
configuration issue (TCHA, DCR, SOHR,CSSR)
• Provide support and guide local engineer on site concerning site configuration and
troubleshooting
• Coordinate with customer and subcontractor concerning site installation and
configuration on site
• Provide solution for site peformance degration problem concerning hardware and
configuration issue mainly for RBS6102, RBS6301
• Solving issue on site concerning transmission packet link and RBS fault
• Activating PW RET, TMA and load configuration for RET devices
• Provide FO, BO and FLM support for regional RBS6000 modernization project
• handling CCR tool for site configuration scripts
• Integrated 6601,6301 on DUW30 and DUL.
• Commissioning and integration of RBS6000 on IP networks.
• Software upgrade of NodeB/eNodeB
• Experience in Site Supervisor, node commissioning RBS & TRM, remote RAN integration
and support
• Experience in 2G, 3G and LTE configuration and integration
• Able to configure Ericsson’s RAN product line such RBS2000, RBS3000 and RBS6000
• Able to integrate and commissioning multi-system 2G,3G and LTE into service for
RBS6000
• Experience in RAN & TRM Back Office, troubleshooting and on site technical support
• Experience with Commisioning tools such OMT, Element Manager, MOshell, Minilink
Craft, putty, Teraterm, FileZilla, OSS, WinFiol
• Familiar with Ericsson’s Transmission product such Minilink-E, Traffic Node (R5),
Hicap,MDRS
• Alarm clearance after commissioning of site and make it ready for integration.
• Conduct voice calls,video calls and internet on each sector of the site.
• Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each
sector.
• Enabling synchronization for the site through ETA and ETB ports.
• Generate RBS scripts, integrate and troubleshoot of 2nd Carrier, HSDPA & HSUPA.
• W14 New Site Integration by using Moshell and OSS-RC
• QA assessment and handover of sites and Transmission Equipments to client.
• Maintaining the Quality of Work.
• To perform Pre-integration site check according to Installed hardware and system
requirement
• Testing, Integrate, commissioning and troubleshoot/clear alarm RBS 6000 (6301 and
6601 family)
• Audit site and make sure the installation, testing and commissioning RBS and follow
Ericsson requirement
May 2013 to April 2014
Celcom Axiata Project
Huawei – Celcom Single RAN900 Project
• Performed Huawei BTS3900 & DBS3900 Single RAN900 2G Swap Project for Celcom Axiata
Berhad in Perlis, Kedah & Penang State.
• Performed installation hot & cold swap from Alcatel BTS to Huawei DBS3900, BTS3900,
TP48200A, TP48200B or adding 2G GTMU Board into existing BBU3900 activities.
• To ensure all the installation was follow Site Design Documentation (SDD) before start
installation and to ensure all the installation in good quality and follow specification.
• Performed testing & commissioning of Huawei BTS, monitored & troubleshooting if have any
alarm activated.
• To ensure all the installation team follow the safety procedures during installation and good
handling of CPRI (Optical Cable) and install it properly to BBU3804.
March 2013 to April 2014
Maxis GABS Project
Huawei – MAXIS Single RAN900 Project
• Involved in Maxis GABS Project (Swap 2G,3G and LTE network Rollout for site Installation.
• Supervision and trained contractor during Installation HUAWEI DBS3900, BTS3900L and
BTS3900E.
• To perform Testing, Commissioning and Troubleshooting for HUAWEI DBS3900, BTS3900L
and BTS3900E.
• To perform VSWR, RETURN LOSS and DTF Test using Anritsu Site Master for each Site.
• To perform checking functionality every sector of site such as voice call, video call, sms,
GPRS, HSDPA, handover and checking cross feeder.
• To monitor and coordinate project progress, status update and meeting with customer.
Jan 2013 to Feb 2013
Ericsson Oman
GRAN & WRAN Support Engineer (Team Leader for Nawras Project)
• Act as Team Leader for Nawras Project Integration for 2nd
Carrier RBS6000 and 3000
• Performing integration for RBS 6000 series for Dual Stack Configuration/Dual DUW
• Performing integration for RBS 6000 series for 2G System
• Responsible for supervision of Outdoor and Indoor Installation of Telecom Equipments viz RF
Feeder Cables, IF cables, GSM Antennas, MW Antennas, BTS (RBS 6601,RBS 6202 & RBS 6601E)
as per Pre-Planned Site Plan.
• Take VSWR sweeps of jumper cables.
• QA assessment and handover of sites and Transmission Equipments to client.
• Maintaining the Quality of Work.
• To perform Pre-integration site check according to Installed hardware and system requirement
• Testing, Integrate, commissioning and troubleshoot/clear alarm RBS 6000 (6201 and 6601
family)
• Audit site and make sure the installation, testing and commissioning RBS and follow Ericsson
requirement
Sept 2011 to May 2012
Ericsson Singapore
RAN Support Engineer
• Performed Support and Integration through OSS-RC11 (Alarm collect, installing license, running
CR, running DT Script, etc.)
• Successfully commissioned and integrated pilot site of Nawras in order to secure the Analyzing
the ATND of a given site and preparing the script for the 3G site accordingly.
• Commissioning and Integration of RBS3206,RBS3106,RBS3418.
• Swapping Migrated 6601,6201 and 6102 from ATM to IP.
• Creating Transport network for IP migration (SCTP).
• Creation of the new IP based Nbap.
• Expansion of the existing E1’s for RBS3206,RBS3106 using ETMC cards.
• ATM to IP Migration of 3G NodeB without affecting the site performance.
• Migration of CBU (RBS 3206) to DUW (DUW30) without the support of RNC using migration
technique.
• Configuration of ETMFX port speed,Nbap creation,creating Sctp Transport network using Moshell.
• Alarm extension (High Temperature,Intruder Alarm,Obstruction Light,Mains Fail,PBC 6200 Major
Alarm,PBC 6200 Minor Alarm,CLU Fail)for 3G sites.
• Upgrading the required number of E1’s as per the request of the customer.
• Reduced the required number of E1’s in site as per the customer requirements.
• Analyzing Kget of sites and troubleshooting
• Sector addition in existing NodeB(RBS3206) without site downtime.
• Good knowledge in MOShell and checking the status of site,E1,restarting the NodeB and checking
the alarms of the site through Moshell.
• Calculate the uplink and downlink feeder delay,the uplink and downlink feeder attenuation and
prepare the external hardware script.
• Activation emergency license in NodeB.
• Integrated sites in W900 band.
• Integrated 6601,6102 on DUW30.
• Commissioning and integration of RBS6000 on ATM platform.(6601,6102,6201)
• Software upgrade of NodeB in 6601,6102.
• Alarm clearance after commissioning of site and make it ready for integration.
• Conduct voice calls,video calls and internet on each sector of the site.
• Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each sector.
• Enabling synchronization for the site through ETA and ETB ports.
• Ping the RNC locally from site and check for loss of data.
• Performed Support and Integration through OSS-RC11 (Alarm collect, installing license, running
CR, running DT Script, etc.)
• Troubleshooting RNC 3810/3820 and Node B 6K Series (ex. RBS 6102)
• Support Upgrade RNC SW to UP level W10B
• Support integration New Node B to RNC via OSS
• Integration new Node-B over IP (Familiar with RBS 3000 Series, RBS 3518[Outdoor], RBS
3418[Indoor], RBS 3412[Indoor], RBS 3206[Indoor], RBS 3107[Outdoor], RBS 6000 Series, RBS
6601, RBS 6201, RBS 6102)
• Perform troubleshooting during Integration on Node B to RNC
• Installing License Key File (LKF) via SMO and Moshell
• Perform implementation 3rd Carrier expansion for RBS 6000 and 3000.
• Perform Upgrade software level Node-B P7 (Node B: CXP9014346/1_R6S05 [P7.1]), W10A and
W10B (RNC: CXP9014711/2_R4K)
• Performed troubleshooting performance issues, such as PS drop, Speech Drop, Low RRC, Low HS
throughput, Low IRAT Handover, Zero Traffic Cells, and other disturbance in Network
• Changes of RF parameter (PrimaryCPichPower, ElectricalAntennaTilt, DlcodeAdm, MaxHsRate,
etc) using AMOS
• Performed integration new RBS into RNC (Cabinet, Site Configuration and OAM, NBAPC & D,
HSDPA, EUL)
• Define UTRAN relation using Common Explorer
• Operation and Maintenance OSS RC11 (Create, Delete, and Modify configuration RNC or Node-B
using Network Explorer), and perform upgrade activity using Software Management Organizer
(SMO)
• To perform support using Oss-RC collect Alarm List Viewer log and generate to excel report
• Documenting test results and log files for presentation to the Customer as part of a
handover/delivery package
• Perform troubleshooting for performances degradation on RNC and RBS, such as speech access
drop, RRC problem, HSDPA drop, SHO degradation, etc.
• Perform RNC/RBS tracing for troubleshooting and collect all the necessary logs.
• Alarm/Trouble ticket handling and troubleshooting on RNC and Node B’s with using OSS Network
Explorer, SMO, EMAS and AMOS/Moshell server.
• Dispatched and guided Field Engineer on troubleshooting
• Performing SIU Integration
June 2011 to August 2011
Ericsson South Korea
Node B / LTE Node B Integrator (Team Leader for LG-Ericsson Project)
• Performing Rollout for 3G network with W11 SW level
• Performing integration for RBS 6000 series for Dual Stack Configuration/Dual DUW
• Performing configuration for transport network such like Iub Over Ip and Iub Over ATM
• Experience in perform Fault Management (FM) and monitor /troubleshooting on WCDMA Node B
alarms by using Element Manager (EMAS) and moshell
• Good knowledge and working experience with RAN fault finding and fault assessment.
• Perform IMA troubleshooting during Integration on Node B to RNC
• Installing License Key File (LKF) via Moshell
• NodeB Software upgrade from W10 to W11 and Features upgrade.
• Perform implementation 4th Carrier expansion for RBS 6000
• To perform supervise of Installation, pre-check, power up Lte NodeB corrected accordingly
• To perform Auto Integration LTE nodeB -to load siteinstall.xml
• To perform testing, integration LTE nodeB- to load MO and MOs (eNB logicalName LKF, eNB
oam tn, eNB oam tn lh0, eNB_radio_create_RRUS01, eNB_cell_create_RRUS01, eNB_S1_setup,
neighbour tuning general, Create wcdma network, feature activate and parameter setting
• To perform LTE nodeB software upgrade from L11B to L12A.
April 2008 to May 2011
Ericsson Oman
WRAN TEAM LEADER (NAWRAS PROJECT)
• Lead the Implementation Team for Performing Rollout for 3G network for NAWRAS
• Integrated 6601,6102 on DUW30.
• Commissioning and integration of RBS6000 on ATM platform.(6601,6102,6201)
• Software upgrade of NodeB in 6601,6102.
• Alarm clearance after commissioning of site and make it ready for integration.
• Conduct voice calls,video calls and internet on each sector of the site.
• Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each sector.
• Enabling synchronization for the site through ETA and ETB ports.
• Generate RBS scripts, integrate and troubleshoot of 2nd Carrier, HSDPA & HSUPA.
• W10 New Site Integration by using Moshell and OSS-RC
• RNC,RXI and NodeB Software upgrade from P7 up to W10 and License and Features upgrade.
• Defined IMA Group & adding new E1’s to the IMA Group for Iub upgrade
• Perform IMA troubleshooting during Integration on Node B to RNC
• Installing License Key File (LKF) via SMO and Moshell
• Support Implementation Team on Rehoming, Reparenting, Ima Upgrade,
• Manage customer questions, support requests for the 2nd Carrier , HSDPA and HUSPA
Performance issues.
• Performed RNC/RBS software upgrade to P7.1.4 and W10 ( 2000 RBS)
• Prepared RF troubleshooting procedures (RRC, HSDPA, RAB, Throughput, RACH) for Maxis
• Supported integration of RBS 3000 and 6000 with DUW and RUW
• Handled operation and maintenance RNC 3810 and RNC 3820
• Implemented customers request and requirements based on agreement
• Performed troubleshooting performance issues, such as PS drop, Speech Drop, Low RRC, Low HS
throughput, Low IRAT Handover, Zero Traffic Cells, and other disturbance in Network
• Prepared Performance Reporting for analysis, troubleshoot using PMR and Business Object
• Changes of RF parameter (PrimaryCPichPower, ElectricalAntennaTilt, DlcodeAdm, MaxHsRate,
etc) using AMOS, Moshell, OSS Planned Configuration Area, and EMAS
• Performed Acceptance test of new RNC/RBS (RNC 3810, RNC 3820)
• Implemented IuCS/IuPS over IP migration in RNC P7
• Implemented Iur over IP in RNCs
• Performed Health Check for RNC and RBS after reparanting / rehoming using MOSHELL / AMOS
Script.
• RNC/RBS upgrade from P6 to P7, P7.0 to P7.1.4
• Implemented Iub over IP for RBS 3206
• Performed Audit for RNC RBS and preventive maintenance
• Performed integration new RBS into RNC (Cabinet, Site Configuration and OAM, NBAPC & D,
HSDPA, EUL)
• Performed Service Based Hand Over (SBHO) Activation in RNC
• Performed MSC in Pool activation in RNC
• Performed Health Check and Implementation of HSDPA 3.6 Mbps, 7.2 Mbps, 14.4 Mbps, 21.1 in
order to Improve HSDPA Capacity Services.
• Dispatched and guided Field Engineer on troubleshooting
January 2008 to April 2008
Ericsson Bahrain
WRAN Support Engineer
• Provide 1st & 2nd level technical support to identify, investigate and resolve technical faults in
UTRAN. Provide emergency on-call support for UTRAN.
• Monitor the 3G Batelco Network via RANOS. Well worse to troubleshoot faults via Moshell and
OSS. Resolve the Node B & RNC faults remotely and on site.
• Prepare Bulk & MO Scripts files for Ericsson 3G Cabinet such as (3206) for new sites and for
rehoming sites. Generate report with daily, weekly on outage and 3G KPI report to costumer
Batelco
• Provide OJT to Batelco Customer on RNC & Node B ATP and faults troubleshooting.
• Responsible to keep the performance of network at optimum level by ensuring that network
problems are detected and corrected accordingly.
• Perform routine preventive maintenance and routine activities such as system backup, health
checks etc of UTRAN Network elements via OSS.
• Involve and experience on perform software and hardware upgrades of UTRAN network
elements. (P6 & P7)
• Experience on Node B Integration adding Node B, deleting Node B, rehoming Node B and
troubleshoot E1 intermittent and disabled faults.
• Integrating node B from RNC using Moshell ,EMAS (OAM.mo, Iub.mo, Utrancell.mo and se.mo) &
OSS(ARW,CELL,AAL2,SAC.xml scripts )
• Support for RF Team to do the drive test and parameter value changes.
Handle problems of ASC, RETU, RU, FU, CBU, swapped feeder, faulty boards on Node B.
• Monitoring Performance of Speech, Video, HSDPA, R99 packet calls using PMR command and
UER.
September 2007 to December 2007
ERICSSON Saudi Arabia
3G O&M Engineer (Team Leader for Operation & Maintenance)
• Performing Operation & Maintenance for 3G network
• Troubleshooting for RBS 3202,3206,3402,3101 and 3303 for 3G and able to using EMAS &
MOSHELL
• Experience in perform Fault Management (FM) and monitor /troubleshoot on WCDMA Node B
alarms by using Element Manager (EMAS)
• Commisioning & Integration RBS 3202,3206,3101,3303 and 3402 and traffic node TN6P, TN20P
for Mobily. Testing and confirmation of E1, crossconnect and traffic node mapping and also
liased with intergrator RNC regarding site preparation .
• Commisioning & Intergration for RBS 3000 systems especially RBS 3202,3206,3402,3101 and
3303. Familiar with EMAS software and related application software.Job process include loading
script for hardware configuration and O&M access and Upgrade Package latest revision.Testing
and confirmation of E1 and also liased with intergrator RNC regarding site preparation .Test
circuit switch(CS) and packet switch(PS) quality before handover to customer Mobily
• Performed IMA upgrading for RBS 3202,3101 & RBS 3206
• Performed E1 upgrading for RBS 3202,3101 & RBS 3206
• Conducting workshops for Node B installers at the sites.
• Inspect and correct site installation by contractors, and inspect site master procedure by using
Ericsson standard documents.
• Integrations of Node B and cross connect of E1.
• Loads software and initial configurations of Node B.
• Performs Site Inspections and Test for newly installed sites according to Ericsson standard
qualities check lists.
• Prepare acceptance checklist on newly installed sites
• Use of site Master test equipment for checking exceeded VSWR limit and DTF ( Distance To
Fault ) for tracing faulty connectors, cables or antennas on the antenna system
• Commisioning & Integration traffic node TN6P, TN20P, Mini Link Hi-Cap for Mobily. Testing and
confirmation of E1, crossconnect and traffic node mapping and also liased with Minilink Manager
regarding site preparation .
• Traffic Node and High Capacity configuration
• Software upgrading for the Traffic Node
• Change IP address for Traffic node
• Perform Link transmission interconnection and integration
• Preloading and loading RBS complete
November 2004 to June 2007
Ericsson Malaysia
RBS Engineer
• Troubleshooting for Node B for 3G and able to using EMAS & MOSHELL
• Experience in perform Fault Management (FM) and monitor /troubleshoot on WCDMA Node B
alarms by using Element Manager (EMAS)
• Perform Troubleshooting/Operation and Maintenance of Node B.
• Commisioning & Intergration for Node B (WCDMA) systems especially RBS 3202,3206,3303 and
3402. Familiar with EMAS software and related application software.Job process include loading
script for hardware configuration and O&M access and Uprade Package latest revision.Testing
and confirmation of E1 and also liased with intergrator RNC regarding site preparation .Test
circuit switch(CS) and packet switch(PS) quality before Handover to customer Maxis
• Installation Enginnering Surveyor for RBS swapping project (2G/3G)
• Being part of testing, commissioning and integration of Ericsson 2G radio equipment. Include
also EDGE upgrading on BTS site for Maxis Mobile (Maxis) . Equiptment covered RBS 2202, 2102,
2206, 2106, 2308
• Responsible to test and verify system functionally and to ensure the system operate accordingly
and fault free within the timeframe before handover to customer
• Responsible in PCM link (E1) arrangement to the site.
• Liased with BSC Integrator regarding site preparation, hardware configuration, BCCHNO
parameters, DCHNO parameters, BSIC parameters, timeslots (TSs) used for SDCCH, SW version
for the RBS.
• Record all DT from BSC Integrator and the reading of signal strength (uplink and downlink).
• Troubleshooting on system failure at site as failed to operated, internal and external alarm
problem, rectifier failed, etc.
• Prepared of Acceptance Test Procedures report before handover to customer.
• Perform Standing Wave Ratio (SWR) and Distance To Fault (DTF) tests for verifying the antenna
system installation
• Test equipments familiar :
• ANRITSU Site-Master
• ERICSSON TEMS
• HP Frequency Signal Generator
• BIRD Watt Meter
• Sunrise Spectrum Analyzer
• Bird Analog Power Meter
• Agilent Digital Power Meter
• Bird Site-Master
• HP frequency counter
• Commisoning & Intergration for RBS 3G (WCDMA) systems especially RBS 3202 and 3101.
Familiar with EMAS software and related application software.Job process include loading script
for hardware configuration and O&M acces. Testing and confirmation of E1 and also liased with
intergrator RNC regarding site preparation .Test voice,video and packet switch(PS) quality before
Handover to customer Maxis esp.
• BTS Rollout Coordinator - Coordinate Integration Process and controlling RBS testers, installers
during swap-over from Motorola BTS to Ericsson BTS.
• BTS Operation & Maintenance Co-Ordinator – Managing BTS technicians to perform maintenance
of RBS 2206, 2106 and 2308 for Maxis 2G.
• 3G BTS Operation & Maintenance for RBS 3101 & RBS 3202.
• Co-Ordinate all installation of antenna system and Node B equipment RBS 3000 and RBS 2000
system for customer Maxis
• Co-Ordinate Testing and Commisioning Node B equipment RBS 3000 and RBS 2000 system for
customer Maxis
Education and Qualifications
1989-1992
Field of Study : Diploma in Communication Engineering
Major : Communication Engineering
Name of Institution : University Technology of Malaysia
Result : 2nd
Class
References
1. Name : Seong Chun Chan
Telephone : +6592313348
Position : Competence Sub-Domain Manager
Name of Institution : Ericsson’s Telecommunication Singapore
E-mail : seong.chun.chan@ericsson.com
2. Name : Belal abu dyab
Telephone : +96895212648
Position : Implementation Manager
Name of Institution : Ericsson Oman
E-mail : belal.abu.dyab@ericsson.com
3. Name : Abdikarim farah Qassim
Telephone : +96612279788
Position : Service Engineer
Name of Institution : Ericsson Saudi Arabia
E-mail : abdikarim.farah.qassim@ericsson.com

CV Azlimi_2016

  • 1.
    Azlimi Bin Awang Tel:+213661910682 (Algeria No) Tel: +60194475797(Malaysia No) +60194027242(Malaysia No) E-mail: azlimi@gmail.com PERSONAL DETAILS: Age : 44 years Genders : Male Passport : A28740202 Marital Status : Married Nationality : Malaysian Date of Birth : 20th April 1971 Religion : Muslim Race : Malay Availability : Anytime Language : Malay , English EDUCATIONAL BACKGROUND: Diploma of Electrical(Comm) PERSONAL SKILL: • Work with a range of people from different backgrounds and experiences and attitudes • Acknowledge and respect different opinions and view points • Experienced in performing Integration for RBS 6000 (WCDMA/LTE/GSM) and EMAS to upload/run the scripts • Over 15 years of experience in Operation and Maintenance of telecommunication networks, specializing in low and high order capacity of transmission and radio networks and good experiences in operation, maintenance, RBS integration and installation • Good written and interpersonal communication skill in both Languages (English and Malay) • Able to work independently with minimum supervision • Able to adapt in different working environments • Cultural and religious awareness • Good collaboration in teamwork and human relation skills, able to work under pressure and independently, self motivated, responsible, ambitious, fast learner and enthusiastic • Hardworking, willing to learn any new technology, able to work independently with minimum supervision. • Survey of Existing Huawei and Siemens 2G 3G sites for the successful • Implementation of Swap to Ericsson RBS. • Analaysis of existing faults in sites and providing solution to overcome them. • Testing of the Existing External Alarms and report the status to the • Implementation head. • Sweep test to find the VSWR in the feeders and connector faults • Verifying the distance to Fault. • Conducting Acceptance test of the sites after the swap and successfully • handing over the site to the Omantel MS team. • GSM (RBS6000 series) integration and troubleshooting and Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301) • WCDMA (RBS6000 series) integration and troubleshooting and Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301) • LTE eNodeB (RBS62016601/RBS/DUL/DUS) integration and troubleshooting and Commissioning and Integration of Ericsson NodeB(6201,6601,6101,6102,6301) • Expertise in Ericsson RBS 6000 2G and 3G and LTE • Verifying the transmission path before swap • Snag clearance and quality assurance of swapped sites • Configuration of ports and VLANs for 3G and LTE • Experienced in performing Integration for RBS 6000, SIU, performing MOSHELL/AMOS that running on Unix Shell platform and EMAS to upload/run the scripts
  • 2.
    • Operation andMaintenance OSS RC11 (Create, Delete, and Modify configuration RNC or Node-B using Network Explorer), and perform upgrade activity using Software Management Organizer (SMO) • Experienced in performing carrier expansion and RBS SW UP • Experienced in testing and commissioning of the new wave RBS 6000 • Responsible in preparing Method of Procedure for Installation and Commissioning for GSM, WCDMA and LTE RBS6000 • Load Siu script using winfiol/putty/total comd • To perform Auto Integration LTE enodeB • To perform LTE enodeB software upgrade from L11B to L12A. • Familiar with thin client software Moshell, EMAS, FTP and CLI • Good understanding of System RNC and RBS configurations and system integration. • Good understanding and working experience with UTRAN Software & License upgrades and troubleshooting upgrade faults. • Good understanding and working experienced with RANOS/OSS-RC. • Good understanding and working experienced with WRAN Integration, SW upgrade, upload script .xml and run mo and activate the site. • Experienced using EMAS and Moshell for WRAN Integration. • Good understanding for WRAN Transport and Radio Network. Solid skills and working experience involved in carrying out all hands on installation, testing, commissioning & troubleshooting activities regarding WRAN nodes.SOFTWARE TOOL AND EXPERIENCE • Competence in RNC Integration and Support level in OSS-RC, AMOS, MOshell and SMO for Integration Node B, Carrier expansion and RBS SW UP. • Competence in EMAS, MOshell, FTP and CLI SW for Integration and O&M Node B and eNode B. • Ericsson UTRAN RNC P5/P6/P7/W10 3810, 3820 O&M Support, MOSHELL scripting, CCR & Integration. • RNC and RBS software upgrade, Hardware upgrade & replacement, License/Features loading. • Installation, Commissioning & Testing Ericsson Node B/ RBS 6000 series(6102,6101,6201,6601) • Installation, Commissioning & Testing Ericsson Node B/ RBS 3000 series(3102,3106,3206,3518,3418) • Installation, Commissioning & Testing Ericsson Node B/ RBS 2000 series(2116,2106,2206,2202,2308) • Intermediate Installation, Commissioning & Testing Ericsson Mini Link Traffic Node & Ethernet over IP • Intermediate Installation, Commissioning & Testing Ericsson Mini Link E • Competence site Installation, Commissioning & Testing Ericsson Mini Link Traffic Node & Ethernet over IP • Competence site Installation, Commissioning & Testing Ericsson Mini Link E • Site Master Anritsu Model 331A, B, C and D HHST version 6_47 , 6.57 and 6.58 • Bird (Power Meter) • Perform PAT acceptance test • Supervise Installation Civil/CME • Element Manager (EMAS) Java Version 1.3.1_06, 1.3.1_07 , 1.3.1_09, 6 update 5,Emas P7 • OMT R14, 19, R23_9, R26_5, 29_2, 30_4, 31_9 ,32_6,34_9, R43A and R50J • RBS Terminal B8 , B9 and B10 (Alcatel Tool) • MSM and TN Tool-Mini Link Craft V1.1,V2.5 , TN R4.2 ML Craft 2.8
  • 3.
    SEMI AND PROFESSIONALTRAINING • WCDMA NodeB Integration LZU 108 6118 (Ericsson Education Malaysia) • Radio Network Tuning LZU 108 3298 (Ericsson Education Malaysia) • Testing and Commissioning Ericsson RBS 6102 (GSM/WCDMA) – Ericsson Singapore • Testing and Commissioning LTE RBS 6000 – Ericsson Singapore • RNC 3820/3810 Integration and O&M for RBS 6000 Rollout – MAXIS Broadband Sdn. Bhd. • Testing and Commissioning Ericsson Node B Expanding 3206/W2100/W900 - Ericsson Malaysia Cyberjaya. Employment History February 2016 – May 2016 Ericsson Algeria FMO Engineer 3G • Lead the Implementation Team for Performing Rollout for 3G network for Mobilis Algeria and for KPI • Support new 3G modernization, troubleshooting and BO support for RBS6000 • 2G 900 & 1800 on Site Integration (Single & Mixed Mode with 3G) • Link upgrade MLTN for Ethernet packet link and configuring native ethernet RL-IME for 3G E2E • Configuring TCU for Abis over IP, 3G Network Transport • Preparing Site Material Request for Link Upgrade/modernization activity • Clearing alarms onsite/remote for mixed mode system in RBS6000 (2G+3G) • Support for Optimizing Network KPI concerning antenna/feeder installation and configuration issue • Provide support and guide local engineer on site concerning site configuration and troubleshooting • Coordinate with customer and subcontractor concerning site installation and configuration on site • Provide solution for site peformance degration problem concerning hardware and configuration issue mainly for RBS6102, RBS6301 • Solving issue on site concerning transmission packet link and RBS fault • Activating PW RET, TMA and load configuration for RET devices • Provide FO, BO and FLM support for regional RBS6000 modernization project • handling CCR tool for site configuration scripts • Integrated 6601,6301 on DUW30 and DUL. • Commissioning and integration of RBS6000 on IP networks. • Software upgrade of NodeB • Experience in Site Supervisor, node commissioning RBS & TRM, remote RAN integration and support • Experience in 2G, 3G and LTE configuration and integration • Able to configure Ericsson’s RAN product line such RBS2000, RBS3000 and RBS6000 • Able to integrate and commissioning multi-system 2G,3G and LTE into service for RBS6000
  • 4.
    August 2014 –Sept 2015 Naghsh Aval Keyfiat(NAK) Tehran, Iran RAN Engineer 3G/LTE • Lead the Implementation Team for Performing Rollout for 3G/LTE network for MCI Iran and for KPI • Support new 3G modernization, troubleshooting and BO support for RBS6000 • Support Transmission Configuration, SBL upgrade to R5 and troubleshooting E2E from BSC to End site • LTE FDD on Site Integration mixed mode 1800 • Preparing Integration scripts for 3G and LTE FDD • 2G 900 & 1800 on Site Integration (Single & Mixed Mode with LTE) • Link upgrade MLTN for Ethernet packet link and configuring native ethernet RL-IME for 3G and LTE E2E • Configuring TCU for Abis over IP, 3G and LTE Network Transport • Preparing Site Material Request for Link Upgrade/modernization activity • Clearing alarms onsite/remote for mixed mode system in RBS6000 (3G+LTE) • Support for Optimizing Network KPI concerning antenna/feeder installation and configuration issue (TCHA, DCR, SOHR,CSSR) • Provide support and guide local engineer on site concerning site configuration and troubleshooting • Coordinate with customer and subcontractor concerning site installation and configuration on site • Provide solution for site peformance degration problem concerning hardware and configuration issue mainly for RBS6102, RBS6301 • Solving issue on site concerning transmission packet link and RBS fault • Activating PW RET, TMA and load configuration for RET devices • Provide FO, BO and FLM support for regional RBS6000 modernization project • handling CCR tool for site configuration scripts • Integrated 6601,6301 on DUW30 and DUL. • Commissioning and integration of RBS6000 on IP networks. • Software upgrade of NodeB/eNodeB • Experience in Site Supervisor, node commissioning RBS & TRM, remote RAN integration and support • Experience in 2G, 3G and LTE configuration and integration • Able to configure Ericsson’s RAN product line such RBS2000, RBS3000 and RBS6000 • Able to integrate and commissioning multi-system 2G,3G and LTE into service for RBS6000 • Experience in RAN & TRM Back Office, troubleshooting and on site technical support • Experience with Commisioning tools such OMT, Element Manager, MOshell, Minilink Craft, putty, Teraterm, FileZilla, OSS, WinFiol • Familiar with Ericsson’s Transmission product such Minilink-E, Traffic Node (R5), Hicap,MDRS • Alarm clearance after commissioning of site and make it ready for integration. • Conduct voice calls,video calls and internet on each sector of the site. • Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each sector. • Enabling synchronization for the site through ETA and ETB ports. • Generate RBS scripts, integrate and troubleshoot of 2nd Carrier, HSDPA & HSUPA.
  • 5.
    • W14 NewSite Integration by using Moshell and OSS-RC • QA assessment and handover of sites and Transmission Equipments to client. • Maintaining the Quality of Work. • To perform Pre-integration site check according to Installed hardware and system requirement • Testing, Integrate, commissioning and troubleshoot/clear alarm RBS 6000 (6301 and 6601 family) • Audit site and make sure the installation, testing and commissioning RBS and follow Ericsson requirement May 2013 to April 2014 Celcom Axiata Project Huawei – Celcom Single RAN900 Project • Performed Huawei BTS3900 & DBS3900 Single RAN900 2G Swap Project for Celcom Axiata Berhad in Perlis, Kedah & Penang State. • Performed installation hot & cold swap from Alcatel BTS to Huawei DBS3900, BTS3900, TP48200A, TP48200B or adding 2G GTMU Board into existing BBU3900 activities. • To ensure all the installation was follow Site Design Documentation (SDD) before start installation and to ensure all the installation in good quality and follow specification. • Performed testing & commissioning of Huawei BTS, monitored & troubleshooting if have any alarm activated. • To ensure all the installation team follow the safety procedures during installation and good handling of CPRI (Optical Cable) and install it properly to BBU3804. March 2013 to April 2014 Maxis GABS Project Huawei – MAXIS Single RAN900 Project • Involved in Maxis GABS Project (Swap 2G,3G and LTE network Rollout for site Installation. • Supervision and trained contractor during Installation HUAWEI DBS3900, BTS3900L and BTS3900E. • To perform Testing, Commissioning and Troubleshooting for HUAWEI DBS3900, BTS3900L and BTS3900E. • To perform VSWR, RETURN LOSS and DTF Test using Anritsu Site Master for each Site. • To perform checking functionality every sector of site such as voice call, video call, sms, GPRS, HSDPA, handover and checking cross feeder. • To monitor and coordinate project progress, status update and meeting with customer. Jan 2013 to Feb 2013 Ericsson Oman
  • 6.
    GRAN & WRANSupport Engineer (Team Leader for Nawras Project) • Act as Team Leader for Nawras Project Integration for 2nd Carrier RBS6000 and 3000 • Performing integration for RBS 6000 series for Dual Stack Configuration/Dual DUW • Performing integration for RBS 6000 series for 2G System • Responsible for supervision of Outdoor and Indoor Installation of Telecom Equipments viz RF Feeder Cables, IF cables, GSM Antennas, MW Antennas, BTS (RBS 6601,RBS 6202 & RBS 6601E) as per Pre-Planned Site Plan. • Take VSWR sweeps of jumper cables. • QA assessment and handover of sites and Transmission Equipments to client. • Maintaining the Quality of Work. • To perform Pre-integration site check according to Installed hardware and system requirement • Testing, Integrate, commissioning and troubleshoot/clear alarm RBS 6000 (6201 and 6601 family) • Audit site and make sure the installation, testing and commissioning RBS and follow Ericsson requirement Sept 2011 to May 2012 Ericsson Singapore RAN Support Engineer • Performed Support and Integration through OSS-RC11 (Alarm collect, installing license, running CR, running DT Script, etc.) • Successfully commissioned and integrated pilot site of Nawras in order to secure the Analyzing the ATND of a given site and preparing the script for the 3G site accordingly. • Commissioning and Integration of RBS3206,RBS3106,RBS3418. • Swapping Migrated 6601,6201 and 6102 from ATM to IP. • Creating Transport network for IP migration (SCTP). • Creation of the new IP based Nbap. • Expansion of the existing E1’s for RBS3206,RBS3106 using ETMC cards. • ATM to IP Migration of 3G NodeB without affecting the site performance. • Migration of CBU (RBS 3206) to DUW (DUW30) without the support of RNC using migration technique. • Configuration of ETMFX port speed,Nbap creation,creating Sctp Transport network using Moshell. • Alarm extension (High Temperature,Intruder Alarm,Obstruction Light,Mains Fail,PBC 6200 Major Alarm,PBC 6200 Minor Alarm,CLU Fail)for 3G sites. • Upgrading the required number of E1’s as per the request of the customer. • Reduced the required number of E1’s in site as per the customer requirements. • Analyzing Kget of sites and troubleshooting • Sector addition in existing NodeB(RBS3206) without site downtime. • Good knowledge in MOShell and checking the status of site,E1,restarting the NodeB and checking the alarms of the site through Moshell. • Calculate the uplink and downlink feeder delay,the uplink and downlink feeder attenuation and prepare the external hardware script. • Activation emergency license in NodeB. • Integrated sites in W900 band. • Integrated 6601,6102 on DUW30. • Commissioning and integration of RBS6000 on ATM platform.(6601,6102,6201) • Software upgrade of NodeB in 6601,6102. • Alarm clearance after commissioning of site and make it ready for integration. • Conduct voice calls,video calls and internet on each sector of the site. • Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each sector. • Enabling synchronization for the site through ETA and ETB ports. • Ping the RNC locally from site and check for loss of data. • Performed Support and Integration through OSS-RC11 (Alarm collect, installing license, running CR, running DT Script, etc.) • Troubleshooting RNC 3810/3820 and Node B 6K Series (ex. RBS 6102) • Support Upgrade RNC SW to UP level W10B • Support integration New Node B to RNC via OSS
  • 7.
    • Integration newNode-B over IP (Familiar with RBS 3000 Series, RBS 3518[Outdoor], RBS 3418[Indoor], RBS 3412[Indoor], RBS 3206[Indoor], RBS 3107[Outdoor], RBS 6000 Series, RBS 6601, RBS 6201, RBS 6102) • Perform troubleshooting during Integration on Node B to RNC • Installing License Key File (LKF) via SMO and Moshell • Perform implementation 3rd Carrier expansion for RBS 6000 and 3000. • Perform Upgrade software level Node-B P7 (Node B: CXP9014346/1_R6S05 [P7.1]), W10A and W10B (RNC: CXP9014711/2_R4K) • Performed troubleshooting performance issues, such as PS drop, Speech Drop, Low RRC, Low HS throughput, Low IRAT Handover, Zero Traffic Cells, and other disturbance in Network • Changes of RF parameter (PrimaryCPichPower, ElectricalAntennaTilt, DlcodeAdm, MaxHsRate, etc) using AMOS • Performed integration new RBS into RNC (Cabinet, Site Configuration and OAM, NBAPC & D, HSDPA, EUL) • Define UTRAN relation using Common Explorer • Operation and Maintenance OSS RC11 (Create, Delete, and Modify configuration RNC or Node-B using Network Explorer), and perform upgrade activity using Software Management Organizer (SMO) • To perform support using Oss-RC collect Alarm List Viewer log and generate to excel report • Documenting test results and log files for presentation to the Customer as part of a handover/delivery package • Perform troubleshooting for performances degradation on RNC and RBS, such as speech access drop, RRC problem, HSDPA drop, SHO degradation, etc. • Perform RNC/RBS tracing for troubleshooting and collect all the necessary logs. • Alarm/Trouble ticket handling and troubleshooting on RNC and Node B’s with using OSS Network Explorer, SMO, EMAS and AMOS/Moshell server. • Dispatched and guided Field Engineer on troubleshooting • Performing SIU Integration June 2011 to August 2011 Ericsson South Korea Node B / LTE Node B Integrator (Team Leader for LG-Ericsson Project) • Performing Rollout for 3G network with W11 SW level • Performing integration for RBS 6000 series for Dual Stack Configuration/Dual DUW • Performing configuration for transport network such like Iub Over Ip and Iub Over ATM • Experience in perform Fault Management (FM) and monitor /troubleshooting on WCDMA Node B alarms by using Element Manager (EMAS) and moshell • Good knowledge and working experience with RAN fault finding and fault assessment. • Perform IMA troubleshooting during Integration on Node B to RNC • Installing License Key File (LKF) via Moshell • NodeB Software upgrade from W10 to W11 and Features upgrade. • Perform implementation 4th Carrier expansion for RBS 6000 • To perform supervise of Installation, pre-check, power up Lte NodeB corrected accordingly • To perform Auto Integration LTE nodeB -to load siteinstall.xml • To perform testing, integration LTE nodeB- to load MO and MOs (eNB logicalName LKF, eNB oam tn, eNB oam tn lh0, eNB_radio_create_RRUS01, eNB_cell_create_RRUS01, eNB_S1_setup, neighbour tuning general, Create wcdma network, feature activate and parameter setting • To perform LTE nodeB software upgrade from L11B to L12A.
  • 8.
    April 2008 toMay 2011 Ericsson Oman WRAN TEAM LEADER (NAWRAS PROJECT) • Lead the Implementation Team for Performing Rollout for 3G network for NAWRAS • Integrated 6601,6102 on DUW30. • Commissioning and integration of RBS6000 on ATM platform.(6601,6102,6201) • Software upgrade of NodeB in 6601,6102. • Alarm clearance after commissioning of site and make it ready for integration. • Conduct voice calls,video calls and internet on each sector of the site. • Conduct VSWR sweeps in feeders and also calculate the correct feeder delay of each sector. • Enabling synchronization for the site through ETA and ETB ports. • Generate RBS scripts, integrate and troubleshoot of 2nd Carrier, HSDPA & HSUPA. • W10 New Site Integration by using Moshell and OSS-RC • RNC,RXI and NodeB Software upgrade from P7 up to W10 and License and Features upgrade. • Defined IMA Group & adding new E1’s to the IMA Group for Iub upgrade • Perform IMA troubleshooting during Integration on Node B to RNC • Installing License Key File (LKF) via SMO and Moshell • Support Implementation Team on Rehoming, Reparenting, Ima Upgrade, • Manage customer questions, support requests for the 2nd Carrier , HSDPA and HUSPA Performance issues. • Performed RNC/RBS software upgrade to P7.1.4 and W10 ( 2000 RBS) • Prepared RF troubleshooting procedures (RRC, HSDPA, RAB, Throughput, RACH) for Maxis • Supported integration of RBS 3000 and 6000 with DUW and RUW • Handled operation and maintenance RNC 3810 and RNC 3820 • Implemented customers request and requirements based on agreement • Performed troubleshooting performance issues, such as PS drop, Speech Drop, Low RRC, Low HS throughput, Low IRAT Handover, Zero Traffic Cells, and other disturbance in Network • Prepared Performance Reporting for analysis, troubleshoot using PMR and Business Object • Changes of RF parameter (PrimaryCPichPower, ElectricalAntennaTilt, DlcodeAdm, MaxHsRate, etc) using AMOS, Moshell, OSS Planned Configuration Area, and EMAS • Performed Acceptance test of new RNC/RBS (RNC 3810, RNC 3820) • Implemented IuCS/IuPS over IP migration in RNC P7 • Implemented Iur over IP in RNCs • Performed Health Check for RNC and RBS after reparanting / rehoming using MOSHELL / AMOS Script. • RNC/RBS upgrade from P6 to P7, P7.0 to P7.1.4 • Implemented Iub over IP for RBS 3206 • Performed Audit for RNC RBS and preventive maintenance • Performed integration new RBS into RNC (Cabinet, Site Configuration and OAM, NBAPC & D, HSDPA, EUL) • Performed Service Based Hand Over (SBHO) Activation in RNC • Performed MSC in Pool activation in RNC • Performed Health Check and Implementation of HSDPA 3.6 Mbps, 7.2 Mbps, 14.4 Mbps, 21.1 in order to Improve HSDPA Capacity Services. • Dispatched and guided Field Engineer on troubleshooting January 2008 to April 2008 Ericsson Bahrain WRAN Support Engineer • Provide 1st & 2nd level technical support to identify, investigate and resolve technical faults in UTRAN. Provide emergency on-call support for UTRAN.
  • 9.
    • Monitor the3G Batelco Network via RANOS. Well worse to troubleshoot faults via Moshell and OSS. Resolve the Node B & RNC faults remotely and on site. • Prepare Bulk & MO Scripts files for Ericsson 3G Cabinet such as (3206) for new sites and for rehoming sites. Generate report with daily, weekly on outage and 3G KPI report to costumer Batelco • Provide OJT to Batelco Customer on RNC & Node B ATP and faults troubleshooting. • Responsible to keep the performance of network at optimum level by ensuring that network problems are detected and corrected accordingly. • Perform routine preventive maintenance and routine activities such as system backup, health checks etc of UTRAN Network elements via OSS. • Involve and experience on perform software and hardware upgrades of UTRAN network elements. (P6 & P7) • Experience on Node B Integration adding Node B, deleting Node B, rehoming Node B and troubleshoot E1 intermittent and disabled faults. • Integrating node B from RNC using Moshell ,EMAS (OAM.mo, Iub.mo, Utrancell.mo and se.mo) & OSS(ARW,CELL,AAL2,SAC.xml scripts ) • Support for RF Team to do the drive test and parameter value changes. Handle problems of ASC, RETU, RU, FU, CBU, swapped feeder, faulty boards on Node B. • Monitoring Performance of Speech, Video, HSDPA, R99 packet calls using PMR command and UER. September 2007 to December 2007 ERICSSON Saudi Arabia 3G O&M Engineer (Team Leader for Operation & Maintenance) • Performing Operation & Maintenance for 3G network • Troubleshooting for RBS 3202,3206,3402,3101 and 3303 for 3G and able to using EMAS & MOSHELL • Experience in perform Fault Management (FM) and monitor /troubleshoot on WCDMA Node B alarms by using Element Manager (EMAS) • Commisioning & Integration RBS 3202,3206,3101,3303 and 3402 and traffic node TN6P, TN20P for Mobily. Testing and confirmation of E1, crossconnect and traffic node mapping and also liased with intergrator RNC regarding site preparation . • Commisioning & Intergration for RBS 3000 systems especially RBS 3202,3206,3402,3101 and 3303. Familiar with EMAS software and related application software.Job process include loading script for hardware configuration and O&M access and Upgrade Package latest revision.Testing and confirmation of E1 and also liased with intergrator RNC regarding site preparation .Test circuit switch(CS) and packet switch(PS) quality before handover to customer Mobily • Performed IMA upgrading for RBS 3202,3101 & RBS 3206 • Performed E1 upgrading for RBS 3202,3101 & RBS 3206 • Conducting workshops for Node B installers at the sites. • Inspect and correct site installation by contractors, and inspect site master procedure by using Ericsson standard documents. • Integrations of Node B and cross connect of E1. • Loads software and initial configurations of Node B. • Performs Site Inspections and Test for newly installed sites according to Ericsson standard qualities check lists. • Prepare acceptance checklist on newly installed sites • Use of site Master test equipment for checking exceeded VSWR limit and DTF ( Distance To Fault ) for tracing faulty connectors, cables or antennas on the antenna system • Commisioning & Integration traffic node TN6P, TN20P, Mini Link Hi-Cap for Mobily. Testing and confirmation of E1, crossconnect and traffic node mapping and also liased with Minilink Manager regarding site preparation . • Traffic Node and High Capacity configuration • Software upgrading for the Traffic Node • Change IP address for Traffic node • Perform Link transmission interconnection and integration
  • 10.
    • Preloading andloading RBS complete November 2004 to June 2007 Ericsson Malaysia RBS Engineer • Troubleshooting for Node B for 3G and able to using EMAS & MOSHELL • Experience in perform Fault Management (FM) and monitor /troubleshoot on WCDMA Node B alarms by using Element Manager (EMAS) • Perform Troubleshooting/Operation and Maintenance of Node B. • Commisioning & Intergration for Node B (WCDMA) systems especially RBS 3202,3206,3303 and 3402. Familiar with EMAS software and related application software.Job process include loading script for hardware configuration and O&M access and Uprade Package latest revision.Testing and confirmation of E1 and also liased with intergrator RNC regarding site preparation .Test circuit switch(CS) and packet switch(PS) quality before Handover to customer Maxis • Installation Enginnering Surveyor for RBS swapping project (2G/3G) • Being part of testing, commissioning and integration of Ericsson 2G radio equipment. Include also EDGE upgrading on BTS site for Maxis Mobile (Maxis) . Equiptment covered RBS 2202, 2102, 2206, 2106, 2308 • Responsible to test and verify system functionally and to ensure the system operate accordingly and fault free within the timeframe before handover to customer • Responsible in PCM link (E1) arrangement to the site. • Liased with BSC Integrator regarding site preparation, hardware configuration, BCCHNO parameters, DCHNO parameters, BSIC parameters, timeslots (TSs) used for SDCCH, SW version for the RBS. • Record all DT from BSC Integrator and the reading of signal strength (uplink and downlink). • Troubleshooting on system failure at site as failed to operated, internal and external alarm problem, rectifier failed, etc. • Prepared of Acceptance Test Procedures report before handover to customer. • Perform Standing Wave Ratio (SWR) and Distance To Fault (DTF) tests for verifying the antenna system installation • Test equipments familiar : • ANRITSU Site-Master • ERICSSON TEMS • HP Frequency Signal Generator • BIRD Watt Meter • Sunrise Spectrum Analyzer • Bird Analog Power Meter • Agilent Digital Power Meter • Bird Site-Master • HP frequency counter • Commisoning & Intergration for RBS 3G (WCDMA) systems especially RBS 3202 and 3101. Familiar with EMAS software and related application software.Job process include loading script for hardware configuration and O&M acces. Testing and confirmation of E1 and also liased with intergrator RNC regarding site preparation .Test voice,video and packet switch(PS) quality before Handover to customer Maxis esp. • BTS Rollout Coordinator - Coordinate Integration Process and controlling RBS testers, installers during swap-over from Motorola BTS to Ericsson BTS. • BTS Operation & Maintenance Co-Ordinator – Managing BTS technicians to perform maintenance of RBS 2206, 2106 and 2308 for Maxis 2G. • 3G BTS Operation & Maintenance for RBS 3101 & RBS 3202.
  • 11.
    • Co-Ordinate allinstallation of antenna system and Node B equipment RBS 3000 and RBS 2000 system for customer Maxis • Co-Ordinate Testing and Commisioning Node B equipment RBS 3000 and RBS 2000 system for customer Maxis Education and Qualifications 1989-1992 Field of Study : Diploma in Communication Engineering Major : Communication Engineering Name of Institution : University Technology of Malaysia Result : 2nd Class References 1. Name : Seong Chun Chan Telephone : +6592313348 Position : Competence Sub-Domain Manager Name of Institution : Ericsson’s Telecommunication Singapore E-mail : seong.chun.chan@ericsson.com 2. Name : Belal abu dyab Telephone : +96895212648 Position : Implementation Manager Name of Institution : Ericsson Oman E-mail : belal.abu.dyab@ericsson.com 3. Name : Abdikarim farah Qassim Telephone : +96612279788 Position : Service Engineer Name of Institution : Ericsson Saudi Arabia E-mail : abdikarim.farah.qassim@ericsson.com