SlideShare a Scribd company logo
Instrument & Telecom Commissioning
Engineer
Kamran Saeed
Khobar,Saudi Araba,
E:instrumentengine@gmail.com kspuri@hotmail.com
M: 00966595273934 Pak: 0092345228115
Skype: k_s_puri (Kamran)
CAREER OBJECTIVE
 A position of dynamic and energetic person to work as RF VSAT
Telecommunication Commissioning Engineer with growth potential and
challenging environment to utilize my technical experience for better prospects of
organization.
PROFESSIONAL EXPERIENCE
.
AU Holding: [ July 24, 2017 to Date ]
 Commissioning Engineer ( Telecom/ Scada & Analyzers )
Current Job Responsibilites:-
Project: Saudi Aramco Monitoring of Wells, Cathodic Protection, Production facilities
RTU & Scada
Contractor: Wipro
Description: Commissioning Testing and performance of new (CP ) NETCONTROL
& GE SCADA automation, UHF/VHF 350 to 360 MHZ Radio Master, Slave Radio
Station, MDS Master Radio, NMS server and PDR Radio configuration and replacement.
Site acceptance test procedures, Scada Remote stations, Visual Checks, Visual
inspection, Radio status, RSSI Check, Frequency Interference Check, Link Check,
and inspection of wave guide at all major Saudi Aramco sites Abquaiq, Harad,
Shedgam, Khurais and other areas
DLPS Alkhobar ,Saudi Arabia 2008 to July 2017
 Working as “ Instrument & Telecom Engineer
Projects: Saudi Aramco
Description: Commissioning of Analyzers in Saudi Aramco Uthmaniya, Mubaraz,
Tanajib, Shedgum and Kaust, for monitoring of Oil, Water, Refinery & Gas Oil
separation Plant.
Project: Sabic & Tasnee
Description: Commissioning and Testing of the Analyzers for monitoring Petrochemical
Waste Water facilities at all segements of Sabic and Tasnee.
Working on STC Fiber Optics Network for OSP, FTTH, Junction and Access network
projects. Using Network Engineering Tool (NE Tool) for supporting the field staff for
troubleshooting fiber optics issues.
Survey for OSP and FTTH installation and Laying all kind of Fiber optical cable for FTTH,
Access and metro network including all type of Civil work. To Manage & reports from
the beginning to completion of FTTH and OSP Projects ,Coordinate with the O&M
department to hand over the OSP Site after the PAT.
Working with different integrators to provide district wise FTTX connectivity in the Saudi
Arabia, Carried out Trouble shouting from MSC to customer end by using different
testing tool like OTDR, power meter, and source meter and laser gun.
Conducting Preliminary Acceptance Test for Fiber Optic cable. Helping field Engineers
and technicians through Fiber Joint Schematic (FJS), Cable Route Diagrams and Granite
Table for troubleshooting the OSP and FTTX issues. For new implementations of DWDM
nodes analyzing the OTDR Traces, section Loss Measurements. Monitoring and
maintaining the Integrity of the Client networks and its vital Elements. Performing
schedules maintenance Issues, trouble tickets and dispatching market personnel as
required.
Prepare survey procedures and coordinate and communicate these with involved
parties’ .Conduct site survey to monitor quality of work performed and prepare regular
reports on the quality of the survey & audit results.
Review site reports, identify technical issues and other blocking issues, and escalate as
necessary. Verify progress and quality of work of the vendors and contractors against
agreed specifications and plans, and report any deviations as per project process.
Working with various internal and external agencies to provide the necessary support
and assistance.
Developed fault tracing procedures for OSP and FTTH network using (EXFO), OTDR and
optical power meter.OTDR testing for Link budgeting and maintaining test
reports. Laying all kind of Fiber optical cable for primary network and secondary
network.
FTTH OSP design approvals according to STC standards and OSP construction activities
as per construction drawing, Perform construction and maintenance of OSP and FTTH
infrastructure according to industry standards.FTTH OSP work including laying/pulling &
jointing of u/g copper and optical fiber cables, cable splicing, cable testing and
reporting, PVC pipes, and construction of Main Holes and all other allied works.
To make connectivity from MSC to cabinet and follow up to subscriber OPTICAL
NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Fiber cable cut
activities (Corrective Maintenance), Preventive Maintenance. Patching in (MSC) by using
LC, FC, SC connectors to make the connectivity between MSC and customer.
Prepare access network design; including fiber access and fiber backbone networks,
employing Fiber-To-The-Node (FTTN), Fiber-To-The-Premises (FTTP), and Fiber-To-The-
Home (FTTH) technology, underground, including Manhole and conduit design as
applicable, in the area under study. Networks planning and optimization, system
engineering, and maintenance of fiber optic transmission networks constituting long-
haul & METRO networks, Junction & Access.
Testing &Splicing ,Termination, laying and installation of indoor/ outdoor fiber network
for GPON and GSM sites and Survey, Planning and design of OSP (Primary, Secondary &
Junction Network) and other cabling techniques.
Providing Technical support to the new deployment projects like GPON FTTH OSP.End to
end coordination with Multi Vendors Ericsson/Huawei/Alcatel Lucent for ISP Equipment
(OLT & ONT).
.
Responsible for checking and testing of OSP and ISP equipment, operation and
maintenance of Access network, metro network OSP and FTTH. Installation ,signal
testing,OTDR test result and report and trouble shouting of Fiber distribution terminal
(FDT),ODF,Splitter,FDF,ONT,OLT and Fusion splicing of optical fiber.
Making As built/Red line drawings at the end of the work completion. Conduct PAT for
the implemented project. Prepare Site Acceptance Test results & Site Inventory
documentation and follow up with vendors to clear the OILS prior to final acceptance.
Making site inspection to make sure that works are accomplished according to the job
order.Qualtity control management for all FTTH and OSP related jobs.
FTTH/ OSP Engineer
Petro Rabigh Complex– SAAF Line 3 Optical Fiber Project
Client: Saudi Aramco
Supervision of the outside plant (OSP) installations, testing & commissioning team for
Fiber optic cables. Planning & implementation of FTTH, OSP, access and junction
Networks. Troubleshooting, relocations, installation & MDT (Maintenance down Times)
on different Fiber Optic Network. Troubleshooting and support for the FTTH, and FTTB
from PON port up to the customer termination ONT.
Prepare survey procedures and coordinate and communicate these with involved
parties’ .Conduct site survey to monitor quality of work performed and prepare regular
reports on the quality of the survey & audit results.
Responsible for checking and testing of OSP and ISP equipment and operation and
maintenance of Access network, metro network OSP and FTTX. Installation, Signal
testing, OTDR test result and report and trouble shouting of Fiber distribution terminal
(FDT), ODF, Splitter, FDF, ONT, OLT and Fusion splicing of optical fiber.
Splicing, Termination and testing using OTDR, VFL & Power meter of OFC.Proven
communication,planning & leadership skills with focus on conflict & problem resolution.
Trouble Shooting on CISCO Routers and Switches. Routing and Switching, MDT, PAT,
testing & commissioning PMR for the STC Data equipment. Troubleshooting on SDH and
DWDM Systems different vendors.
Developed fault tracing procedures for OSP and FTTH PON network using (EXFO), OTDR
and optical power meter. OTDR testing for Link budgeting and maintaining test
reports. Laying all kind of Fiber optical cable for primary and secondary network.
Survey, Planning and installation of OSP and FTTH (Primary, Secondary & Junction
Network) and other cabling techniques ,OSP and FTTH civil work including laying/pulling
& jointing of u/g copper and optical fiber cables ,cable splicing, cable testing and
reporting ,PVC pipes , and construction of Main Holes and all other allied works.
Making Red line drawings at the end of the work completion. Conduct PAT for the
implemented project. Prepare Site Acceptance Test results & Site Inventory
documentation and follow up with vendors to clear the OILS prior to final acceptance.
Making site inspection to make sure that works are accomplished according to the job
order.Qualtity control management for all FTTH and OSP related jobs.
Site Engineer
Client: Saudi Telecom Company
Location: Yanbu Industrial Area
Laying all kind of Fiber optical cable for primary network and secondary network. Survey
for the installation of optical fiber. Civil work for the laying of all kind of Fiber optical
cable. Installation of Fiber distribution terminal (FDT), ODF, Splitter, FDF and Fusion
splicing of optical fiber. Installation of optical fiber for FTTH and OSP projects and GSM
tower. Installation of splitter terminal box (STB), terminal box (TB), optical network
terminal (ONT), optical distribution frame (ODF).
Carried out Trouble shouting from MSC to customer end by using different testing tool
like OTDR, power meter, and source meter and laser gun. Patching in (MSC) by using LC,
FC, SC connectors to make the connectivity between MSC and customer. To make all
type of optical Fiber installation according to the STC plan and granite paper. To make a
connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK
TERMINAL (ONT) according to the STC plan and granite paper.
Signal testing and trouble shouting of optical fiber by using power meter and source
meter. To handover all jobs to STC as per STC standards and requirements. Prioritizes
on-site installation activities to support the project schedule provided by the Project
Manager. Coordinating with the logistic team to make sure material and equipment
delivered at the site in time.
Review site reports, identify discrepancies, technical issues and other blocking issues,
and escalate as necessary .In coordination with contractors, vendors and Customer,
prepare acceptance schedule and related documents. Verify progress and quality of work
of the vendors and contractors against agreed specifications and plans, and report any
deviations as per project process. Working with various internal and external agencies to
provide the necessary support and assistance.
BTC
 Senior Engineer Operations
Responsibilities:-
I. Sawan Gas Plant & Sawan Rigs (Total Nos of Rig 25 )
Description: Installation, configurations, commissioning and testing of RF SCPC
Earth Station Gas Rigs of M/s OMV’s (Austrian Company) 25 Rigs.
Establishment of data and voice Communication involve RF high frequency
wireless connection from Gas Sawan Rig (05), Sawan (10) and Duljan sites to their
head office there at Islamabad via SCPC Link. Installation involve civil work for
construction of base, installation of 3.0 M antenna, Low Noise Amplifier, OMT,
SPT, Down converter, Upconverters and commissioning part consist of
configuration of RF Agilis ASM 4800 modems. The assignment was being
conducted regularly with interval of two months
II. BHPBILLITION (Oil & Gas sector):
Description: Rectification of faults in their 128kpbs, voice and data satellite RF
communication link there at Zamzama Gas plant, Dadu, which is connected to head
office in city of Islamabad.
III. T.V One (Teleport)
Description: Commissioning and testing of Satellite Encoder, Encoder’s Redundant
Switches, 200 Watts Solid State Power Amplifier and maintenance of RF 6GHZ
link. Propagation of Distribution Amplifier’s 0.75 V Video Signal to transponder
via Encoder & Encoder Switches.
IV. PAKTEL (Mobile Phone Operator)
Description: Diagnoses of fault at their BTS sites. Operation comprises adjustment
of power in Comstream Paradise modem, attenuation, frequencies in SPT (Agilis) at
Karachi as well as Gwader BTS sites. Detection of fault with the help of spectrum
analyzer such as spike in carrier while transmitting signal.
 Commissioning of Radio (Wimen –II 24 db, 2.4GHZ). Antennas and
Transceiver unit with line of sight alignment to another Microwave Antenna
network system, with 512 Kbps baud rate.
 Designing and preparation of Radio & Satellite Link Budge.
 Installation of Power sections in Up converters during time of no power.
V. PAKISTAN INTERNATIONAL AIRLINES (PIA)
Description: Installation and commissioning of Earth Station at Karachi Airport.
Configured as a main HUB for Quetta and Faisalabad Airports. ASM 4800 and
COMTECH EF 600 satellite modems with Ring Focus 3.0 M Antenna were
commissioned in order to connect with remote earth station with both cities via
Satellite.
VI. WAQT T.V
Description: preparation of Civil work (Earth Station Base for 3.7 meter
Anntena).Installation & Commissioning of their link from Lahore, Islamabad to
Karachi using satellite (Paksat).
VII. PRIME BANK:
Description:Installation, commissioning & testing of Mesh Satellite Network at
Clifton Branch ,Zamzama Karachi linked and configured with Lahore and
Islamabad Branch via Satellite (AP-STAR-2R). 3.7m Antenna powered by 20
Watts Agilis SPT with pair of Comtech CDM 5700 modem. Civil Work Comprises
construction of base and prior construction analysis also included in project
VIII. ALLIED BANK
Description: Installation, commissioning & testing of DVB-S2, remote satellite
link to connect it with other branches for exchanging the data and internet traffic.
1.2M Ku Band Antenna, BUC and Access Broad Band Terminal (Efficient
Channel Coding Inc, USA) were used.
IX. BUSINESS PLUS
Description: Maintenance of T.V channel transmitting video signals over PAKSAT
satellite. Fault diagnostic and rectification comprising diagnostic of all electrical
and electronic equipment involve in the RF transmission.
QUALIFICATION
 B.E 1998-99
 Certification: Fiber Optics
 Certification: Radyne RF Equipments.USA (Installation of Satellite Modems,
Upconverter, NMS, Downconverters, RCS, SSPA at Pakistan Telecommunication
Ltd, Karachi
TRAININGS____________________________________________________________
 Satellite Earth Station, Dhahmandro Pakistan 2005
 T.D California,U.S.A. November 2013.
PERSONAL PROFILE
Marital Status : Married
Nationality : Pakistani
Iqama # : Transferable
Languages : English, Urdu, Punjabi, Basic Arabic.
REFERENCES
1. Mr. Ashraf, PMT , Saudi Aramco, Mobile: 0552352735
2. Mr. Yahya Al Janabi , Saudi Aramco Phone:013- 8768079

More Related Content

What's hot

Meltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 PresentationMeltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 Presentation
Mavana IT Solution Pvt. Ltd
 
Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0
Ketut Widya
 
Cv meynard
Cv meynardCv meynard
Cv meynard
Meynardo Gotoman
 
Panduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling SystemPanduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling System
Panduit
 
ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013Frank Lucchesi
 
568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overviewFadir Salmen
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDsunil Saini
 
Ramesh resume
Ramesh resumeRamesh resume
Ramesh resumeRamesh R
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
YanZhang314
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resumejay prakash
 
Lte project report
Lte project reportLte project report
Lte project reportRahul Kumar
 
Asif Naveed Resume
Asif Naveed ResumeAsif Naveed Resume
Asif Naveed ResumeAsif Naveed
 
Training report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3GTraining report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3G
engramjadislam78
 
Cabling Standards Update 2014
Cabling Standards Update 2014Cabling Standards Update 2014
Cabling Standards Update 2014Dimitris Filippou
 

What's hot (20)

Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Meltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 PresentationMeltek Infosystems BSX 2010 Presentation
Meltek Infosystems BSX 2010 Presentation
 
Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0Og 103 test and analysis of gsm electromagnetic background issue1.0
Og 103 test and analysis of gsm electromagnetic background issue1.0
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Panduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling SystemPanduit Signature Core Fiber Optic Cabling System
Panduit Signature Core Fiber Optic Cabling System
 
ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013ATEI PII SBIR Proj Description 5 Feb 2013
ATEI PII SBIR Proj Description 5 Feb 2013
 
KAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEWKAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEW
 
568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATED
 
Ramesh resume
Ramesh resumeRamesh resume
Ramesh resume
 
Asif CV
Asif CVAsif CV
Asif CV
 
suresh resume
suresh resumesuresh resume
suresh resume
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
 
Lte project report
Lte project reportLte project report
Lte project report
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
Asif Naveed Resume
Asif Naveed ResumeAsif Naveed Resume
Asif Naveed Resume
 
Training report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3GTraining report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3G
 
Cabling Standards Update 2014
Cabling Standards Update 2014Cabling Standards Update 2014
Cabling Standards Update 2014
 

Similar to Telecom Instument engineer

Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
Aslam Fahmi
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
Aslam Fahmi
 
Resume sanjeev agarwal New
Resume sanjeev agarwal NewResume sanjeev agarwal New
Resume sanjeev agarwal Newskag2010
 
CelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptxCelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptx
LeonhardKorowajczuk
 

Similar to Telecom Instument engineer (20)

vimal resume
vimal resumevimal resume
vimal resume
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
resume
resumeresume
resume
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
shashank3
shashank3shashank3
shashank3
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
CV_Satyendra
CV_SatyendraCV_Satyendra
CV_Satyendra
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
Resume sanjeev agarwal New
Resume sanjeev agarwal NewResume sanjeev agarwal New
Resume sanjeev agarwal New
 
Mamdouh C.V NEW
Mamdouh C.V NEWMamdouh C.V NEW
Mamdouh C.V NEW
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
CelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptxCelPlan Portfolio - Utilities 2023.pptx
CelPlan Portfolio - Utilities 2023.pptx
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
omer daraz cv
omer daraz cvomer daraz cv
omer daraz cv
 
umer new cv
umer new cvumer new cv
umer new cv
 
Sangamesh reddy CV.
Sangamesh reddy CV.Sangamesh reddy CV.
Sangamesh reddy CV.
 

More from Kamran Saeed

Laboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning EngineerLaboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning Engineer
Kamran Saeed
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
Kamran Saeed
 
Calibration engineer vibration instruments
Calibration engineer vibration instrumentsCalibration engineer vibration instruments
Calibration engineer vibration instruments
Kamran Saeed
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
Kamran Saeed
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
Kamran Saeed
 
Analyzer Engineer Process Hydrocarbons
Analyzer Engineer Process HydrocarbonsAnalyzer Engineer Process Hydrocarbons
Analyzer Engineer Process Hydrocarbons
Kamran Saeed
 

More from Kamran Saeed (6)

Laboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning EngineerLaboratory Maintenance installation Commissioning Engineer
Laboratory Maintenance installation Commissioning Engineer
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
Calibration engineer vibration instruments
Calibration engineer vibration instrumentsCalibration engineer vibration instruments
Calibration engineer vibration instruments
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Analyzer Engineer Process Hydrocarbons
Analyzer Engineer Process HydrocarbonsAnalyzer Engineer Process Hydrocarbons
Analyzer Engineer Process Hydrocarbons
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Telecom Instument engineer

  • 1. Instrument & Telecom Commissioning Engineer Kamran Saeed Khobar,Saudi Araba, E:instrumentengine@gmail.com kspuri@hotmail.com M: 00966595273934 Pak: 0092345228115 Skype: k_s_puri (Kamran) CAREER OBJECTIVE  A position of dynamic and energetic person to work as RF VSAT Telecommunication Commissioning Engineer with growth potential and challenging environment to utilize my technical experience for better prospects of organization. PROFESSIONAL EXPERIENCE . AU Holding: [ July 24, 2017 to Date ]  Commissioning Engineer ( Telecom/ Scada & Analyzers ) Current Job Responsibilites:- Project: Saudi Aramco Monitoring of Wells, Cathodic Protection, Production facilities RTU & Scada Contractor: Wipro Description: Commissioning Testing and performance of new (CP ) NETCONTROL & GE SCADA automation, UHF/VHF 350 to 360 MHZ Radio Master, Slave Radio Station, MDS Master Radio, NMS server and PDR Radio configuration and replacement. Site acceptance test procedures, Scada Remote stations, Visual Checks, Visual inspection, Radio status, RSSI Check, Frequency Interference Check, Link Check, and inspection of wave guide at all major Saudi Aramco sites Abquaiq, Harad, Shedgam, Khurais and other areas DLPS Alkhobar ,Saudi Arabia 2008 to July 2017  Working as “ Instrument & Telecom Engineer Projects: Saudi Aramco Description: Commissioning of Analyzers in Saudi Aramco Uthmaniya, Mubaraz, Tanajib, Shedgum and Kaust, for monitoring of Oil, Water, Refinery & Gas Oil separation Plant. Project: Sabic & Tasnee
  • 2. Description: Commissioning and Testing of the Analyzers for monitoring Petrochemical Waste Water facilities at all segements of Sabic and Tasnee. Working on STC Fiber Optics Network for OSP, FTTH, Junction and Access network projects. Using Network Engineering Tool (NE Tool) for supporting the field staff for troubleshooting fiber optics issues. Survey for OSP and FTTH installation and Laying all kind of Fiber optical cable for FTTH, Access and metro network including all type of Civil work. To Manage & reports from the beginning to completion of FTTH and OSP Projects ,Coordinate with the O&M department to hand over the OSP Site after the PAT. Working with different integrators to provide district wise FTTX connectivity in the Saudi Arabia, Carried out Trouble shouting from MSC to customer end by using different testing tool like OTDR, power meter, and source meter and laser gun. Conducting Preliminary Acceptance Test for Fiber Optic cable. Helping field Engineers and technicians through Fiber Joint Schematic (FJS), Cable Route Diagrams and Granite Table for troubleshooting the OSP and FTTX issues. For new implementations of DWDM nodes analyzing the OTDR Traces, section Loss Measurements. Monitoring and maintaining the Integrity of the Client networks and its vital Elements. Performing schedules maintenance Issues, trouble tickets and dispatching market personnel as required. Prepare survey procedures and coordinate and communicate these with involved parties’ .Conduct site survey to monitor quality of work performed and prepare regular reports on the quality of the survey & audit results. Review site reports, identify technical issues and other blocking issues, and escalate as necessary. Verify progress and quality of work of the vendors and contractors against agreed specifications and plans, and report any deviations as per project process. Working with various internal and external agencies to provide the necessary support and assistance. Developed fault tracing procedures for OSP and FTTH network using (EXFO), OTDR and optical power meter.OTDR testing for Link budgeting and maintaining test reports. Laying all kind of Fiber optical cable for primary network and secondary network. FTTH OSP design approvals according to STC standards and OSP construction activities as per construction drawing, Perform construction and maintenance of OSP and FTTH infrastructure according to industry standards.FTTH OSP work including laying/pulling &
  • 3. jointing of u/g copper and optical fiber cables, cable splicing, cable testing and reporting, PVC pipes, and construction of Main Holes and all other allied works. To make connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Fiber cable cut activities (Corrective Maintenance), Preventive Maintenance. Patching in (MSC) by using LC, FC, SC connectors to make the connectivity between MSC and customer. Prepare access network design; including fiber access and fiber backbone networks, employing Fiber-To-The-Node (FTTN), Fiber-To-The-Premises (FTTP), and Fiber-To-The- Home (FTTH) technology, underground, including Manhole and conduit design as applicable, in the area under study. Networks planning and optimization, system engineering, and maintenance of fiber optic transmission networks constituting long- haul & METRO networks, Junction & Access. Testing &Splicing ,Termination, laying and installation of indoor/ outdoor fiber network for GPON and GSM sites and Survey, Planning and design of OSP (Primary, Secondary & Junction Network) and other cabling techniques. Providing Technical support to the new deployment projects like GPON FTTH OSP.End to end coordination with Multi Vendors Ericsson/Huawei/Alcatel Lucent for ISP Equipment (OLT & ONT). . Responsible for checking and testing of OSP and ISP equipment, operation and maintenance of Access network, metro network OSP and FTTH. Installation ,signal testing,OTDR test result and report and trouble shouting of Fiber distribution terminal (FDT),ODF,Splitter,FDF,ONT,OLT and Fusion splicing of optical fiber. Making As built/Red line drawings at the end of the work completion. Conduct PAT for the implemented project. Prepare Site Acceptance Test results & Site Inventory documentation and follow up with vendors to clear the OILS prior to final acceptance. Making site inspection to make sure that works are accomplished according to the job order.Qualtity control management for all FTTH and OSP related jobs. FTTH/ OSP Engineer Petro Rabigh Complex– SAAF Line 3 Optical Fiber Project Client: Saudi Aramco Supervision of the outside plant (OSP) installations, testing & commissioning team for Fiber optic cables. Planning & implementation of FTTH, OSP, access and junction Networks. Troubleshooting, relocations, installation & MDT (Maintenance down Times) on different Fiber Optic Network. Troubleshooting and support for the FTTH, and FTTB from PON port up to the customer termination ONT.
  • 4. Prepare survey procedures and coordinate and communicate these with involved parties’ .Conduct site survey to monitor quality of work performed and prepare regular reports on the quality of the survey & audit results. Responsible for checking and testing of OSP and ISP equipment and operation and maintenance of Access network, metro network OSP and FTTX. Installation, Signal testing, OTDR test result and report and trouble shouting of Fiber distribution terminal (FDT), ODF, Splitter, FDF, ONT, OLT and Fusion splicing of optical fiber. Splicing, Termination and testing using OTDR, VFL & Power meter of OFC.Proven communication,planning & leadership skills with focus on conflict & problem resolution. Trouble Shooting on CISCO Routers and Switches. Routing and Switching, MDT, PAT, testing & commissioning PMR for the STC Data equipment. Troubleshooting on SDH and DWDM Systems different vendors. Developed fault tracing procedures for OSP and FTTH PON network using (EXFO), OTDR and optical power meter. OTDR testing for Link budgeting and maintaining test reports. Laying all kind of Fiber optical cable for primary and secondary network. Survey, Planning and installation of OSP and FTTH (Primary, Secondary & Junction Network) and other cabling techniques ,OSP and FTTH civil work including laying/pulling & jointing of u/g copper and optical fiber cables ,cable splicing, cable testing and reporting ,PVC pipes , and construction of Main Holes and all other allied works. Making Red line drawings at the end of the work completion. Conduct PAT for the implemented project. Prepare Site Acceptance Test results & Site Inventory documentation and follow up with vendors to clear the OILS prior to final acceptance. Making site inspection to make sure that works are accomplished according to the job order.Qualtity control management for all FTTH and OSP related jobs. Site Engineer Client: Saudi Telecom Company Location: Yanbu Industrial Area Laying all kind of Fiber optical cable for primary network and secondary network. Survey for the installation of optical fiber. Civil work for the laying of all kind of Fiber optical cable. Installation of Fiber distribution terminal (FDT), ODF, Splitter, FDF and Fusion splicing of optical fiber. Installation of optical fiber for FTTH and OSP projects and GSM tower. Installation of splitter terminal box (STB), terminal box (TB), optical network terminal (ONT), optical distribution frame (ODF). Carried out Trouble shouting from MSC to customer end by using different testing tool like OTDR, power meter, and source meter and laser gun. Patching in (MSC) by using LC, FC, SC connectors to make the connectivity between MSC and customer. To make all
  • 5. type of optical Fiber installation according to the STC plan and granite paper. To make a connectivity from MSC to cabinet and follow up to subscriber OPTICAL NETWORK TERMINAL (ONT) according to the STC plan and granite paper. Signal testing and trouble shouting of optical fiber by using power meter and source meter. To handover all jobs to STC as per STC standards and requirements. Prioritizes on-site installation activities to support the project schedule provided by the Project Manager. Coordinating with the logistic team to make sure material and equipment delivered at the site in time. Review site reports, identify discrepancies, technical issues and other blocking issues, and escalate as necessary .In coordination with contractors, vendors and Customer, prepare acceptance schedule and related documents. Verify progress and quality of work of the vendors and contractors against agreed specifications and plans, and report any deviations as per project process. Working with various internal and external agencies to provide the necessary support and assistance. BTC  Senior Engineer Operations Responsibilities:- I. Sawan Gas Plant & Sawan Rigs (Total Nos of Rig 25 ) Description: Installation, configurations, commissioning and testing of RF SCPC Earth Station Gas Rigs of M/s OMV’s (Austrian Company) 25 Rigs. Establishment of data and voice Communication involve RF high frequency wireless connection from Gas Sawan Rig (05), Sawan (10) and Duljan sites to their head office there at Islamabad via SCPC Link. Installation involve civil work for construction of base, installation of 3.0 M antenna, Low Noise Amplifier, OMT, SPT, Down converter, Upconverters and commissioning part consist of configuration of RF Agilis ASM 4800 modems. The assignment was being conducted regularly with interval of two months II. BHPBILLITION (Oil & Gas sector): Description: Rectification of faults in their 128kpbs, voice and data satellite RF communication link there at Zamzama Gas plant, Dadu, which is connected to head office in city of Islamabad. III. T.V One (Teleport) Description: Commissioning and testing of Satellite Encoder, Encoder’s Redundant Switches, 200 Watts Solid State Power Amplifier and maintenance of RF 6GHZ link. Propagation of Distribution Amplifier’s 0.75 V Video Signal to transponder via Encoder & Encoder Switches. IV. PAKTEL (Mobile Phone Operator) Description: Diagnoses of fault at their BTS sites. Operation comprises adjustment of power in Comstream Paradise modem, attenuation, frequencies in SPT (Agilis) at
  • 6. Karachi as well as Gwader BTS sites. Detection of fault with the help of spectrum analyzer such as spike in carrier while transmitting signal.  Commissioning of Radio (Wimen –II 24 db, 2.4GHZ). Antennas and Transceiver unit with line of sight alignment to another Microwave Antenna network system, with 512 Kbps baud rate.  Designing and preparation of Radio & Satellite Link Budge.  Installation of Power sections in Up converters during time of no power. V. PAKISTAN INTERNATIONAL AIRLINES (PIA) Description: Installation and commissioning of Earth Station at Karachi Airport. Configured as a main HUB for Quetta and Faisalabad Airports. ASM 4800 and COMTECH EF 600 satellite modems with Ring Focus 3.0 M Antenna were commissioned in order to connect with remote earth station with both cities via Satellite. VI. WAQT T.V Description: preparation of Civil work (Earth Station Base for 3.7 meter Anntena).Installation & Commissioning of their link from Lahore, Islamabad to Karachi using satellite (Paksat). VII. PRIME BANK: Description:Installation, commissioning & testing of Mesh Satellite Network at Clifton Branch ,Zamzama Karachi linked and configured with Lahore and Islamabad Branch via Satellite (AP-STAR-2R). 3.7m Antenna powered by 20 Watts Agilis SPT with pair of Comtech CDM 5700 modem. Civil Work Comprises construction of base and prior construction analysis also included in project VIII. ALLIED BANK Description: Installation, commissioning & testing of DVB-S2, remote satellite link to connect it with other branches for exchanging the data and internet traffic. 1.2M Ku Band Antenna, BUC and Access Broad Band Terminal (Efficient Channel Coding Inc, USA) were used. IX. BUSINESS PLUS Description: Maintenance of T.V channel transmitting video signals over PAKSAT satellite. Fault diagnostic and rectification comprising diagnostic of all electrical and electronic equipment involve in the RF transmission. QUALIFICATION  B.E 1998-99  Certification: Fiber Optics
  • 7.  Certification: Radyne RF Equipments.USA (Installation of Satellite Modems, Upconverter, NMS, Downconverters, RCS, SSPA at Pakistan Telecommunication Ltd, Karachi TRAININGS____________________________________________________________  Satellite Earth Station, Dhahmandro Pakistan 2005  T.D California,U.S.A. November 2013. PERSONAL PROFILE Marital Status : Married Nationality : Pakistani Iqama # : Transferable Languages : English, Urdu, Punjabi, Basic Arabic. REFERENCES 1. Mr. Ashraf, PMT , Saudi Aramco, Mobile: 0552352735 2. Mr. Yahya Al Janabi , Saudi Aramco Phone:013- 8768079