SlideShare a Scribd company logo
1 of 7
Trivinder Singh
Current Address:
Mob: +905345130680; +919654863138
E-mail: Trivinder.singh@huawei.com
Career objective:
To integrate the Professional qualification skills and work experience in Telecommunications
with my personal interest and drive in the Emerging concepts of Telecommunications for a
challenging and enriching journey, ultimately to the value addition to organizational goals and
Creating a niche for organization and myself.
Core Competencies:-
 As team leader, Supervision and Survey, Implementation, integration and
troubleshooting of LTE ENodeB.
 Supervision and management of E2E implementation, installation ,
Commissioning and Integration of Huawei BSC, BTS, RNC, NODEB, IPClock
server and M2000.
 Software Upgradation of NE’s.
 Managing the highly proficient team for L2 BSS/RAN support for
troubleshooting 2G and 3G networks.
 Doing Health Check Up of BSC, RNC.
Tool Knowledge:
 OM STAR
 FMA (2G, 3G & Lte)
 CME
Huawei’s Project Handled:-
Project-1: Vodafone LTE rollout, Turkey
Duration: From Dec 2015 to till date.
Role: Technical Support Engineer ( LTE )
Project Scope: New LTE sites rollout., GUL expansion, Embms and CC testing.
 Configuration & Intergration of test enodeb for Testing embms.
 Preparing database for LTE800 sites, UO to UL configuration.
 Preparing database for LTE900 sites.
 Preparing database for cell addition and deletion in LTE sites.
 Configuration & Intergration of test enodeb for 4T4R with 256QAM.
 Configuration & Intergration of test enodeb for Micro Enodeb.
 Configuration & Intergration of test enodeb for 4CC(3FDD + 1TDD) trail.
Project-2: Cable & Wireless,Seychelles
Duration: From Sept, 2015 to Oct, 2015
Project Scope: New LTE sites rollout. CA
Role: Technical Support Engineer ( LTE )
Project-3: Georgia Magticom GUL Swap, Magticom, Georgai.
Duration: From May 2015 To August 2015.
Project Scope: GUL swap from E// to Huawei. New LTE sites rollout.
Role: Technical Support Engineer ( LTE )
Project-4: Konya_SWAP_Service, Turkcell, Turkey
Duration: From Oct’ 2014 to 2015/04.
Project Scope: 2G/3G swap(1000 sites in three regions), BSC 6900 integration, BSC 6910
integration, IP Clock 3000 commissioning, Preventive maintenance tasks, other maintenance
tasks.
Role: Technical Support Engineer ( 2G & 3G )
Project-5: Bulgaria Telelnor Network Renovation swap project
Duration: From July’ 2014 to Oct 2014.
Project Scope: Quality Survey, Swap 2G sites, Leading Acceptance team
Job Description:
 Resolving 2G technical issues.
 Pre-installation Quality check of new Sites
 Preparing 2g Swap solution and support implementation of swap
 Supervising Acceptance team for PAT signing and Documentation
Project-6: Iraq Asiacell IP Modernisation Project ( 2G & 3G )
Duration: From Aug’ 2013 to June’ 2014.
Role: Project TD
Project Scope: Project Start-up, Kick-off meetings and Progress Review meetings with
Customer, Technical Resource Alignment, Design Reviewal of New RNC/BSC’s, Abis, A &
GB over IP migration tasks, BSC & RNC Software upgradation tasks, Node B Intergration
tasks, Overall Supervision of different teams involved in Project, Preparing PIP’s & getting all
kinds of approval from Customer including PAC.
Job Description:
 Supporting all regions for 2G & 3G related technical issues.
 Preparing PIP’s and getting approvals from Customer.
 Aligning teams for smooth and successful Abis over IP migration tasks.
 Preparing Implementation solutions, HLD & LLD for Abis , A & GB over IP
migration.
 Support Implementation of IP migration of A interface for 11 BSC’s.
 Support Implementation of IP migration of Gb interface in 27 BSC’s
 Abis Over IP migration of almost 4000 sites.
R15 software upgradation of all BSC’s & RNC’s.
Project-7: Globe Mobile Project – Philippines
Duration: From NOV’ 2012 to July 2013
Project Scope: L2 support for NOC , handling all the 2G & 3G network trouble tickets, NE
software upgradation, New Integration.
Job Description:
 Giving support to all regions for all 2G & 3G BSS/RAN related issues.
 Resolving SR and closing FT in coordination with Customer NOC.
 Commissioning, Configuration and Integration of Huawei BSC, RNC, BTS and
NodeB
 Troubleshooting of Huawei BSC, BTS and RNC, NODEB & M2000
 Expansion tasks of BSC and RNC involving card expansion, Subrack
expansion and Cabinet expansions.
 Re-homing/Cut-over of BSC, BTS and RNC & NODEB
 Software Up-gradations of different NE’s.
 Health Check Up of BSC, RNC and submitting report to the customer.
Project-8: VIVA Project-Bahrain
Duration: From August 2012 to October 2012
Project Scope: New Site Integration, Carrier Expansion
Job Description:
 3G 4th Carrier Expansion on 200 NodeB sites.
 3G 3rd Carrier Expansion (DC) on 150 NodeB sites.
 Supervising and helping Subcon teams for Installation of equipments on Sites.
 Circulating daily and weekly reports to high level
 Leading the major expansion of carrier and DC Expansion 3G Network to
achieve 42Mbps
 Alarm Handling, performance management, Monitoring KPIs and associated
troubleshooting.
 TRX & Cell expansion for 2G BTS
 Training the concerned subcontractors for hardware installation expansions
 Enabling MIMO feature in sites within prescribed outage window.
 Re-homing of 2G, 3G .
 Upgradation of BSC6000 to BSC6900 using remote client.
 Provisional Acceptance test with customer for all above mentioned expansions.
Project-9: XL INDONESIA
Duration: From May 2012 to July 2012
Project Scope: New BSC/RNC integration, New site integration,
Job Description:
 Commissioning and Integration of BSC6900 in GSM only, UMTS only and
GSM+UMTS mode.
 Data configuration of BSC 6900
 Commissioning of Huawei OSN family Mux’s.
 Commissioning and integration of BTS 3900, 3900A, DBS 3900 and Node B.
 Creation of 2G & Node B Sites using CME tool.
Project-10: MPT GSM 4M Engineering Service & Reliance
Duration: From December 2011 to April 2012
Project Scope: New BSC/RNC integration, New site integration
Job Description:
 Commissioning and Integration of BSC6900 in GSM only, UMTS only and
GSM+UMTS mode.
 Data configuration of BSC 6900 .
 Commissioning and integration of BTS 3900, 3900A, DBS 3900 and Node B.
 Creation of 2G & Node B Sites using CME tool
Previous Experience:-
Previous Organization: Tata Tele services(I) Pvt Ltd
Department: BSS.
Duration: Nov, 2009 to Nov, 2011
Designation: SENIOR ENGINEER
Key Job Responsibilities:
As a team leader managing the highly proficient transmission and O&M teams
for daily activities and Tx design BSC, BTS , MGW, Inter MGW, Backbone involving
multi-vendor transmission equipments & Microwave (SDH,PDH).
Achievements:
• TTSL HSIA (DATA) Service’s
• Ring implementation of Cell Sites
• POI for 5 different Operators.
Previous Organization: Ericsson India private Ltd
Department: Field Maintenance
Duration: Feb, 2009 to Nov, 2009
Designation: ENGINEER
Key Job Responsibilities:
As FM Engineer, responsible for trouble shooting of faults occurring either in RBS or
Transmission equipments in short span of time so as to drop down outage level to
minimum
• Integration, Installation, Commissioning of GSM cell sites
(RBS2206/RBS2204/2308/2204v2/2964/2954/2111)
• Configuration of Redundant transmission ring structures (Traffic routing)
• Configuration of microwave links of 7 GHz & 15 GHz bands which includes
Minilink E hops & STM hops
• Acceptance Testing of Radio Base stations with customer.
• Quality audit of RBS Stations.
• Smooth execution of projects and network rollouts
• Up gradation of Ericsson equipments for the smooth flow of operations
• Commissioning of traffic nodes (2p,6p,20p)
Huawei’s Trainings attended
Duration: Nov’2011 to Dec’2011
• GSM/ WCDMA fundamentals.
• Hardware and Data configuration of BSC6900.
• M2000, CME
• IP Addressing and subnetting
Professional Qualification
 B.E from MBS College of Engg & Tech, Jammu (J & K), JAMMU UNIVERSITY with
aggregate Percentage - 64.00 %
Educational Qualification:
Examination From Year of Passing Percentage
10 th J&K State Board 2002 64.5%
12 th J&K State Board 2004 63%
Personal Profile:
Name : Trivinder Singh
Father’s Name : S. Trilok Singh
Gender : Male
Hobbies : Net Surfing, Singing
Permanent Address : Sujwan Road Nowabad Jammu
Phone : +919654863138, +905059894706
Date of Birth : 31-12-1985
Languages : English, Hindi, Punjabi, Dogri
Declaration:
I hereby declare that the above-mentioned information is correct up to my
knowledge and I bear the responsibility for the correctness of the above-mentioned
particulars.
Place: Turkey (Trivinder Singh)
CV-Trivinder
CV-Trivinder

More Related Content

What's hot (20)

Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
 
BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
Rami Abou Omeira_CV
Rami Abou Omeira_CVRami Abou Omeira_CV
Rami Abou Omeira_CV
 
Wyden Sagun's CV
Wyden Sagun's CVWyden Sagun's CV
Wyden Sagun's CV
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
 
KAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEWKAMALJEET_SINGH_cv_NEW
KAMALJEET_SINGH_cv_NEW
 
MUHAMMAD FARRUKH_LTE
MUHAMMAD FARRUKH_LTEMUHAMMAD FARRUKH_LTE
MUHAMMAD FARRUKH_LTE
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
Deepak Rajpoot_Resume (RAN Engg.)
Deepak Rajpoot_Resume (RAN Engg.)Deepak Rajpoot_Resume (RAN Engg.)
Deepak Rajpoot_Resume (RAN Engg.)
 
ATUL.DOC
ATUL.DOCATUL.DOC
ATUL.DOC
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
rohit_soni
rohit_sonirohit_soni
rohit_soni
 
Resume_Mohit_Panwar
Resume_Mohit_PanwarResume_Mohit_Panwar
Resume_Mohit_Panwar
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
Resume
ResumeResume
Resume
 

Similar to CV-Trivinder

Similar to CV-Trivinder (20)

sunil CV _2016
sunil CV _2016sunil CV _2016
sunil CV _2016
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 
RESUME_Sushil
RESUME_SushilRESUME_Sushil
RESUME_Sushil
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
arun kumar
arun kumararun kumar
arun kumar
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATED
 
Waqas Khan(Project Manager)
Waqas Khan(Project Manager)Waqas Khan(Project Manager)
Waqas Khan(Project Manager)
 
Abid CURRICULUM 15112016
Abid CURRICULUM 15112016Abid CURRICULUM 15112016
Abid CURRICULUM 15112016
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Senior LTE Engineer CV
Senior LTE Engineer CVSenior LTE Engineer CV
Senior LTE Engineer CV
 
Prince cv
Prince cvPrince cv
Prince cv
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 

CV-Trivinder

  • 1. Trivinder Singh Current Address: Mob: +905345130680; +919654863138 E-mail: Trivinder.singh@huawei.com Career objective: To integrate the Professional qualification skills and work experience in Telecommunications with my personal interest and drive in the Emerging concepts of Telecommunications for a challenging and enriching journey, ultimately to the value addition to organizational goals and Creating a niche for organization and myself. Core Competencies:-  As team leader, Supervision and Survey, Implementation, integration and troubleshooting of LTE ENodeB.  Supervision and management of E2E implementation, installation , Commissioning and Integration of Huawei BSC, BTS, RNC, NODEB, IPClock server and M2000.  Software Upgradation of NE’s.  Managing the highly proficient team for L2 BSS/RAN support for troubleshooting 2G and 3G networks.  Doing Health Check Up of BSC, RNC. Tool Knowledge:  OM STAR  FMA (2G, 3G & Lte)  CME Huawei’s Project Handled:- Project-1: Vodafone LTE rollout, Turkey Duration: From Dec 2015 to till date. Role: Technical Support Engineer ( LTE ) Project Scope: New LTE sites rollout., GUL expansion, Embms and CC testing.  Configuration & Intergration of test enodeb for Testing embms.  Preparing database for LTE800 sites, UO to UL configuration.  Preparing database for LTE900 sites.  Preparing database for cell addition and deletion in LTE sites.  Configuration & Intergration of test enodeb for 4T4R with 256QAM.  Configuration & Intergration of test enodeb for Micro Enodeb.  Configuration & Intergration of test enodeb for 4CC(3FDD + 1TDD) trail.
  • 2. Project-2: Cable & Wireless,Seychelles Duration: From Sept, 2015 to Oct, 2015 Project Scope: New LTE sites rollout. CA Role: Technical Support Engineer ( LTE ) Project-3: Georgia Magticom GUL Swap, Magticom, Georgai. Duration: From May 2015 To August 2015. Project Scope: GUL swap from E// to Huawei. New LTE sites rollout. Role: Technical Support Engineer ( LTE ) Project-4: Konya_SWAP_Service, Turkcell, Turkey Duration: From Oct’ 2014 to 2015/04. Project Scope: 2G/3G swap(1000 sites in three regions), BSC 6900 integration, BSC 6910 integration, IP Clock 3000 commissioning, Preventive maintenance tasks, other maintenance tasks. Role: Technical Support Engineer ( 2G & 3G ) Project-5: Bulgaria Telelnor Network Renovation swap project Duration: From July’ 2014 to Oct 2014. Project Scope: Quality Survey, Swap 2G sites, Leading Acceptance team Job Description:  Resolving 2G technical issues.  Pre-installation Quality check of new Sites  Preparing 2g Swap solution and support implementation of swap  Supervising Acceptance team for PAT signing and Documentation Project-6: Iraq Asiacell IP Modernisation Project ( 2G & 3G ) Duration: From Aug’ 2013 to June’ 2014. Role: Project TD Project Scope: Project Start-up, Kick-off meetings and Progress Review meetings with Customer, Technical Resource Alignment, Design Reviewal of New RNC/BSC’s, Abis, A & GB over IP migration tasks, BSC & RNC Software upgradation tasks, Node B Intergration tasks, Overall Supervision of different teams involved in Project, Preparing PIP’s & getting all kinds of approval from Customer including PAC. Job Description:  Supporting all regions for 2G & 3G related technical issues.  Preparing PIP’s and getting approvals from Customer.  Aligning teams for smooth and successful Abis over IP migration tasks.  Preparing Implementation solutions, HLD & LLD for Abis , A & GB over IP migration.  Support Implementation of IP migration of A interface for 11 BSC’s.  Support Implementation of IP migration of Gb interface in 27 BSC’s  Abis Over IP migration of almost 4000 sites. R15 software upgradation of all BSC’s & RNC’s. Project-7: Globe Mobile Project – Philippines Duration: From NOV’ 2012 to July 2013 Project Scope: L2 support for NOC , handling all the 2G & 3G network trouble tickets, NE software upgradation, New Integration.
  • 3. Job Description:  Giving support to all regions for all 2G & 3G BSS/RAN related issues.  Resolving SR and closing FT in coordination with Customer NOC.  Commissioning, Configuration and Integration of Huawei BSC, RNC, BTS and NodeB  Troubleshooting of Huawei BSC, BTS and RNC, NODEB & M2000  Expansion tasks of BSC and RNC involving card expansion, Subrack expansion and Cabinet expansions.  Re-homing/Cut-over of BSC, BTS and RNC & NODEB  Software Up-gradations of different NE’s.  Health Check Up of BSC, RNC and submitting report to the customer. Project-8: VIVA Project-Bahrain Duration: From August 2012 to October 2012 Project Scope: New Site Integration, Carrier Expansion Job Description:  3G 4th Carrier Expansion on 200 NodeB sites.  3G 3rd Carrier Expansion (DC) on 150 NodeB sites.  Supervising and helping Subcon teams for Installation of equipments on Sites.  Circulating daily and weekly reports to high level  Leading the major expansion of carrier and DC Expansion 3G Network to achieve 42Mbps  Alarm Handling, performance management, Monitoring KPIs and associated troubleshooting.  TRX & Cell expansion for 2G BTS  Training the concerned subcontractors for hardware installation expansions  Enabling MIMO feature in sites within prescribed outage window.  Re-homing of 2G, 3G .  Upgradation of BSC6000 to BSC6900 using remote client.  Provisional Acceptance test with customer for all above mentioned expansions. Project-9: XL INDONESIA Duration: From May 2012 to July 2012 Project Scope: New BSC/RNC integration, New site integration, Job Description:  Commissioning and Integration of BSC6900 in GSM only, UMTS only and GSM+UMTS mode.  Data configuration of BSC 6900  Commissioning of Huawei OSN family Mux’s.  Commissioning and integration of BTS 3900, 3900A, DBS 3900 and Node B.  Creation of 2G & Node B Sites using CME tool. Project-10: MPT GSM 4M Engineering Service & Reliance Duration: From December 2011 to April 2012 Project Scope: New BSC/RNC integration, New site integration Job Description:
  • 4.  Commissioning and Integration of BSC6900 in GSM only, UMTS only and GSM+UMTS mode.  Data configuration of BSC 6900 .  Commissioning and integration of BTS 3900, 3900A, DBS 3900 and Node B.  Creation of 2G & Node B Sites using CME tool Previous Experience:- Previous Organization: Tata Tele services(I) Pvt Ltd Department: BSS. Duration: Nov, 2009 to Nov, 2011 Designation: SENIOR ENGINEER Key Job Responsibilities: As a team leader managing the highly proficient transmission and O&M teams for daily activities and Tx design BSC, BTS , MGW, Inter MGW, Backbone involving multi-vendor transmission equipments & Microwave (SDH,PDH). Achievements: • TTSL HSIA (DATA) Service’s • Ring implementation of Cell Sites • POI for 5 different Operators. Previous Organization: Ericsson India private Ltd Department: Field Maintenance Duration: Feb, 2009 to Nov, 2009 Designation: ENGINEER Key Job Responsibilities: As FM Engineer, responsible for trouble shooting of faults occurring either in RBS or Transmission equipments in short span of time so as to drop down outage level to minimum • Integration, Installation, Commissioning of GSM cell sites (RBS2206/RBS2204/2308/2204v2/2964/2954/2111) • Configuration of Redundant transmission ring structures (Traffic routing) • Configuration of microwave links of 7 GHz & 15 GHz bands which includes Minilink E hops & STM hops • Acceptance Testing of Radio Base stations with customer. • Quality audit of RBS Stations. • Smooth execution of projects and network rollouts • Up gradation of Ericsson equipments for the smooth flow of operations • Commissioning of traffic nodes (2p,6p,20p) Huawei’s Trainings attended Duration: Nov’2011 to Dec’2011 • GSM/ WCDMA fundamentals. • Hardware and Data configuration of BSC6900. • M2000, CME • IP Addressing and subnetting
  • 5. Professional Qualification  B.E from MBS College of Engg & Tech, Jammu (J & K), JAMMU UNIVERSITY with aggregate Percentage - 64.00 % Educational Qualification: Examination From Year of Passing Percentage 10 th J&K State Board 2002 64.5% 12 th J&K State Board 2004 63% Personal Profile: Name : Trivinder Singh Father’s Name : S. Trilok Singh Gender : Male Hobbies : Net Surfing, Singing Permanent Address : Sujwan Road Nowabad Jammu Phone : +919654863138, +905059894706 Date of Birth : 31-12-1985 Languages : English, Hindi, Punjabi, Dogri Declaration: I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place: Turkey (Trivinder Singh)