SlideShare a Scribd company logo
RESUME
DEVESH CHANDRA
Phone: +91-9911795002
+91-9412657813
E-mail: sagar.devesh@gmail.com
Objective
To pursue a career with a company having a global vision that encourages creativity and offers an
opportunity to learn and developing new Technologies.
TOTAL EXPERIENCE:- Successfully 7 years of experience in Commissioning & Integration of
NOKIA,ERICSSON BTSs, Integrating ,BSS support. Good at Analytic and Problem solving skills.3G, NSNBSS,
RNC, Tellabs, Node-B, O&M, 3G Configuration, Alarm rectification and handled all transmission equipment
SDH (Ceragon,IP10,IP20,Nec Peso Link, Huawei 905,950,980 Families Tejas Mux, Flexi Hybrid,
FIU).Support to Ensure 99.99% BSS network. Successfully completed 3 years as a BSS O&M/ NOC
Transmission Lead.
Current Employer:- Altran Technologies PVT. LTD.
Dec 2015 To Till Time
Organization:- NOKIA NETWORKS PVT. LTD.
Location:- GDC Noida
Designation:- NOC Transmission Engineer
Responsibility as Fault Enginee:-
Network Management System(NMS)
I have hands on experience on Huawei iManager U2000NMS.
Responsibilities for Airtel GSM/CDMA/LTE Project:----
• To Monitor the Whole Airtel GSM network through Huawei NMS and iManager U2000.
• To support the on site Field engineers to perform Critical, Major and Minor activities on Airtel
GSM network.
• To configure services on Transmission media for the whole Airtel GSM Network and also to perform
fault location and troubleshooting.
• Raising CR’s for the activities to be performed on Transmission networks.
• Taking NE backup weekly
• Maintaining Rain/Fog fading details, RSL Deviation details, N/W Hardware failure details, LOS
block hop details, CR Tracker details, POI/RTN Spares details, Fiber cut details.
• Software up gradation of Network elements.
• Commissioning and Network configuration for all TX Nodes.
• Ethernet service configuration.
• Configuring Different types of Protection services(MSP,SNCP,ERPS)
• Knowledge in small cell’s/Femto cell’s, macro cell’s for 3G&4G/LTE technologies in secure and self-
Managing.
• Ensuring network quality through fault and performance management.
• Provided 1st line support to field maintenance.
• Logging, rectification and clearance of fault conditions achieving minimal downtime.
• Coordinated network activities with circle team.
• Analyzed, identified and solved transmission problems in a PDH network.
• Escalation of appropriate faults to RAN second line maintenance/OSS support engineers.
• Produced daily status and network availability reports.
• Trouble handling under the direction of the Network Operation Centre.
• Analyzed and identified all network status reports, performance statistics and customer faults for
• appropriate fix and escalation within defined guidelines.
• Provided main interface with customer services for end user problem management.
Previous Employer:- Serco INDIA PVT. LTD.
Oct 2014 To Dec 2015
Organization:- NOKIA NETWORKS PVT. LTD.
Location:- GDC Noida
Designation:- FM NOC Transmission Engineer
Responsibility Noc Engineer
• Responsible for the NOC operation and maintenance of NOKIA wireless GSM network consisting of
multiple BSC, BTS that includes Citrix applications, Net act CM Editor and Management on a 24
hour/7 day basis.
• Ensuring network quality through fault and performance management.
• Provided 1st line support to field maintenance.
• Logging, rectification and clearance of fault conditions achieving minimal downtime.
• Coordinated network activities with circle team.
• Analyzed, identified and solved transmission problems in a PDH network.
• Escalation of appropriate faults to RAN second line maintenance/OSS support engineers.
Previous Employer:- NR SWITCH & RADIO INDIA PVT. LTD.
Oct 2012 TO Oct 2014
Organization:- NOKIA SOLUTIONS NETWORKS.
Location:- GWALIOR (MADHYA PRADESH)
Designation:- BSS FLM ENGG. (2G)
Responsibilities as an O&M /Trnsmission Engineer
BTS:-
 Commissioning of Nokia Flexi Edge BTS.
 Commissioning of Nokia WBTS Node B Site(3G).
 Commissioning of Nokia Flexi Hybrid.
 Commissioning of Ceragon-IP10.
 Commissioning of Ceragon Old (R15).
 Commissioning of Nokia Ultra Site BTS.
 Commissioning of Nokia Metro BTS.
 Commissioning of Alcatel Lucent Mux(1642,1660).
 Commissioning of NOKIA FLEXI HOPPER links.
 Loop/Break testing of E1 with OMCR
 Testing external alarms with OMCR.
 Upgrading the BTS site to increase network capacity
SUPPORT FROM FM :-
1. Site creation.
2. ET creation.
3. Loop-break checking.
4. GPRS creation.
5. A-Ter & GB Link Connectivity Upgradation.
6. Supporting the BTS integration team.
7. Responsible for the NOC operation and maintenance of NOKIA wireless GSM
network consisting of multiple BSC, BTS that includes Citrix applications, Net act
CM Editor and Management tools.
PREVIOUS EMPLOYER:- SNEL (Sasken Networks Engineer Pvt. Ltd.)
Jan 2011 To Nov 2011
Organization:- NOKIA SIEMENS NETWORKS.
Location:- (Bihar&Jharkhand)
Designation:- Transmission Engineer (3G)
PREVIOUS EMPLOYER:- Zeppelin Mobile System India Pvt. Ltd.
Oct 2009 TO Dec 2010
Organization:- NOKIA SIEMENS NETWORKS.
Location:- VARANSI (UP EAST)
Designation:- O&M ENGINEER
Responsibilities as an O&M Engineer
• Creation of Transcoders and addition of signalling link to link set to reduce the congestion.
• Planning and provisioning of E1 or PCM for new BTS sites with the help of SDH and PDH transmission
paths and troubleshooting PCM related problems using different transmission tools.
• Software up gradation on BTS(Master File).
• Rehoming of existing BTS from one BSC to another.
• Installation, Commissioning of NOKIA Ultra & Flexi BTS.
• Installation, Commissioning of FIU, ODU
• Checking alarms in BSC and rectify all the unwanted alarms.
• Making cross-connections and E1 connections from the transmission positions
• Antenna Power Check up by VSWR / POWER Meter.
• Coverage optimization by change in Antenna, Orientation & Tilting of GSM Antenna for optimum
coverage.
• Solving KPI (Key Performance Indicator) issue.
OTHERSKILLS:-
Knowledge Area : GSM, CDMA, IP Backbone Network, DWDM.
BTS : Nokia(MR,Ultra,Flexi),Ericsson.
Microwave : Nokia Flexi Hopper, CERAGON IP10, IP20N, FHY, NEC, Huawei.
VSWR : BIRD.
ACADEMICS:-
• Completed B.Tech (Electronics & Instrumentation) from M.I.E.T, MEERUT in 2008.
• Passed class 12th
from U P BOARD, Allahabad in 2002.
• Passed class 12th
from U P BOARD, Allahabad in 2002.
IT SKILLS:
• One year course in computer diploma Application from EXEILLENT COMPUTER GROUP in 2001-2002
• Windows, MS-Dos, MS- Office, Internet, Web Designing.
Academic Projects:
Title: - Revolution of CDMA technology
Project Description: The project was based on detailed study of CDMA mobile communication System.
Study of evolution of CDMA in chronological order along with its architecture. It also deals with Channel
encoding and speech encoding used in communication. Stress is given on traffic issues and Handover
concerned in mobile communication.
PERSONAL DETAILS:
Father's Name : Mr. C.L.SAGAR
Mother Name : Urmila Devi
Marital Status : Married
Nationality : Indian
Date of birth : 27th
August 1983
Permanent Address : H.NO-:161, Shanti Niketan Colony
Near LIC Building, BULANDSHAHAR
(UTTAR PRADESH)-203001
Contact no : +91-9911795002
DECLARATION:-
I hereby declare that all the information above mentioned are true to my knowledge and I
abide by them all.
DATE: (DEVESH CHANDRA)

More Related Content

What's hot (20)

Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Mark G Quiambao's CV
Mark G Quiambao's CVMark G Quiambao's CV
Mark G Quiambao's CV
 
CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1CV_SIVAM OCT.doc 1
CV_SIVAM OCT.doc 1
 
Bhagwan_S._Sharma_CV
Bhagwan_S._Sharma_CVBhagwan_S._Sharma_CV
Bhagwan_S._Sharma_CV
 
shriram2016
shriram2016shriram2016
shriram2016
 
CARRICULLUM VITAE Aslam
CARRICULLUM VITAE AslamCARRICULLUM VITAE Aslam
CARRICULLUM VITAE Aslam
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATED
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Vijay Resume
Vijay ResumeVijay Resume
Vijay Resume
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Ramesh CV
Ramesh CVRamesh CV
Ramesh CV
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
Siyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_ResumeSiyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_Resume
 
Ibrar Hussain CV
Ibrar Hussain  CVIbrar Hussain  CV
Ibrar Hussain CV
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 

Viewers also liked

G2 bsc commissioning manual release b7.2 ccl
G2 bsc commissioning manual   release b7.2 cclG2 bsc commissioning manual   release b7.2 ccl
G2 bsc commissioning manual release b7.2 ccl
chungminh1108
 
Mobiserve
MobiserveMobiserve
Mobiserve
murashjavaid
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)slavun
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001Max Gathers
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2
chungminh1108
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
Neonetwireless
 
Field commissioning
Field commissioningField commissioning
Field commissioningAmjad Jamil
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONMax Gathers
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioningginorosido
 
Notes on gsm
Notes on gsmNotes on gsm
Notes on gsm
uttam927
 
Review on Green Networking Solutions
Review on Green Networking SolutionsReview on Green Networking Solutions
Review on Green Networking Solutions
iosrjce
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
AIRTEL
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSNreyaz alam
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioning
engramjadislam78
 
Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)
Behnam Dorudian
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirements
Achmad Salsabil
 
Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)ihtisham ulhaq
 

Viewers also liked (20)

G2 bsc commissioning manual release b7.2 ccl
G2 bsc commissioning manual   release b7.2 cclG2 bsc commissioning manual   release b7.2 ccl
G2 bsc commissioning manual release b7.2 ccl
 
Mobiserve
MobiserveMobiserve
Mobiserve
 
Wavelink Presentation(Updated)
Wavelink Presentation(Updated)Wavelink Presentation(Updated)
Wavelink Presentation(Updated)
 
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
US CELLULAR FLEXI LTE BTS COMMISSIONING AND INTEGRATION 4G-LTE 001
 
msvel
msvelmsvel
msvel
 
G2 bsc commissioning manual release b7.2
G2 bsc commissioning manual   release b7.2G2 bsc commissioning manual   release b7.2
G2 bsc commissioning manual release b7.2
 
Practical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineeringPractical 2 g and 3g rf engineering
Practical 2 g and 3g rf engineering
 
Field commissioning
Field commissioningField commissioning
Field commissioning
 
Certificate5
Certificate5Certificate5
Certificate5
 
FLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATIONFLEXI LTE BTS COMMISSIONING & INTEGRATION
FLEXI LTE BTS COMMISSIONING & INTEGRATION
 
Bts commissioning
Bts commissioningBts commissioning
Bts commissioning
 
Notes on gsm
Notes on gsmNotes on gsm
Notes on gsm
 
Review on Green Networking Solutions
Review on Green Networking SolutionsReview on Green Networking Solutions
Review on Green Networking Solutions
 
Abstract of bts installation & commisioning
Abstract of bts installation & commisioningAbstract of bts installation & commisioning
Abstract of bts installation & commisioning
 
Md Reyaz Alam NSN
Md Reyaz Alam NSNMd Reyaz Alam NSN
Md Reyaz Alam NSN
 
Adewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTSAdewale Adeyemi - Field Telecoms Engineer BTS
Adewale Adeyemi - Field Telecoms Engineer BTS
 
Alcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and CommissioningAlcate lucent bts Installation and Commissioning
Alcate lucent bts Installation and Commissioning
 
Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)Ericsson Rbs 6201 commisioning (1)
Ericsson Rbs 6201 commisioning (1)
 
Flexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirementsFlexi multiradio bts lte installation site requirements
Flexi multiradio bts lte installation site requirements
 
Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)Bts3900 gsm commissioning guide (v300 r008-03)
Bts3900 gsm commissioning guide (v300 r008-03)
 

Similar to CV_Devesh

LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUMELokesh Yadav
 
DORAIRAJ_2015_
DORAIRAJ_2015_DORAIRAJ_2015_
DORAIRAJ_2015_dorai raj
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerSyed Atif Shamim
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMAGaurav Sharma
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
AhmedAdry1
 

Similar to CV_Devesh (20)

LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
 
Rakesh
RakeshRakesh
Rakesh
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
KUNAL CV jan
KUNAL CV janKUNAL CV jan
KUNAL CV jan
 
Avinash_cv for Txn
Avinash_cv for TxnAvinash_cv for Txn
Avinash_cv for Txn
 
DORAIRAJ_2015_
DORAIRAJ_2015_DORAIRAJ_2015_
DORAIRAJ_2015_
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Ammar Murtaza-IM
Ammar Murtaza-IMAmmar Murtaza-IM
Ammar Murtaza-IM
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMA
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Resume
ResumeResume
Resume
 
arun kumar
arun kumararun kumar
arun kumar
 
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
AMIT _RESUME
AMIT _RESUMEAMIT _RESUME
AMIT _RESUME
 
Ahmed Ibrahim.pdf
Ahmed Ibrahim.pdfAhmed Ibrahim.pdf
Ahmed Ibrahim.pdf
 

CV_Devesh

  • 1. RESUME DEVESH CHANDRA Phone: +91-9911795002 +91-9412657813 E-mail: sagar.devesh@gmail.com Objective To pursue a career with a company having a global vision that encourages creativity and offers an opportunity to learn and developing new Technologies. TOTAL EXPERIENCE:- Successfully 7 years of experience in Commissioning & Integration of NOKIA,ERICSSON BTSs, Integrating ,BSS support. Good at Analytic and Problem solving skills.3G, NSNBSS, RNC, Tellabs, Node-B, O&M, 3G Configuration, Alarm rectification and handled all transmission equipment SDH (Ceragon,IP10,IP20,Nec Peso Link, Huawei 905,950,980 Families Tejas Mux, Flexi Hybrid, FIU).Support to Ensure 99.99% BSS network. Successfully completed 3 years as a BSS O&M/ NOC Transmission Lead. Current Employer:- Altran Technologies PVT. LTD. Dec 2015 To Till Time Organization:- NOKIA NETWORKS PVT. LTD. Location:- GDC Noida Designation:- NOC Transmission Engineer Responsibility as Fault Enginee:- Network Management System(NMS) I have hands on experience on Huawei iManager U2000NMS. Responsibilities for Airtel GSM/CDMA/LTE Project:---- • To Monitor the Whole Airtel GSM network through Huawei NMS and iManager U2000. • To support the on site Field engineers to perform Critical, Major and Minor activities on Airtel GSM network. • To configure services on Transmission media for the whole Airtel GSM Network and also to perform fault location and troubleshooting. • Raising CR’s for the activities to be performed on Transmission networks. • Taking NE backup weekly • Maintaining Rain/Fog fading details, RSL Deviation details, N/W Hardware failure details, LOS block hop details, CR Tracker details, POI/RTN Spares details, Fiber cut details. • Software up gradation of Network elements.
  • 2. • Commissioning and Network configuration for all TX Nodes. • Ethernet service configuration. • Configuring Different types of Protection services(MSP,SNCP,ERPS) • Knowledge in small cell’s/Femto cell’s, macro cell’s for 3G&4G/LTE technologies in secure and self- Managing. • Ensuring network quality through fault and performance management. • Provided 1st line support to field maintenance. • Logging, rectification and clearance of fault conditions achieving minimal downtime. • Coordinated network activities with circle team. • Analyzed, identified and solved transmission problems in a PDH network. • Escalation of appropriate faults to RAN second line maintenance/OSS support engineers. • Produced daily status and network availability reports. • Trouble handling under the direction of the Network Operation Centre. • Analyzed and identified all network status reports, performance statistics and customer faults for • appropriate fix and escalation within defined guidelines. • Provided main interface with customer services for end user problem management. Previous Employer:- Serco INDIA PVT. LTD. Oct 2014 To Dec 2015 Organization:- NOKIA NETWORKS PVT. LTD. Location:- GDC Noida Designation:- FM NOC Transmission Engineer Responsibility Noc Engineer • Responsible for the NOC operation and maintenance of NOKIA wireless GSM network consisting of multiple BSC, BTS that includes Citrix applications, Net act CM Editor and Management on a 24 hour/7 day basis. • Ensuring network quality through fault and performance management. • Provided 1st line support to field maintenance. • Logging, rectification and clearance of fault conditions achieving minimal downtime. • Coordinated network activities with circle team. • Analyzed, identified and solved transmission problems in a PDH network. • Escalation of appropriate faults to RAN second line maintenance/OSS support engineers. Previous Employer:- NR SWITCH & RADIO INDIA PVT. LTD. Oct 2012 TO Oct 2014 Organization:- NOKIA SOLUTIONS NETWORKS. Location:- GWALIOR (MADHYA PRADESH) Designation:- BSS FLM ENGG. (2G) Responsibilities as an O&M /Trnsmission Engineer BTS:-  Commissioning of Nokia Flexi Edge BTS.  Commissioning of Nokia WBTS Node B Site(3G).  Commissioning of Nokia Flexi Hybrid.  Commissioning of Ceragon-IP10.  Commissioning of Ceragon Old (R15).  Commissioning of Nokia Ultra Site BTS.  Commissioning of Nokia Metro BTS.
  • 3.  Commissioning of Alcatel Lucent Mux(1642,1660).  Commissioning of NOKIA FLEXI HOPPER links.  Loop/Break testing of E1 with OMCR  Testing external alarms with OMCR.  Upgrading the BTS site to increase network capacity SUPPORT FROM FM :- 1. Site creation. 2. ET creation. 3. Loop-break checking. 4. GPRS creation. 5. A-Ter & GB Link Connectivity Upgradation. 6. Supporting the BTS integration team. 7. Responsible for the NOC operation and maintenance of NOKIA wireless GSM network consisting of multiple BSC, BTS that includes Citrix applications, Net act CM Editor and Management tools. PREVIOUS EMPLOYER:- SNEL (Sasken Networks Engineer Pvt. Ltd.) Jan 2011 To Nov 2011 Organization:- NOKIA SIEMENS NETWORKS. Location:- (Bihar&Jharkhand) Designation:- Transmission Engineer (3G) PREVIOUS EMPLOYER:- Zeppelin Mobile System India Pvt. Ltd. Oct 2009 TO Dec 2010 Organization:- NOKIA SIEMENS NETWORKS. Location:- VARANSI (UP EAST) Designation:- O&M ENGINEER Responsibilities as an O&M Engineer • Creation of Transcoders and addition of signalling link to link set to reduce the congestion. • Planning and provisioning of E1 or PCM for new BTS sites with the help of SDH and PDH transmission paths and troubleshooting PCM related problems using different transmission tools. • Software up gradation on BTS(Master File). • Rehoming of existing BTS from one BSC to another. • Installation, Commissioning of NOKIA Ultra & Flexi BTS. • Installation, Commissioning of FIU, ODU • Checking alarms in BSC and rectify all the unwanted alarms. • Making cross-connections and E1 connections from the transmission positions • Antenna Power Check up by VSWR / POWER Meter. • Coverage optimization by change in Antenna, Orientation & Tilting of GSM Antenna for optimum coverage. • Solving KPI (Key Performance Indicator) issue. OTHERSKILLS:- Knowledge Area : GSM, CDMA, IP Backbone Network, DWDM. BTS : Nokia(MR,Ultra,Flexi),Ericsson. Microwave : Nokia Flexi Hopper, CERAGON IP10, IP20N, FHY, NEC, Huawei. VSWR : BIRD. ACADEMICS:-
  • 4. • Completed B.Tech (Electronics & Instrumentation) from M.I.E.T, MEERUT in 2008. • Passed class 12th from U P BOARD, Allahabad in 2002. • Passed class 12th from U P BOARD, Allahabad in 2002. IT SKILLS: • One year course in computer diploma Application from EXEILLENT COMPUTER GROUP in 2001-2002 • Windows, MS-Dos, MS- Office, Internet, Web Designing. Academic Projects: Title: - Revolution of CDMA technology Project Description: The project was based on detailed study of CDMA mobile communication System. Study of evolution of CDMA in chronological order along with its architecture. It also deals with Channel encoding and speech encoding used in communication. Stress is given on traffic issues and Handover concerned in mobile communication. PERSONAL DETAILS: Father's Name : Mr. C.L.SAGAR Mother Name : Urmila Devi Marital Status : Married Nationality : Indian Date of birth : 27th August 1983 Permanent Address : H.NO-:161, Shanti Niketan Colony Near LIC Building, BULANDSHAHAR (UTTAR PRADESH)-203001 Contact no : +91-9911795002 DECLARATION:- I hereby declare that all the information above mentioned are true to my knowledge and I abide by them all. DATE: (DEVESH CHANDRA)