This document summarizes a city's plan to address requirements from an EPA consent decree to reduce combined sewer overflows. The plan includes 26 projects estimated to cost over $250 million. It would reduce overflow locations from 32 to 23, reduce overflow frequency and volume, and reduce pollutant discharge by 86-89%. Public input was gathered during the planning process. The plan involves storage basins, storage pipelines, tunnel improvements, and sewer separation projects.