CPAC Meeting 2-23-04

  1. 1. EQ Basin Monday, February 23, 2004
  2. 2. Today’s Agenda <ul><li>Program update </li></ul><ul><li>EQ Basin discussion </li></ul><ul><ul><li>Consent Decree requirements </li></ul></ul><ul><ul><li>Location </li></ul></ul><ul><ul><li>Input </li></ul></ul><ul><ul><ul><li>Initial Design Concepts </li></ul></ul></ul><ul><li>Future meetings </li></ul>
  3. 3. EQ Basin 101 <ul><li>60-million gallon equalization basin is required under consent decree. </li></ul><ul><ul><li>Still discussing smaller basin with EPA. </li></ul></ul>
  4. 4. EQ Basin 101 <ul><li>Designed to reduce need to discharge raw sewage into the Maumee River during heavy rains. </li></ul><ul><li>Will hold wastewater at “peak” times when flow of waste exceeds plant’s capacity. </li></ul><ul><li>When the rain lets up, wastewater in the basin sent to plant for treatment. </li></ul>
  5. 5. EQ Basin 101 <ul><li>Basin basically a large holding facility </li></ul><ul><li>400,000 square feet (about the size 7 football fields). </li></ul><ul><li>Under EPA agreement, design of the equalization basin must be completed by December of 2004. </li></ul><ul><li>Construction would not start until spring 2005. </li></ul>
  6. 6. EQ Basin 101 <ul><li>4 cells </li></ul><ul><li>First 8 mg covered </li></ul>60 MG FLOW EQUALIZATION BASIN 17.33 MG 17.33 MG 17.33 MG 4 MG 4 MG
  7. 7. EQ Basin 101 <ul><li>To be located on seniors golf course </li></ul><ul><li>Most cost-effective site </li></ul><ul><ul><li>Saves $8-10 million </li></ul></ul>
  8. 8. EQ Basin 101 <ul><li>Every effort will be made to design the construction to reduce the impact on the course and community. </li></ul><ul><li>Committed to enhancements for the remaining 9-hole course. </li></ul><ul><li>Pursuing Port Authority land for possible new holes. </li></ul>
  9. 9. EQ Basin 101 <ul><li>Water in basin will be partially treated </li></ul><ul><ul><li>Goes through ballasted flocculation first </li></ul></ul><ul><ul><ul><li>Solids removed </li></ul></ul></ul><ul><ul><li>Fairly dilute to begin with – mostly storm water </li></ul></ul><ul><ul><ul><li>“ First flush” goes to plant </li></ul></ul></ul>
  10. 10. Initial Design Concepts <ul><li>Fluted concrete </li></ul><ul><li>100% Brick </li></ul><ul><li>Brick and concrete with “towers” </li></ul>
  11. 11. Discussion <ul><li>Initial thoughts on design </li></ul><ul><li>Color of brick (if used)? </li></ul>
  12. 12. Fence or No Fence <ul><li>Security concerns </li></ul><ul><li>Keep out vandals </li></ul>
  13. 13. Fence Options <ul><li>Like pump station? </li></ul><ul><li>Chain link? </li></ul>
  14. 14. Fence Discussion <ul><li>Thoughts? </li></ul>
  15. 15. Next Meeting <ul><li>Time </li></ul><ul><li>Place </li></ul>
  16. 16. Rendering <ul><li>Southwest view without perimeter fence. </li></ul>
  17. 17. Rendering <ul><li>Southwest view with perimeter fence. </li></ul>

×