Submit Search
Upload
CPAC Meeting 9-22-03
•
Download as PPT, PDF
•
0 likes
•
265 views
H
HartTWI
Follow
Report
Share
Report
Share
1 of 18
Download now
Recommended
The community meeting was held to inform residents about the Langley School Pump Station project and to present the county's preliminary plans for the gravity sewer, pump station and force main.
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
Fairfax County
Little Hunting Creek Sewer Replacement Community Meeting: 12-1-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Fairfax County
Currently working on getting VDOT approval of the plan set and VDOT permit approval - end of the year.
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
Fairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Fairfax County
Belle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Fairfax County
The Purpose Inform the community about the upcoming project, Phase 1 of the project is eminent Gravity Sewer on Langley Lane Force main from Langley High School to Georgetown Pike
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Fairfax County
City of Corona Strategic Plan Goal 5: Improve Circulation and Reduce Traffic 2015 will provide the foundation for significant improvements to help improve traffic circulation within the City of Corona. Construction of road improvements along with several water & sewer improvements will be noticeable throughout the City.
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
City of Corona
Recommended
The community meeting was held to inform residents about the Langley School Pump Station project and to present the county's preliminary plans for the gravity sewer, pump station and force main.
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
Fairfax County
Little Hunting Creek Sewer Replacement Community Meeting: 12-1-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Fairfax County
Currently working on getting VDOT approval of the plan set and VDOT permit approval - end of the year.
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
Fairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Fairfax County
Belle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Fairfax County
The Purpose Inform the community about the upcoming project, Phase 1 of the project is eminent Gravity Sewer on Langley Lane Force main from Langley High School to Georgetown Pike
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Fairfax County
City of Corona Strategic Plan Goal 5: Improve Circulation and Reduce Traffic 2015 will provide the foundation for significant improvements to help improve traffic circulation within the City of Corona. Construction of road improvements along with several water & sewer improvements will be noticeable throughout the City.
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
City of Corona
Design Phase includes: Finalize sewer alignment Manhole locations and material selection Construction phasing plan Final restoration for former pump station site/access Existing utility coordination Easement acquisition (if applicable) By-pass water & sewer locations Temporary service outage plan – water/sewer/gas Traffic control plans Phasing Detour and closure plan
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Fairfax County
Open House display boards for the St. Clair Reservoir Rehab project.
Display boards
Display boards
Toronto Public Consultation Unit
The Fort Hunt Road Service Road sewer services 21 homes and was constructed as an 8-inch diameter clay pipe. The Wastewater Collection Division inspected the pipe and identified a break that appeared to have been caused by a utility cross bore from a utility pole which was visible on the pipe inspection video. The Wastewater Design and Construction Division kicked off an expedited design and construction project to address this damaged sewer pipe. The project included the installation of roughly 350-feet of 8-inch diameter gravity sewer, 4 new manholes, 2 sewer reconnections, and abandonment-in-place of roughly 350-feet of old 8-inch diameter clay pipe. This project was substantially complete on June 4, 2021.
Fort Hunt Road Emergency Gravity Sewer Project
Fort Hunt Road Emergency Gravity Sewer Project
Fairfax County
Approximately 4000 linear feet of degraded stream channel from Walney Road to the culvert at Route 28 was stabilized.
Substantial completion flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
Fairfax County
A Closed-Circuit Television (CCTV) Camera became stuck in the sanitary sewer line located in the Old Keene Mill Shopping Center. Wastewater Design and Construction Division mobilized to the site with the on-call contractor to begin the 15-foot excavation to replace 50 feet of broken gravity sewer. Because the work was within a shopping center parking lot, the project team worked the night shift to limit disturbance to the community. After four days of work, the camera was retrieved, and the pit was backfilled. This project was substantially complete on August 27, 2021.
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
Fairfax County
This project included rehabilitation of the 21 MGD Little Hunting Creek Pump Station (LHCPS). Located at 8600 Stockton Parkway, Alexandria, Virginia, this pump station is the third largest pump station in the Fairfax County System. LHCPS is constructed on a 10-acre parcel that was previously utilized as the Little Hunting Creek Sewer Treatment Plant 44B. LHCPS was constructed and placed into service in 1983. Flow from LHCPS is pumped through a 30-inch force main across Little Hunting Creek to a receiving structure approximately 4,500 feet away on Surrey Court. This project was substantially complete on June 25, 2021.
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
Fairfax County
This project included construction and rehabilitation of three equalization basins and ancillary facilities located at the Noman M. Cole, Jr. Pollution Control Plant. The basins temporarily store overflow wastewater resulting from heavy storm events that exceed the plant’s treatment capacity. Work included construction of a new concrete liner system for Equalization Basin QQ1, rehabilitation of existing pump stations and addition of a new underdrain pump station and stormwater pump station. Construction of a new flood protection system and addition of a new check dam and sluice gate in Hogge Run for emergency spill protection. The new liner system for QQ1 includes a concrete slab with an HDPE membrane liner constructed over a pipe underdrain collection system.
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Fairfax County
Feb 28th College /Shaw Library Public Meeting Presentation Regarding continuing construction activities along College St during 2017
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Toronto Public Consultation Unit
A virtual meeting about the project will be held on August 19, 2020 at 6:00 p.m. Please see a how to sign in on slide 2. A 2019 study evaluated several alternatives for replacement. Those alternatives will be discussed with the community at the virtual meeting.
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Fairfax County
deck
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Crosstown TO
The Merrywood Force Main Rehabilitation project included rehabilitation of 1,080 linear feet of 6-inch force main, its discharge manhole, and the installation of a future bypass system in front of the pump station.
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Fairfax County
A presentation deck from the Leaside/ Laird CLC meeting in January 2019
Leaside/ Laird CLC Construction Update - January 2019
Leaside/ Laird CLC Construction Update - January 2019
Crosstown TO
deck
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Crosstown TO
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Fairfax County
During the Preliminary Engineering We are currently revising our website to match the recent revisions with the project (Same Location) Mid-November we will have a Public Input Meeting via Zoom Mid December we will make the Final Recommend of the Alternative available on out website During the Detailed Design Maintain and update the website Public Input at the 35% design (March 2022) Public Outreach Meeting at the 95% design summer/fall 2022 During the Construction Install a Project Sign Hold a Preconstruction meeting and routine status meetings as we proceed
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
Fairfax County
Water Pumping Station Rehabilitation, Bascule (Crest) Gate Replacement, Dam and Dike Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
ThomasSexton8
deck
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Crosstown TO
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
Fairfax County
State College Borough construction projects planned for the 2015 construction season.
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
Courtney Hayden
The purpose of this emergency project was to replace approximately 60-ft segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. This project was substantially complete on May 14, 2021.
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
Fairfax County
CPAC Meeting 3-19-03
CPAC Meeting 3-19-03
HartTWI
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
HartTWI
More Related Content
What's hot
Design Phase includes: Finalize sewer alignment Manhole locations and material selection Construction phasing plan Final restoration for former pump station site/access Existing utility coordination Easement acquisition (if applicable) By-pass water & sewer locations Temporary service outage plan – water/sewer/gas Traffic control plans Phasing Detour and closure plan
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Fairfax County
Open House display boards for the St. Clair Reservoir Rehab project.
Display boards
Display boards
Toronto Public Consultation Unit
The Fort Hunt Road Service Road sewer services 21 homes and was constructed as an 8-inch diameter clay pipe. The Wastewater Collection Division inspected the pipe and identified a break that appeared to have been caused by a utility cross bore from a utility pole which was visible on the pipe inspection video. The Wastewater Design and Construction Division kicked off an expedited design and construction project to address this damaged sewer pipe. The project included the installation of roughly 350-feet of 8-inch diameter gravity sewer, 4 new manholes, 2 sewer reconnections, and abandonment-in-place of roughly 350-feet of old 8-inch diameter clay pipe. This project was substantially complete on June 4, 2021.
Fort Hunt Road Emergency Gravity Sewer Project
Fort Hunt Road Emergency Gravity Sewer Project
Fairfax County
Approximately 4000 linear feet of degraded stream channel from Walney Road to the culvert at Route 28 was stabilized.
Substantial completion flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
Fairfax County
A Closed-Circuit Television (CCTV) Camera became stuck in the sanitary sewer line located in the Old Keene Mill Shopping Center. Wastewater Design and Construction Division mobilized to the site with the on-call contractor to begin the 15-foot excavation to replace 50 feet of broken gravity sewer. Because the work was within a shopping center parking lot, the project team worked the night shift to limit disturbance to the community. After four days of work, the camera was retrieved, and the pit was backfilled. This project was substantially complete on August 27, 2021.
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
Fairfax County
This project included rehabilitation of the 21 MGD Little Hunting Creek Pump Station (LHCPS). Located at 8600 Stockton Parkway, Alexandria, Virginia, this pump station is the third largest pump station in the Fairfax County System. LHCPS is constructed on a 10-acre parcel that was previously utilized as the Little Hunting Creek Sewer Treatment Plant 44B. LHCPS was constructed and placed into service in 1983. Flow from LHCPS is pumped through a 30-inch force main across Little Hunting Creek to a receiving structure approximately 4,500 feet away on Surrey Court. This project was substantially complete on June 25, 2021.
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
Fairfax County
This project included construction and rehabilitation of three equalization basins and ancillary facilities located at the Noman M. Cole, Jr. Pollution Control Plant. The basins temporarily store overflow wastewater resulting from heavy storm events that exceed the plant’s treatment capacity. Work included construction of a new concrete liner system for Equalization Basin QQ1, rehabilitation of existing pump stations and addition of a new underdrain pump station and stormwater pump station. Construction of a new flood protection system and addition of a new check dam and sluice gate in Hogge Run for emergency spill protection. The new liner system for QQ1 includes a concrete slab with an HDPE membrane liner constructed over a pipe underdrain collection system.
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Fairfax County
Feb 28th College /Shaw Library Public Meeting Presentation Regarding continuing construction activities along College St during 2017
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Toronto Public Consultation Unit
A virtual meeting about the project will be held on August 19, 2020 at 6:00 p.m. Please see a how to sign in on slide 2. A 2019 study evaluated several alternatives for replacement. Those alternatives will be discussed with the community at the virtual meeting.
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Fairfax County
deck
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Crosstown TO
The Merrywood Force Main Rehabilitation project included rehabilitation of 1,080 linear feet of 6-inch force main, its discharge manhole, and the installation of a future bypass system in front of the pump station.
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Fairfax County
A presentation deck from the Leaside/ Laird CLC meeting in January 2019
Leaside/ Laird CLC Construction Update - January 2019
Leaside/ Laird CLC Construction Update - January 2019
Crosstown TO
deck
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Crosstown TO
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Fairfax County
During the Preliminary Engineering We are currently revising our website to match the recent revisions with the project (Same Location) Mid-November we will have a Public Input Meeting via Zoom Mid December we will make the Final Recommend of the Alternative available on out website During the Detailed Design Maintain and update the website Public Input at the 35% design (March 2022) Public Outreach Meeting at the 95% design summer/fall 2022 During the Construction Install a Project Sign Hold a Preconstruction meeting and routine status meetings as we proceed
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
Fairfax County
Water Pumping Station Rehabilitation, Bascule (Crest) Gate Replacement, Dam and Dike Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
ThomasSexton8
deck
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Crosstown TO
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
Fairfax County
State College Borough construction projects planned for the 2015 construction season.
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
Courtney Hayden
The purpose of this emergency project was to replace approximately 60-ft segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. This project was substantially complete on May 14, 2021.
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
Fairfax County
What's hot
(20)
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Display boards
Display boards
Fort Hunt Road Emergency Gravity Sewer Project
Fort Hunt Road Emergency Gravity Sewer Project
Substantial completion flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Leaside/ Laird CLC Construction Update - January 2019
Leaside/ Laird CLC Construction Update - January 2019
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
Viewers also liked
CPAC Meeting 3-19-03
CPAC Meeting 3-19-03
HartTWI
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
HartTWI
LTCP meeting 03-02-05
LTCP meeting 03-02-05
HartTWI
Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05
HartTWI
CPAC Meeting 5-5-03
CPAC Meeting 5-5-03
HartTWI
Quieres ser el primero en saber como ganarse
Quieres ser el primero en saber como ganarse
alexruiz452
Juliet_sampa_CV_ edited
Juliet_sampa_CV_ edited
julietsampa
LTCP meeting 02-10-05
LTCP meeting 02-10-05
HartTWI
Ppt grundkurs test
Ppt grundkurs test
britttagmark
Point Place Meeting 7-19-05
Point Place Meeting 7-19-05
HartTWI
SSES Wheeling 9-4-08
SSES Wheeling 9-4-08
HartTWI
Walk thro
Play chinese chess
Play chinese chess
bbuffone
CPAC Meeting 9-27-05
CPAC Meeting 9-27-05
HartTWI
CPAC Meeting 2-23-04
CPAC Meeting 2-23-04
HartTWI
LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
HartTWI
Viewers also liked
(15)
CPAC Meeting 3-19-03
CPAC Meeting 3-19-03
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
LTCP meeting 03-02-05
LTCP meeting 03-02-05
Point Place/Edgewater 2-3-05
Point Place/Edgewater 2-3-05
CPAC Meeting 5-5-03
CPAC Meeting 5-5-03
Quieres ser el primero en saber como ganarse
Quieres ser el primero en saber como ganarse
Juliet_sampa_CV_ edited
Juliet_sampa_CV_ edited
LTCP meeting 02-10-05
LTCP meeting 02-10-05
Ppt grundkurs test
Ppt grundkurs test
Point Place Meeting 7-19-05
Point Place Meeting 7-19-05
SSES Wheeling 9-4-08
SSES Wheeling 9-4-08
Play chinese chess
Play chinese chess
CPAC Meeting 9-27-05
CPAC Meeting 9-27-05
CPAC Meeting 2-23-04
CPAC Meeting 2-23-04
LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
Similar to CPAC Meeting 9-22-03
River Road Meeting 3-10-05
River Road Meeting 3-10-05
HartTWI
CPAC Meeting 3-21-05
CPAC Meeting 3-21-05
HartTWI
River Road Meeting 7-22-04
River Road Meeting 7-22-04
HartTWI
River Road Meeting 6-24-04
River Road Meeting 6-24-04
HartTWI
CPAC Meeting 9-8-04
CPAC Meeting 9-8-04
HartTWI
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
Mark Oberschmidt
Identify and evaluate house flooding and public safety concerns Improve drainage conditions to convey 100-year storm if feasible Reduce and treat stormwater runoff at the source Improve water quality and stream protection Use resilient & functional designs Make improvements compatible with characteristics of neighborhood Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained Build on lessons learned to help improve site development process for infill development
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
CPAC Meeting 5-17-05
CPAC Meeting 5-17-05
HartTWI
Potomac Avenue Sinkhole Emergency
Potomac Avenue Sinkhole Emergency
Potomac Avenue Sinkhole Emergency
Fairfax County
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
Timothy Antos
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
VDOT Northern Virginia
CPAC Meeting 6-12-06
CPAC Meeting 6-12-06
HartTWI
Public Meeting display boards
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
Toronto Public Consultation Unit
deck
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Crosstown TO
2017 TWCA Mid-Year Conference
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
TWCA
Identify and evaluate house flooding and public safety concerns Improve drainage conditions to convey 100-year storm if feasible Reduce and treat stormwater runoff at the source Improve water quality and stream protection Use innovative & functional designs Make improvements compatible with characteristics of neighborhood Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained Build on lessons learned to help improve site development process for infill development
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Fairfax County
Various Infrastructure Construction Projects
Infrastructure improvements
Infrastructure improvements
Nabil Zein
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Fairfax County
Okeechobee Road (US 27/SR 25) from Krome Avenue (SR 997) to NW 79 Avenue PD&E Study presentation to the Citizens Transportation Advisory Committee (CTAC), July 23, 2014.
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Miami-Dade Transportation Planning Organization
Detail of the Traffic Flow Improvement project in Bird Rock, CA, suburban San Deigo
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
THECITYALLIANCE
Similar to CPAC Meeting 9-22-03
(20)
River Road Meeting 3-10-05
River Road Meeting 3-10-05
CPAC Meeting 3-21-05
CPAC Meeting 3-21-05
River Road Meeting 7-22-04
River Road Meeting 7-22-04
River Road Meeting 6-24-04
River Road Meeting 6-24-04
CPAC Meeting 9-8-04
CPAC Meeting 9-8-04
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
CPAC Meeting 5-17-05
CPAC Meeting 5-17-05
Potomac Avenue Sinkhole Emergency
Potomac Avenue Sinkhole Emergency
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
CPAC Meeting 6-12-06
CPAC Meeting 6-12-06
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Infrastructure improvements
Infrastructure improvements
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
More from HartTWI
SSES Presentation
SSES Presentation
HartTWI
SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08
HartTWI
SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08
HartTWI
SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08
HartTWI
SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06
HartTWI
River Road Meeting 11-10-04
River Road Meeting 11-10-04
HartTWI
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05
HartTWI
Point Place Meeting 2-8-06
Point Place Meeting 2-8-06
HartTWI
Point Place Meeting 4-5-06
Point Place Meeting 4-5-06
HartTWI
CPAC Meeting 9-25-06
CPAC Meeting 9-25-06
HartTWI
CPAC Meeting 11-1-05
CPAC Meeting 11-1-05
HartTWI
CPAC Meeting 7-11-05
CPAC Meeting 7-11-05
HartTWI
CPAC Meeting 1-10-05
CPAC Meeting 1-10-05
HartTWI
CPAC Meeting 8-29-05
CPAC Meeting 8-29-05
HartTWI
CPAC Meeting 4-19-04
CPAC Meeting 4-19-04
HartTWI
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
HartTWI
More from HartTWI
(16)
SSES Presentation
SSES Presentation
SSES New York/Ash 9-9-08
SSES New York/Ash 9-9-08
SSES Williams/Knapp 9-11-08
SSES Williams/Knapp 9-11-08
SSES Woodsdale/Highland 9-3-08
SSES Woodsdale/Highland 9-3-08
SSES Bennett Area 2-8-06
SSES Bennett Area 2-8-06
River Road Meeting 11-10-04
River Road Meeting 11-10-04
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05
Point Place Meeting 2-8-06
Point Place Meeting 2-8-06
Point Place Meeting 4-5-06
Point Place Meeting 4-5-06
CPAC Meeting 9-25-06
CPAC Meeting 9-25-06
CPAC Meeting 11-1-05
CPAC Meeting 11-1-05
CPAC Meeting 7-11-05
CPAC Meeting 7-11-05
CPAC Meeting 1-10-05
CPAC Meeting 1-10-05
CPAC Meeting 8-29-05
CPAC Meeting 8-29-05
CPAC Meeting 4-19-04
CPAC Meeting 4-19-04
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
CPAC Meeting 9-22-03
1.
Point Place Sewer
Improvements Community Program Advisory Committee September 22, 2003
2.
3.
4.
5.
Pump Station Locations
290 th Street Pump Station Location Proposed Edgewater Pump Station Location
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Download now