  1. 1. Point Place Sewer Improvements Community Program Advisory Committee September 22, 2003
  2. 2. Today’s Agenda <ul><li>Point Place Improvements </li></ul><ul><ul><li>Overview </li></ul></ul><ul><ul><ul><li>Force Main </li></ul></ul></ul><ul><ul><ul><li>290 th Street Pump Station </li></ul></ul></ul><ul><ul><ul><li>Edgewater Pump Station </li></ul></ul></ul><ul><ul><li>Updates </li></ul></ul><ul><ul><ul><li>EQ Basin </li></ul></ul></ul><ul><li>Future meetings </li></ul>
  3. 3. Point Place Overview <ul><li>Project Goals </li></ul><ul><ul><li>Increase capacity of system for wet weather flows </li></ul></ul><ul><li>Project Benefits </li></ul><ul><ul><li>“Elimination” of sewage discharge to Ottawa River and Maumee Bay </li></ul></ul><ul><ul><li>Improved protection and reduced risk of basement backup </li></ul></ul>
  4. 4. Point Place Overview <ul><li>Consent Order Requirements </li></ul><ul><ul><li>11/01/03 – Award first construction contract </li></ul></ul><ul><ul><li>12/01/06 – Eliminate SSO discharges </li></ul></ul><ul><li>Project Plans </li></ul><ul><ul><li>Additional system capacity </li></ul></ul><ul><ul><ul><li>26,000 feet of new sewer/force main </li></ul></ul></ul><ul><ul><ul><li>Replace two pump stations </li></ul></ul></ul><ul><ul><ul><li>Eliminate one pump station </li></ul></ul></ul>
  5. 5. Pump Station Locations 290 th Street Pump Station Location Proposed Edgewater Pump Station Location
  6. 6. Phase 2A Overview <ul><li>36 inch sewer running from Bayview Plant up 290 th Street to Ottawa River Road </li></ul><ul><li>Construction of new pump station at Ottawa River Road and 290 Street </li></ul>
  7. 7. Phase 2A Schedule <ul><li>Detwiler Park and Golf Course crossing – Winter 2003-04 </li></ul><ul><li>290 th Street – Spring/Summer 2004 </li></ul><ul><li>Detour of Ottawa River Road – Summer 2004 </li></ul><ul><li>Paving of 290 th Street – Summer/Fall 2004 </li></ul><ul><li>Pump Station Construction Completed – Fall 2004 </li></ul>
  8. 8. Phase 2A Update <ul><li>Bids went out the third week of July for force main </li></ul><ul><ul><li>Underground Utilities, Inc. had low bid of $3,186,343 </li></ul></ul><ul><ul><li>Currently negotiating contract </li></ul></ul><ul><ul><li>Anticipated start date is Nov. 1, 2003/ To be completed by Nov. 1, 2004 </li></ul></ul><ul><li>Bids went out the third week of July for pump station </li></ul><ul><ul><li>Have a prospective low bidder </li></ul></ul><ul><ul><li>Anticipated bid is $2,249,000 </li></ul></ul><ul><ul><li>Anticipated start date is November/ To be completed by </li></ul></ul><ul><ul><li>Nov. 1, 2004 </li></ul></ul>
  9. 9. Sewer Routing Basis <ul><ul><li>Preference was to use roadways with pavement in poor conditions </li></ul></ul><ul><ul><li>Preference was to avoid busy streets </li></ul></ul><ul><ul><li>Costs impacts of Routes were considered </li></ul></ul><ul><ul><li>Number of utilities in roadway were considered </li></ul></ul>290 th Street 117 th Street Edgewater at 145 th Street
  10. 10. 290 th Street Recommendations <ul><li>Point Place Committee recommended block-by-block closures versus maintaining one lane of traffic </li></ul><ul><li>City Traffic Department will work with contractor to re-route traffic nearest east/west roads </li></ul><ul><ul><li>Anticipate no major traffic issues </li></ul></ul>
  11. 11. Ottawa River Road Crossing <ul><li>Summer 2004 </li></ul><ul><li>Road crossing much be trenched </li></ul><ul><ul><li>Connects to existing manholes </li></ul></ul><ul><li>Will require closure of Ottawa River Road </li></ul><ul><li>Simultaneous work at pump station location </li></ul><ul><ul><li>Pump station construction will not cause traffic disruption </li></ul></ul>
  12. 12. Ottawa River Road Recommendations <ul><li>Committee recommended closure for 7 consecutive days to complete project </li></ul><ul><ul><li>Rather than night work schedule or weekend closures </li></ul></ul><ul><li>City Traffic Department recommended detour – Suder Avenue to Manhattan to Summit Street </li></ul><ul><ul><li>Avoids residential areas </li></ul></ul><ul><ul><li>Keeps heavy trucks out of neighborhoods </li></ul></ul><ul><li>Alternate detour – 108 th Street to Summit Street </li></ul><ul><ul><li>Runs through residential area </li></ul></ul>
  13. 13. 290 th Street Pump Station Design Concepts <ul><ul><li>Will eliminate raw sewage from Ottawa River </li></ul></ul><ul><ul><li>1 st SSO eliminated under Consent Decree </li></ul></ul><ul><ul><li>Size is 32’7” x 34’1” </li></ul></ul><ul><ul><ul><li>This is the smallest structure that can do the job </li></ul></ul></ul><ul><ul><li>Initial design concept based on station at Manhattan and Summit streets </li></ul></ul><ul><ul><li>Point Place group providing input on design </li></ul></ul>Point Place Relief Station to be used as architectural model
  14. 14. Phase 2B/2C Overview <ul><li>Installation of 24-inch gravity relief sewer from the 290 th Street pump station east on 117 th , then south on Summit to 116 th </li></ul><ul><li>Installation of a 24-inch force main from the 290 th pump station, east on 117 th to 304 th , north on 304 th to 306 th and east on 129 th to the 129 th pump station </li></ul>
  15. 15. Phase 2B/2C Overview Continued <ul><li>Additional sewer pipes will be installed from that pump station north to 136 th street on Edgewater Drive </li></ul><ul><li>Construction of a new pump station on the northeast corner of the Edgewater School property </li></ul><ul><li>Pump stations at 145 th St. and 129 th St. will be removed </li></ul><ul><li>Phase 3 includes the installation of a 24-inch gravity relief sewer from 136 th north on Edgewater to 149 th </li></ul>
  16. 16. Edgewater Pump Station <ul><ul><li>Size about the same as 290 th Street station </li></ul></ul><ul><ul><li>Located near Edgewater School </li></ul></ul><ul><ul><li>Have agreement with school for right of way </li></ul></ul><ul><ul><li>Working with Toledo Public Schools so that station design compliments new school design </li></ul></ul>
  17. 17. EQ Basin <ul><li>Met with EPA Sept. 12 </li></ul><ul><ul><li>Positive meeting – expressed willingness to consider splitting storage </li></ul></ul><ul><ul><ul><li>Some at plant </li></ul></ul></ul><ul><ul><ul><li>Some on East side </li></ul></ul></ul><ul><ul><ul><li>Potentially means significantly smaller basin on senior golf course </li></ul></ul></ul><ul><li>Will present formal recommendation with engineering data to EPA next month </li></ul><ul><li>Could be months before final decision on size and locations </li></ul>
  18. 18. Next Meeting <ul><li>Date? </li></ul><ul><li>Time? </li></ul><ul><li>Topics </li></ul>

×