SITE DEVLOPEMENT AND UNDERGROUND
SOLUTIONS FOR MINING
Review and use of SPCSP in Mining Applications
Design , Corrosion , Earthquake Considerations
Q & A
Armtec Introduction
Portals, Haul Roads, Tunnels, Raise Bores
Onsite Assembly, Corrosion - Life Expectancy
3
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
JOIN THE DISCUSSION
3
4
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CPD CREDIT CERTIFICATES
• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical
Informal
• Formal completion certificates are emailed within one week of attending
• Check your local guidelines if unsure of your requirements
Email Your Attendance List:
• Full Name
• Title
• Email
webinars@armtec.com
Will send certificate
5
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
• 43 locations in Canada
• Approximately 2,000 employees
• Exceptional product range for:
Armtec is a leading global infrastructure
and construction materials company.
– Mine Portals
– Reclaim Tunnels
– Stockpile Tunnels
– Heavy Haul Road Bridges
6
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Bridge Materials
Drainage Solutions
and Water Treatment
Landscaping
Products
and Amenities
Noise Control
Road and
Highway Safety Soil Retention
Underground
and Utilities
Precast Concrete
Buildings and
Venues
Precast Concrete
Garages and
Parkades
7
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
YOUR SPEAKERS
7
Sales Supervisor, Atlantic
Armtec Drainage Solutions
Glenn.Smith@armtec.com
Doug Leitch, P. Eng
Manager International Sales
Armtec Drainage Solutions
Doug.Leitch@armtec.com
Glenn Smith, CET
8
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Webinar - Nov 14, 2014
BIG DIGS
Nov 14, 2014
SITE DEVELOPMENT AND UNDERGROUND
SOLUTIONS FOR MINING
Doug Leitch, P. Eng
Manager International Sales
Armtec Drainage Solutions
Glenn Smith, CET
Sales Supervisor, Atlantic
Armtec Drainage Solutions
9
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
WORK SAFE !!
10
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Jacioeta Stream Crossing
MOA Nickel
• JV Cuba
• Sherritt International
Cuba, West Indies
Conveyor Wildlife Crossing
Cortez Mine
Barrick Gold
Nevada, USA
Portal Tunnel Entrance
Tafts Quarry
Tafts Well Limestone
Wales, UK
RECENT BIG DIGS
11
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Mine Portal
Buyanhula Gold Mine
Barrick Gold
Tanzania, West Africa
Mine Portal
Kumtor
Centerra Gold
Kyrgystan, Asia
Haul Road
Minera Cerre Verde
Freeport , McMoron
Peru, South America
12
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
CORRUGATED STEEL PIPE
13
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Multi-Plate(SPCSP)
(152 mm x 51 mm)
Bridge-Plate (DCSP)
(400 mm x 150 mm)
CORRUGATED STRUCTURAL PLATE
Two Corrugation Profiles
Corrugate and Punch Plates
14
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Given the versatility of structural plate
products, a wide variety of shapes
and sizes can be manufactured to
meet your needs.
CORRUGATED STRUCTURAL PLATE
15
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CORRUGATED STRUCTURAL PLATE
Ship to the Site
16
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CORRUGATED STRUCTURAL PLATE
Bolts the Plates together
Per Assembly Drawings
17
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
And this ….. Becomes this
CORRUGATED STRUCTURAL PLATE
18
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
EVOLUTION OF STRUCTURAL
PLATE
19
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
EVOLUTION OF STRUCTURAL PLATE
1896 - CORRUGATED STEEL PIPE PATENTED
CONSTRAINTS
Large dia. pipe fabrication
Available gauges
Transportability
Demand for larger diameter
SEGMENTAL PLATE CONSTRUCTION
Heavy gauge corrugated plate
Bolted connections
Assembled on site
20
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Multi-Plate (SPCSP)
(152 mm x 51 mm)
Bridge-Plate (DCSP)
(400 mm x 150 mm)
Late 1990’s Armtec
introduced a Deep
Corrugated Structural
Plate and at the time
Bridge Plate became
the strongest such
Product available
EVOLUTION OF STRUCTURAL PLATE
21
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
EVOLUTION OF STRUCTURAL PLATE
21
Bridge Plate 400 mmx 150 mm
corrugation
• is 3 times stronger
• 10 times stiffer.
It extended structure spans over
20 meters and brought expanded
use of SPCSP in demanding
mining applications.
22
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
FLEXIBLE STEEL PIPE DESIGN
23
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
The Handbook of Steel Drainage and
Highway Construction
Published By
Corrugated Steel Pipe Institute
652 Bishop Street North
Cambridge Ontario , Canada
N3H 4V6
Ray Wilcock
+1 519-650-8080
www.cspi.ca
CANADIAN HANDBOOK of STEEL DRAINAGE
AND HIGHWAY CONSTRUCTION
24
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
SUPPORT
FROM
BACKFILL
SUPPORT
FROM
BACKFILL
Live load applied
Dead load applied Structure deflects
towards fill
RING COMPRESSION THEORY
25
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Net Result:
An economical buried
structure capable of
supporting significant loads
FLEXIBLE SOIL – STEEL STRUCTURES
Steel Component:
Corrugated thin wall flexible pipe
Corrugated shell is highly efficient
member to support axial
compressive loads
Soil Component:
Engineered granular
Backfill envelope with
materials of known
properties
26
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
FLEXIBLE VS RIDGID STRUCTURE
Flexible Structures deflect
outward toward the soil mobilizing
passive support from surrounding
fill, distributing the load into the
surrounding fill.
The load is distributed into the soil
Rigid structures are designed
for limited deflection, reducing
the support provided from the
surrounding fill.
The structure carries more load
27
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
FLEXIBLE –RIDGID LOAD RESPONSE
12.0 m span x 4.0 m rise arch
Bending Moments and Thrust
Flexible Soil Steel
Ridgid Concrete Arch
28
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DESIGN CODES
• Handbook of Steel Drainage and
Highway Construction Products
• basis is AISI (American Iron and Steel
Institute) AISI design – historical
procedure based on semi-empirical
equations
• AISI generally gives less conservative
design
• CHBDC – ( Canadian Highway Bridge
Design Code) and AASHTO LRFD
methods provide more modern approach
to thrust and buckling resistance and are
based on Ultimate Strength Principles.
• CHBDC and AASHTObetter address
Deep Cor structures and constructability
29
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
FLEXIBLE STEEL PIPE DESIGN
29
Mining presents unique situations
which often require the use of
Finite Element Analysis in
combination with codes to extend
the design scope
30
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DEEP CORRUGATED/
STANDARD CORRUGATED
DIFFERENCES
31
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
BRIDGE PLATE – MULTI-PLATE
Bridge Plate
• Corrugation 400 mm x 150 mm
• Steel thickness 4.3 mm – 8.0 mm
• Plate length 1.2 m
• Sizes 6 m – 20+ m
• Low cover, high live load applications
• Wide span arches and Box Culverts
• Easier constructability in large sizes
Multi-Plate
• Corrugation 150 mm 50 mm
• Steel thickness 3.0 mm – 7.0 mm
• Plate length 3.0 – 3.6 m
• Sizes 1.5 m – 17.0 m
• High cover applications with soil arch
• Wide range of shapes
• More conducive to fittings, curving
1.2 m
3.6 m
32
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
What it means on paper
BRIDGE PLATE MULTI-PLATE 7MM
COMPARISON
Bridge Plate – What three times as strong
and ten times as stiff really means –
Table 1 - Section Properties of Armtec Bridge Plate
Nominal Area of Moment Section Radius of
Thickness Section of Inertia Modulus Gyration
mm mm2/mm mm4/mm mm3/mm mm
4 5.351 14944 252.66 52.85
5 6.811 19060 322.05 52.85
6 8.26 23154 391.01 52.85
7 9.64 27071 456.91 52.85
8 10.94 30759 518.88 52.85
Table 2 - Section Properties of Armtec Multi-Plate
Nominal Area of Moment Section Radius of
Thickness Section of Inertia Modulus Gyration
mm mm2/mm mm4/mm mm3/mm mm
3 3.522 1057.25 39.42 17.327
4 4.828 1457.56 53.3 17.327
5 6.15 1867.16 66.98 17.327
6 7.461 2278.31 80.22 17.327
7 8.712 2675.11 92.56 17.327
33
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
WHAT TEN TIMES STIFF REALLY MEANS
Multi-Plate requires
• Cables or struts to hold in place
• Is more susceptible to peaking
during backfill procedures
• Is more prone to arch flattening
• Additional costs for shape control
Bridge Plate
• Is much stiffer
• Allows faster assembly of plates
• In most cases no additional shape
control
•
34
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
APPLICATIONS IN MINING
35
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Afton Mines
MINE HAUL ROADS
Considerations for design
• Live load
• Dead load
• Width of Structure
• Cover height
• Backfill material
• Span
• Stream crossing or grade crossing
• Earthquake load
36
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Vehicle weight
• Todays mining trucks can
weight up to 600 metric
tonnes or more
• Is the design for payload
included ( truck loaded ) or
no payload
• Two way traffic
Vehicle Weight Distribution
• Live loads are distributed
through the soil cover and
it essential to know how
front and rear wheel loads
are disbursed
• Often wheel loads overlap
Unbalanced Loading
• Low cover , can generate
unbalanced loads must be
evaluated
• Finite Element Analysis
required for these
applications
LIVE LOAD
37
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Number of trucks
• One or two vehicles on
structure
• Are both loaded, both
unloaded or fully loaded
Load Distribution
• Axle spacing
• Wheel Spacing
• Tire Imprint
Traffic Conditions
• What Live load is
• Rail, standard highway or
special mine load on top
• Yandi Mine, Hamersley
Iron, Western Austraila
LIVE LOAD
38
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Soil Properties
• Bulk density
• best estimate of the dead
load soil weight
• AASHTO / CHBDC have
default values
• Testing – remote mine
sites may use non
standard soils
Geometry
• Span requirements
• Hydraulic requirements
• Rise requirements
• Cardinal River Coals, Teck
Minerals, Alberta Canada
Roadway or Rail Grade
• Sets the cover height
• Most mine vehicles
operate at maximum 15%
gradient
• Railways typically want
2% gradients
• Toromocho – Chinalco
Copper, Peru
DEAD LOAD
39
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Roadway width
• Single or double lane
traffic through the tunnel –
define the clearance box
• Use of side berms for haul
trucks defines length of
structure
• Pueblo Viejo, Barrick Gold,
Dominican Republic
Site Accessibility
• Bridge Plates are fully
nestable and easy to
deliver to site
• Bridges over a standard
two lane highway can be
delivered on as few as two
flatbeds.
• Quintette Coal, Teck
Resources, BC Canada
High Cover Applications
• The ability of flexible
structures to distribute
loads into the soil are ideal
for high load applications
• Walker Brothers Quarry,
Ontario, Canada
OTHER CONSIDERATIONS
40
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DESIGNING FOR SEISMIC EVENTS
Canadian code requires buried
structures be designed to resist inertial
forces based on seismic event with
a10% chance of being exceeded in 50
years.
CHBDC defines zonal acceleration ratios for seismic regions in Canada. The
earthquake load on the structure is defined as 2/3 of the horizontal ground acceleration
times the unfactored dead load thrust. In haul road design height of cover are often
minimized and the additional thrust is generally not significant.
AASHTO evaluates earthquake loads for known fault areas.
41
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
HAUL ROADS – BENEFITS OF SPCSP
Benefits of Buried Metal Structures for
Haul Roads
• Low maintenance
• Easy to extend length to accommodate
future road widening
• Safer travel for large haul trucks- no
bridge deck freezing issues
• Design can accommodate a wide
range of Mining vehicles
• Cost efficient -Life expectancy can
match mine life.
• Easy to deliver and assemble in
remote locations
• Wide range of sizes for all applications
42
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE PORTALS
43
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE PORTALS
44
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE PORTALS
Mine Portals
• Prevent surface water from entering
the mine
• Provide ground support and safe
passage of surface roadways over the
mine entrance
• Egress from ground level to the
underground mine face for
1. Equipment and mine vehicles
2. Manpower
3. Ventilation pipes
4. Utility lines
45
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Egress requirements
• One/two lane traffic
• Pedestrian traffic
• Utility Lines
• Combination of all
Location of the mine face
• Sets depth and cover
• Sets ramp grade
• Defines tunnel length
• Defines solid rock
above the entrance
Constructability
• Amount of rock
removal
• Mine face portal
connection
• Constructed with or
without the free flow of
traffic into the mine
PORTAL DESIGN CONSIDERATIONS
46
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
End Treatment
• Vertical Pre-Cut
• Vertical Elbow
Safety
• Include Safe Chamber
• Chamber Spacing
• Vertical Riser Access
Size of Rock Cut
• Rock removal costs
• Amount of Backfill
Required
PORTAL DESIGN CONSIDERATIONS
47
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PORTAL DESIGN - SHAPE
48
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PORTAL DESIGN-FOOTING
Footing design by Consultant
15% gradient –maximum
7.5 degree vertical elbow
49
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PORTAL DESIGN - INTERFACE
Portal – Interface Connection
• Flexible meshing
• Shotcrete grout
50
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PORTAL - CONSTRUCTION
Backfill and compact
box cut
Room to compact
backfill
Assemble
Safety space
Plate Assembly
Start at the face
51
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Consultant provides:
• Alignment & Clearance Box
• Rock / Portal Interface
• Footing Design
Armtec provides:
• Cross-section Shape
• Footing Reactions
• Assembly & Backfill Specifications
• Sealed Drawings*
• Continuous On-site Daily Supervision*
• Construction Certification Package*
* Dependent on jurisdiction
MINE PORTALS
Design to Construction Support
52
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE TUNNELS
53
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE TUNNELS
Multi-Plate, Bridge-Plate and Tunnel Liner Plate
• Reclaim Tunnels
• Escape tunnels
• Conveyor Tunnels
• Process and Utility Tunnels
54
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
500mm wide sections
Thickness = 3, 4, 5, 6 mm
Plate weights = 15 kg - 42 kg
54
TUNNEL LINER PLATE
55
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Loading
• Live load
• Dead Load
• Varying Load
• Earthquake Load
Use
• Shape
• Size
• What goes through?
Access
• Emergency
• Maintenance
• Hopper openings
TUNNEL DESIGN CONSIDERATIONS
56
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ESCAPE TUNNELS
Versatility of Multi-Plate provides wide range of options
57
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CONVEYOR AND STOCKPILE TUNNELS
57
Range of shapes and bolted plate construction allow for
• Installation over live lines
• Economical design for variable stockpile height
• Maintenance access
58
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CONVEYOR AND STOCKPILE TUNNELS
Reinforced Hopper Openings are designed by Armtec per ASTM A998/A
59
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PROCESS TUNNELS
Fittings can be designed and constructed to match needs
of raw ore processes.
60
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ROCKFALL PROTECTION
61
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
RAISEBORE TUNNELS
Raisebore liners protect
vertical shafts between
Underground drifts.
Plates are bolted together
and lowered down the
shaft prior to connecting to
the rock wall. The space
is then grouted to provide
protection from falling
Rock.
62
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
GROUNDFALL TUNNELS
Underground utilities and conveyors can
be afforded protection from roof falls using
liner plate or structural plate
63
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
MINE ACCESS CROSSINGS
64
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Multiple structures make
excellent low cover, wide
stream crossings for both
mine exploration and
servicing.
Stream crossings under rail
lines can be pre-assembled
and set into place as the line
is progressed forward.
Large low cover Bridge-Plate
make excellent train crossings
for rail lines servicing remote
mine sites
ACCESS ROAD AND RAIL CROSSINGS
65
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ON-SITE INSTALLATION
66
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TWO CREEKS – BRIDGE PLATE ARCH
11.34 m
6.545 m
67
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ASSEMBLY EQUIPMENT
1 small crane + 2 man lifts
1 large crane
2 - 4.0 ft. bars
Drift pins
Air wrenches
Hand wrenches
68
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PLATES ARRANGED & SET ON-SITE
69
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
-
Footing channel
FOOTINGS
8.9 Deg.
Re-Entry
Angle
70
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
The first 2 rings are assembled on ground,
then bolted to the footing channels
INSTALLATION
Lifting the first pre-assembled “ring”
71
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
INSTALLATION
The next ring is
installed
“plate-by-plate”
72
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Set Footing PlatesINSTALLATION
73
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
INSTALLATION
74
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
INSTALLATION
75
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
INSTALLATION
76
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Longitudinal
seam
Circumferential.
seam
1200 mm wide per ring
77
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURE READY FOR BACKFILL
78
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
79
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
80
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
LIFE CYCLE DESIGN
81
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
STRATA CAT POLYMER COATING
• Additional barrier coating applied to the steel which eliminates or minimizes
contact with environmental contaminants
• Dual coating systems will provide 2 levels of protection
• Broadens the allowable range of environmental parameters that are known
to negatively influence the Estimated Material Service Life (EMSL) of buried
steel products
82
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
STRATACAT POLYMER COATING - APPLICATION
• Process of coating fabricated steel by applying a Ethylene Acrylic Acid (EAA)
copolymer over a zinc based layer – 4 step process
• Surface Preparation – 8 stage pre-treatment wash
• Zinc application – (minimum 1.5 mil per side)
• Copolymer application – spray applied and baked (10 mil thickness per side)
• Inspection
• Each process ensures proper bonding of each coating layer
83
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
83
CAT = Corrosion Arresting Technology
Download at www.armtec.com
84
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Hand Spray guns
THE COATING PROCESS
85
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Plates coming out of the spray booth and
entering the oven
86
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Ready for shipment
87
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
Environmental
Parameter
Suggested Limits
Galvanized Steel
Suggested Limits for Polymer Coated
Steel
50 year
EMSL
75 year
EMSL
100 year
EMSL
pH preferred
range
5 – 9 3 – 12 4 – 9 5 – 9
Resistivity 2,000 – 8,000 ohm-cm
>100
ohm cm
>750 ohm
cm
>1,500 ohm
cm
Chlorides < 250 ppm NA NA NA
Sulfates < 600 ppm NA NA NA
Hardness > 80 ppm CaCO3 NA NA NA
87
Table 21
Environmental Limits For Galvanized Steel and Polymer Coated Steel
1 Performance Guideline For Buried Steel Structures – Tech. Bulletin 13, CSPI Feb 2012
88
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
88www.cspi.ca
89
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE COATINGS
91
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
91
Contact Your Local Rep:
www.armtec.com/contact-us
Today’s Speakers:
Doug Leitch
Doug.Leitch@armtec.com
Glenn Smith
Glenn.Smith@armtec.com
92
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
UPCOMING MONTHLY WEBINARS
www.armtec.com/webinars/
Dec 12 | Armtec’s Earth Retention
Solutions - An Overview
Doug Lowry & Ron Prychitko
Many more to come in 2015!
93
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STAY CONNECTED!
Please Stay Connected!
Choose Yes!
Armtec respects your privacy. All communications comply with CASL and general best
practices. For more information, you can find links to privacy policy and options to
unsubscribe in footer of any emails.
94
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Follow us on social media to learn more
about our company, projects and people,
while getting all the latest Armtec and
industry news.
Join Us on Social Media!
95
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
BIG DIGS Mine Site Development & Underground Solutions
QUESTIONS?

More Related Content

What's hot

Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Communications Branding
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsCommunications Branding
 
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesCommunications Branding
 
Think outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precastThink outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precastHamilton_Kent
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Communications Branding
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Communications Branding
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationCommunications Branding
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetankAdrian Frantescu
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochureAdrian Frantescu
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresAdrian Frantescu
 
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDANDESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDANAjit Sabnis
 
DESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsDESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsAjit Sabnis
 
Alternative Structural System - Session 10
Alternative Structural System - Session 10Alternative Structural System - Session 10
Alternative Structural System - Session 10Ajit Sabnis
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication TowersTowerpeople
 
Ail 516 pedestrian bridges brochure r3
Ail 516 pedestrian bridges brochure r3Ail 516 pedestrian bridges brochure r3
Ail 516 pedestrian bridges brochure r3asdihss
 
Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Towerayishairshad
 
Structural engineering a responsible career 27.02.2021
Structural engineering a responsible career 27.02.2021Structural engineering a responsible career 27.02.2021
Structural engineering a responsible career 27.02.2021Ajit Sabnis
 

What's hot (18)

Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain Applications
 
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
 
Think outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precastThink outside the box (culvert): How creativity sells more precast
Think outside the box (culvert): How creativity sells more precast
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetank
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochure
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structures
 
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDANDESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
 
DESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsDESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBs
 
Alternative Structural System - Session 10
Alternative Structural System - Session 10Alternative Structural System - Session 10
Alternative Structural System - Session 10
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
Ail 516 pedestrian bridges brochure r3
Ail 516 pedestrian bridges brochure r3Ail 516 pedestrian bridges brochure r3
Ail 516 pedestrian bridges brochure r3
 
Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Tower
 
Structural engineering a responsible career 27.02.2021
Structural engineering a responsible career 27.02.2021Structural engineering a responsible career 27.02.2021
Structural engineering a responsible career 27.02.2021
 

Similar to Big Digs - Site Development & Underground Solutions for Mining

Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Agata Woźniak
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Agata Woźniak
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewThe Howard Group Inc.
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxMailapalliJayaRaju
 
Exterior Portland Cement Plaster Assemblies
Exterior Portland Cement Plaster AssembliesExterior Portland Cement Plaster Assemblies
Exterior Portland Cement Plaster AssembliesBryan Stanley
 
Nsa1214 unistrut metal framing
Nsa1214 unistrut metal framingNsa1214 unistrut metal framing
Nsa1214 unistrut metal framingMichael Hoff
 
AK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationAK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationKeith Evans
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Agata Woźniak
 
FRP Electrical Distribution and Transmission Structures
FRP Electrical Distribution and Transmission Structures FRP Electrical Distribution and Transmission Structures
FRP Electrical Distribution and Transmission Structures Creative Pultrusions, Inc.
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Communications Branding
 
Optima-Product-Brochure
Optima-Product-BrochureOptima-Product-Brochure
Optima-Product-BrochureDave Holmwood
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 

Similar to Big Digs - Site Development & Underground Solutions for Mining (20)

Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product Overview
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptx
 
Exterior Portland Cement Plaster Assemblies
Exterior Portland Cement Plaster AssembliesExterior Portland Cement Plaster Assemblies
Exterior Portland Cement Plaster Assemblies
 
Nsa1214 unistrut metal framing
Nsa1214 unistrut metal framingNsa1214 unistrut metal framing
Nsa1214 unistrut metal framing
 
AK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationAK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre Qualification
 
Earth Retention Solutions
Earth Retention SolutionsEarth Retention Solutions
Earth Retention Solutions
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
 
AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3
 
FRP Electrical Distribution and Transmission Structures
FRP Electrical Distribution and Transmission Structures FRP Electrical Distribution and Transmission Structures
FRP Electrical Distribution and Transmission Structures
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
 
IDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & VaultsIDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & Vaults
 
CSI Company Profile (1)
CSI Company Profile (1)CSI Company Profile (1)
CSI Company Profile (1)
 
Optima-Product-Brochure
Optima-Product-BrochureOptima-Product-Brochure
Optima-Product-Brochure
 
Ashwall
AshwallAshwall
Ashwall
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
SMARTDEK-Brochure
SMARTDEK-BrochureSMARTDEK-Brochure
SMARTDEK-Brochure
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 

More from Communications Branding

MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016Communications Branding
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsCommunications Branding
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationCommunications Branding
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecCommunications Branding
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecCommunications Branding
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Communications Branding
 

More from Communications Branding (6)

MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise Mitigation
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - Armtec
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - Armtec
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 

Recently uploaded

S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...manju garg
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 

Recently uploaded (20)

S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 

Big Digs - Site Development & Underground Solutions for Mining

  • 1. 1 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Webinar - Nov 14, 2014 BIG DIGS Nov 14, 2014 SITE DEVELOPMENT AND UNDERGROUND SOLUTIONS FOR MINING Doug Leitch, P. Eng Manager International Sales Armtec Drainage Solutions Glenn Smith, CET Sales Supervisor, Atlantic Armtec Drainage Solutions
  • 2. 2 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary 2 SITE DEVLOPEMENT AND UNDERGROUND SOLUTIONS FOR MINING Review and use of SPCSP in Mining Applications Design , Corrosion , Earthquake Considerations Q & A Armtec Introduction Portals, Haul Roads, Tunnels, Raise Bores Onsite Assembly, Corrosion - Life Expectancy
  • 3. 3 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary JOIN THE DISCUSSION 3
  • 4. 4 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CPD CREDIT CERTIFICATES • Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical Informal • Formal completion certificates are emailed within one week of attending • Check your local guidelines if unsure of your requirements Email Your Attendance List: • Full Name • Title • Email webinars@armtec.com Will send certificate
  • 5. 5 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary • 43 locations in Canada • Approximately 2,000 employees • Exceptional product range for: Armtec is a leading global infrastructure and construction materials company. – Mine Portals – Reclaim Tunnels – Stockpile Tunnels – Heavy Haul Road Bridges
  • 6. 6 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Bridge Materials Drainage Solutions and Water Treatment Landscaping Products and Amenities Noise Control Road and Highway Safety Soil Retention Underground and Utilities Precast Concrete Buildings and Venues Precast Concrete Garages and Parkades
  • 7. 7 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary YOUR SPEAKERS 7 Sales Supervisor, Atlantic Armtec Drainage Solutions Glenn.Smith@armtec.com Doug Leitch, P. Eng Manager International Sales Armtec Drainage Solutions Doug.Leitch@armtec.com Glenn Smith, CET
  • 8. 8 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Webinar - Nov 14, 2014 BIG DIGS Nov 14, 2014 SITE DEVELOPMENT AND UNDERGROUND SOLUTIONS FOR MINING Doug Leitch, P. Eng Manager International Sales Armtec Drainage Solutions Glenn Smith, CET Sales Supervisor, Atlantic Armtec Drainage Solutions
  • 9. 9 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary WORK SAFE !!
  • 10. 10 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Jacioeta Stream Crossing MOA Nickel • JV Cuba • Sherritt International Cuba, West Indies Conveyor Wildlife Crossing Cortez Mine Barrick Gold Nevada, USA Portal Tunnel Entrance Tafts Quarry Tafts Well Limestone Wales, UK RECENT BIG DIGS
  • 11. 11 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Mine Portal Buyanhula Gold Mine Barrick Gold Tanzania, West Africa Mine Portal Kumtor Centerra Gold Kyrgystan, Asia Haul Road Minera Cerre Verde Freeport , McMoron Peru, South America
  • 12. 12 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE CORRUGATED STEEL PIPE
  • 13. 13 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Multi-Plate(SPCSP) (152 mm x 51 mm) Bridge-Plate (DCSP) (400 mm x 150 mm) CORRUGATED STRUCTURAL PLATE Two Corrugation Profiles Corrugate and Punch Plates
  • 14. 14 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Given the versatility of structural plate products, a wide variety of shapes and sizes can be manufactured to meet your needs. CORRUGATED STRUCTURAL PLATE
  • 15. 15 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CORRUGATED STRUCTURAL PLATE Ship to the Site
  • 16. 16 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CORRUGATED STRUCTURAL PLATE Bolts the Plates together Per Assembly Drawings
  • 17. 17 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary And this ….. Becomes this CORRUGATED STRUCTURAL PLATE
  • 18. 18 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary EVOLUTION OF STRUCTURAL PLATE
  • 19. 19 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary EVOLUTION OF STRUCTURAL PLATE 1896 - CORRUGATED STEEL PIPE PATENTED CONSTRAINTS Large dia. pipe fabrication Available gauges Transportability Demand for larger diameter SEGMENTAL PLATE CONSTRUCTION Heavy gauge corrugated plate Bolted connections Assembled on site
  • 20. 20 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Multi-Plate (SPCSP) (152 mm x 51 mm) Bridge-Plate (DCSP) (400 mm x 150 mm) Late 1990’s Armtec introduced a Deep Corrugated Structural Plate and at the time Bridge Plate became the strongest such Product available EVOLUTION OF STRUCTURAL PLATE
  • 21. 21 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary EVOLUTION OF STRUCTURAL PLATE 21 Bridge Plate 400 mmx 150 mm corrugation • is 3 times stronger • 10 times stiffer. It extended structure spans over 20 meters and brought expanded use of SPCSP in demanding mining applications.
  • 22. 22 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary FLEXIBLE STEEL PIPE DESIGN
  • 23. 23 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary The Handbook of Steel Drainage and Highway Construction Published By Corrugated Steel Pipe Institute 652 Bishop Street North Cambridge Ontario , Canada N3H 4V6 Ray Wilcock +1 519-650-8080 www.cspi.ca CANADIAN HANDBOOK of STEEL DRAINAGE AND HIGHWAY CONSTRUCTION
  • 24. 24 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary SUPPORT FROM BACKFILL SUPPORT FROM BACKFILL Live load applied Dead load applied Structure deflects towards fill RING COMPRESSION THEORY
  • 25. 25 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Net Result: An economical buried structure capable of supporting significant loads FLEXIBLE SOIL – STEEL STRUCTURES Steel Component: Corrugated thin wall flexible pipe Corrugated shell is highly efficient member to support axial compressive loads Soil Component: Engineered granular Backfill envelope with materials of known properties
  • 26. 26 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary FLEXIBLE VS RIDGID STRUCTURE Flexible Structures deflect outward toward the soil mobilizing passive support from surrounding fill, distributing the load into the surrounding fill. The load is distributed into the soil Rigid structures are designed for limited deflection, reducing the support provided from the surrounding fill. The structure carries more load
  • 27. 27 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary FLEXIBLE –RIDGID LOAD RESPONSE 12.0 m span x 4.0 m rise arch Bending Moments and Thrust Flexible Soil Steel Ridgid Concrete Arch
  • 28. 28 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DESIGN CODES • Handbook of Steel Drainage and Highway Construction Products • basis is AISI (American Iron and Steel Institute) AISI design – historical procedure based on semi-empirical equations • AISI generally gives less conservative design • CHBDC – ( Canadian Highway Bridge Design Code) and AASHTO LRFD methods provide more modern approach to thrust and buckling resistance and are based on Ultimate Strength Principles. • CHBDC and AASHTObetter address Deep Cor structures and constructability
  • 29. 29 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary FLEXIBLE STEEL PIPE DESIGN 29 Mining presents unique situations which often require the use of Finite Element Analysis in combination with codes to extend the design scope
  • 30. 30 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DEEP CORRUGATED/ STANDARD CORRUGATED DIFFERENCES
  • 31. 31 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary BRIDGE PLATE – MULTI-PLATE Bridge Plate • Corrugation 400 mm x 150 mm • Steel thickness 4.3 mm – 8.0 mm • Plate length 1.2 m • Sizes 6 m – 20+ m • Low cover, high live load applications • Wide span arches and Box Culverts • Easier constructability in large sizes Multi-Plate • Corrugation 150 mm 50 mm • Steel thickness 3.0 mm – 7.0 mm • Plate length 3.0 – 3.6 m • Sizes 1.5 m – 17.0 m • High cover applications with soil arch • Wide range of shapes • More conducive to fittings, curving 1.2 m 3.6 m
  • 32. 32 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary What it means on paper BRIDGE PLATE MULTI-PLATE 7MM COMPARISON Bridge Plate – What three times as strong and ten times as stiff really means – Table 1 - Section Properties of Armtec Bridge Plate Nominal Area of Moment Section Radius of Thickness Section of Inertia Modulus Gyration mm mm2/mm mm4/mm mm3/mm mm 4 5.351 14944 252.66 52.85 5 6.811 19060 322.05 52.85 6 8.26 23154 391.01 52.85 7 9.64 27071 456.91 52.85 8 10.94 30759 518.88 52.85 Table 2 - Section Properties of Armtec Multi-Plate Nominal Area of Moment Section Radius of Thickness Section of Inertia Modulus Gyration mm mm2/mm mm4/mm mm3/mm mm 3 3.522 1057.25 39.42 17.327 4 4.828 1457.56 53.3 17.327 5 6.15 1867.16 66.98 17.327 6 7.461 2278.31 80.22 17.327 7 8.712 2675.11 92.56 17.327
  • 33. 33 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary WHAT TEN TIMES STIFF REALLY MEANS Multi-Plate requires • Cables or struts to hold in place • Is more susceptible to peaking during backfill procedures • Is more prone to arch flattening • Additional costs for shape control Bridge Plate • Is much stiffer • Allows faster assembly of plates • In most cases no additional shape control •
  • 34. 34 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary APPLICATIONS IN MINING
  • 35. 35 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Afton Mines MINE HAUL ROADS Considerations for design • Live load • Dead load • Width of Structure • Cover height • Backfill material • Span • Stream crossing or grade crossing • Earthquake load
  • 36. 36 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Vehicle weight • Todays mining trucks can weight up to 600 metric tonnes or more • Is the design for payload included ( truck loaded ) or no payload • Two way traffic Vehicle Weight Distribution • Live loads are distributed through the soil cover and it essential to know how front and rear wheel loads are disbursed • Often wheel loads overlap Unbalanced Loading • Low cover , can generate unbalanced loads must be evaluated • Finite Element Analysis required for these applications LIVE LOAD
  • 37. 37 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Number of trucks • One or two vehicles on structure • Are both loaded, both unloaded or fully loaded Load Distribution • Axle spacing • Wheel Spacing • Tire Imprint Traffic Conditions • What Live load is • Rail, standard highway or special mine load on top • Yandi Mine, Hamersley Iron, Western Austraila LIVE LOAD
  • 38. 38 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Soil Properties • Bulk density • best estimate of the dead load soil weight • AASHTO / CHBDC have default values • Testing – remote mine sites may use non standard soils Geometry • Span requirements • Hydraulic requirements • Rise requirements • Cardinal River Coals, Teck Minerals, Alberta Canada Roadway or Rail Grade • Sets the cover height • Most mine vehicles operate at maximum 15% gradient • Railways typically want 2% gradients • Toromocho – Chinalco Copper, Peru DEAD LOAD
  • 39. 39 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Roadway width • Single or double lane traffic through the tunnel – define the clearance box • Use of side berms for haul trucks defines length of structure • Pueblo Viejo, Barrick Gold, Dominican Republic Site Accessibility • Bridge Plates are fully nestable and easy to deliver to site • Bridges over a standard two lane highway can be delivered on as few as two flatbeds. • Quintette Coal, Teck Resources, BC Canada High Cover Applications • The ability of flexible structures to distribute loads into the soil are ideal for high load applications • Walker Brothers Quarry, Ontario, Canada OTHER CONSIDERATIONS
  • 40. 40 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DESIGNING FOR SEISMIC EVENTS Canadian code requires buried structures be designed to resist inertial forces based on seismic event with a10% chance of being exceeded in 50 years. CHBDC defines zonal acceleration ratios for seismic regions in Canada. The earthquake load on the structure is defined as 2/3 of the horizontal ground acceleration times the unfactored dead load thrust. In haul road design height of cover are often minimized and the additional thrust is generally not significant. AASHTO evaluates earthquake loads for known fault areas.
  • 41. 41 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary HAUL ROADS – BENEFITS OF SPCSP Benefits of Buried Metal Structures for Haul Roads • Low maintenance • Easy to extend length to accommodate future road widening • Safer travel for large haul trucks- no bridge deck freezing issues • Design can accommodate a wide range of Mining vehicles • Cost efficient -Life expectancy can match mine life. • Easy to deliver and assemble in remote locations • Wide range of sizes for all applications
  • 42. 42 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE PORTALS
  • 43. 43 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE PORTALS
  • 44. 44 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE PORTALS Mine Portals • Prevent surface water from entering the mine • Provide ground support and safe passage of surface roadways over the mine entrance • Egress from ground level to the underground mine face for 1. Equipment and mine vehicles 2. Manpower 3. Ventilation pipes 4. Utility lines
  • 45. 45 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Egress requirements • One/two lane traffic • Pedestrian traffic • Utility Lines • Combination of all Location of the mine face • Sets depth and cover • Sets ramp grade • Defines tunnel length • Defines solid rock above the entrance Constructability • Amount of rock removal • Mine face portal connection • Constructed with or without the free flow of traffic into the mine PORTAL DESIGN CONSIDERATIONS
  • 46. 46 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary End Treatment • Vertical Pre-Cut • Vertical Elbow Safety • Include Safe Chamber • Chamber Spacing • Vertical Riser Access Size of Rock Cut • Rock removal costs • Amount of Backfill Required PORTAL DESIGN CONSIDERATIONS
  • 47. 47 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PORTAL DESIGN - SHAPE
  • 48. 48 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PORTAL DESIGN-FOOTING Footing design by Consultant 15% gradient –maximum 7.5 degree vertical elbow
  • 49. 49 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PORTAL DESIGN - INTERFACE Portal – Interface Connection • Flexible meshing • Shotcrete grout
  • 50. 50 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PORTAL - CONSTRUCTION Backfill and compact box cut Room to compact backfill Assemble Safety space Plate Assembly Start at the face
  • 51. 51 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Consultant provides: • Alignment & Clearance Box • Rock / Portal Interface • Footing Design Armtec provides: • Cross-section Shape • Footing Reactions • Assembly & Backfill Specifications • Sealed Drawings* • Continuous On-site Daily Supervision* • Construction Certification Package* * Dependent on jurisdiction MINE PORTALS Design to Construction Support
  • 52. 52 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE TUNNELS
  • 53. 53 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE TUNNELS Multi-Plate, Bridge-Plate and Tunnel Liner Plate • Reclaim Tunnels • Escape tunnels • Conveyor Tunnels • Process and Utility Tunnels
  • 54. 54 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary 500mm wide sections Thickness = 3, 4, 5, 6 mm Plate weights = 15 kg - 42 kg 54 TUNNEL LINER PLATE
  • 55. 55 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Loading • Live load • Dead Load • Varying Load • Earthquake Load Use • Shape • Size • What goes through? Access • Emergency • Maintenance • Hopper openings TUNNEL DESIGN CONSIDERATIONS
  • 56. 56 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ESCAPE TUNNELS Versatility of Multi-Plate provides wide range of options
  • 57. 57 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CONVEYOR AND STOCKPILE TUNNELS 57 Range of shapes and bolted plate construction allow for • Installation over live lines • Economical design for variable stockpile height • Maintenance access
  • 58. 58 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CONVEYOR AND STOCKPILE TUNNELS Reinforced Hopper Openings are designed by Armtec per ASTM A998/A
  • 59. 59 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PROCESS TUNNELS Fittings can be designed and constructed to match needs of raw ore processes.
  • 60. 60 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ROCKFALL PROTECTION
  • 61. 61 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary RAISEBORE TUNNELS Raisebore liners protect vertical shafts between Underground drifts. Plates are bolted together and lowered down the shaft prior to connecting to the rock wall. The space is then grouted to provide protection from falling Rock.
  • 62. 62 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary GROUNDFALL TUNNELS Underground utilities and conveyors can be afforded protection from roof falls using liner plate or structural plate
  • 63. 63 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary MINE ACCESS CROSSINGS
  • 64. 64 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Multiple structures make excellent low cover, wide stream crossings for both mine exploration and servicing. Stream crossings under rail lines can be pre-assembled and set into place as the line is progressed forward. Large low cover Bridge-Plate make excellent train crossings for rail lines servicing remote mine sites ACCESS ROAD AND RAIL CROSSINGS
  • 65. 65 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ON-SITE INSTALLATION
  • 66. 66 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TWO CREEKS – BRIDGE PLATE ARCH 11.34 m 6.545 m
  • 67. 67 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ASSEMBLY EQUIPMENT 1 small crane + 2 man lifts 1 large crane 2 - 4.0 ft. bars Drift pins Air wrenches Hand wrenches
  • 68. 68 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PLATES ARRANGED & SET ON-SITE
  • 69. 69 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary - Footing channel FOOTINGS 8.9 Deg. Re-Entry Angle
  • 70. 70 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary The first 2 rings are assembled on ground, then bolted to the footing channels INSTALLATION Lifting the first pre-assembled “ring”
  • 71. 71 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary INSTALLATION The next ring is installed “plate-by-plate”
  • 72. 72 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Set Footing PlatesINSTALLATION
  • 73. 73 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary INSTALLATION
  • 74. 74 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary INSTALLATION
  • 75. 75 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary INSTALLATION
  • 76. 76 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Longitudinal seam Circumferential. seam 1200 mm wide per ring
  • 77. 77 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURE READY FOR BACKFILL
  • 78. 78 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
  • 79. 79 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
  • 80. 80 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary LIFE CYCLE DESIGN
  • 81. 81 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS STRATA CAT POLYMER COATING • Additional barrier coating applied to the steel which eliminates or minimizes contact with environmental contaminants • Dual coating systems will provide 2 levels of protection • Broadens the allowable range of environmental parameters that are known to negatively influence the Estimated Material Service Life (EMSL) of buried steel products
  • 82. 82 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS STRATACAT POLYMER COATING - APPLICATION • Process of coating fabricated steel by applying a Ethylene Acrylic Acid (EAA) copolymer over a zinc based layer – 4 step process • Surface Preparation – 8 stage pre-treatment wash • Zinc application – (minimum 1.5 mil per side) • Copolymer application – spray applied and baked (10 mil thickness per side) • Inspection • Each process ensures proper bonding of each coating layer
  • 83. 83 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS 83 CAT = Corrosion Arresting Technology Download at www.armtec.com
  • 84. 84 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Hand Spray guns THE COATING PROCESS
  • 85. 85 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Plates coming out of the spray booth and entering the oven
  • 86. 86 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Ready for shipment
  • 87. 87 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS Environmental Parameter Suggested Limits Galvanized Steel Suggested Limits for Polymer Coated Steel 50 year EMSL 75 year EMSL 100 year EMSL pH preferred range 5 – 9 3 – 12 4 – 9 5 – 9 Resistivity 2,000 – 8,000 ohm-cm >100 ohm cm >750 ohm cm >1,500 ohm cm Chlorides < 250 ppm NA NA NA Sulfates < 600 ppm NA NA NA Hardness > 80 ppm CaCO3 NA NA NA 87 Table 21 Environmental Limits For Galvanized Steel and Polymer Coated Steel 1 Performance Guideline For Buried Steel Structures – Tech. Bulletin 13, CSPI Feb 2012
  • 88. 88 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS 88www.cspi.ca
  • 89. 89 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE COATINGS
  • 90. 91 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary 91 Contact Your Local Rep: www.armtec.com/contact-us Today’s Speakers: Doug Leitch Doug.Leitch@armtec.com Glenn Smith Glenn.Smith@armtec.com
  • 91. 92 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary UPCOMING MONTHLY WEBINARS www.armtec.com/webinars/ Dec 12 | Armtec’s Earth Retention Solutions - An Overview Doug Lowry & Ron Prychitko Many more to come in 2015!
  • 92. 93 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STAY CONNECTED! Please Stay Connected! Choose Yes! Armtec respects your privacy. All communications comply with CASL and general best practices. For more information, you can find links to privacy policy and options to unsubscribe in footer of any emails.
  • 93. 94 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news. Join Us on Social Media!
  • 94. 95 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary BIG DIGS Mine Site Development & Underground Solutions QUESTIONS?