ContingencyPlanning
ProjectTitle:
Consider:1.Technical [camera, equipment,etc], 2. Organisational, 3. Logistical and 4. Personnel
Ideally4 or 5 for each
Pot. Problem Effecton Production Solution/Control PersonResponsible
Loss of SD card. We could potentially
lose workand may
have to pay the
college.
Keepitsafe alongwith
the equipmentwitha
teammemberthatcan
be trusted.
Jesse <3
Team members
cannot get to point of
recording.
We will notbe able to
workas effectivelyand
may be missingkey
rolesinproduction.
Make sure we all agree
on a locationandplan
out whenwe will go
together.
The HawkHills is
unavailable.
We will be forcedto
spendmore time
findinganewlocation
to film.
Make sure we have
multiple available
locationsforbackup.
Whole Group<3
Missingprops. Couldmessupthe
productionandhalt
filming.
Have a responsible
teammembertake
care of them.
Daniel Thompson
Team Memberillness. Slowerrecordingor
may have to halt
production.
Ensure we have
emergencycontactsto
fill theirpositionif they
are unable toshow up.
KieranBeal
Accidenton set. We wouldhave tostop
and call out the
emergencycontacts.
Make contact withthe
emergencycontactto
fill theirposition.
KieranBeal
Wrong equipment
requested.
It will hinder
productionuntil we
getthe correct
equipment.
Double checkto make
sure the right
equipmenthasbeen
requisitioned.
Daniel Thompson
Equipmentbreaking. Will hinderproduction
to a laterdate until we
can get new
equipment.
Requestnew
equipmentand
reschedule toalater
date,or simplyensure
that the equipment
doesn’tbreakinthe
firstplace.
KieranBeal
Weatherproblems. Halt or hinder
transportto location
Schedule foraday
withgoodweather.
everyone
No scripts on set. Has the possibility of
slowingdown
productionif
screenplay/linesaren't
memorised.
Produce extracopies
of scriptand give
everyone acopy.
Jesse Lapworth
Other people booking
studio.
Wouldhinder
productiontoa later
day
Wait till itisnext
available orswitchto
backuplocation.
Everyone
Bad Footage. Wouldcause us to re-
filmscenesandhinder
productionof the final
product.
Re-shootfootage
ensure qualitycontrol
KieranBeal
Batteriesrunning out
during recording.
Thiswouldhalt
production until
replacementscanbe
found.
Bringa spare setof
batteries.
Daniel Thompson
Equipmentmissing. Wouldhinderorcreate
difficultiesin
recording.
Ensure all equipmentis
accountedfor.
Daniel Thompson
EmergencyContacts
unavailable after team
membersnot
available.
Thiswouldstop
productionanother
replacementcanbe
found.
Consideralternate
replacements.
KieranBeal

Contingency form 2017 (kieran beal)

  • 1.
    ContingencyPlanning ProjectTitle: Consider:1.Technical [camera, equipment,etc],2. Organisational, 3. Logistical and 4. Personnel Ideally4 or 5 for each Pot. Problem Effecton Production Solution/Control PersonResponsible Loss of SD card. We could potentially lose workand may have to pay the college. Keepitsafe alongwith the equipmentwitha teammemberthatcan be trusted. Jesse <3 Team members cannot get to point of recording. We will notbe able to workas effectivelyand may be missingkey rolesinproduction. Make sure we all agree on a locationandplan out whenwe will go together. The HawkHills is unavailable. We will be forcedto spendmore time findinganewlocation to film. Make sure we have multiple available locationsforbackup. Whole Group<3 Missingprops. Couldmessupthe productionandhalt filming. Have a responsible teammembertake care of them. Daniel Thompson Team Memberillness. Slowerrecordingor may have to halt production. Ensure we have emergencycontactsto fill theirpositionif they are unable toshow up. KieranBeal Accidenton set. We wouldhave tostop and call out the emergencycontacts. Make contact withthe emergencycontactto fill theirposition. KieranBeal Wrong equipment requested. It will hinder productionuntil we getthe correct equipment. Double checkto make sure the right equipmenthasbeen requisitioned. Daniel Thompson Equipmentbreaking. Will hinderproduction to a laterdate until we can get new equipment. Requestnew equipmentand reschedule toalater date,or simplyensure that the equipment doesn’tbreakinthe firstplace. KieranBeal Weatherproblems. Halt or hinder transportto location Schedule foraday withgoodweather. everyone No scripts on set. Has the possibility of slowingdown productionif screenplay/linesaren't memorised. Produce extracopies of scriptand give everyone acopy. Jesse Lapworth
  • 2.
    Other people booking studio. Wouldhinder productiontoalater day Wait till itisnext available orswitchto backuplocation. Everyone Bad Footage. Wouldcause us to re- filmscenesandhinder productionof the final product. Re-shootfootage ensure qualitycontrol KieranBeal Batteriesrunning out during recording. Thiswouldhalt production until replacementscanbe found. Bringa spare setof batteries. Daniel Thompson Equipmentmissing. Wouldhinderorcreate difficultiesin recording. Ensure all equipmentis accountedfor. Daniel Thompson EmergencyContacts unavailable after team membersnot available. Thiswouldstop productionanother replacementcanbe found. Consideralternate replacements. KieranBeal