This document outlines potential issues that could arise during the production of an IRN BRU advertisement and contingency plans to deal with them. It identifies four categories of issues: technical, organizational, logistical, and personnel. Several potential problems are listed under each category along with the expected effect on production, a proposed solution or control measure, and the person responsible. Some examples include not having enough people if someone is ill, technical issues with camera equipment, poor audio or video quality, weather interfering with recording, loss of recorded work, and rooms not being available as scheduled. Contingency plans include postponing recordings, borrowing equipment, testing equipment functionality, backing up work, and efficiently using facilities. The responsibilities of crew members are also defined