The document describes a project to build a scale model construction crane. It will apply knowledge of mechanics, physics, and technical drawing learned over three years of study. The crane will use a pulley system with four pulleys, a counterweight to balance forces, a central pillar for stability, and a wide base to distribute weight and forces. It will demonstrate understanding of fixed pulleys, movable pulleys, composite pulley systems, and the formulas for mechanical advantage. The crane will be designed to achieve static equilibrium, where the sum of all forces and sum of all moments equal zero.