SlideShare a Scribd company logo
COMPANY
PROFILE
(966129U)
TABLE OF CONTENT
THE COMPANY
1
EXECUTIVE SUMMARY
2
BOARD OF DIRECTOR
3
THE SERVICES
5
PROJECT SUMMARIES
6
4 MANAGEMENT STRUCTURE
IPCSB has cumulative track record of various and wide range of projects in
civil engineering. Made up of specialist professional engineers and geologists
with in-depth theoretical and analytical knowledge which culminates in safe,
effective, economic and sustainable engineering consultancy and forensic
solutions.
THE COMPANY
IKRAM PREMIER CONSULTING 03
As the group broaden its horizons, an associate company, IKRAM Premier Consulting Sdn Bhd was
established to provide innovative and cost-effective consultancy solutions specifically in the areas of
civil, geotechnics, pavement, structure, pavement material, traffic engineering, architecture services
and quantity surveying services. Backed by the support from our valued customers, IKRAM Premier
Consulting is poised to meet the challenges of today’s competitive environment.
Registration No: 201101037995 (966129-U)
Incorporation Date : 31. Oct 2011
MOF : 465-02033960 Validity : (16.12.2021-19.12.2024)
BEM : 2212-1000-00000-MD-3 Validity : 31 DEC 2023
EXECUTIVE
SUMMARY Bank : CIMB ISLAMIC BERHAD
Account No : 86-0075211-9
Authorized Capital : RM 500,000.00
Paid Up Capital RM : 150,000.00
Current Asset RM : 8,760,235.00
Current Liabilities : RM 10,126,800.00
To Be The Premier Company For TOTAL
ENGINEERING CONSULTANCY SERVICES
Make continual improvements on our
services
Upgrade competencies through latest
technologies
Enhance human resource capabilities
Foster good customer elations
WE ARE COMMITTED TO
FINANCIAL
VISION
MISSION
IKRAM PREMIER CONSULTING 04
www.ikram.com.my
IKRAM PREMIER CONSULTING
www.ikram.com.my
Ir. Ts. Nor'aishah Md Ali
DIRECTOR
Ir. Mat Zin Hussain
B.sc Hons Civil ,San Diego State University,
California MIEM, PE No : 15644
Ar. Mohd Yusri Jamaluddin
Ba (Hons) (Architect), UTM
LAM : A/M212
PAM: M2591
OUR BOARD OF DIRECTOR
MSc (Geotechnical, UiTM BSc (Hons) (Civil), UiTM
MIEM, PE No : 13299
DIRECTOR
DIRECTOR
05
MANAGEMENT
STRUCTURE
06
About Service Team Project
06
IPC provide expertise in comprehensive investigation of
geotechnical failures, geotechnical evaluation, stability
determination and provides safe, cost-effective and
sustainable engineering design and solutions
GEOTECHNICAL &
GEO-ENVIRONMENTAL
GEOTECHNICAL FORENSIC & ENGINEERING CONSULTANCY
GEOLOGICAL & GEOMORPHOLOGIC
Utilize LiDAR technology to survey large areas and GIS
technology to produce various maps useful for land use
planning and overall slope management. Geomorphology have
helped engineers, planners, and attorneys from private and
public entities better understand how the built environment will
be impacted by natural processes
. INSTRUMENTATION AND MONITORING
Apart from design and investigation works, we are also
involved during the construction and implementation phases of
a project, we provide geotechnical instrumentation and real-
time monitoring services (before, during and after construction)
in association with our affiliate companies
GEOTECHNICAL AUDIT
Through comprehensive geotechnical engineering and
geological auditing process, to synchronize the consultant’s
design report and audit report hence establish quality
assurance assessment and control to create safe engineering
and sustainable solutions for proposed development projects
. GEO ENVIRONMENTAL
Provide specialized geo-environmental consultancy services
and solutions in environmental assessment, management and
rehabilitation for wide range of projects such as River of Live,
flood mitigation, road construction, slope remedial work etc
that helps in minimizing the impact of urbanization towards the
environment and strike the balance between social, economic
and environmental concerns
OUR
SERVICES
01
FLOOD MITIGATION
WORK
GEO-ENVIRONMENTAL
I
nfo Works ICM is advance
integrated catchment
modelling software for
modelling complex hydraulic
and hydrologic network
elements quickly , accurately
and collaboratively for water
and wastewater
07
GEOTECHNICAL FORENSICS
SLOPE FAILURE INVESTIGATION
AT CADANGAN SKIM BEKALAN
AIR KUALA TERENGGANU UTARA
BUKIT BERAPIT, KUALA
TERENGGANU
INTEGRITY STUDY AT PINTU
SUNGAI LOJI RAWATAN AIR
SUNGAI LINGGI
SLOPE FAILURE AT INSTITUT
AMINUDDIN BAKI CAWANGAN
GENTING HIGHLANDS, GENTING
08
About Service Team Project
09
Pavement, Highway Geometry & Traffic Engineering Design – Providing
engineering solutions employing advanced technologies and
implementation strategies
Public Transport Planning – Contributing solutions on public transport
accessibility and service planning to meet the current and future demands
Road Safety Studies – Research and review of international practices to
introduce road management schemes that enhance road safety
Traffic Simulation Modelling – Development of traffic simulation model
that replicates current traffic flow which allow the future forecasting
Adopting systematic approach in data gathering and understanding of the
nature of the problems, we satisfy our clients in their needs for Highway &
Transportation Engineering Consultancy services which include :
PAVEMENT HIGHWAY
& TRANSPORTATION
NETWORK AND PROJECT LEVEL PAVEMENT ASSESSMENT
Network Level Pavement Assessment – Develop and maintain fit-for-
purpose Pavement Management System (PMS) for roads and highways
network in Malaysia or abroad
Project Level Pavement Assessment – Detailed project level pavement
evaluation and rehabilitation design of existing pavements utilizing
systematic and well established methods, including the Mechanistic-
Empirical design tools and pavement recycling techniques
PAVEMENT AUDIT
Pavement Audit – Provide pavement audit services and quality
assurance assessment and control to ensure compliance to the
adopted standard and specifications
Feasibility Study & Travel Demand Forecasting – Accurate
forecasting of the travel demands on new and current road projects
to determine the cost benefits to road users
Traffic Impact Assessment – Entailing assessment of the expected
impact from the traffic generated by the proposed development to
the road network and identifying solutions to mitigate any adverse
impact
Construction supervision
Traffic control & management plan
Well exposed the works standard & specifications, industry best
practices and clients’ requirement, we assist in delivering quality
product and complying with traffic safety regulations through our
services in :
PAVEMENT FORENSIC & FAILURE INVESTIGATION
Dedicated team with specialized equipment is ever ready to be
mobilized to determine the causes of pavement failures through
comprehensive data gathering and analysis before any effective
solutions to mitigate the problem can be proposed
OUR
SERVICES
02
LIST OF
PROJECT SUMMARIES
www.ikram.com.my
10
ANIH BERHAD
JKR SABAH
IKRAM PAVES
(LABORATORY) SDN BHD
JPS
Proposed To Conduct The Pavement Condition Assessment (PCA) Along: 1. East
Coast Expressway (ECE1) 2. Kuala Lumpur - Karak (Partial Network Level 2017)
Kerja-Kerja Ujian Bahan untuk Sekolah Kebangsaan Tagasan Semporna,
Sabah. (5 Aug 2019 - 4 Sep 2019)
Cadangan Bagi Kerja-Kerja Penyediaan Pengurusan Aset Jalan Di Kawasan
Petaling Jaya Untuk Majlis Bandaraya Petaling Jaya
KERJA-KERJA PENYIASATAN TAPAK DAN KAJIAN GEOTEKNIKAL DI JALAN JALIL
PERKASA 19, TAMAN ESPLANADE, KUALA LUMPUR
RM3,446,536.41
RM248,050.00
RM 394,588.00
RM210,000.00
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
2017-2019
PROJECT SUMMARIES
Client Project Amount
JKR KEMAMAN Kerja-kerja Pembaikan Cerun Hadapan Rumah Tamu, Jalan Utama dan
Kuarters D3 Di Intan Kampus Wilayah Timur (INTIM) Kemaman, Terengganu
RM314,809.00
JKR KEDAH
DBKL
Projek Kerja Pembaikan Cerun Di Istana Kedah, Cameron Highland
Proposed pavement condition assessment (PCA) works and rehabilitation design
of the existing four-lane dual carriageway and overtaking land for pan borneo
highway-2018
RM 435,737.48
RM 11,000,000.00
DBKL
Detailed Design of Rectification, Upgrading and Strengthening Flood Wall
Within 10.7Km Along Sungai Klang And Sungai Gombak
RM 261,513.00
11
KIIC
KIIC / MEXAJATI
MBSA
MMC
Pavement Condition Assessment (PCA) Along East Coast Expressway (ECE) for
Year 2019
Design and Build For Slope Remedial Works at Murum Hydroelectric Project
(HEP), Sarawak
MBSA (J8 Kota Kemuning - Supervision)
PROPOSED DESIGN & CONSTRUCT A NEW PIT AREA AT COIL STORAGE BUILDING AT LOT
6343
RM 205,938.96
RM 200,000.00
RM277,288.00
RM291,000.00
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
2017-2019
PROJECT SUMMARIES
Client Project Amount
KPS-HCM Proposed Infrastructure Work For The Development of Phase 3C Lot 74079 Pulau
Indah Industrial park, Mukim Klang, Daerah Klang, selangor Darul Ehsan
RM300,000.00
MMC
PKNS
Cad. Pembinaan Langat Centralised Sewage Treatment Plant & Penyambungan
Rangkaian Paip Pembentungan di Kawasan Tadahan Lembangan Sungai Langat
Secara Reka Bina (Perundingan Januari - Jun 2019)
Structural & Geotechnical Assessment for Block F, Rumah Pangsa AU 1B, Taman
Keramat Permai, Ampang, Selangor
RM223,494.00
RM RM 465,841.90
PMSB
Cad. Pembinaan Langat Centralised Sewage Treatment Plant & Penyambungan
Rangkaian Paip Pembentungan di Kawasan Tadahan Lembangan Sungai Langat Secara
Reka Bina
RM266,798.00
12
MRCB Lingkaran Selatan
Sdn Bhd
PMSB
PMSB
PMSB
Consultancy Services For The Execution And Completion Of The Outstanding
Works For Eastern Dispersal Link (Edl) Johor Bahru, Johor
CADANGAN PEMBINAAN JAMBATAN KONKRIT UNTUK 4 LALUAN (132") DI ATAS
RIZAB SUNGAI SERENDAH
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN KILANG HIGH TENSILE
STRENGTH DI ATAS SEBAHAGIAN LOT 40481 (PT16027) (BUILDING)
PROPOSED RENOVATION & REFURBISHMENT CKD UTILIZATION WAREHOUSE AT LOT
6345 *CONTRACT AMOUNT 473085 (141789 (2019)) - 10% RETENTION
RM 361,000.00
RM261,000.00
RM 3,438,182.00
RM 473,085.00
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
2017-2019
PROJECT SUMMARIES
Client Project Amount
PMSB PPROPOSED DESIGN & CONSTRUCT NEW LOCKER ROOM 2 AT LOT 6343 RM
300,000.00
RM300,000.00
PMSB
PMSB
PHASE 2 - CADANGAN MEMBINA & MENYIAPKAN JALAN PERSENDIRIAN (EAST SITE ROAD)
66' BESERTA LAIN-LAIN BERKAITAN DI ATAS SEBAHAGIAN LOT PT 16027 (LOT 40481)
PROPOSED BUS TERMINAL, CANOPY WALKWAY AND ROADWORKS AT LOT 6343 FOR
PERODUA MANUFACTURING SDN BHD * (MAC-JUNE 2019) * Design issue (ADA EOT UNTIL
DEC) - 10% RETENTION AWARD (3.5M)
RM288,000.00
RM 210,000.00
PMSB
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH BANGUNAN DYNAMIC INSPECTION
DAN LAIN LAIN KERJA BERKAITAN DI ATAS LOT 6345
RM840,000.00
13
PMSB
PMSB
PMSB
Anih Berhad
Proposed refurbishment of PMSB canteen seksyen 20 Bandar Serendah Daerah
Hulu Selangor (Design & Build)
PHASE 1-CADANGAN MEMBINA & MENYIAPKAN JALAN PERSENDIRIAN (EAST SITE
ROAD) 66' BESERTA LAIN-LAIN BERKAITAN DI ATAS SEBAHAGIAN LOT PT 16027
(LOT 40481) * 10% RETENTION
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN KILANG HIGH TENSILE
STRENGTH DI ATAS SEBAHAGIAN LOT 40481 (PT16027) (EARTHWORKS)
Cadanganperlaksanaan kerja pavement condition assessment (PCA) bagikontrak
jangkapanjang penyelenggaraanjalan-jalan negeri di negeri Selangor- 2021
RM209,517.50
RM 276,000.00
RM279,000.00
RM5,000,000.00
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
2019-2021
PROJECT SUMMARIES
Client Project Amount
PMSB PROPOSED R&D TEST COURSE EXPANSION AT LOT 29139 & LOT 40481 RM250,600.00
PMSB
JPS
Proposed Hydraulic Servo Machine Building At Lot 29139, Seksyen 20, Bandar
Serendah, Daerah Hulu Selangor, Selangor Darul Ehsan For Perodua Manufacturing
Sdn Bhd (Start date : 1st Aug 2019 until 30rd March 2020) - RM357,180.00
REKABENTUK TERPERINCI PEMBANGUNAN LEMBANGAN SUNGAI BERSEPADU SG PERAK
FASA 1, RANCANGAN TEBATAN BANJIR LENGGONG FASA 1, DAERAH HULU PERAK, PERAK
RM357,180.00
RM1,795,310.00
KUMPULAN SEMESTA
SDN BHD
Cadangan perlaksanaan kerja pavement condition assessment (PCA) bagi lebuhraya
KL-Karak & Lebuhraya Pantai Timur Fasa 1.- 2021 - RM 3,9000,000.00
RM3,900,000.00
14
HCM Engineering Sdn Bhd
DBKL
DBKL
menaiktaraf Jalan Persekutuan FT004, Gerik/ Kupang/ Lunas dari Seksyen 23.10
ke seksyen 35.70 Kulim, Kedah -2021 (IPSB was appointed to involve in road
widening and pavement condition assessment of JKR road FT004)
CADANGAN REKABENTUK TERPERINCI RANCANGAN TEBATAN BANJIR SG TOBA,
KUALA LUMPUR
(FLYOVER) CADANGAN PENYURAIAN TRAFFIC DAN PENYAMBUNGAN JALAN IPOH KE
PASAR HARIAN SELAYANG, JALAN IPOH , MUKIM BATU, KUALA LUMPUR
MONITORING SUNGAI BUNUS - RM 377,874.91
RM6,000,000.50
RM 319,497.00
RM1,352,882.71
RM 377,874.91
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
2019-2021
PROJECT SUMMARIES
Client Project Amount
PAAB KEGAGALAN CERUN DI TAPAK ENAPCEMAR LRA SG. LINGGI, REMBAU NEGERI SEMBILAN RM227,863.00
DBKL CADANGAN MENAIKTARAF JALAN SELAYANG BARU, JALAN IPOH DAN JALAN-JALAN DI
SEKITARNYA BAGI PEMBANGUNAN SEMULA PASAR HARIAN SELAYANG, MUKIM BATU, KL
RM 1,239,765.26
GAYA ANALISA
15
KONSORTIUM KAJV SDN BHD
JKR PULAI PINANG
CADANGAN PEMBAIKAN CERUN RUNTUH DI LOKASI KAWASAN PROJEK CADANGAN
MEREKABENTUK & MEMBINA LOJI AIR 120 MLD DAN 28 MLD DAN LAIN-LAIN KERJA
YANG BERKAITAN BAGI CADANGAN SKIL BEKALAN AIR KUALA TERENGGANU UTARA
CADANGAN MENJALANKAN KERJA-KERJAKECEMASAN PEMBAIKANCERUN
AKIBATTANAH RUNTUH DI ATAS TANAHKERAJAAN LOT 1416 MUKIM 13 DAERAH
TIMUR LAUT
2022
RM
RM
RM
www.ikram.com.my
CENTRE OF ENGINEERING SOLUTION
Geotechnical
PROJECT SUMMARIES
Client Project Amount
15
PHOTO GALLERY
SLOPE FAILURE INVESTIGATION AT
CADANGAN SKIM BEKALAN AIR KUALA
TERENGGANU UTARA, BUKIT BERAPIT,
KUALA TERENGGANU.
CADANGAN
MEMPERTINGKATKAN SISTEM
PERPARITAN DAN
PENGURUSAN AIR HUJAN
UNTUK MENGATASI MASALAH
BANJIR KILAT DI JALAN CHERAS
BERHAMPIRAN TAMAN DESA
AMAN DAN TAMAN MUTIARA
BARAT
KAJIAN INTEGRITI JAMBATAN UNTUK JAMBATAN PULAU MELAKA,
MELAKA TENGAH
CENTRE OF ENGINEERING SOLUTION
CONTACT
US
Contact us to get more info
+603-87383644
2nd Floor, Block 5, Unipark Suria,
Jalan Ikram Uniten 43000 Kajang,
Selangor.
www.ikram.com.my

More Related Content

Similar to Company Profile IKRAM PREMIER CONSULTING

Presenattion on Intelligent Transport System (ITS)
Presenattion on Intelligent Transport System (ITS)Presenattion on Intelligent Transport System (ITS)
Presenattion on Intelligent Transport System (ITS)Maksudul Hasan Muvy
 
Akmal Azlan (CV & Cover Letter)
Akmal Azlan (CV & Cover Letter)Akmal Azlan (CV & Cover Letter)
Akmal Azlan (CV & Cover Letter)Akmal Azlan
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesIndiaMART InterMESH Limited
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015Obinna Ezeifedi
 
Cv Ir. Ainul Jamal bin Musa - 2020
Cv   Ir. Ainul Jamal bin Musa -  2020Cv   Ir. Ainul Jamal bin Musa -  2020
Cv Ir. Ainul Jamal bin Musa - 2020AINULJAMALMUSA
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL ProfileAP Murthy
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016Mohamed Gamal
 

Similar to Company Profile IKRAM PREMIER CONSULTING (20)

Presenattion on Intelligent Transport System (ITS)
Presenattion on Intelligent Transport System (ITS)Presenattion on Intelligent Transport System (ITS)
Presenattion on Intelligent Transport System (ITS)
 
Akmal Azlan (CV & Cover Letter)
Akmal Azlan (CV & Cover Letter)Akmal Azlan (CV & Cover Letter)
Akmal Azlan (CV & Cover Letter)
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
CV - Hassan Ssentamu
CV - Hassan SsentamuCV - Hassan Ssentamu
CV - Hassan Ssentamu
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV_MPS_Elango_Vadiveloo
CV_MPS_Elango_VadivelooCV_MPS_Elango_Vadiveloo
CV_MPS_Elango_Vadiveloo
 
Sanjay CV
Sanjay CVSanjay CV
Sanjay CV
 
balu UG
balu UGbalu UG
balu UG
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
mubashir C-V
mubashir C-Vmubashir C-V
mubashir C-V
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
Cv Ir. Ainul Jamal bin Musa - 2020
Cv   Ir. Ainul Jamal bin Musa -  2020Cv   Ir. Ainul Jamal bin Musa -  2020
Cv Ir. Ainul Jamal bin Musa - 2020
 
resume.b
resume.bresume.b
resume.b
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL Profile
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 

Recently uploaded

Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 

Recently uploaded (20)

Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 

Company Profile IKRAM PREMIER CONSULTING

  • 2. TABLE OF CONTENT THE COMPANY 1 EXECUTIVE SUMMARY 2 BOARD OF DIRECTOR 3 THE SERVICES 5 PROJECT SUMMARIES 6 4 MANAGEMENT STRUCTURE
  • 3. IPCSB has cumulative track record of various and wide range of projects in civil engineering. Made up of specialist professional engineers and geologists with in-depth theoretical and analytical knowledge which culminates in safe, effective, economic and sustainable engineering consultancy and forensic solutions. THE COMPANY IKRAM PREMIER CONSULTING 03 As the group broaden its horizons, an associate company, IKRAM Premier Consulting Sdn Bhd was established to provide innovative and cost-effective consultancy solutions specifically in the areas of civil, geotechnics, pavement, structure, pavement material, traffic engineering, architecture services and quantity surveying services. Backed by the support from our valued customers, IKRAM Premier Consulting is poised to meet the challenges of today’s competitive environment.
  • 4. Registration No: 201101037995 (966129-U) Incorporation Date : 31. Oct 2011 MOF : 465-02033960 Validity : (16.12.2021-19.12.2024) BEM : 2212-1000-00000-MD-3 Validity : 31 DEC 2023 EXECUTIVE SUMMARY Bank : CIMB ISLAMIC BERHAD Account No : 86-0075211-9 Authorized Capital : RM 500,000.00 Paid Up Capital RM : 150,000.00 Current Asset RM : 8,760,235.00 Current Liabilities : RM 10,126,800.00 To Be The Premier Company For TOTAL ENGINEERING CONSULTANCY SERVICES Make continual improvements on our services Upgrade competencies through latest technologies Enhance human resource capabilities Foster good customer elations WE ARE COMMITTED TO FINANCIAL VISION MISSION IKRAM PREMIER CONSULTING 04 www.ikram.com.my
  • 5. IKRAM PREMIER CONSULTING www.ikram.com.my Ir. Ts. Nor'aishah Md Ali DIRECTOR Ir. Mat Zin Hussain B.sc Hons Civil ,San Diego State University, California MIEM, PE No : 15644 Ar. Mohd Yusri Jamaluddin Ba (Hons) (Architect), UTM LAM : A/M212 PAM: M2591 OUR BOARD OF DIRECTOR MSc (Geotechnical, UiTM BSc (Hons) (Civil), UiTM MIEM, PE No : 13299 DIRECTOR DIRECTOR 05
  • 7. About Service Team Project 06 IPC provide expertise in comprehensive investigation of geotechnical failures, geotechnical evaluation, stability determination and provides safe, cost-effective and sustainable engineering design and solutions GEOTECHNICAL & GEO-ENVIRONMENTAL GEOTECHNICAL FORENSIC & ENGINEERING CONSULTANCY GEOLOGICAL & GEOMORPHOLOGIC Utilize LiDAR technology to survey large areas and GIS technology to produce various maps useful for land use planning and overall slope management. Geomorphology have helped engineers, planners, and attorneys from private and public entities better understand how the built environment will be impacted by natural processes . INSTRUMENTATION AND MONITORING Apart from design and investigation works, we are also involved during the construction and implementation phases of a project, we provide geotechnical instrumentation and real- time monitoring services (before, during and after construction) in association with our affiliate companies GEOTECHNICAL AUDIT Through comprehensive geotechnical engineering and geological auditing process, to synchronize the consultant’s design report and audit report hence establish quality assurance assessment and control to create safe engineering and sustainable solutions for proposed development projects . GEO ENVIRONMENTAL Provide specialized geo-environmental consultancy services and solutions in environmental assessment, management and rehabilitation for wide range of projects such as River of Live, flood mitigation, road construction, slope remedial work etc that helps in minimizing the impact of urbanization towards the environment and strike the balance between social, economic and environmental concerns OUR SERVICES 01
  • 8. FLOOD MITIGATION WORK GEO-ENVIRONMENTAL I nfo Works ICM is advance integrated catchment modelling software for modelling complex hydraulic and hydrologic network elements quickly , accurately and collaboratively for water and wastewater 07
  • 9. GEOTECHNICAL FORENSICS SLOPE FAILURE INVESTIGATION AT CADANGAN SKIM BEKALAN AIR KUALA TERENGGANU UTARA BUKIT BERAPIT, KUALA TERENGGANU INTEGRITY STUDY AT PINTU SUNGAI LOJI RAWATAN AIR SUNGAI LINGGI SLOPE FAILURE AT INSTITUT AMINUDDIN BAKI CAWANGAN GENTING HIGHLANDS, GENTING 08
  • 10. About Service Team Project 09 Pavement, Highway Geometry & Traffic Engineering Design – Providing engineering solutions employing advanced technologies and implementation strategies Public Transport Planning – Contributing solutions on public transport accessibility and service planning to meet the current and future demands Road Safety Studies – Research and review of international practices to introduce road management schemes that enhance road safety Traffic Simulation Modelling – Development of traffic simulation model that replicates current traffic flow which allow the future forecasting Adopting systematic approach in data gathering and understanding of the nature of the problems, we satisfy our clients in their needs for Highway & Transportation Engineering Consultancy services which include : PAVEMENT HIGHWAY & TRANSPORTATION NETWORK AND PROJECT LEVEL PAVEMENT ASSESSMENT Network Level Pavement Assessment – Develop and maintain fit-for- purpose Pavement Management System (PMS) for roads and highways network in Malaysia or abroad Project Level Pavement Assessment – Detailed project level pavement evaluation and rehabilitation design of existing pavements utilizing systematic and well established methods, including the Mechanistic- Empirical design tools and pavement recycling techniques PAVEMENT AUDIT Pavement Audit – Provide pavement audit services and quality assurance assessment and control to ensure compliance to the adopted standard and specifications Feasibility Study & Travel Demand Forecasting – Accurate forecasting of the travel demands on new and current road projects to determine the cost benefits to road users Traffic Impact Assessment – Entailing assessment of the expected impact from the traffic generated by the proposed development to the road network and identifying solutions to mitigate any adverse impact Construction supervision Traffic control & management plan Well exposed the works standard & specifications, industry best practices and clients’ requirement, we assist in delivering quality product and complying with traffic safety regulations through our services in : PAVEMENT FORENSIC & FAILURE INVESTIGATION Dedicated team with specialized equipment is ever ready to be mobilized to determine the causes of pavement failures through comprehensive data gathering and analysis before any effective solutions to mitigate the problem can be proposed OUR SERVICES 02
  • 12. ANIH BERHAD JKR SABAH IKRAM PAVES (LABORATORY) SDN BHD JPS Proposed To Conduct The Pavement Condition Assessment (PCA) Along: 1. East Coast Expressway (ECE1) 2. Kuala Lumpur - Karak (Partial Network Level 2017) Kerja-Kerja Ujian Bahan untuk Sekolah Kebangsaan Tagasan Semporna, Sabah. (5 Aug 2019 - 4 Sep 2019) Cadangan Bagi Kerja-Kerja Penyediaan Pengurusan Aset Jalan Di Kawasan Petaling Jaya Untuk Majlis Bandaraya Petaling Jaya KERJA-KERJA PENYIASATAN TAPAK DAN KAJIAN GEOTEKNIKAL DI JALAN JALIL PERKASA 19, TAMAN ESPLANADE, KUALA LUMPUR RM3,446,536.41 RM248,050.00 RM 394,588.00 RM210,000.00 www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical 2017-2019 PROJECT SUMMARIES Client Project Amount JKR KEMAMAN Kerja-kerja Pembaikan Cerun Hadapan Rumah Tamu, Jalan Utama dan Kuarters D3 Di Intan Kampus Wilayah Timur (INTIM) Kemaman, Terengganu RM314,809.00 JKR KEDAH DBKL Projek Kerja Pembaikan Cerun Di Istana Kedah, Cameron Highland Proposed pavement condition assessment (PCA) works and rehabilitation design of the existing four-lane dual carriageway and overtaking land for pan borneo highway-2018 RM 435,737.48 RM 11,000,000.00 DBKL Detailed Design of Rectification, Upgrading and Strengthening Flood Wall Within 10.7Km Along Sungai Klang And Sungai Gombak RM 261,513.00 11
  • 13. KIIC KIIC / MEXAJATI MBSA MMC Pavement Condition Assessment (PCA) Along East Coast Expressway (ECE) for Year 2019 Design and Build For Slope Remedial Works at Murum Hydroelectric Project (HEP), Sarawak MBSA (J8 Kota Kemuning - Supervision) PROPOSED DESIGN & CONSTRUCT A NEW PIT AREA AT COIL STORAGE BUILDING AT LOT 6343 RM 205,938.96 RM 200,000.00 RM277,288.00 RM291,000.00 www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical 2017-2019 PROJECT SUMMARIES Client Project Amount KPS-HCM Proposed Infrastructure Work For The Development of Phase 3C Lot 74079 Pulau Indah Industrial park, Mukim Klang, Daerah Klang, selangor Darul Ehsan RM300,000.00 MMC PKNS Cad. Pembinaan Langat Centralised Sewage Treatment Plant & Penyambungan Rangkaian Paip Pembentungan di Kawasan Tadahan Lembangan Sungai Langat Secara Reka Bina (Perundingan Januari - Jun 2019) Structural & Geotechnical Assessment for Block F, Rumah Pangsa AU 1B, Taman Keramat Permai, Ampang, Selangor RM223,494.00 RM RM 465,841.90 PMSB Cad. Pembinaan Langat Centralised Sewage Treatment Plant & Penyambungan Rangkaian Paip Pembentungan di Kawasan Tadahan Lembangan Sungai Langat Secara Reka Bina RM266,798.00 12
  • 14. MRCB Lingkaran Selatan Sdn Bhd PMSB PMSB PMSB Consultancy Services For The Execution And Completion Of The Outstanding Works For Eastern Dispersal Link (Edl) Johor Bahru, Johor CADANGAN PEMBINAAN JAMBATAN KONKRIT UNTUK 4 LALUAN (132") DI ATAS RIZAB SUNGAI SERENDAH CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN KILANG HIGH TENSILE STRENGTH DI ATAS SEBAHAGIAN LOT 40481 (PT16027) (BUILDING) PROPOSED RENOVATION & REFURBISHMENT CKD UTILIZATION WAREHOUSE AT LOT 6345 *CONTRACT AMOUNT 473085 (141789 (2019)) - 10% RETENTION RM 361,000.00 RM261,000.00 RM 3,438,182.00 RM 473,085.00 www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical 2017-2019 PROJECT SUMMARIES Client Project Amount PMSB PPROPOSED DESIGN & CONSTRUCT NEW LOCKER ROOM 2 AT LOT 6343 RM 300,000.00 RM300,000.00 PMSB PMSB PHASE 2 - CADANGAN MEMBINA & MENYIAPKAN JALAN PERSENDIRIAN (EAST SITE ROAD) 66' BESERTA LAIN-LAIN BERKAITAN DI ATAS SEBAHAGIAN LOT PT 16027 (LOT 40481) PROPOSED BUS TERMINAL, CANOPY WALKWAY AND ROADWORKS AT LOT 6343 FOR PERODUA MANUFACTURING SDN BHD * (MAC-JUNE 2019) * Design issue (ADA EOT UNTIL DEC) - 10% RETENTION AWARD (3.5M) RM288,000.00 RM 210,000.00 PMSB CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH BANGUNAN DYNAMIC INSPECTION DAN LAIN LAIN KERJA BERKAITAN DI ATAS LOT 6345 RM840,000.00 13
  • 15. PMSB PMSB PMSB Anih Berhad Proposed refurbishment of PMSB canteen seksyen 20 Bandar Serendah Daerah Hulu Selangor (Design & Build) PHASE 1-CADANGAN MEMBINA & MENYIAPKAN JALAN PERSENDIRIAN (EAST SITE ROAD) 66' BESERTA LAIN-LAIN BERKAITAN DI ATAS SEBAHAGIAN LOT PT 16027 (LOT 40481) * 10% RETENTION CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN KILANG HIGH TENSILE STRENGTH DI ATAS SEBAHAGIAN LOT 40481 (PT16027) (EARTHWORKS) Cadanganperlaksanaan kerja pavement condition assessment (PCA) bagikontrak jangkapanjang penyelenggaraanjalan-jalan negeri di negeri Selangor- 2021 RM209,517.50 RM 276,000.00 RM279,000.00 RM5,000,000.00 www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical 2019-2021 PROJECT SUMMARIES Client Project Amount PMSB PROPOSED R&D TEST COURSE EXPANSION AT LOT 29139 & LOT 40481 RM250,600.00 PMSB JPS Proposed Hydraulic Servo Machine Building At Lot 29139, Seksyen 20, Bandar Serendah, Daerah Hulu Selangor, Selangor Darul Ehsan For Perodua Manufacturing Sdn Bhd (Start date : 1st Aug 2019 until 30rd March 2020) - RM357,180.00 REKABENTUK TERPERINCI PEMBANGUNAN LEMBANGAN SUNGAI BERSEPADU SG PERAK FASA 1, RANCANGAN TEBATAN BANJIR LENGGONG FASA 1, DAERAH HULU PERAK, PERAK RM357,180.00 RM1,795,310.00 KUMPULAN SEMESTA SDN BHD Cadangan perlaksanaan kerja pavement condition assessment (PCA) bagi lebuhraya KL-Karak & Lebuhraya Pantai Timur Fasa 1.- 2021 - RM 3,9000,000.00 RM3,900,000.00 14
  • 16. HCM Engineering Sdn Bhd DBKL DBKL menaiktaraf Jalan Persekutuan FT004, Gerik/ Kupang/ Lunas dari Seksyen 23.10 ke seksyen 35.70 Kulim, Kedah -2021 (IPSB was appointed to involve in road widening and pavement condition assessment of JKR road FT004) CADANGAN REKABENTUK TERPERINCI RANCANGAN TEBATAN BANJIR SG TOBA, KUALA LUMPUR (FLYOVER) CADANGAN PENYURAIAN TRAFFIC DAN PENYAMBUNGAN JALAN IPOH KE PASAR HARIAN SELAYANG, JALAN IPOH , MUKIM BATU, KUALA LUMPUR MONITORING SUNGAI BUNUS - RM 377,874.91 RM6,000,000.50 RM 319,497.00 RM1,352,882.71 RM 377,874.91 www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical 2019-2021 PROJECT SUMMARIES Client Project Amount PAAB KEGAGALAN CERUN DI TAPAK ENAPCEMAR LRA SG. LINGGI, REMBAU NEGERI SEMBILAN RM227,863.00 DBKL CADANGAN MENAIKTARAF JALAN SELAYANG BARU, JALAN IPOH DAN JALAN-JALAN DI SEKITARNYA BAGI PEMBANGUNAN SEMULA PASAR HARIAN SELAYANG, MUKIM BATU, KL RM 1,239,765.26 GAYA ANALISA 15
  • 17. KONSORTIUM KAJV SDN BHD JKR PULAI PINANG CADANGAN PEMBAIKAN CERUN RUNTUH DI LOKASI KAWASAN PROJEK CADANGAN MEREKABENTUK & MEMBINA LOJI AIR 120 MLD DAN 28 MLD DAN LAIN-LAIN KERJA YANG BERKAITAN BAGI CADANGAN SKIL BEKALAN AIR KUALA TERENGGANU UTARA CADANGAN MENJALANKAN KERJA-KERJAKECEMASAN PEMBAIKANCERUN AKIBATTANAH RUNTUH DI ATAS TANAHKERAJAAN LOT 1416 MUKIM 13 DAERAH TIMUR LAUT 2022 RM RM RM www.ikram.com.my CENTRE OF ENGINEERING SOLUTION Geotechnical PROJECT SUMMARIES Client Project Amount 15
  • 18. PHOTO GALLERY SLOPE FAILURE INVESTIGATION AT CADANGAN SKIM BEKALAN AIR KUALA TERENGGANU UTARA, BUKIT BERAPIT, KUALA TERENGGANU. CADANGAN MEMPERTINGKATKAN SISTEM PERPARITAN DAN PENGURUSAN AIR HUJAN UNTUK MENGATASI MASALAH BANJIR KILAT DI JALAN CHERAS BERHAMPIRAN TAMAN DESA AMAN DAN TAMAN MUTIARA BARAT KAJIAN INTEGRITI JAMBATAN UNTUK JAMBATAN PULAU MELAKA, MELAKA TENGAH
  • 19. CENTRE OF ENGINEERING SOLUTION CONTACT US Contact us to get more info +603-87383644 2nd Floor, Block 5, Unipark Suria, Jalan Ikram Uniten 43000 Kajang, Selangor. www.ikram.com.my