MINCONSULT SDN BHD (OCT 2000 – PRESENT)
Assistant Resident Engineer
THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS
FOR KELANA JAYA (KLJ) LINE EXTENSION PROJECT
(September 2013 - Todate)
Client: Syarikat Prasarana Negara Berhad (SPNB)
Facilities Work Package A2 (Pier 137 to Pier 272): Quality Management and
Technical Supervision of the following works;
- Bore piling, pier pilecap, Pier column and Pier crosshead
- Single and Double track Segmental Box Girder erection by using Launching
Girder Method and stressing
- Segmental Box Girder erection by Segment Erector Method and stressing
(Special Crossing – 42m-65m-42m and 65m-100m-65m, straight and curve)
- Mechanical bearing installation and grouting
- Cast in-situ span
- Facilities and Systems work coordination (cable openings, shear dowel block
outs, hat bars, rail anchors)
- Drainage and existing road widening/reinstatement
- Review Method Statement, Shop Drawings and attend progress meetings
MPS ELANGO VADIVELOO
Assistant Resident Engineer
KELANA JAYA (KLJ) LINE EXTENSION PROJECT
CONSTRUCTION, COMPLETION AND COMMISSIONING OF
TELECOMMUNICATION, TNB 11KV, 33KV, LOW VOLTAGE CABLE
RELOCATION WORKS AND TNB HIGH VOLTAGE OVERHEAD
TRANSMISSION LINE RELOCATION WORKS
(July 2010 – September 2013)
Client: Syarikat Prasarana Negara Berhad (SPNB)
- Quality Management and Technical Supervision of utility
relocation works: Assigned as consultant’s Assistant Resident
Engineer for the utility relocation works (Low voltage and high
voltage TNB cables and Telecommunication cables – Telekom,
Maxis, Digi, Celcom, Timedot.com, ITIS) in the KELANA JAYA
(KLJ) LINE EXTENSION PROJECT. Responsible in Quality
Management and Technical Supervision, monitoring and reporting
on engineering and site activities including liaison with local
authorities, utility owners, review shop drawing, material approval,
Factory acceptance test, review work programme, quality plan,
weekly and monthly progress report, and prepare progress
payment for utilities relocation works.
- Prepare and verify Variation work for clients approval
- Review As-Built Drawings
Assistant Manager, Railway Division
PROPOSED MASTERPLAN FOR MIXED DEVELOPMENT ON
LOTS 20922, 20924 AND 20925 SUBANG FOR IMPIANA
IMPRESIF SDN BHD
Client: Bandaraya Development Bhd.
- Developed conceptual layout of the proposed KTMB Station
integrated with the development
- Preliminary engineering and preliminary cost estimate for the
proposed trackwork alignment and E&M Systems.
- Liaison with KTMB, Architect and Developer in
finalising/preparing the Master Plan
Detailed Design Consultancy Services for the Proposed
Kelana Jaya Line Extension Project (professional
engineering, Civil and Structural Engineering, Mechanical and
Electrical Engineering and System Works, architectural and
quantity surveying services relating to all specialised and
MPS ELANGO VADIVELOO
detailed designs as well as supervision of the works for the
implementation of the KLJ Line LRT Extension Project)
Client: Syarikat Prasarana Negara Berhad (SPNB)
Project management team member with key responsibilities in the
following system & facilities works;
1) LRT geometric alignment detail design (mainline, double ended
depot access, cross-over, pocket track, centre siding, stabling
lines, engineering track link, maintenance pit) in compliance with
NFPA 130, RTD and all light rail transit design criteria
2) Design development of Alignment control plan and plan and profile
for all trackworks.
3) Prepared rail track stage works implementation programme (North
and South depot access)
4) Prepared Systems/Interface tender Drawings (Schematic routing
plan for Power Supply & Distribution and Communication cable at
station /TPSS/Cross Over/ Centre Siding/ Pocket track, Rail
anchor and shear dowel block out location and details)
5) Identified interfacing works between facilities and System works
contractor
6) Interfacing/liaison engineer with Systems sub-consultant (Mott
MacDonald) on various E&M systems requirements including
power, signalling, telecommunications, SCADA, trackwork etc.
7) Presentation and briefing to the client on alignment design
aspects.
8) Preparation of Railway scheme and attendance to public feedback
followed by series of town hall meetings and presentation with
various authorities and resident associations.
9) Various alignment options study with relevant input in the
geometric alignment and trackworks
10) Preparation of alternative public transport proposal (Sunway and
Alam Megah route)
11) Involved in preparation of coordinated utility relocation drawings
with guideway sub-structure drawings
12) Preparation of utility clash analysis drawing for the utility
relocation work
13) Coordinating engineer between guideway and utility relocation
designers in providing necessary data/information/input for the
utility relocation works
13) Preparation of Utility relocation works (IWK, SYABAS, TMB, Digi,
Celcom, Maxis, Time.com & TNB) Tender drawings and
Specifications
Involved actively in the preparation and compilation of Functional
Requirement Manual, Performance Specification, Preliminary Design
Report, Detail Design Report/specification, Railway Scheme, EIA,
preliminary estimates and other milestone deliverables for the project
MPS ELANGO VADIVELOO
Kajian Peningkatan Infrastruktur Yang Sedia Ada -
Kajian Landasan Pintas Serendah - Pelabuhan Kelang - Seremban
(Feasibility Study for the Serendah - Port Kelang - Seremban Bypass :
Engineering, environment screening, economic/financial evaluation and
land use study)
Client: Keretapi Tanah Melayu Berhad (KTMB)
Project management team member in the following engineering
consultancy work;
a) Preparation of Terms of Reference for survey works
b) Planning of SI Works and preparation of Tender Documents
c) Preliminary conceptual engineering study of infrastructure
requirements
i. Identify and propose several alternative rail alignments and
evaluating suitability of each
ii. Preliminary horizontal and vertical alignment design.
iii. Preliminary bridge design and special structures conceptual
design
iv. Preliminary drainage design
v. Preliminary design of ground improvement works
vi. Preliminary design of building and miscellaneous structures
vii. Preliminary design of building services for stations
viii. Preliminary design for relocation of utilities / building services
(water supply, electrical and telecommunications)
ix. Preliminary design in trackworks, electrification, signaling,
communication and rolling stock requirement
d) Environmental screening
e) Land and property valuation
f) Transportation studies
g) Preliminary project cost estimate
h) Economic analysis
Railway Transport Master Plan Study For Sabah
Client: MESTAPEX Sdn Bhd
A team member in Providing professional input in regard of the railway
and economic elements of the study.
1) Railway Element of Study
To provide preliminary engineering and conceptual engineering
information in regard of trackworks, signalling, communication, rolling
stock, intermodal facilities, maintenance and operation facilities.
2) Economic Element of Study
Cost estimates of the railway element that including the capital and
operation / maintenance portions of the study. Analyse the revenue
streams, estimate project return indicators and carry out sensitivity tests.
MPS ELANGO VADIVELOO
Project Consultancy Services for The Proposed Monorail System for
the State of Penang (Engineering, land use study, SIA, socio-economic
study, economic/financial evaluation)
Client: Mott MacDonald (M) Berhad
STAGE A (Feasibility Study)
Key Project Team member involved actively as a project coordinator,
responsible for coordinating the Project Team and assisting the Project
Manager for overall output management, oversee and refine output to
client’s requirement of the Project including the following task;
- Preparation of Performance Specification
- Preliminary horizontal and vertical alignment design
- Preliminary Engineering and Conceptual Designs for
Foundations, Piers and Guideways
- Preliminary Designs of Stations, Depot and Ancillary Buildings
and liaison with architect
- Preliminary Engineering for Station Infrastructure Works
- Preliminary Plan for Relocation of Utilities (Water Supply,
Sewerage and buried pipes) and liaise with other divisions and
authorities
- Preliminary plan for relocation of utilities (Electrical &
Telecommunication) and liase with other divisions and
authorities
- Review the Socio economic study / Socio economic
assessment
- Review the Environmental Impact Assessment
- Estimate cost of property acquisition and liase with Property
Valuer
- Preliminary BQ and overall project cost estimate
- Preparation of Performance Specifications
- Preparation of Final Report
STAGE B (Bid Clarification)
- Assisting the Project Manager in responding to clarifications
from the Design and Build Contract Proponents
STAGE C (Bid Evaluation)
- Key team member involved actively in the Bid Evaluation
(Technical and Commercial) Exercise from the Design and
Build Contract Proponents
Feasibility study for the proposed LRT New Line (Kota Damansara-
CBD-Cheras) - Engineering, land use study, SIA, socio-economic study,
economic/financial evaluation
Client: Syarikat Prasarana Negara Berhad (SPNB)
Involved actively as a project coordinator, responsible for coordinating the
Project Team and assisting the Project Manager for overall management
of the Project including the following task;
MPS ELANGO VADIVELOO
- Airborne laser and digital imagery survey (for Digital Elevation Model
Extraction)
- Geotechnical investigation planning and execution of work at site
- Environmental base line monitoring
- Underground Utility Detection
- Socio Economic Study / Survey
- Land and Property Evaluation
- Sensitivity Testing
- Preliminary Engineering for Foundations, elevated guideways,
tunnels, stations, LRT Systems, power distribution, signalling, control
systems, building services, drainage and utility relocation
- Site reconnaissance to propose suitable station locations
- Liaison and coordinating meetings with various government authority
and agency, traffic consultant, developers, land owners, architects,
quantity surveyors, property valuers and land consultant
- Project preliminary cost estimation
- Preparation of Progress Report, Interim Report and Final report
Suncity Monorail Phase 2 Feasibility Study
Client: Suncity Sdn Bhd
- Assisted the Project manager in Supervising the implementation of
the study which involves Traffic studies and preliminary engineering of
structures and operating system of the monorail
Johor Bahru Monorail Pre-Feasibility Study
Client: Jalur Mudra Sdn Bhd
- Assisted the Project manager in carrying out preliminary assessment
on the feasibility of implementing a monorail system, preparation of a
preliminary alignment, economic evaluation and cost estimation
Divisional Task
 Establishment of Model Specification, Standard Drawings and Bill Of
Quantities
 To edit/review/update the existing railway engineering specification
to form the Model Specification for Minconsult
 To Provide Standard Drawings for the commonly executed
architectural and engineering designs
 To provide Standard railway engineering Bill of Quantities in
accordance to Civil Engineering Standard Method Of Measurement
published by the Institution of Civil Engineers and local practises
 Expression Of Interest (EOI), Tender Bid, Pre-Qualification and
Proposals
 Assist the Railway Division General Manager in Business
Development by participating, preparing and submitting Expression
Of Interest (EOI), Tender Bid, Pre-Qualification, technical &
commercial proposals and presentations to undertake projects
locally and internationally.
MPS ELANGO VADIVELOO
 Quality Management System
 Overall management and administration of divisional Quality
Management System in accordance to MS ISO 9001:2000
Assistant Resident Engineer
Electrified Double Track Project from Rawang to Ipoh
(Sep 2003 – July 2006)
Client: DRB HICOM BHD / UEMC BERHAD
- Quality Management and Technical Supervision of Civil, structural
and utility relocation works: Assigned as consultant’s Assistant
Resident Engineer for the Civil, structural and utility relocation
works (Water, electrical, sewerage & telecoms) in the Electrified
Double Track Project (EDTP). Responsible to assist the Resident
Engineer in Quality Management and Technical Supervision,
monitoring and reporting on engineering and site activities
including all civil, structural and utilities relocation works as listed
below.
Tapah and Kampar Yard
- Earthworks, Drainage works, Box Culvert Works and utility
relocation works.
Tapah and Kampar Freight and Passenger Station
- Steel Structural Works, Concrete Structural Works, Premix
pavement Works, Drainage works, concrete structural works and
utility relocation works (IWK, SYABAS, TMB, Celcom, Maxis,
Time.com & TNB)
Bridges
 3 Pedestrian and Motorcycle Bridges,
 5 Railway Bridges
 2 Road Bridges
- All sub-structure and superstructure works including Bore Piling
and Spun Piling Works, Post Tensioning of I-Beams, Beam
Launching, Maintained Load Test, Osterberg Test, Sonic logging
Test, PDA Test, Concrete Structural Works, earthworks, drainage
works and pavement works.
- Responsible for handing over of completed sub-ballast formation
from civil works contractor to Track work contractor, Review and
verification of Joint Measurement Sheets for progress and claims,
Review and approval of Method Statements, Review of temporary
works and Shop Drawings, Preparation of As-Built Drawings and
Preparation of Monthly Progress Reports.
- Liaison with relevant local authorities/utility companies for
approval and monitoring works between contractor and other third
parties.
- Testing and commissioning of water works on district water
reticulation system (Infra works).
- Review/Preparation of as-built drawings.
MPS ELANGO VADIVELOO
Engineer, Railway Division (Jan 2003 – May 2003)
Electrified Double Track Project from Parit Buntar to Pulau Pinang,
Malaysia
Client: DRB HICOM BHD
- Project Team Member responsible for the design review of preliminary
engineering design
- Technical and commercial proposal assistance to the client for
onwards submission to government
Kuantan-Kerteh Railway Project (Sep 2001 to Jan 2003)
Client: PETRONAS
- Assigned as consultant’s Assistant Resident Engineer for the
Permanent Way Works and Kertih, Gebeng and Kuantan yard civil
works in the Kuantan-Kerteh Railway Project (KKRP).
- Responsible for management, contract administration and
implementation of Quality Assurance and Quality Control of all
track works and yard civil works.
- Leading the team of track Permanent Way Inspectors and
Supervisors responsible for supervision and Quality Audit of all
track works for the project.
- Responsible for Procurement Audit of Track components like
concrete sleepers, ballasts, flash butt and aluminothermic welded
rail joints from indigenous sources to stringent safety
specifications required.
- Responsible for Construction Audit, involving taking over sub-
ballast formation, ballast laying and compaction, sleeper laying,
rail threading, final ballasting, stabilizing and distressing of 70km
Single New Railway track.
- Involved in weekly and monthly progress meetings among the
client, consultant and contractors, and tracked the progress using
Microsoft Project and March Chart.
- Advised client on technical issues on the construction, payments
to contractors and other matters pertaining to the contractors
execution of their contracts.
- Reviewed and approved contractors submission of plans, design
drawings, Method Statements, Test Procedures, Test Reports and
all relevant documents pertaining to the construction.
- Carried out factory inspections to ensure that the Point Operating
Mechanism manufacturing schedule was met and were
manufactured in accordance with Documented Quality procedures
in Kolkata, India.
MPS ELANGO VADIVELOO
- Planned and supervised the successful commissioning of
trackworks with Track Recording Car, EM 120.
- Administered submission of Handing Over Documents.
- Recommended to client the Mechanical Completion prior to Initial
Acceptance of the Project.
Graduate Engineer (April 2000 to Sep 2001)
Railway Division
- Preparation of the Invitation To Bid (ITB) for Package III (Yards,
Building and Workshop Equipment).
- Technical & Commercial Tender Evaluation team member for
Package III (Yards, Building and Workshop Equipment).
- Approved For Construction Drawing Management.
- Design and Coordination for Brunei LNG Railway Line,
Rehabilitation Project – Brunei.
- Preparation of technical and financial proposal for DRB-HICOM
for Electrified Double Track Project between Ipoh-Butterworth-
Padang Besar.
- Preparation of preliminary financial proposal for PJI Holdings for
Sudan Railway from Port Sudan-Haiya-Khartoum.
SHR ASSOCIATES SDN. BHD. (CONSULTING ENGINEERS)
(MAY 1999 TO APRIL 2000)
Graduate Engineer
Road Works
- Preparation and Submission of land Acquisition Plan to Authority.
- Pavement Design.
- Preparation of Bill of Quantities for Proposed Soil Investigation.
- Preparation of Bill of quantities for Road Works.
- Preparation of Preliminary Design for Road safety Audit.
Bridge Works
- Preparation of Hydrological calculation Using Rational Method.
- Preparation of General Arrangement Drawings for Submission to
Authority.
- Preparation of Bill of Quantities for Bridge Works.
- Grillage Analysis (By using – LEAP-5).
Building Works
- Retaining Wall Design.
- Design of 2 Storey School Building (By using – ESTEEM).
- Box Culvert Design.
- Building Water reticulation and connection design
MPS ELANGO VADIVELOO
ECK CONSTRUCTION SDN. BHD (MARCH 1999 TO MAY 1999)
Site Engineer
- Office administration, planning, structural, sub-structural, geotechnical,
road and drainage, sewage, water reticulation, utility relocation and
installation, construction supervision and contract management for the
172 units of double storey terrace houses in Batu Kawan, Pulau Pinang.
TAHIR WONG SDN BHD (MARCH 1998 TO MAY 1998)
Trainee Engineer
New North Klang Valley Bypass Toll Expressway in Klang
Piling Works
- Supervision of 300mm and 600mm precast spun piles driving
- Supervision of Load Tests (Maintained Load Tests).
Concreting
- Placing orders for concrete from an approved supplier.
- Inspection of the slump test and concrete cube test.
- Supervision of concreting works on site in the designated location.
- Inspection of Reinforcement Bars.
Post Tensioning
- Supervision of post tensioning works and Windsor Probe Tests for
cast in-situ I-Beams (Grade 60).
Civil Works
- Laying of Geotextiles, excavation works and the installation of the
Prefabricated Vertical Drain (PVD).
- Supervision of utility relocation works (Water, electrical, sewerage
& telecoms)

CV_MPS_Elango_Vadiveloo

  • 1.
    MPS ELANGO VADIVELOO Education: University Science of Malaysia (1996 - 1999) B. Eng in Civil Engineering Registration : Board of Engineers, Malaysia (Graduate) Nationality : Malaysian Born : 14 June 1975 MINCONSULT SDN BHD (OCT 2000 – PRESENT) Assistant Resident Engineer THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS FOR KELANA JAYA (KLJ) LINE EXTENSION PROJECT (September 2013 - Todate) Client: Syarikat Prasarana Negara Berhad (SPNB) Facilities Work Package A2 (Pier 137 to Pier 272): Quality Management and Technical Supervision of the following works; - Bore piling, pier pilecap, Pier column and Pier crosshead - Single and Double track Segmental Box Girder erection by using Launching Girder Method and stressing - Segmental Box Girder erection by Segment Erector Method and stressing (Special Crossing – 42m-65m-42m and 65m-100m-65m, straight and curve) - Mechanical bearing installation and grouting - Cast in-situ span - Facilities and Systems work coordination (cable openings, shear dowel block outs, hat bars, rail anchors) - Drainage and existing road widening/reinstatement - Review Method Statement, Shop Drawings and attend progress meetings
  • 2.
    MPS ELANGO VADIVELOO AssistantResident Engineer KELANA JAYA (KLJ) LINE EXTENSION PROJECT CONSTRUCTION, COMPLETION AND COMMISSIONING OF TELECOMMUNICATION, TNB 11KV, 33KV, LOW VOLTAGE CABLE RELOCATION WORKS AND TNB HIGH VOLTAGE OVERHEAD TRANSMISSION LINE RELOCATION WORKS (July 2010 – September 2013) Client: Syarikat Prasarana Negara Berhad (SPNB) - Quality Management and Technical Supervision of utility relocation works: Assigned as consultant’s Assistant Resident Engineer for the utility relocation works (Low voltage and high voltage TNB cables and Telecommunication cables – Telekom, Maxis, Digi, Celcom, Timedot.com, ITIS) in the KELANA JAYA (KLJ) LINE EXTENSION PROJECT. Responsible in Quality Management and Technical Supervision, monitoring and reporting on engineering and site activities including liaison with local authorities, utility owners, review shop drawing, material approval, Factory acceptance test, review work programme, quality plan, weekly and monthly progress report, and prepare progress payment for utilities relocation works. - Prepare and verify Variation work for clients approval - Review As-Built Drawings Assistant Manager, Railway Division PROPOSED MASTERPLAN FOR MIXED DEVELOPMENT ON LOTS 20922, 20924 AND 20925 SUBANG FOR IMPIANA IMPRESIF SDN BHD Client: Bandaraya Development Bhd. - Developed conceptual layout of the proposed KTMB Station integrated with the development - Preliminary engineering and preliminary cost estimate for the proposed trackwork alignment and E&M Systems. - Liaison with KTMB, Architect and Developer in finalising/preparing the Master Plan Detailed Design Consultancy Services for the Proposed Kelana Jaya Line Extension Project (professional engineering, Civil and Structural Engineering, Mechanical and Electrical Engineering and System Works, architectural and quantity surveying services relating to all specialised and
  • 3.
    MPS ELANGO VADIVELOO detaileddesigns as well as supervision of the works for the implementation of the KLJ Line LRT Extension Project) Client: Syarikat Prasarana Negara Berhad (SPNB) Project management team member with key responsibilities in the following system & facilities works; 1) LRT geometric alignment detail design (mainline, double ended depot access, cross-over, pocket track, centre siding, stabling lines, engineering track link, maintenance pit) in compliance with NFPA 130, RTD and all light rail transit design criteria 2) Design development of Alignment control plan and plan and profile for all trackworks. 3) Prepared rail track stage works implementation programme (North and South depot access) 4) Prepared Systems/Interface tender Drawings (Schematic routing plan for Power Supply & Distribution and Communication cable at station /TPSS/Cross Over/ Centre Siding/ Pocket track, Rail anchor and shear dowel block out location and details) 5) Identified interfacing works between facilities and System works contractor 6) Interfacing/liaison engineer with Systems sub-consultant (Mott MacDonald) on various E&M systems requirements including power, signalling, telecommunications, SCADA, trackwork etc. 7) Presentation and briefing to the client on alignment design aspects. 8) Preparation of Railway scheme and attendance to public feedback followed by series of town hall meetings and presentation with various authorities and resident associations. 9) Various alignment options study with relevant input in the geometric alignment and trackworks 10) Preparation of alternative public transport proposal (Sunway and Alam Megah route) 11) Involved in preparation of coordinated utility relocation drawings with guideway sub-structure drawings 12) Preparation of utility clash analysis drawing for the utility relocation work 13) Coordinating engineer between guideway and utility relocation designers in providing necessary data/information/input for the utility relocation works 13) Preparation of Utility relocation works (IWK, SYABAS, TMB, Digi, Celcom, Maxis, Time.com & TNB) Tender drawings and Specifications Involved actively in the preparation and compilation of Functional Requirement Manual, Performance Specification, Preliminary Design Report, Detail Design Report/specification, Railway Scheme, EIA, preliminary estimates and other milestone deliverables for the project
  • 4.
    MPS ELANGO VADIVELOO KajianPeningkatan Infrastruktur Yang Sedia Ada - Kajian Landasan Pintas Serendah - Pelabuhan Kelang - Seremban (Feasibility Study for the Serendah - Port Kelang - Seremban Bypass : Engineering, environment screening, economic/financial evaluation and land use study) Client: Keretapi Tanah Melayu Berhad (KTMB) Project management team member in the following engineering consultancy work; a) Preparation of Terms of Reference for survey works b) Planning of SI Works and preparation of Tender Documents c) Preliminary conceptual engineering study of infrastructure requirements i. Identify and propose several alternative rail alignments and evaluating suitability of each ii. Preliminary horizontal and vertical alignment design. iii. Preliminary bridge design and special structures conceptual design iv. Preliminary drainage design v. Preliminary design of ground improvement works vi. Preliminary design of building and miscellaneous structures vii. Preliminary design of building services for stations viii. Preliminary design for relocation of utilities / building services (water supply, electrical and telecommunications) ix. Preliminary design in trackworks, electrification, signaling, communication and rolling stock requirement d) Environmental screening e) Land and property valuation f) Transportation studies g) Preliminary project cost estimate h) Economic analysis Railway Transport Master Plan Study For Sabah Client: MESTAPEX Sdn Bhd A team member in Providing professional input in regard of the railway and economic elements of the study. 1) Railway Element of Study To provide preliminary engineering and conceptual engineering information in regard of trackworks, signalling, communication, rolling stock, intermodal facilities, maintenance and operation facilities. 2) Economic Element of Study Cost estimates of the railway element that including the capital and operation / maintenance portions of the study. Analyse the revenue streams, estimate project return indicators and carry out sensitivity tests.
  • 5.
    MPS ELANGO VADIVELOO ProjectConsultancy Services for The Proposed Monorail System for the State of Penang (Engineering, land use study, SIA, socio-economic study, economic/financial evaluation) Client: Mott MacDonald (M) Berhad STAGE A (Feasibility Study) Key Project Team member involved actively as a project coordinator, responsible for coordinating the Project Team and assisting the Project Manager for overall output management, oversee and refine output to client’s requirement of the Project including the following task; - Preparation of Performance Specification - Preliminary horizontal and vertical alignment design - Preliminary Engineering and Conceptual Designs for Foundations, Piers and Guideways - Preliminary Designs of Stations, Depot and Ancillary Buildings and liaison with architect - Preliminary Engineering for Station Infrastructure Works - Preliminary Plan for Relocation of Utilities (Water Supply, Sewerage and buried pipes) and liaise with other divisions and authorities - Preliminary plan for relocation of utilities (Electrical & Telecommunication) and liase with other divisions and authorities - Review the Socio economic study / Socio economic assessment - Review the Environmental Impact Assessment - Estimate cost of property acquisition and liase with Property Valuer - Preliminary BQ and overall project cost estimate - Preparation of Performance Specifications - Preparation of Final Report STAGE B (Bid Clarification) - Assisting the Project Manager in responding to clarifications from the Design and Build Contract Proponents STAGE C (Bid Evaluation) - Key team member involved actively in the Bid Evaluation (Technical and Commercial) Exercise from the Design and Build Contract Proponents Feasibility study for the proposed LRT New Line (Kota Damansara- CBD-Cheras) - Engineering, land use study, SIA, socio-economic study, economic/financial evaluation Client: Syarikat Prasarana Negara Berhad (SPNB) Involved actively as a project coordinator, responsible for coordinating the Project Team and assisting the Project Manager for overall management of the Project including the following task;
  • 6.
    MPS ELANGO VADIVELOO -Airborne laser and digital imagery survey (for Digital Elevation Model Extraction) - Geotechnical investigation planning and execution of work at site - Environmental base line monitoring - Underground Utility Detection - Socio Economic Study / Survey - Land and Property Evaluation - Sensitivity Testing - Preliminary Engineering for Foundations, elevated guideways, tunnels, stations, LRT Systems, power distribution, signalling, control systems, building services, drainage and utility relocation - Site reconnaissance to propose suitable station locations - Liaison and coordinating meetings with various government authority and agency, traffic consultant, developers, land owners, architects, quantity surveyors, property valuers and land consultant - Project preliminary cost estimation - Preparation of Progress Report, Interim Report and Final report Suncity Monorail Phase 2 Feasibility Study Client: Suncity Sdn Bhd - Assisted the Project manager in Supervising the implementation of the study which involves Traffic studies and preliminary engineering of structures and operating system of the monorail Johor Bahru Monorail Pre-Feasibility Study Client: Jalur Mudra Sdn Bhd - Assisted the Project manager in carrying out preliminary assessment on the feasibility of implementing a monorail system, preparation of a preliminary alignment, economic evaluation and cost estimation Divisional Task  Establishment of Model Specification, Standard Drawings and Bill Of Quantities  To edit/review/update the existing railway engineering specification to form the Model Specification for Minconsult  To Provide Standard Drawings for the commonly executed architectural and engineering designs  To provide Standard railway engineering Bill of Quantities in accordance to Civil Engineering Standard Method Of Measurement published by the Institution of Civil Engineers and local practises  Expression Of Interest (EOI), Tender Bid, Pre-Qualification and Proposals  Assist the Railway Division General Manager in Business Development by participating, preparing and submitting Expression Of Interest (EOI), Tender Bid, Pre-Qualification, technical & commercial proposals and presentations to undertake projects locally and internationally.
  • 7.
    MPS ELANGO VADIVELOO Quality Management System  Overall management and administration of divisional Quality Management System in accordance to MS ISO 9001:2000 Assistant Resident Engineer Electrified Double Track Project from Rawang to Ipoh (Sep 2003 – July 2006) Client: DRB HICOM BHD / UEMC BERHAD - Quality Management and Technical Supervision of Civil, structural and utility relocation works: Assigned as consultant’s Assistant Resident Engineer for the Civil, structural and utility relocation works (Water, electrical, sewerage & telecoms) in the Electrified Double Track Project (EDTP). Responsible to assist the Resident Engineer in Quality Management and Technical Supervision, monitoring and reporting on engineering and site activities including all civil, structural and utilities relocation works as listed below. Tapah and Kampar Yard - Earthworks, Drainage works, Box Culvert Works and utility relocation works. Tapah and Kampar Freight and Passenger Station - Steel Structural Works, Concrete Structural Works, Premix pavement Works, Drainage works, concrete structural works and utility relocation works (IWK, SYABAS, TMB, Celcom, Maxis, Time.com & TNB) Bridges  3 Pedestrian and Motorcycle Bridges,  5 Railway Bridges  2 Road Bridges - All sub-structure and superstructure works including Bore Piling and Spun Piling Works, Post Tensioning of I-Beams, Beam Launching, Maintained Load Test, Osterberg Test, Sonic logging Test, PDA Test, Concrete Structural Works, earthworks, drainage works and pavement works. - Responsible for handing over of completed sub-ballast formation from civil works contractor to Track work contractor, Review and verification of Joint Measurement Sheets for progress and claims, Review and approval of Method Statements, Review of temporary works and Shop Drawings, Preparation of As-Built Drawings and Preparation of Monthly Progress Reports. - Liaison with relevant local authorities/utility companies for approval and monitoring works between contractor and other third parties. - Testing and commissioning of water works on district water reticulation system (Infra works). - Review/Preparation of as-built drawings.
  • 8.
    MPS ELANGO VADIVELOO Engineer,Railway Division (Jan 2003 – May 2003) Electrified Double Track Project from Parit Buntar to Pulau Pinang, Malaysia Client: DRB HICOM BHD - Project Team Member responsible for the design review of preliminary engineering design - Technical and commercial proposal assistance to the client for onwards submission to government Kuantan-Kerteh Railway Project (Sep 2001 to Jan 2003) Client: PETRONAS - Assigned as consultant’s Assistant Resident Engineer for the Permanent Way Works and Kertih, Gebeng and Kuantan yard civil works in the Kuantan-Kerteh Railway Project (KKRP). - Responsible for management, contract administration and implementation of Quality Assurance and Quality Control of all track works and yard civil works. - Leading the team of track Permanent Way Inspectors and Supervisors responsible for supervision and Quality Audit of all track works for the project. - Responsible for Procurement Audit of Track components like concrete sleepers, ballasts, flash butt and aluminothermic welded rail joints from indigenous sources to stringent safety specifications required. - Responsible for Construction Audit, involving taking over sub- ballast formation, ballast laying and compaction, sleeper laying, rail threading, final ballasting, stabilizing and distressing of 70km Single New Railway track. - Involved in weekly and monthly progress meetings among the client, consultant and contractors, and tracked the progress using Microsoft Project and March Chart. - Advised client on technical issues on the construction, payments to contractors and other matters pertaining to the contractors execution of their contracts. - Reviewed and approved contractors submission of plans, design drawings, Method Statements, Test Procedures, Test Reports and all relevant documents pertaining to the construction. - Carried out factory inspections to ensure that the Point Operating Mechanism manufacturing schedule was met and were manufactured in accordance with Documented Quality procedures in Kolkata, India.
  • 9.
    MPS ELANGO VADIVELOO -Planned and supervised the successful commissioning of trackworks with Track Recording Car, EM 120. - Administered submission of Handing Over Documents. - Recommended to client the Mechanical Completion prior to Initial Acceptance of the Project. Graduate Engineer (April 2000 to Sep 2001) Railway Division - Preparation of the Invitation To Bid (ITB) for Package III (Yards, Building and Workshop Equipment). - Technical & Commercial Tender Evaluation team member for Package III (Yards, Building and Workshop Equipment). - Approved For Construction Drawing Management. - Design and Coordination for Brunei LNG Railway Line, Rehabilitation Project – Brunei. - Preparation of technical and financial proposal for DRB-HICOM for Electrified Double Track Project between Ipoh-Butterworth- Padang Besar. - Preparation of preliminary financial proposal for PJI Holdings for Sudan Railway from Port Sudan-Haiya-Khartoum. SHR ASSOCIATES SDN. BHD. (CONSULTING ENGINEERS) (MAY 1999 TO APRIL 2000) Graduate Engineer Road Works - Preparation and Submission of land Acquisition Plan to Authority. - Pavement Design. - Preparation of Bill of Quantities for Proposed Soil Investigation. - Preparation of Bill of quantities for Road Works. - Preparation of Preliminary Design for Road safety Audit. Bridge Works - Preparation of Hydrological calculation Using Rational Method. - Preparation of General Arrangement Drawings for Submission to Authority. - Preparation of Bill of Quantities for Bridge Works. - Grillage Analysis (By using – LEAP-5). Building Works - Retaining Wall Design. - Design of 2 Storey School Building (By using – ESTEEM). - Box Culvert Design. - Building Water reticulation and connection design
  • 10.
    MPS ELANGO VADIVELOO ECKCONSTRUCTION SDN. BHD (MARCH 1999 TO MAY 1999) Site Engineer - Office administration, planning, structural, sub-structural, geotechnical, road and drainage, sewage, water reticulation, utility relocation and installation, construction supervision and contract management for the 172 units of double storey terrace houses in Batu Kawan, Pulau Pinang. TAHIR WONG SDN BHD (MARCH 1998 TO MAY 1998) Trainee Engineer New North Klang Valley Bypass Toll Expressway in Klang Piling Works - Supervision of 300mm and 600mm precast spun piles driving - Supervision of Load Tests (Maintained Load Tests). Concreting - Placing orders for concrete from an approved supplier. - Inspection of the slump test and concrete cube test. - Supervision of concreting works on site in the designated location. - Inspection of Reinforcement Bars. Post Tensioning - Supervision of post tensioning works and Windsor Probe Tests for cast in-situ I-Beams (Grade 60). Civil Works - Laying of Geotextiles, excavation works and the installation of the Prefabricated Vertical Drain (PVD). - Supervision of utility relocation works (Water, electrical, sewerage & telecoms)