SlideShare a Scribd company logo
Reliable Partner
for
Balance of
Plant
We are a professionally
managed company with sound
technical background.
We are supported by our
Principals who have rich
experience over 15 years.
We have skilled work force to
execute specialized jobs even
of large magnitude.
Integrated Solutions
• Single point
responsibility for
Design, Engineering,
Supply, Erection &
Commissioning
• Flexibility for
Engineering changes
and Execution
• Ready Availability of
Vendor Base
• Simplified Co-
Ordination during
Project Execution
Structured Approach
• Concept to Execution –
Customized Workable Solutions
• Integrated delivery of diverse
products & systems
• Quality Checks at Every Stage of
Execution
• Experience in Executing Turn
Key Projects
• Trained Engineers, Managers
and Staff
Civil BOP
Civil Work :
• Chimney
• Eqpt. Foundations
• Wastewater Plants
• Equalization Tanks
• Water Storage Tanks
• Containment Basins
• Cooling Water Basins
• Effluent Channels
• Gardens
Mechanical BOP
Mechanical BOP :
• Coal Handling Plant
• Ash Handling Plant
• Plant Water Sys.
• Fuel Oil Sys.
• Fire Fighting Sys.
• Air Circulation Sys.
• Compressed Air Sys.
• Other Piping Sys.
• General Mechanical
Sys.
Electrical BOP
Electrical BOP :
• All Electrical
Distribution Sys.
• Switchgear and
Control Panel
Installations
• Control,
Instrumentation
and Automation
• Solar Power
Plant
Erection and
Commissioning
Erection &
Commissioning :
• Erection of Basic
Eqpt. Packages
• Project Management
• Commissioning
• Performance Testing
• Etc.
CORE STRENGTHS
• Application
Engineering
• Familiarity with
variety of Projects
and their
requirements
• Expertise in concept
to Execution
Contact At
UDADHI
INFRASTRUCTURE
Office # A-10, Gr. Floor,
BK Avenue, DP Road,
Opp. Paranjape School,
Kothrud, Pune - 411038
Phone : 0091-9422355563
Mobile : 0091-9730065654
E-mail : udadhi-ho@outlook.com

More Related Content

What's hot

Smart contractor positionning
Smart contractor positionningSmart contractor positionning
Smart contractor positionning
Laila Miyara
 
Type of work undertaken
Type of work undertakenType of work undertaken
Type of work undertaken
Paul Doughty
 
RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
RBS Group
 
Saikaat Saha CV
Saikaat Saha CVSaikaat Saha CV
Saikaat Saha CV
saikaat saha
 
Gps 2018
Gps 2018Gps 2018
Performance Resume 2
Performance Resume 2Performance Resume 2
Performance Resume 2
George Wright
 
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
Sustainable Business Partnership
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
Anthony Vitola
 
Graduation Project Work Progess (May 2014)
Graduation Project Work Progess (May 2014)Graduation Project Work Progess (May 2014)
Graduation Project Work Progess (May 2014)
Mostafa El-kaffas
 
Kenya internship
Kenya internshipKenya internship
Kenya internship
hojoman
 
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
Clay Asbury
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
Suman083479 suman123
 
Mark McCroy resume
Mark McCroy resumeMark McCroy resume
Mark McCroy resume
Mark McCroy mccroy
 
Case Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityCase Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown Reliability
Flex Process
 
MR LEE B C.V 2015
MR LEE B C.V 2015MR LEE B C.V 2015
MR LEE B C.V 2015
Lee Bellingham
 
Independent service for kkk turbines
Independent service for kkk turbinesIndependent service for kkk turbines
Independent service for kkk turbines
Lieve Van Hoey
 
ESL Line card
ESL Line cardESL Line card
ESL Line card
Daniel Anderson
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
Cüneyt Yurtseven
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
McKenney's Inc
 
Fuelco capability statement compressed
Fuelco capability statement compressedFuelco capability statement compressed
Fuelco capability statement compressed
S RK
 

What's hot (20)

Smart contractor positionning
Smart contractor positionningSmart contractor positionning
Smart contractor positionning
 
Type of work undertaken
Type of work undertakenType of work undertaken
Type of work undertaken
 
RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
 
Saikaat Saha CV
Saikaat Saha CVSaikaat Saha CV
Saikaat Saha CV
 
Gps 2018
Gps 2018Gps 2018
Gps 2018
 
Performance Resume 2
Performance Resume 2Performance Resume 2
Performance Resume 2
 
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
Graduation Project Work Progess (May 2014)
Graduation Project Work Progess (May 2014)Graduation Project Work Progess (May 2014)
Graduation Project Work Progess (May 2014)
 
Kenya internship
Kenya internshipKenya internship
Kenya internship
 
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Mark McCroy resume
Mark McCroy resumeMark McCroy resume
Mark McCroy resume
 
Case Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityCase Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown Reliability
 
MR LEE B C.V 2015
MR LEE B C.V 2015MR LEE B C.V 2015
MR LEE B C.V 2015
 
Independent service for kkk turbines
Independent service for kkk turbinesIndependent service for kkk turbines
Independent service for kkk turbines
 
ESL Line card
ESL Line cardESL Line card
ESL Line card
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
 
Fuelco capability statement compressed
Fuelco capability statement compressedFuelco capability statement compressed
Fuelco capability statement compressed
 

Similar to Company Presentation of Udadhi Infrastructure - BOP Division.

JGP Service Summary August 2016
JGP Service Summary August 2016JGP Service Summary August 2016
JGP Service Summary August 2016
John Glavey
 
ISS Company Profile 2015 most updated
ISS Company Profile 2015 most updatedISS Company Profile 2015 most updated
ISS Company Profile 2015 most updated
iss integrated saftey services
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
Dean McNulty
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
Peter Bright
 
iH Brochure
iH BrochureiH Brochure
iH Brochure
Laura Roberts
 
KONI RESUME
KONI RESUMEKONI RESUME
Turnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry ServicesTurnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry Services
raghunathan janarthanan
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
Girish Mishra
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
Allwyn Stanley
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
Allwyn Stanley
 
TES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_backTES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_back
Dave Simon
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
Maribel Renteria
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
Hussein Khalil
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017
Damian Connelly
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_web
Martin Kerrigan
 
Alzagon diversify inc 2014
Alzagon diversify inc 2014Alzagon diversify inc 2014
Alzagon diversify inc 2014
Jose F. Gonzalez, P. Eng.
 
Company Presentation of Udadhi Infrastructure
Company Presentation of Udadhi Infrastructure Company Presentation of Udadhi Infrastructure
Company Presentation of Udadhi Infrastructure
UDADHIINFRASTRUCTURE
 
Coates Hire Engineering Solutions - Temporary Works
Coates Hire Engineering Solutions - Temporary Works Coates Hire Engineering Solutions - Temporary Works
Coates Hire Engineering Solutions - Temporary Works
Rafi Tchopourian
 
LAR-MEX_BROCHURE
LAR-MEX_BROCHURELAR-MEX_BROCHURE
LAR-MEX_BROCHURE
Eric Montambeault
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
Allen Schmitgen
 

Similar to Company Presentation of Udadhi Infrastructure - BOP Division. (20)

JGP Service Summary August 2016
JGP Service Summary August 2016JGP Service Summary August 2016
JGP Service Summary August 2016
 
ISS Company Profile 2015 most updated
ISS Company Profile 2015 most updatedISS Company Profile 2015 most updated
ISS Company Profile 2015 most updated
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
iH Brochure
iH BrochureiH Brochure
iH Brochure
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 
Turnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry ServicesTurnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry Services
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
TES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_backTES_Brochure_Trifold_2015_back
TES_Brochure_Trifold_2015_back
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_web
 
Alzagon diversify inc 2014
Alzagon diversify inc 2014Alzagon diversify inc 2014
Alzagon diversify inc 2014
 
Company Presentation of Udadhi Infrastructure
Company Presentation of Udadhi Infrastructure Company Presentation of Udadhi Infrastructure
Company Presentation of Udadhi Infrastructure
 
Coates Hire Engineering Solutions - Temporary Works
Coates Hire Engineering Solutions - Temporary Works Coates Hire Engineering Solutions - Temporary Works
Coates Hire Engineering Solutions - Temporary Works
 
LAR-MEX_BROCHURE
LAR-MEX_BROCHURELAR-MEX_BROCHURE
LAR-MEX_BROCHURE
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 

Recently uploaded

Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptxExploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Elastostar Rubber Corporation
 
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
ch775c0l
 
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
es4hjcss
 
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
es4hjcss
 
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
ch775c0l
 
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
pv4uhplv
 
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for EntrepreneursComplete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Kopa Global Technologies
 

Recently uploaded (7)

Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptxExploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
Exploring the Contrast Silicone Sponge Rubber Versus Foam Rubber.pptx
 
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
在线办理(加拿大Concordia毕业证书)康考迪亚大学毕业证学历证书一模一样
 
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
1比1定做(aub毕业证书)伯恩茅斯艺术大学毕业证硕士学历证书原版一模一样
 
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
1:1制作英国伦敦大学毕业证(london毕业证书)学历学位证书原版一模一样
 
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
快速办理(McGill毕业证书)麦吉尔大学毕业证Offer一模一样
 
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
 
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for EntrepreneursComplete Self-write Restaurant Business Plan Guide for Entrepreneurs
Complete Self-write Restaurant Business Plan Guide for Entrepreneurs
 

Company Presentation of Udadhi Infrastructure - BOP Division.

  • 2. We are a professionally managed company with sound technical background. We are supported by our Principals who have rich experience over 15 years. We have skilled work force to execute specialized jobs even of large magnitude.
  • 3. Integrated Solutions • Single point responsibility for Design, Engineering, Supply, Erection & Commissioning • Flexibility for Engineering changes and Execution • Ready Availability of Vendor Base • Simplified Co- Ordination during Project Execution
  • 4. Structured Approach • Concept to Execution – Customized Workable Solutions • Integrated delivery of diverse products & systems • Quality Checks at Every Stage of Execution • Experience in Executing Turn Key Projects • Trained Engineers, Managers and Staff
  • 5. Civil BOP Civil Work : • Chimney • Eqpt. Foundations • Wastewater Plants • Equalization Tanks • Water Storage Tanks • Containment Basins • Cooling Water Basins • Effluent Channels • Gardens
  • 6. Mechanical BOP Mechanical BOP : • Coal Handling Plant • Ash Handling Plant • Plant Water Sys. • Fuel Oil Sys. • Fire Fighting Sys. • Air Circulation Sys. • Compressed Air Sys. • Other Piping Sys. • General Mechanical Sys.
  • 7. Electrical BOP Electrical BOP : • All Electrical Distribution Sys. • Switchgear and Control Panel Installations • Control, Instrumentation and Automation • Solar Power Plant
  • 8. Erection and Commissioning Erection & Commissioning : • Erection of Basic Eqpt. Packages • Project Management • Commissioning • Performance Testing • Etc.
  • 9. CORE STRENGTHS • Application Engineering • Familiarity with variety of Projects and their requirements • Expertise in concept to Execution
  • 10. Contact At UDADHI INFRASTRUCTURE Office # A-10, Gr. Floor, BK Avenue, DP Road, Opp. Paranjape School, Kothrud, Pune - 411038 Phone : 0091-9422355563 Mobile : 0091-9730065654 E-mail : udadhi-ho@outlook.com