SlideShare a Scribd company logo
SAIKAAT SAHA
E -M ai l : saikatme2008@gmail.com
Pho ne: +91 9993864777
MECHANICAL ENGINEERING
Targeting assignments in Mechanical Maintenance/Production/Inspection with Boiler
Manufacturing/ Energy & Environmental Engineering/Automobile Engineering /Heavy Machinery/
Valve Manufacturing industry preferably in Pune & Bangalore
P R O F I L E S U M M A R Y
• A focused professional with 07 years of experience in:
~Power Plant Operations & Maintenance ~ Installation & Commissioning ~ Vendor Management
~Boiler Operations ~ Technical Documentation ~ Maintenance Planning
~Quality Assurance & Control ~ Liaison & Coordination ~ Team Management
• Currently associated with 1920MW Lanco Amarkantak Power Ltd., Patadi, Korba as Senior Engineer
• Possess specialization in Boiler and Air Pre Heater (APH) in Thermal Power Plant and maintenance field
• Skilled in managing erection & commissioning of equipment, maintenance functions for reducing
breakdown / downtime and enhancing operational effectiveness
• Experience of working as Internal Lead Auditor and Safety Leader and gained working knowledge of SAP,
Water & Steam Systems
• Instrumental in implementing programs for ensuring attainment of growth and profit plans; providing
direction to operating units and participating in developing strategic plans
• Efficient organizer, motivator, team player and a decisive a leader with the ability to motivate teams to
excel and win
C O R E C O M P E T E N C I E S
• Managing strategic planning, analysis of Power Plant Projects including selection of Technology Partner and
Engineering Consultants
• Monitoring plant efficiency, preparing monthly progress report & schedules, power and energy production
cost report; initiating new schemes for formulation, sanctions and implementation
• Anchoring erection & commissioning operations and ensuring completion of project in minimum
turnaround time with effective resource utilisation to maximise the output
• Spearheading installation & commissioning as well as conducting tests & inspections to ensure operational
effectiveness of utilities; planning & effectuating maintenance plans for machines and equipment
• Executing operations of equipment in power plant ensuring execution of activities; rendering assistance in
commissioning of power plant equipment for planned shutdown/ overhauling
• Coordinating projects for strategic utilization & deployment of available resources for achieving
organizational objectives
O R G A N I S A T I O N A L E X P E R I E N C E
Since Sep’08: 1920MW Lanco Amarkantak Power Ltd, Patadi, Korba (C.G.) as Senior Engineer
O&M group for 2x300 MW of Lanco Amarkantak
Growth Path
Sep’08 – mm’09: Graduate Engineer Trainee
Mm’09 – mm’12: Mechanical Executive Engineer
Mm’12 – Present: Senior Mechanical Engineer
Role
• Administering maintenance of the pressure part of the boiler and air pre-heater
• De-metering (thickness survey) of pressure parts
• Managing the replacement of burner compartment and coal nozzle
• Performing 4 times overhauling of 2x300 MW units
• Maintaining the valves (safety valve) in pressure part
• Ensuring spare parts availability and development of indigenous spares
• Implementing and executing the plant equipment including preventive and predictive maintenance
• Contributing in rectification of faults / breakdowns from boiler area for continuous power generation
• Preparing documentation for capital budget and analysing breakdown and time delay in restoration
• Inspecting the work of outside contractors for accuracy and maintaining repair work for plant lines
• Ensuring up-to-date knowledge of plant & maintenance procedures and maintenance of plant equipment
including preventive and predictive maintenance for design improvement plans
• Executing repair development estimates, installation and maintenance work
Highlights
• Reduced downtime by 88.8%
• Received safety appreciation letter for maintaining good safety practice
• Successfully executed plant modification to reduce the APC by:
o Interconnection of HFO forwarding line of both unit
o Air pre-heater sector plate adjustment thereby reducing leakage in APH and reducing loading of ID fans
• Complete overhaul of APH, seal and basket replacement and adjustment for smooth operation of unit with
minimal losses and better efficiency
• Identification of duct leakages via oxygen mapping and ATT and attending the same during available
opportunity for reduction of fan loading
A C A D E M I C D E T A I L S
• Pursuing MBA (Operations Management) from Sikkim Manipal University
• B.E. (Mechanical Engineering) from Shri Shankaracharya College of Engineering and Technology, Bhilai,
Pandit Ravi Shankar Shukla University, Raipur in year 2008 with 6.9 CPI (1st class)
• 12th from AGEM School, Bhopal (M.P Board )
• 10th from AGEM School, Bhopal (M.P Board )
E X T R A C U R R I C U L A R A C T I V I T I E S
• Vice-captain of LANCO Amarkantak Power Ltd. cricket team
• Captain of winner volleyball team of LANCO Amarkantak Power Ltd.
• Member of collage cricket team in Inter Technical College Day Night Cricket Tournament
I T S K I L L S
• MS Office (Word, Excel and PowerPoint)
• SAP end-user
P E R S O N A L D E T A I L S
Date of Birth: 6th November 1985
Languages Known: Hindi, English & Bengali
Permanent Address: C-59, Parijat Extension, Nehru Nagar Bilaspur-495001
Present address: LAPLColony, Pathadi, Korba, Chhattisgarh-495677

More Related Content

What's hot

Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
Sudhanshu Mohan
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
Mahesh Patil
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
Arun Goyle
 
VATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATTVATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATT
Vatsal Bhatt
 
surya's resume
surya's resumesurya's resume
surya's resume
Suryanarayana Guruzu
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
Abdul Ahad shahzad
 
Linda_A_Ray1
Linda_A_Ray1Linda_A_Ray1
Linda_A_Ray1
Linda Ray
 
BIO DATA - kaushik - latest
BIO DATA - kaushik - latestBIO DATA - kaushik - latest
BIO DATA - kaushik - latest
Kaushik Rudra
 
arghadip
arghadiparghadip
arghadip
ARGHADIP PODDAR
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
Vijay thakur
 
Lawrence Bjornsson resume
Lawrence Bjornsson resumeLawrence Bjornsson resume
Lawrence Bjornsson resume
Larry Bjornsson
 
CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
Sayed Mosawi
 
Nitesh 1 pager CV Green
Nitesh 1 pager CV GreenNitesh 1 pager CV Green
Nitesh 1 pager CV Green
nitesh chaturvedi
 
RESUME_BA
RESUME_BARESUME_BA
RESUME_BA
Bill Adler
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
resume
resumeresume
Resume
ResumeResume
Resume Nikhil Sudan
Resume Nikhil SudanResume Nikhil Sudan
Resume Nikhil Sudan
NIKHIL SUDAN
 

What's hot (19)

Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
VATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATTVATSAL JANAKRAI BHATT
VATSAL JANAKRAI BHATT
 
surya's resume
surya's resumesurya's resume
surya's resume
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
 
Linda_A_Ray1
Linda_A_Ray1Linda_A_Ray1
Linda_A_Ray1
 
BIO DATA - kaushik - latest
BIO DATA - kaushik - latestBIO DATA - kaushik - latest
BIO DATA - kaushik - latest
 
arghadip
arghadiparghadip
arghadip
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
 
Lawrence Bjornsson resume
Lawrence Bjornsson resumeLawrence Bjornsson resume
Lawrence Bjornsson resume
 
CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
 
Nitesh 1 pager CV Green
Nitesh 1 pager CV GreenNitesh 1 pager CV Green
Nitesh 1 pager CV Green
 
RESUME_BA
RESUME_BARESUME_BA
RESUME_BA
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
resume
resumeresume
resume
 
Resume
ResumeResume
Resume
 
Resume Nikhil Sudan
Resume Nikhil SudanResume Nikhil Sudan
Resume Nikhil Sudan
 

Similar to Saikaat Saha CV

VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
Pancharathinam Venkadesan
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
kamal wadhwa
 
Santhosh Resume updated
Santhosh Resume updatedSanthosh Resume updated
Santhosh Resume updated
santhosh sreedharan
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
Reda Fathallah
 
CV rajesh
CV rajeshCV rajesh
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
Nishant Patil
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
Kunal Saha
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
venkata Narayana
 
Hari Prasath _N
Hari Prasath _NHari Prasath _N
Hari Prasath _N
Hari Prasath
 
R.Kumar
R.KumarR.Kumar
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
Prashant Maulikar
 
Resume R
Resume RResume R
Resume R
RISHIKESH YADAV
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
sanjeev kumar dogra
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
Avinash Bigbags
 
AKM
AKMAKM
Reliability Engineer
Reliability EngineerReliability Engineer
Reliability Engineer
Faisal Ghaffar
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
Kishor Pal
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu
 
Purushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMSPurushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMS
purushothaman kathaperumal
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
Ukeje Ev'rest
 

Similar to Saikaat Saha CV (20)

VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
 
Santhosh Resume updated
Santhosh Resume updatedSanthosh Resume updated
Santhosh Resume updated
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Hari Prasath _N
Hari Prasath _NHari Prasath _N
Hari Prasath _N
 
R.Kumar
R.KumarR.Kumar
R.Kumar
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume R
Resume RResume R
Resume R
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
AKM
AKMAKM
AKM
 
Reliability Engineer
Reliability EngineerReliability Engineer
Reliability Engineer
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Purushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMSPurushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMS
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 

Saikaat Saha CV

  • 1. SAIKAAT SAHA E -M ai l : saikatme2008@gmail.com Pho ne: +91 9993864777 MECHANICAL ENGINEERING Targeting assignments in Mechanical Maintenance/Production/Inspection with Boiler Manufacturing/ Energy & Environmental Engineering/Automobile Engineering /Heavy Machinery/ Valve Manufacturing industry preferably in Pune & Bangalore P R O F I L E S U M M A R Y • A focused professional with 07 years of experience in: ~Power Plant Operations & Maintenance ~ Installation & Commissioning ~ Vendor Management ~Boiler Operations ~ Technical Documentation ~ Maintenance Planning ~Quality Assurance & Control ~ Liaison & Coordination ~ Team Management • Currently associated with 1920MW Lanco Amarkantak Power Ltd., Patadi, Korba as Senior Engineer • Possess specialization in Boiler and Air Pre Heater (APH) in Thermal Power Plant and maintenance field • Skilled in managing erection & commissioning of equipment, maintenance functions for reducing breakdown / downtime and enhancing operational effectiveness • Experience of working as Internal Lead Auditor and Safety Leader and gained working knowledge of SAP, Water & Steam Systems • Instrumental in implementing programs for ensuring attainment of growth and profit plans; providing direction to operating units and participating in developing strategic plans • Efficient organizer, motivator, team player and a decisive a leader with the ability to motivate teams to excel and win C O R E C O M P E T E N C I E S • Managing strategic planning, analysis of Power Plant Projects including selection of Technology Partner and Engineering Consultants • Monitoring plant efficiency, preparing monthly progress report & schedules, power and energy production cost report; initiating new schemes for formulation, sanctions and implementation • Anchoring erection & commissioning operations and ensuring completion of project in minimum turnaround time with effective resource utilisation to maximise the output • Spearheading installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipment • Executing operations of equipment in power plant ensuring execution of activities; rendering assistance in commissioning of power plant equipment for planned shutdown/ overhauling • Coordinating projects for strategic utilization & deployment of available resources for achieving organizational objectives O R G A N I S A T I O N A L E X P E R I E N C E Since Sep’08: 1920MW Lanco Amarkantak Power Ltd, Patadi, Korba (C.G.) as Senior Engineer O&M group for 2x300 MW of Lanco Amarkantak Growth Path Sep’08 – mm’09: Graduate Engineer Trainee Mm’09 – mm’12: Mechanical Executive Engineer Mm’12 – Present: Senior Mechanical Engineer Role • Administering maintenance of the pressure part of the boiler and air pre-heater • De-metering (thickness survey) of pressure parts • Managing the replacement of burner compartment and coal nozzle • Performing 4 times overhauling of 2x300 MW units • Maintaining the valves (safety valve) in pressure part • Ensuring spare parts availability and development of indigenous spares • Implementing and executing the plant equipment including preventive and predictive maintenance • Contributing in rectification of faults / breakdowns from boiler area for continuous power generation
  • 2. • Preparing documentation for capital budget and analysing breakdown and time delay in restoration • Inspecting the work of outside contractors for accuracy and maintaining repair work for plant lines • Ensuring up-to-date knowledge of plant & maintenance procedures and maintenance of plant equipment including preventive and predictive maintenance for design improvement plans • Executing repair development estimates, installation and maintenance work Highlights • Reduced downtime by 88.8% • Received safety appreciation letter for maintaining good safety practice • Successfully executed plant modification to reduce the APC by: o Interconnection of HFO forwarding line of both unit o Air pre-heater sector plate adjustment thereby reducing leakage in APH and reducing loading of ID fans • Complete overhaul of APH, seal and basket replacement and adjustment for smooth operation of unit with minimal losses and better efficiency • Identification of duct leakages via oxygen mapping and ATT and attending the same during available opportunity for reduction of fan loading A C A D E M I C D E T A I L S • Pursuing MBA (Operations Management) from Sikkim Manipal University • B.E. (Mechanical Engineering) from Shri Shankaracharya College of Engineering and Technology, Bhilai, Pandit Ravi Shankar Shukla University, Raipur in year 2008 with 6.9 CPI (1st class) • 12th from AGEM School, Bhopal (M.P Board ) • 10th from AGEM School, Bhopal (M.P Board ) E X T R A C U R R I C U L A R A C T I V I T I E S • Vice-captain of LANCO Amarkantak Power Ltd. cricket team • Captain of winner volleyball team of LANCO Amarkantak Power Ltd. • Member of collage cricket team in Inter Technical College Day Night Cricket Tournament I T S K I L L S • MS Office (Word, Excel and PowerPoint) • SAP end-user P E R S O N A L D E T A I L S Date of Birth: 6th November 1985 Languages Known: Hindi, English & Bengali Permanent Address: C-59, Parijat Extension, Nehru Nagar Bilaspur-495001 Present address: LAPLColony, Pathadi, Korba, Chhattisgarh-495677