Project Manager – about 19 years Experience in
Project Management of Multiple Large EPC Projects in India, including Public sector and
Private Sector.
Industry Preference: Heavy Industry, Steel Plants, Oil Refineries, Chemical, Bulk Material Handling
SUMMARY
• 19 years experience in EPC project management of industrial projects in Public sector and Private sector.
• Focussed on resource planning & mobilising, team selection, developing project scope (budgets, timeline and delivery
dates), customer relationship, vendor and sub-contractors management, cost control and monitoring, conducting status
review meetings and customer reviews.
• Presently managing as Mechanical project manager of SAIL Rourkela HSM project at Odisha, India.
• Having working experience in Larsen & Toubro Limited, ECC Division (MMHW) for 19 years.
• Managed large EPC projects in Steel, Power, Petrochemicals Sector ensuring project delivery to meet organisational objectives, with
100% adherence to Health, Safety & Environment policy.
• Ensuring delivery of high quality services to support customer's business needs & achieve continued high customer satisfaction from
all operational users
• Well versed with MS Project and MS Office Suite; conversant with International Standards of project execution and quality
consciousness
• A strategist cum implementer with recognized proficiency in spearheading business to accomplish corporate plans and
goals successfully
Skill Set:
EPC Project Management Vendor Development Quality Control
Procurement Cost Estimation Safety Management
Management Information System (MIS) Client Servicing Resource Planning
JOB RESPONSIBILITIES
• To manage projects through all phases from Bidding to Capitalisation within Larsen & Toubro Limited.
• Managing Project Teams at Site and Corporate Office to ensure successful execution of a large EPC Projects of value over
500 Crore INR
• Contract Management, including interpretation of scope & specifications, payment terms, statutory requirements and bindings
• Claim Management including contractual claims and other claims viz insurance claims etc.
• Risk management identification of risks and updating the risk matrix and preparing mitigation plan and reporting to the
Divisional management
• Formulating of Project Budget and Time Schedule, Cash Flow Schedule, Resource Schedule including Manpower, Plant
& Machinery, and Bulk Materials etc.
• Active participation during tendering of the New project
• Liaison between various functional departments viz. Design Engineering, Procurement, QAQC, HSE, Finance & HR.
• Periodic project monitoring at Site and Review of Project Cost and Profitability and reporting the same to Divisional
Management.
• Working Capital Management including monitoring of timely invoicing, collection, optimisation of stock at site.
• Developing & implementing key procurement strategies; ensuring that plans are aligned with all contractual & statutory
requirements, holding techno-commercial discussion with buyers and finalising the order of products
• Ensuring purchase schedules against the purchase plan for timely procurement of various items, raw materials, capital
equipment & engineering spares to ensure smooth operations
• Vendor & Subcontractor Management and Development Establishing the productive & professional relationships with key
vendors in strict adherence with pre-set norms
• Monitoring the performance of suppliers and ensuring strict adherence & compliance to pre-set schedule; conducting price
negotiation & finalization of all bought-out items, raw materials & other commodities
ORGANISATIONAL EXPERIENCE
Since Aug’97: Larsen & Toubro Ltd. MMH Division.
Growth Path:
Aug’97 – June’99 Trainee Engineer – Projects
July’99 – June’05 Junior Engineer & Engineer – Projects
July’-05 –June’07 Executive Engineer, Projects
July’-07 –June’09 Executive Officer, Projects
July’09 – June-11 Asst. Construction Manager, Projects.
July’11 – Till Now Construction Manager, Projects
ACCOMPLISHMENTS
• At L&T, Since last 10 consecutive years being rated as Top performer for contribution towards project physical and
financial performance with highest standards of Safety and quality
• Successfully implemented a MSP based project monitoring system in SAIL-ISP, SAIL-RSP, SAIL-DSP project for a seamless
and accurate tracking and monitoring of project progress.
• Took personal initiative upon new vendor development and successfully identified and introduced several vendors in L&T in
past 10 years.
PREVIOUS EXPERIENCE
Aug ’97 - Aug’ 16 Larsen & Toubro Limited
Joined as Trainee Engineer and presently rose to the positon of Construction Manager – Mechanical i.e. (8 levels within a
span of 17 years excluding 2 years as Trainee)
Highlights:
As Construction Manager – Mechanical
• Acted as Project Manager Mechanical for 3MTPA Hot Strip Mill EPC Project at RSP & Project Coordinator for L&T for 0.37 MTPA
Coke Oven EPC Project at SAIL Durgapur
• Monitored Project Engineering progress, supply of equipment’s to be installed, Execution progress ,Resource flow, cost & schedule
compliance of systems and verified reconciliations to ensure operational excellence
• Generated and maintained yearly budget for the cluster and got the same approved from the management
• Reviewed performance reports and job cost reports extracted monthly to monitor the financial health of the projects and took required
corrective actions to maintain the profitability of the Business Units & Cluster.
As Asst. Manager – Mechanical
• Acted as Project Coordinator from cluster for Ferrous Business unit EPC Projects in Eastern India in projects like – 3.5 MTPA Sinter
Plant project at Rourkela, 4.6 MTPA Sinter Plant project at ISP Burnpur, 2.5 MTPA Bhushan Blast Furnace.
• Monitored Project Engineering progress, supply of equipment’s to be installed, Execution progress ,Resource flow, cost & schedule
compliance of systems and verified reconciliations to ensure operational excellence
• Regular visit to project site for meeting clients and review of job progress
• Generated and maintained yearly budget for the cluster and got the same approved from the management
• Reviewed performance reports and job cost reports extracted monthly to monitor the financial health of the projects and took required
corrective actions to maintain the profitability of the Business Units & Cluster.
As Sr. Engineer – Mechanical Planning In-charge (2.3 MTPA Tata Steel Sinter Plant EPC project)
• Looked after project Planning and monitoring from project site
• Monitored Engineering & Supply progress w.r.t schedule and review of site progress with project team.
• Planed and monitored resource utilization to the optimum level.
• Submission and collection of invoices from client and certification of sub-contractor measurement
• Presenting the project status at various forum of internal management and customers
As Engineer – Mechanical (Construction Engineer along with Mechanical Planning; Tata Steel G- Blast Furnace, CPP Nalco, CPP
Talcher Project)
• Supervised entire Piping work of G- Blast Furnace including supply follow up and engineering coordination’s.
• Planned and monitored resources to ensure optimum level
• Looked after Sub-contractor Management during execution stage towards achieving the targeted financial objectives
As Junior Engineer & Trainee Engineer – Mechanical (Site Construction Engineer)
• As Mechanical Erection Engineer accountable for execution of Power Cycle Piping at CPP Nalco and NTPC Kaniha Thermal power
project.
• Supervised Rack Piping work at IOCL Barauni Refinery expansion project
• Supervised Fabrication and Erection of various Stainless Steel, Alloy Steel& Carbon Steel Piping at Hydro Cracker of Numaligarh
Refinery Limited at Assam in a Green field project.
• Examined drawings and carried out execution ensuring adherence to safety compliance
Accomplishment:
• Acknowledged as a Top Performer in Larsen & Toubro Limited, ECC Division each year since 2004 to 2009.
PROJECTS
Larsen & Toubro Ltd.
• 3 MTPA Hot Strip Mill Package for SAIL –Rourkela , Odisha, India – EPC Contract
• 0.37MTPA Coke Oven project for SAIL- Durgapur, West Bengal, India – EPC Contract
• SMS Project at JSPL for Jindal Steel and Power – Angul,Odisha, India – Item Rate Contract
• 2.5 MTPA Blast Furnace package for Bhushan Steel- Angul,Odisha, - EPC Contract
• 3.5 MTPA Sinter Plant project for SAIL- Rourkela, Odisha ,India –EPC Contract
• 4.6 MTPA Sinter Plant project for SAIL –ISP ,West Bengal, India- EPC Contract
• 2.3 MTPA Sinter Plant project for TATA Steel ,Jamshedpur, India- EPC Contract
• G Blast Furnace Upgradation project for TATA Steel ,Jamshedpur, India- Semi EPC Contract
• Power Cycle Piping for CPP Nalco for NALCO - Angul ,India – Item Rate Contract
• Power Cycle Piping for 4x500 MW NTPC KANIHA for NTPC - Talcher ,India – Item Rate Contract
• Expansion of Barauni Refinery for IOCL, Bihar, India – LSTK Project
• Hydro Cracker Unit at Numaligarh Refinery Limited for BPCL , Golaghat, Assam, India- Item Rate Contract
PROFESSIONAL ENHANCEMENTS
• Successfully completed Management Development programme (Faculty of XLRI Jamshedpur)
• Successfully completed Executive Development programme (Faculty of Symbiosis University –Pune)
ACADEMIC DETAILS
• B.S. Engineering Technology from Birla Institute of Technology and Science (BITS), Pilani (WILP) in 2012
• Diploma in Mechanical Engineering from MBC Institute of Government Polytechnic, Burdwan in 1997
PERSONAL DETAILS
Date of Birth: 12th
December 1975
Address: 76/3 M G Road, Haridevpur, Kolkata – 700082, WB
Languages: English, Bengali ,Hindi and Odiya.

More Related Content

What's hot

Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
Steve Wonnacott
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz HabidFeroz Habid
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyParan K
 
TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract Tivra Tarun
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newK K Jalori
 
Resume latest
Resume latestResume latest
Resume latest
Salazar Mugong Caluang
 
Updated CV
Updated CVUpdated CV
Updated CV
Arun Kumar Gupta
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir Tolouei
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna ResumeKrishna avs
 

What's hot (19)

Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Resume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamyResume-ParanthamanKrishnasamy
Resume-ParanthamanKrishnasamy
 
Resume
ResumeResume
Resume
 
TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract TIVRA TARUN -Commercial & Contract
TIVRA TARUN -Commercial & Contract
 
nazeemres
nazeemresnazeemres
nazeemres
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori new
 
Resume latest
Resume latestResume latest
Resume latest
 
AK+CV
AK+CVAK+CV
AK+CV
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modified
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna Resume
 

Viewers also liked

Donders Tempi di Reazione
Donders Tempi di Reazione Donders Tempi di Reazione
Donders Tempi di Reazione
PERUSSIA #psicotenica
 
Psicotecnica
PsicotecnicaPsicotecnica
Psicotecnica
PERUSSIA #psicotenica
 
El turismo diana jojoa
El turismo diana jojoaEl turismo diana jojoa
El turismo diana jojoamarce1998
 
Torino Psicologi universitari
Torino Psicologi universitariTorino Psicologi universitari
Torino Psicologi universitari
PERUSSIA #psicotenica
 
Corporate profile
Corporate profileCorporate profile
Corporate profile
hcgroup
 
Redessociales4 a
Redessociales4 aRedessociales4 a
Redessociales4 alupitakhia
 
Terza Forza
Terza ForzaTerza Forza
Secuencias didácticas
Secuencias didácticasSecuencias didácticas
Secuencias didácticas
Ramos Laura
 
Modelo elaboracao trabalho_academico_2012
Modelo elaboracao trabalho_academico_2012Modelo elaboracao trabalho_academico_2012
Modelo elaboracao trabalho_academico_2012Heitor Aguiar
 
المعلم الالكتروني
المعلم الالكترونيالمعلم الالكتروني
المعلم الالكتروني
امل العايد
 
6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
 6acfbd164b5fb1607d886eaa50548962 fswd-big_picture 6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
Emad Elmogy
 
Howard mark schultz
Howard mark schultzHoward mark schultz
Howard mark schultz
shruthi nair
 
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attualeIpnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
Nicola Piccinini
 
SWOT Sawahlunto
SWOT SawahluntoSWOT Sawahlunto
SWOT Sawahlunto
Ayuni Rizkia
 
مستحدثات تكنولوجيا التعليم
مستحدثات تكنولوجيا التعليممستحدثات تكنولوجيا التعليم
مستحدثات تكنولوجيا التعليم
امل العايد
 
Proceso de campo infantil
Proceso de campo infantilProceso de campo infantil
Proceso de campo infantil
Alexis Bracamontes
 

Viewers also liked (20)

Donders Tempi di Reazione
Donders Tempi di Reazione Donders Tempi di Reazione
Donders Tempi di Reazione
 
Shruthi Nair
Shruthi NairShruthi Nair
Shruthi Nair
 
Psicotecnica
PsicotecnicaPsicotecnica
Psicotecnica
 
El turismo diana jojoa
El turismo diana jojoaEl turismo diana jojoa
El turismo diana jojoa
 
Torino Psicologi universitari
Torino Psicologi universitariTorino Psicologi universitari
Torino Psicologi universitari
 
Corporate profile
Corporate profileCorporate profile
Corporate profile
 
Redessociales4 a
Redessociales4 aRedessociales4 a
Redessociales4 a
 
Terza Forza
Terza ForzaTerza Forza
Terza Forza
 
Musculos expo alexis (2)
Musculos expo alexis (2)Musculos expo alexis (2)
Musculos expo alexis (2)
 
Facebook
FacebookFacebook
Facebook
 
Secuencias didácticas
Secuencias didácticasSecuencias didácticas
Secuencias didácticas
 
Modelo elaboracao trabalho_academico_2012
Modelo elaboracao trabalho_academico_2012Modelo elaboracao trabalho_academico_2012
Modelo elaboracao trabalho_academico_2012
 
المعلم الالكتروني
المعلم الالكترونيالمعلم الالكتروني
المعلم الالكتروني
 
6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
 6acfbd164b5fb1607d886eaa50548962 fswd-big_picture 6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
6acfbd164b5fb1607d886eaa50548962 fswd-big_picture
 
Howard mark schultz
Howard mark schultzHoward mark schultz
Howard mark schultz
 
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attualeIpnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
Ipnosi e Psicoterapia Ipnotica: un aggiornamento sulla situazione attuale
 
SWOT Sawahlunto
SWOT SawahluntoSWOT Sawahlunto
SWOT Sawahlunto
 
6. quistes hepaticos
6.  quistes hepaticos6.  quistes hepaticos
6. quistes hepaticos
 
مستحدثات تكنولوجيا التعليم
مستحدثات تكنولوجيا التعليممستحدثات تكنولوجيا التعليم
مستحدثات تكنولوجيا التعليم
 
Proceso de campo infantil
Proceso de campo infantilProceso de campo infantil
Proceso de campo infantil
 

Similar to CV_SUMAN MUKHERJEE- JULY-16

Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
Anuraj Panicker
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_shailendra kumar
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
sachin tagalpallewar
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
MOHAMMAD VASIL K
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016mohd hamid
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 

Similar to CV_SUMAN MUKHERJEE- JULY-16 (20)

Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Naresh Resume
Naresh Resume Naresh Resume
Naresh Resume
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
CV Dip 03-11-15
CV Dip 03-11-15CV Dip 03-11-15
CV Dip 03-11-15
 
Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 

CV_SUMAN MUKHERJEE- JULY-16

  • 1. SUMAN MUKHERJEE (Manager – Projects @ Larsen & Toubro Limited) suman083479@rediffmail.com +91 9903026229 Project Manager – about 19 years Experience in Project Management of Multiple Large EPC Projects in India, including Public sector and Private Sector. Industry Preference: Heavy Industry, Steel Plants, Oil Refineries, Chemical, Bulk Material Handling SUMMARY • 19 years experience in EPC project management of industrial projects in Public sector and Private sector. • Focussed on resource planning & mobilising, team selection, developing project scope (budgets, timeline and delivery dates), customer relationship, vendor and sub-contractors management, cost control and monitoring, conducting status review meetings and customer reviews. • Presently managing as Mechanical project manager of SAIL Rourkela HSM project at Odisha, India. • Having working experience in Larsen & Toubro Limited, ECC Division (MMHW) for 19 years. • Managed large EPC projects in Steel, Power, Petrochemicals Sector ensuring project delivery to meet organisational objectives, with 100% adherence to Health, Safety & Environment policy. • Ensuring delivery of high quality services to support customer's business needs & achieve continued high customer satisfaction from all operational users • Well versed with MS Project and MS Office Suite; conversant with International Standards of project execution and quality consciousness • A strategist cum implementer with recognized proficiency in spearheading business to accomplish corporate plans and goals successfully Skill Set: EPC Project Management Vendor Development Quality Control Procurement Cost Estimation Safety Management Management Information System (MIS) Client Servicing Resource Planning JOB RESPONSIBILITIES • To manage projects through all phases from Bidding to Capitalisation within Larsen & Toubro Limited. • Managing Project Teams at Site and Corporate Office to ensure successful execution of a large EPC Projects of value over 500 Crore INR • Contract Management, including interpretation of scope & specifications, payment terms, statutory requirements and bindings • Claim Management including contractual claims and other claims viz insurance claims etc. • Risk management identification of risks and updating the risk matrix and preparing mitigation plan and reporting to the Divisional management • Formulating of Project Budget and Time Schedule, Cash Flow Schedule, Resource Schedule including Manpower, Plant & Machinery, and Bulk Materials etc. • Active participation during tendering of the New project • Liaison between various functional departments viz. Design Engineering, Procurement, QAQC, HSE, Finance & HR. • Periodic project monitoring at Site and Review of Project Cost and Profitability and reporting the same to Divisional Management. • Working Capital Management including monitoring of timely invoicing, collection, optimisation of stock at site. • Developing & implementing key procurement strategies; ensuring that plans are aligned with all contractual & statutory requirements, holding techno-commercial discussion with buyers and finalising the order of products • Ensuring purchase schedules against the purchase plan for timely procurement of various items, raw materials, capital equipment & engineering spares to ensure smooth operations • Vendor & Subcontractor Management and Development Establishing the productive & professional relationships with key vendors in strict adherence with pre-set norms • Monitoring the performance of suppliers and ensuring strict adherence & compliance to pre-set schedule; conducting price negotiation & finalization of all bought-out items, raw materials & other commodities ORGANISATIONAL EXPERIENCE Since Aug’97: Larsen & Toubro Ltd. MMH Division. Growth Path: Aug’97 – June’99 Trainee Engineer – Projects July’99 – June’05 Junior Engineer & Engineer – Projects July’-05 –June’07 Executive Engineer, Projects July’-07 –June’09 Executive Officer, Projects July’09 – June-11 Asst. Construction Manager, Projects. July’11 – Till Now Construction Manager, Projects
  • 2. ACCOMPLISHMENTS • At L&T, Since last 10 consecutive years being rated as Top performer for contribution towards project physical and financial performance with highest standards of Safety and quality • Successfully implemented a MSP based project monitoring system in SAIL-ISP, SAIL-RSP, SAIL-DSP project for a seamless and accurate tracking and monitoring of project progress. • Took personal initiative upon new vendor development and successfully identified and introduced several vendors in L&T in past 10 years. PREVIOUS EXPERIENCE Aug ’97 - Aug’ 16 Larsen & Toubro Limited Joined as Trainee Engineer and presently rose to the positon of Construction Manager – Mechanical i.e. (8 levels within a span of 17 years excluding 2 years as Trainee) Highlights: As Construction Manager – Mechanical • Acted as Project Manager Mechanical for 3MTPA Hot Strip Mill EPC Project at RSP & Project Coordinator for L&T for 0.37 MTPA Coke Oven EPC Project at SAIL Durgapur • Monitored Project Engineering progress, supply of equipment’s to be installed, Execution progress ,Resource flow, cost & schedule compliance of systems and verified reconciliations to ensure operational excellence • Generated and maintained yearly budget for the cluster and got the same approved from the management • Reviewed performance reports and job cost reports extracted monthly to monitor the financial health of the projects and took required corrective actions to maintain the profitability of the Business Units & Cluster. As Asst. Manager – Mechanical • Acted as Project Coordinator from cluster for Ferrous Business unit EPC Projects in Eastern India in projects like – 3.5 MTPA Sinter Plant project at Rourkela, 4.6 MTPA Sinter Plant project at ISP Burnpur, 2.5 MTPA Bhushan Blast Furnace. • Monitored Project Engineering progress, supply of equipment’s to be installed, Execution progress ,Resource flow, cost & schedule compliance of systems and verified reconciliations to ensure operational excellence • Regular visit to project site for meeting clients and review of job progress • Generated and maintained yearly budget for the cluster and got the same approved from the management • Reviewed performance reports and job cost reports extracted monthly to monitor the financial health of the projects and took required corrective actions to maintain the profitability of the Business Units & Cluster. As Sr. Engineer – Mechanical Planning In-charge (2.3 MTPA Tata Steel Sinter Plant EPC project) • Looked after project Planning and monitoring from project site • Monitored Engineering & Supply progress w.r.t schedule and review of site progress with project team. • Planed and monitored resource utilization to the optimum level. • Submission and collection of invoices from client and certification of sub-contractor measurement • Presenting the project status at various forum of internal management and customers As Engineer – Mechanical (Construction Engineer along with Mechanical Planning; Tata Steel G- Blast Furnace, CPP Nalco, CPP Talcher Project) • Supervised entire Piping work of G- Blast Furnace including supply follow up and engineering coordination’s. • Planned and monitored resources to ensure optimum level • Looked after Sub-contractor Management during execution stage towards achieving the targeted financial objectives As Junior Engineer & Trainee Engineer – Mechanical (Site Construction Engineer) • As Mechanical Erection Engineer accountable for execution of Power Cycle Piping at CPP Nalco and NTPC Kaniha Thermal power project. • Supervised Rack Piping work at IOCL Barauni Refinery expansion project • Supervised Fabrication and Erection of various Stainless Steel, Alloy Steel& Carbon Steel Piping at Hydro Cracker of Numaligarh Refinery Limited at Assam in a Green field project. • Examined drawings and carried out execution ensuring adherence to safety compliance Accomplishment: • Acknowledged as a Top Performer in Larsen & Toubro Limited, ECC Division each year since 2004 to 2009. PROJECTS Larsen & Toubro Ltd. • 3 MTPA Hot Strip Mill Package for SAIL –Rourkela , Odisha, India – EPC Contract • 0.37MTPA Coke Oven project for SAIL- Durgapur, West Bengal, India – EPC Contract • SMS Project at JSPL for Jindal Steel and Power – Angul,Odisha, India – Item Rate Contract • 2.5 MTPA Blast Furnace package for Bhushan Steel- Angul,Odisha, - EPC Contract
  • 3. • 3.5 MTPA Sinter Plant project for SAIL- Rourkela, Odisha ,India –EPC Contract • 4.6 MTPA Sinter Plant project for SAIL –ISP ,West Bengal, India- EPC Contract • 2.3 MTPA Sinter Plant project for TATA Steel ,Jamshedpur, India- EPC Contract • G Blast Furnace Upgradation project for TATA Steel ,Jamshedpur, India- Semi EPC Contract • Power Cycle Piping for CPP Nalco for NALCO - Angul ,India – Item Rate Contract • Power Cycle Piping for 4x500 MW NTPC KANIHA for NTPC - Talcher ,India – Item Rate Contract • Expansion of Barauni Refinery for IOCL, Bihar, India – LSTK Project • Hydro Cracker Unit at Numaligarh Refinery Limited for BPCL , Golaghat, Assam, India- Item Rate Contract PROFESSIONAL ENHANCEMENTS • Successfully completed Management Development programme (Faculty of XLRI Jamshedpur) • Successfully completed Executive Development programme (Faculty of Symbiosis University –Pune) ACADEMIC DETAILS • B.S. Engineering Technology from Birla Institute of Technology and Science (BITS), Pilani (WILP) in 2012 • Diploma in Mechanical Engineering from MBC Institute of Government Polytechnic, Burdwan in 1997 PERSONAL DETAILS Date of Birth: 12th December 1975 Address: 76/3 M G Road, Haridevpur, Kolkata – 700082, WB Languages: English, Bengali ,Hindi and Odiya.