COLD WORK PERMIT
Page 1 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23)
Issue Date: _______________ Permit No: ____________
Permit Requested By: __________________ Company Name: ________________
Permit Accepted By: __________________ Company Name: ________________
Validity From: __________ To: __________
1. Job Location: _____________________________________________________________
2. Job Description: __________________________________________________________
________________________________________________________________________
________________________________________________________________________
3 Tools & Materials to be used:
❑Explosive Device ❑Sandblaster ❑Jack hammers
❑Hand Tools ❑Drill ❑Jack hammers
❑Powered Excavation Equipment ❑Powered cutting Saw ❑Ladder/Scaffolding
❑Air Heater ❑LPG Gas ❑Others
4- Details of potential hazards:
❑Falling from height ❑ Material Fall down ❑Skin Exposures
❑Electrocuted ❑ Slip and trip ❑Burn out due to fire/acid etc.
❑Exposure to Eye ❑ Inhalation of any Gas ❑Breathing Problem ❑Others
5- Details of precaution need to be taken:
❑Caution Signage to be placed ❑Proper fixture an erection of Scaffolding/Ladder
❑Excavated Area fencing ❑Electrical Isolation
❑Fire water supply isolation ❑Fire water tanker to be provided
❑Fire Extinguishers to be provided ❑Exhaust fan to be provided
❑Informed security Et Help Desk ❑Other
6- Details of protective equipment to be used or worn:
❑Safety Shoes
❑Safety Helmet
❑Face Shield/Goggle/Glasses
❑Gloves (As per work)
❑Safety harness/Belt/Lifeline
❑Uniform
❑Respiratory Equipment/Dust Mask
❑Chemical Suite/Apron
❑Ear protection
❑Fire Blanket/Protection Sheet
❑Rubber Mat/Ground Fault Interrupter
❑Other
7- Signature of Permit Requestor:
Contact No:-
8- Signature of PTW Acceptor:
Contact No:-
9- Signature of Permit Issuer/HSE Representative:
COLD WORK PERMIT
Page 2 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23)
10- Signature of handover of responsibility between shifts, if needed.
11- Declaration by competent person in -charge of work that work is completed.
12- Signature of Maintenance / works representative ensuring that the work is
completed, site has been checked and that equipment and place may be reinstated / left
Safely isolated.
13- Signature of person issuing the permit / HSE representative which confirms that the
Site has been left in safe condition and the permit is cancelled.
14- Signature of the management representative signing off the permit to work.
REMARKS:-

COLD WORK PERMIT Form # HSEQ - CWP Rev 2.docx

  • 1.
    COLD WORK PERMIT Page1 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23) Issue Date: _______________ Permit No: ____________ Permit Requested By: __________________ Company Name: ________________ Permit Accepted By: __________________ Company Name: ________________ Validity From: __________ To: __________ 1. Job Location: _____________________________________________________________ 2. Job Description: __________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 3 Tools & Materials to be used: ❑Explosive Device ❑Sandblaster ❑Jack hammers ❑Hand Tools ❑Drill ❑Jack hammers ❑Powered Excavation Equipment ❑Powered cutting Saw ❑Ladder/Scaffolding ❑Air Heater ❑LPG Gas ❑Others 4- Details of potential hazards: ❑Falling from height ❑ Material Fall down ❑Skin Exposures ❑Electrocuted ❑ Slip and trip ❑Burn out due to fire/acid etc. ❑Exposure to Eye ❑ Inhalation of any Gas ❑Breathing Problem ❑Others 5- Details of precaution need to be taken: ❑Caution Signage to be placed ❑Proper fixture an erection of Scaffolding/Ladder ❑Excavated Area fencing ❑Electrical Isolation ❑Fire water supply isolation ❑Fire water tanker to be provided ❑Fire Extinguishers to be provided ❑Exhaust fan to be provided ❑Informed security Et Help Desk ❑Other 6- Details of protective equipment to be used or worn: ❑Safety Shoes ❑Safety Helmet ❑Face Shield/Goggle/Glasses ❑Gloves (As per work) ❑Safety harness/Belt/Lifeline ❑Uniform ❑Respiratory Equipment/Dust Mask ❑Chemical Suite/Apron ❑Ear protection ❑Fire Blanket/Protection Sheet ❑Rubber Mat/Ground Fault Interrupter ❑Other 7- Signature of Permit Requestor: Contact No:- 8- Signature of PTW Acceptor: Contact No:- 9- Signature of Permit Issuer/HSE Representative:
  • 2.
    COLD WORK PERMIT Page2 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23) 10- Signature of handover of responsibility between shifts, if needed. 11- Declaration by competent person in -charge of work that work is completed. 12- Signature of Maintenance / works representative ensuring that the work is completed, site has been checked and that equipment and place may be reinstated / left Safely isolated. 13- Signature of person issuing the permit / HSE representative which confirms that the Site has been left in safe condition and the permit is cancelled. 14- Signature of the management representative signing off the permit to work. REMARKS:-