Curriculum Vitae
Name Colin J Hind
Address 12 Fairhaven Close
Great Sankey
Warrington
WA5 2YA
Telephone Numbers 07969665569 (mobile)
01925 870981 (home) e-mail colin.jhind@gmail.com
Marital Status Married
Nationality British
Date of Birth 4 July 1965
Summary of Qualifications
HND Mechanical and Production Engineering
HNC Mechanical and Production Engineering
'O' Levels/C.S.E.s – Maths, English, Chemistry, Physics, Geography, History
City & Guilds for Laboratory Technicians
Education
1976 to 1981 Irlam High School, Greater Manchester
1981 to 1982 Salford College of Technology
1982 to 1988 Warrington Technical College
Professional Experience
2013 to Date AM Technology
-
-
-
-
-
Employed as Production Engineering Manager, responsible for the implementation of
systematic procedures for documenting and tracking manufacturing operations, instructing
and supervising assembly, procurement and the work of suppliers, ordering and tracking of
machine parts and spares. Mechanical and electrical assembly and testing of reactors.
Sourcing new suppliers for parts, streamlining the number of suppliers reducing the cost of
components and company overheads.
Customer support for installation, commissioning, maintenance and trials, tracking and
recording equipment faults. Writing of operating manuals and assembly procedures.
Management of individual projects to ensure delivery on time and to specification.
Integration with design team advising on best practice and manufacturing methods,
specification and procurement of peripheral items, such as pressure vessels, pumps, valves
pipework and fittings.
Providing support for marketing, administration and accounts, including checking and
approval of invoices, allocation of project codes. Co-ordinating equipment and logistics
provision for customers and exhibitions.
Due to the size of the company and the limited experience of the employees, I took on a
number of roles not in my job description that would normally have been the responsibility of
a single individual, these included;
Facilities Management – Organising, recording and monitoring of utilities and factory
maintenance, co-ordination with suppliers and contractors. Arranging servicing and
calibration of equipment, Pat testing, monitoring fire and security arrangements.
Quality Manager – I wrote, implemented and administered the Quality Management System
and achieved accreditation to ISO9001 in 2014.
H&S Manager – writing, implementing and administering the H&S Management System in
line with OHAS standard 18001, ensuring site risk and COSHH assessments where carried
out and safe systems of work introduced. Providing staff with H&S information and
performing regular toolbox talks.
Environmental Manager – introducing an EMS, monitoring environmental aspects on site,
recording and monitoring of hazardous waste and emissions. Performing workplace
inspections, identifying potential problems and areas where money could be saved.
2010 to Apr 2013 Starkstrom
Employed as Service Sales and Technical Support Engineer, tasked with increasing the
service turnover on ppm contracts whilst maintaining current business at a high standard.
Expanding into areas not yet tapped by Starkstrom, through my experience of IPS/UPS
systems and Medical devices.
- Developing further relationships with hospital engineers and FM companies to offer quality
and reliability through the service team.
- Continuing my work with architects and consulting engineers supporting the sales team in
designing systems for the critical care areas of the hospital.
- Attending site meetings with NHS staff and project engineers, demonstrating systems,
explaining construction methods and installation techniques.
- Providing mechanical and electrical Installation, commissioning and maintenance support as
required by the Service department.
2008 to Nov 2010 Brandon Medical
Employed as Service and Installation Manager, tasked with increasing the service turnover
on ppm contracts whilst maintaining current business at a high standard. Expanding into
areas not yet tapped by Brandon Medical, through my experience of IPS/UPS systems.
- Developing further relationships with hospital engineers and FM companies to offer quality
and reliability through the service team. Continuing my work with architects and consulting
engineers supporting the sales team in designing systems for the critical care areas of the
hospital
- Involved in numerous PFI projects throughout the UK, responsible for scheduling labour and
materials for installation within construction sites and hospital environments. Ensuring
works are carried out to program and cost, supervising sub-contract labour, commissioning
and test engineers.
- Attending site meetings with NHS staff and project engineers, demonstrating systems,
explaining construction methods and installation techniques. Co-ordination meetings with
other service providers i.e. Medical gases, electrics, data and nurse call.
2003 to July 2008 Jemini Services (UK) Ltd (Director)
Set up Jemini Services as a sales and marketing company for medical equipment working
with major manufacturers in the fields of electrical power supplies, medical gas pipeline
systems, operating and examination lights and ceiling pendants for operating rooms,
Intensive care areas and general wards.
- Developing relationships with hospital engineers and M&E contracting companies to offer
quality equipment and service for hospitals.
- We were involved in numerous projects in the north of England including DTC’s and PFI
bids, mainly as a sub-contractor (suppliers of IPS/UPS systems)
- We provided manufactured materials and components for numerous clients and projects,
including structural steelwork and other fabrications
- Also providing installation, commissioning and maintenance services for operating theatres
and critical care areas, involving project management and materials logistics
2001 to March 2003 Dräger Medical (Architectural Systems)
Appointed as business development manager in July 2002, reporting to both regional and
national sales directors, I was responsible for:-
- Establishing leads and co-ordinating with account managers.
- Qualifying leads by inclusion of site visits/surveys, pre-contract meetings and written
quotations.
- Establishing targets and reporting at sales meetings.
- Developing project specifications into manufactured product co-ordinated with UK and
German projecting departments.
Appointed as Contract Manager in February 2001, reporting to the Projects Director, I was
responsible for, Pre-contract meeting and design clarification, site survey and contractor
liaison
- Co-ordinate manufacturing detail drawings with Dräger (Germany) and customer design
approval, completing all relevant quality documentation and purchase orders.
- Programme and instruct sub-contract labour on mechanical and electrical installation of
equipment on site, produce post installation testing and handover documentation for
customer approval.
1999 to 2001 Dräger Medical (Gas Management Systems)
Appointed as Product Manager in September 99, for this medical gas equipment
manufacturer reporting to the General Manager, I was responsible for:-
- Design and development of the current product range and the introduction of new products
through direct liaison with customers, design engineer and manufacturing employees.
- Marketing and promotion of the company and products through advertising and
merchandising, including product data sheets.
- Updating product literature, including technical files for each product, in line with current
manufacturing and testing techniques to provide the users with correct and presentable
instructions.
- Produced bills of materials, assembly and test instructions for the manufacturing personnel.
Working with and maintaining the company quality assurance system to ISO9001.
Developed a user interface for drawing and manufacturing information on microsoft access.
- Marketing and product training presentations in house and abroad, involving customers and
Dräger partnership companies.
1998 to 1999 JAB Design (Architectural, Civil and Building Services design consultants)
Reporting to the Managing Director and as Business Support Manager, I was responsible
for:
- Supervising permanent and contract non-technical support staff
- The design and Implementation of the Quality Management System in line with ISO9001,
accredited 17/2/99. Ensuring that design and management is carried out effectively and
efficiently whilst maintaining traceability, this included internal quality audits.
- Network, peripheral and computer support for 20 users, on Microsoft NT version 4.0. This
included initiating backup routines using Cheyanne Arcserve, solving software/hardware
problems and training staff to use Microsoft Office 97 Professional.
- Human Resource services
- Company insurance
- Ensuring hours are recorded and wages paid
- Monitoring a fleet of company cars
- Procurement Services
- Monitoring project status, issuing project numbers and entering project details into the JAB
Design Database.
1995 to 1998 Signal Ambitech (a division of Signal Instruments Company Limited)
Reporting to the Technical Director as Drawing Office Manager, I was responsible for: -
- Supervising permanent and contract drawing/reprographic staff
- Undertaking design draughting, bill of materials' maintenance and all reprographic work;
including the printing of drawings and instruction manuals and the collation of
documentation to meet customer requirements
- Scheduling, monitoring and prioritising workloads
- Controlling, maintaining and securing the CAD system (AutoCAD rev 12) and drawing
register with regular server back-ups
- Creating work instructions, test procedures and engineering specifications
- Solving design-related problems for the Production Department in conjunction with the
Engineering Department
- Implementing and maintaining the Quality Control system in line with ISO9001 and ensuring
design change is carried out effectively and efficiently
- Providing project support whilst compiling analyser systems from contract scope of supply
stage to delivery
1982 to 1995 United Kingdom Atomic Energy Authority
1993 to 1995 - Calculating masses and volumes of the Joint European Torus vacuum vessel and ancillary
components, processing the data to compile a nuclear inventory for decommissioning
purposes
- Compiling and writing Q.A. manuals
- Gaining practical experience of Oracle 6 & 7 Databases, Microsoft software, such as Word,
Excel, Access, Query and Project, Freelance Graphics, DesignCAD and CorelDraw
- Changing control drawings for the Compass experimental area on CAD: MEDUSA rev. 12.2,
some AutoCAD experience
1991 to 1993 - Assembly and detail drawings for the Compass Fusion experiment including 3-D models of
the vessel and ancillary components
- Flow diagrams and architectural layouts
- All of the above on CAD: MEDUSA rev. 12.2
- Finite element analysis of High Active Liquor Containment Vessels
- Supervising contractors and checking drawings
1989 to 1991 - Prototype to final commissioning drawings of the Centrifugal Contactor Facility at Sellafield,
Cumbria, used to separate effluent to its solid and aqueous phases
- Designing and developing Fast Reactor and AGR fuel
- Designing plant layout drawings
- Producing flow diagrams
- Designing and detailing drawings for Sodium/Water Reaction Test Facility, waste disposal
and storage equipment
- Operating computervision CADDS 4x system during the above procedures
1986 to 1989 - Producing pipework isometrics, arrangements and detail drawings
- Carrying out extensive site survey work including liaison with site engineers and model
makers then implementing decisions to produce as-built drawings
1982 to 1986 - Indentured to full Mechanical Apprenticeship with the U.K.A.E.A.
Additional Professional Activities and Training
IEMA Foundation Certificate in Environmental Management
NEBOSH Health and Safety Certificate
Portable Appliance Tester Qualified
Certificate in Electrical test and Inspection 2391
CITB Supervising Safely
PASMA certified
17
th
Edition Qualification
ECA H&S certificate
CSCS cardholder
MPGS Authorised Person
MPGS Competent Person
First Aid at Work
IOSH Managing Safely
Fire Extinguisher Training
Human Focus Qualified at Supervisor Level (SKANSKA)
Retained firefighter for Oxfordshire Fire Service, this required good teamwork and discipline
Challenge for Industry Outward Bound course - Poole, Dorset Centre
Project Management for Junior Grades
Communication and Team Building
References
Robert Ashe
AM Technology
18 Berkeley Court
Runcorn
WA7 1TQ
01928 237420
Mark Smith
Draeger Medical
The Willows
Hemel Hempstead
01442 213542
Matthew Mears
Starkstrom
256 Field End Road
Eastcote, Ruislip
Middlesex, HA4 9UW
0208 8683732
Adrian Hall
Brandon Medical Ltd
Holme Well Road
Leeds
LS10 4TQ
0113 2777393
Interests and Activities
Football, D.I.Y., gardening, reading, cycling.
Additional General Information
I have a full, clean driving licence an office and PC at home

cjhcv @ 15

  • 1.
    Curriculum Vitae Name ColinJ Hind Address 12 Fairhaven Close Great Sankey Warrington WA5 2YA Telephone Numbers 07969665569 (mobile) 01925 870981 (home) e-mail colin.jhind@gmail.com Marital Status Married Nationality British Date of Birth 4 July 1965 Summary of Qualifications HND Mechanical and Production Engineering HNC Mechanical and Production Engineering 'O' Levels/C.S.E.s – Maths, English, Chemistry, Physics, Geography, History City & Guilds for Laboratory Technicians Education 1976 to 1981 Irlam High School, Greater Manchester 1981 to 1982 Salford College of Technology 1982 to 1988 Warrington Technical College Professional Experience 2013 to Date AM Technology - - - - - Employed as Production Engineering Manager, responsible for the implementation of systematic procedures for documenting and tracking manufacturing operations, instructing and supervising assembly, procurement and the work of suppliers, ordering and tracking of machine parts and spares. Mechanical and electrical assembly and testing of reactors. Sourcing new suppliers for parts, streamlining the number of suppliers reducing the cost of components and company overheads. Customer support for installation, commissioning, maintenance and trials, tracking and recording equipment faults. Writing of operating manuals and assembly procedures. Management of individual projects to ensure delivery on time and to specification. Integration with design team advising on best practice and manufacturing methods, specification and procurement of peripheral items, such as pressure vessels, pumps, valves pipework and fittings. Providing support for marketing, administration and accounts, including checking and approval of invoices, allocation of project codes. Co-ordinating equipment and logistics provision for customers and exhibitions. Due to the size of the company and the limited experience of the employees, I took on a number of roles not in my job description that would normally have been the responsibility of a single individual, these included; Facilities Management – Organising, recording and monitoring of utilities and factory maintenance, co-ordination with suppliers and contractors. Arranging servicing and calibration of equipment, Pat testing, monitoring fire and security arrangements. Quality Manager – I wrote, implemented and administered the Quality Management System and achieved accreditation to ISO9001 in 2014. H&S Manager – writing, implementing and administering the H&S Management System in line with OHAS standard 18001, ensuring site risk and COSHH assessments where carried out and safe systems of work introduced. Providing staff with H&S information and performing regular toolbox talks. Environmental Manager – introducing an EMS, monitoring environmental aspects on site, recording and monitoring of hazardous waste and emissions. Performing workplace inspections, identifying potential problems and areas where money could be saved.
  • 2.
    2010 to Apr2013 Starkstrom Employed as Service Sales and Technical Support Engineer, tasked with increasing the service turnover on ppm contracts whilst maintaining current business at a high standard. Expanding into areas not yet tapped by Starkstrom, through my experience of IPS/UPS systems and Medical devices. - Developing further relationships with hospital engineers and FM companies to offer quality and reliability through the service team. - Continuing my work with architects and consulting engineers supporting the sales team in designing systems for the critical care areas of the hospital. - Attending site meetings with NHS staff and project engineers, demonstrating systems, explaining construction methods and installation techniques. - Providing mechanical and electrical Installation, commissioning and maintenance support as required by the Service department. 2008 to Nov 2010 Brandon Medical Employed as Service and Installation Manager, tasked with increasing the service turnover on ppm contracts whilst maintaining current business at a high standard. Expanding into areas not yet tapped by Brandon Medical, through my experience of IPS/UPS systems. - Developing further relationships with hospital engineers and FM companies to offer quality and reliability through the service team. Continuing my work with architects and consulting engineers supporting the sales team in designing systems for the critical care areas of the hospital - Involved in numerous PFI projects throughout the UK, responsible for scheduling labour and materials for installation within construction sites and hospital environments. Ensuring works are carried out to program and cost, supervising sub-contract labour, commissioning and test engineers. - Attending site meetings with NHS staff and project engineers, demonstrating systems, explaining construction methods and installation techniques. Co-ordination meetings with other service providers i.e. Medical gases, electrics, data and nurse call. 2003 to July 2008 Jemini Services (UK) Ltd (Director) Set up Jemini Services as a sales and marketing company for medical equipment working with major manufacturers in the fields of electrical power supplies, medical gas pipeline systems, operating and examination lights and ceiling pendants for operating rooms, Intensive care areas and general wards. - Developing relationships with hospital engineers and M&E contracting companies to offer quality equipment and service for hospitals. - We were involved in numerous projects in the north of England including DTC’s and PFI bids, mainly as a sub-contractor (suppliers of IPS/UPS systems) - We provided manufactured materials and components for numerous clients and projects, including structural steelwork and other fabrications - Also providing installation, commissioning and maintenance services for operating theatres and critical care areas, involving project management and materials logistics 2001 to March 2003 Dräger Medical (Architectural Systems) Appointed as business development manager in July 2002, reporting to both regional and national sales directors, I was responsible for:- - Establishing leads and co-ordinating with account managers. - Qualifying leads by inclusion of site visits/surveys, pre-contract meetings and written quotations. - Establishing targets and reporting at sales meetings. - Developing project specifications into manufactured product co-ordinated with UK and German projecting departments. Appointed as Contract Manager in February 2001, reporting to the Projects Director, I was responsible for, Pre-contract meeting and design clarification, site survey and contractor liaison - Co-ordinate manufacturing detail drawings with Dräger (Germany) and customer design approval, completing all relevant quality documentation and purchase orders. - Programme and instruct sub-contract labour on mechanical and electrical installation of equipment on site, produce post installation testing and handover documentation for customer approval.
  • 3.
    1999 to 2001Dräger Medical (Gas Management Systems) Appointed as Product Manager in September 99, for this medical gas equipment manufacturer reporting to the General Manager, I was responsible for:- - Design and development of the current product range and the introduction of new products through direct liaison with customers, design engineer and manufacturing employees. - Marketing and promotion of the company and products through advertising and merchandising, including product data sheets. - Updating product literature, including technical files for each product, in line with current manufacturing and testing techniques to provide the users with correct and presentable instructions. - Produced bills of materials, assembly and test instructions for the manufacturing personnel. Working with and maintaining the company quality assurance system to ISO9001. Developed a user interface for drawing and manufacturing information on microsoft access. - Marketing and product training presentations in house and abroad, involving customers and Dräger partnership companies. 1998 to 1999 JAB Design (Architectural, Civil and Building Services design consultants) Reporting to the Managing Director and as Business Support Manager, I was responsible for: - Supervising permanent and contract non-technical support staff - The design and Implementation of the Quality Management System in line with ISO9001, accredited 17/2/99. Ensuring that design and management is carried out effectively and efficiently whilst maintaining traceability, this included internal quality audits. - Network, peripheral and computer support for 20 users, on Microsoft NT version 4.0. This included initiating backup routines using Cheyanne Arcserve, solving software/hardware problems and training staff to use Microsoft Office 97 Professional. - Human Resource services - Company insurance - Ensuring hours are recorded and wages paid - Monitoring a fleet of company cars - Procurement Services - Monitoring project status, issuing project numbers and entering project details into the JAB Design Database. 1995 to 1998 Signal Ambitech (a division of Signal Instruments Company Limited) Reporting to the Technical Director as Drawing Office Manager, I was responsible for: - - Supervising permanent and contract drawing/reprographic staff - Undertaking design draughting, bill of materials' maintenance and all reprographic work; including the printing of drawings and instruction manuals and the collation of documentation to meet customer requirements - Scheduling, monitoring and prioritising workloads - Controlling, maintaining and securing the CAD system (AutoCAD rev 12) and drawing register with regular server back-ups - Creating work instructions, test procedures and engineering specifications - Solving design-related problems for the Production Department in conjunction with the Engineering Department - Implementing and maintaining the Quality Control system in line with ISO9001 and ensuring design change is carried out effectively and efficiently - Providing project support whilst compiling analyser systems from contract scope of supply stage to delivery
  • 4.
    1982 to 1995United Kingdom Atomic Energy Authority 1993 to 1995 - Calculating masses and volumes of the Joint European Torus vacuum vessel and ancillary components, processing the data to compile a nuclear inventory for decommissioning purposes - Compiling and writing Q.A. manuals - Gaining practical experience of Oracle 6 & 7 Databases, Microsoft software, such as Word, Excel, Access, Query and Project, Freelance Graphics, DesignCAD and CorelDraw - Changing control drawings for the Compass experimental area on CAD: MEDUSA rev. 12.2, some AutoCAD experience 1991 to 1993 - Assembly and detail drawings for the Compass Fusion experiment including 3-D models of the vessel and ancillary components - Flow diagrams and architectural layouts - All of the above on CAD: MEDUSA rev. 12.2 - Finite element analysis of High Active Liquor Containment Vessels - Supervising contractors and checking drawings 1989 to 1991 - Prototype to final commissioning drawings of the Centrifugal Contactor Facility at Sellafield, Cumbria, used to separate effluent to its solid and aqueous phases - Designing and developing Fast Reactor and AGR fuel - Designing plant layout drawings - Producing flow diagrams - Designing and detailing drawings for Sodium/Water Reaction Test Facility, waste disposal and storage equipment - Operating computervision CADDS 4x system during the above procedures 1986 to 1989 - Producing pipework isometrics, arrangements and detail drawings - Carrying out extensive site survey work including liaison with site engineers and model makers then implementing decisions to produce as-built drawings 1982 to 1986 - Indentured to full Mechanical Apprenticeship with the U.K.A.E.A. Additional Professional Activities and Training IEMA Foundation Certificate in Environmental Management NEBOSH Health and Safety Certificate Portable Appliance Tester Qualified Certificate in Electrical test and Inspection 2391 CITB Supervising Safely PASMA certified 17 th Edition Qualification ECA H&S certificate CSCS cardholder MPGS Authorised Person MPGS Competent Person First Aid at Work IOSH Managing Safely Fire Extinguisher Training Human Focus Qualified at Supervisor Level (SKANSKA) Retained firefighter for Oxfordshire Fire Service, this required good teamwork and discipline Challenge for Industry Outward Bound course - Poole, Dorset Centre Project Management for Junior Grades Communication and Team Building References Robert Ashe AM Technology 18 Berkeley Court Runcorn WA7 1TQ 01928 237420 Mark Smith Draeger Medical The Willows Hemel Hempstead 01442 213542 Matthew Mears Starkstrom 256 Field End Road Eastcote, Ruislip Middlesex, HA4 9UW 0208 8683732 Adrian Hall Brandon Medical Ltd Holme Well Road Leeds LS10 4TQ 0113 2777393 Interests and Activities Football, D.I.Y., gardening, reading, cycling. Additional General Information I have a full, clean driving licence an office and PC at home