Petrol station management from A-Z:
Proven solutions for today’s forecourt retailer
Scheidt & Bachmann Petrol station systems
2
The company: History and development
Maintaining values to create a sustainable future:
Tradition and innovation – trademarks of being a
global market leader
A company with heritage and
character
	
	 Founded in 1872
	
	 Number of employees > 2,000
	
	 Developed from a mechanical
	 engineering company to a global 	
	 systems provider.
	
	 Global market leader with future-	
	 proofed system designs.
	 Continuous investment in innovative 	
	 production technologies.
	 Continuous investment in highly 	
	 qualified employees.
2
From the beginning,
Scheidt & Bachmann has
held high the standard of
being a reliable partner
to its customers based on
continuity and farsighted
vision.
Since its founding in 1872, Scheidt & Bachmann has
become a global solutions provider. The company’s
worldwide success is due to its innovative vision and
customer-oriented approach.
We take development one step further
At Scheidt & Bachmann, it is our tradition to plan our
company’s development so that it is both consistent and
long term. Since our early beginnings as a mechanical
engineering company, we have made significant targeted
investments in the continuous training of our employees
and in highly developed state-of-the-art production
technology. From manufacturing of level crossings, signal
boxes and signalling systems for railways, the company
expanded in the 1930s to the construction of fuel pumps.
Since the 1960s the company has been developing and
delivering access control systems for multi-storey car parks,
swimming pools and leisure facilities. The trend towards
automated fare collection systems at the end of the 1970s
led to the forming of the company’s fourth division, of Fare
collection systems. Systematic driving forward of innovative
processes and continuous improvement has enabled
Scheidt & Bachmann to evolve into a global leader in its
chosen fields. The result is that our system solutions meet all
international standards. Also by adopting a modular systems
architecture the Scheidt & Bachmann customer has piece
of mind that their investment is future-proof to meet the
standards of the future.
Giving our best, together
A pioneering spirit and the continuous improvement of our
products have transformed us from what was once a
mechanical engineering company to an international
system integrator. This success is not just possible thanks
to state-of-the-art technology, but our highly qualified
employees also contribute to this effective concept. The
result: For five generations, the company has been run by
the founding family and many of our employees have been
connected to the company for generations.
3
A passion for perfection:
Worldwide knowledge delivered for you locally
Scheidt & Bachmann is known throughout Europe
as the reliable partner of international mineral oil
companies and independant forecourt operators. As
one of the market leaders in our sector, we are proud
to be able to reflect on strong customer relationships
forged over many years. Scheidt & Bachmann are
recognised throughout the sector as experts in
systems for all aspects of forecourt operations.
Our solutions are your advantage. Our customers can
rely on this promise, for us, it is not only current market
standards that count, but much more our customers’
demands. For this, we are continually developing our
products so that we can constantly offer our customers
modern solutions for successful forecourt management.
With our own R&D, production and quality assurance
departments, we ensure that our products maintain their
position at the leading edge of technology and can offer
our customers individual solutions for their forecourt
business.
Our membership of national and international industry
committees means that we are kept informed of legal and
legislative requirements relating to technical changes
well in advance, and can offer this knowledge as
consultative partners to our clients.
Chile
Canada (S)
Mexico
USA (S)
•	 Baltimore
•	 Burlington
•	 Houston
•	 New York
•	 Phoenix
•	 San Francisco
The company: Organization and structure
Egypt
Ghana
Maghreb (S)
Nigeria
4
Our products are supplemented by an extensive range of
services. These enable our customers to benefit from the
expertise of our personnel. We are available 24/7 to
provide technical support, whether via our service hotline
or on site. Our focus is preventative rather than cure,
minimising downtime.
Our extensive sales and service network throughout our
own subsidiaries and agencies ensure that we are always
present nationally and internationally.
Scheidt & Bachmann is made up of four – largely
independent – business sectors:
Luxembourg
Morocco
Norway
Poland (S)
Portugal
Romania
Russia (S)
Serbia
Slovak Republic (S)
China
Hong Kong
Indonesia
Korea
Slovenia
Spain (S)
Sweden
Switzerland (S)
The Netherlands (S)
Turkey
Ukraine
India
Jordan
Kazakhstan
Lebanon
Qatar
United Arab Emirates
Australia (S)
New Zealand
Austria (S)
Belgium (S)
Bulgaria
Croatia
Denmark
Estonia
Finland (S)
France (S)
Germany (S)
Great Britain (S)
Greece
Hungary
Iceland
Ireland (S)
Israel (S)
Italy (S)
Latvia
Lithuania
S=Subsidiaries
Malaysia
Thailand
Parking and
leisure centre systems
Signalling
systems
Fare collection
systems
Petrol station
systems
5
66
The company: History and development
02 I 03	 Tradition and innovation - trademarks
	 of being a global market leader
	 The company: Organization and structure
04 I 05	 Worldwide knowledge delivered
	 for you locally
	 Petrol station systems
08 I 09	 Proven solutions for
	today’s forecourt retailer
	 Product portfolio
10 I 15	 The one-stop
	 petrol station management package
	 Installation, maintenance, repairs, training
16 I 17	 Services from Scheidt & Bachmann
	 The system integrator Scheidt & Bachmann
18 I 21	 System integrators for a mobile world
Contents
7
Petrol station systems
Petrol station systems
Proven solutions for today’s forecourt retailer
One-stop petrol station
management
	 Solutions for individual petrol
stations and entire networks
	 From the dispenser to the
extensive network management
system
	 Service ensures sales readiness
These mineral oil companies rely on us:
8
Since the first fuel pump left the
Moenchengladbach factory in 1932,
we have worked continuously on
developing and improving our
systems to make visits to petrol
stations both fast and easy.
Stop, fill, drive
This is what most customers expect
when visiting a petol station. The faster
and more straightforward the visit, the
happier the customer will be to return.
Smooth operation at the dispensers
and in the shop along with reliable
equipment are essential for a successful
petrol station. This is why we offer our
customers a complete, one-stop petrol
station management package.
Petrol station management – from
dispensers to data analysis
Every petrol station is different, which
is why we offer our customers a product
portfolio which meets all demands.
Along with basic fuel pumps for just one
or two fuel types, we offer modern fuel
pumps with integrated multimedia
touch screens and card payment
terminals. Regardless of whether the
petrol station has a shop or is operated
totally unmanned, our petrol station
management system (TMS 30) ensures
that the petrol station is kept running,
24/7.
The system controls all fuelling points
and payment terminals at the petrol
station as well as the POS system. All
fuel data and information on shop
sales are collected in the system and
made available for evaluation and daily
reconciliation. Moreover, our Network
Management System (NMS) makes it
possible to monitor and control entire
networks from a central office. Extensive
reporting functions support the planning
and optimisation of business processes.
Drive increase sales – with Scheidt &
Bachmann solutions
Active and innovative sales promotions
also help increase revenues. With our
multimedia displays at the fuel pumps
and promotional displays at the cash
desk. This helps the modern retailer
position his products effectively. This
provides an effective platform to drive
promotional campaigns and monitor
the results.
Extensive range of services
Reliable equipment and minimum
downtimes are essential for a successful
petrol station. We support our customers
with a comprehensive range of services
tailored to meet their needs. Whether
individual training in the use of our fuel
pumps and systems or, fastrack help
from our service hotline: we have the
right service for everyone. In the event
of a disruption, our service personnel
can correct most issues remotely online
by remote access. However, should help
be required on site, our experienced
service technicians will be on their way
to you as soon as possible.
Extensive data analysis tools with NMS Training for our system Here we are! Service by Scheidt & Bachmann
Dispenser Clou Outdoor Payment Terminal OPT 240 POS system TMS 30 with Touch display
9
A well maintained forecourt with
modern, easy-to-use dispensers is
the showpiece of every petrol
station. In keeping with the motto
“First impressions count,” the
dispensers are your customers’ first
contact with the petrol station.
Invest in low costs
High-quality workmanship, high
availability, low service and maintenance
costs and a long lifecycle are the out-
standing features of dispensers by
Scheidt & Bachmann. Moreover, all
dispensers are manufactured and
tested by us in Moenchengladbach.
Invest in the future. The high quality
of our pumps guarantees maximum
investment security and a low TCO
(total cost of ownership).
Equipment for every forecourt
Our fuel pumps conform with MID
(Measuring Instruments Directive)
Dispensers
Enhancing the customers’ experience
Product portfolio
and hold national licenses for more
than 35 countries in Europe and beyond.
This means we have the right dispenser
for every forecourt:
from the basic version for dispensing
just one or two grades of fuel to the
fully-equipped multi product multimedia
dispenser which can continue to
operate in unmanned mode, after the
shop has closed. Scheidt & Bachmann
dispensers fulfil the requirements of
all petrol stations, whether manned or
unmanned.
Customer-friendly use
The audio-visual offers user instructions
at our multimedia dispensers presented
in different languages for ease of use.
The attractive touch screen guides the
customer through the petrol procedure
step by step and provides instructions
for correct use when paying at the
dispenser and can help to prevent
mis-fuels.
Vapour recovery
For countries where Stage II vapour
recovery and/or vapour recovery
monitoring is statutory, this can be
factory fitted, we can also supply retro-
fitting kits for all Scheidt & Bachmann
dispensers already in the field.
Automatic temperature compensation
Optimisation of costs by means of
automatic temperature compensation.
With this technology the sold amount
of fuel is calculated at the standard
temperature of 15°C. This way it is
guaranteed that the quantities of fuel
purchased and sold at your petrol
station are the same. This prevents
losses caused by variations in
temperatures especially during the
colder seasons of the year. Your wet-
stock business remains transparent
and clear to you at all times.
Highlights at a glance
Dispensers
	 Vapour recovery monitoring
	
	 Automatic temperature compensation
	
	 Multimedia display with integrated 	
	 tank data display
	
	 Pay at the pump
	 Various kinds of equipment can 	
	 be retrofitted at any time
10
Regardless of whether you operate a
forecourt with one dispenser or a
high-volume motorway petrol station
with a busy C-store, the Scheidt &
Bachmann petrol station management
system TMS 30 is completely scalable
ensuring that you have control of
your business.
Modular system
TMS 30 puts you in control of your
business maintaining forecourt and
C-store, allowing flexibility to operate
unmanned if required. TMS 30 is
modular in structure, which means
that it can flex to meet today’s and
tomorrow’s retailers demands,
delivering added value to your
investment. Alongside the entry level
version with a POS (point of sale) and
BOS (back office system). This gives the
platform to build on our station server
concept, where you can seamlessly add
Petrol station management
Scalable solutions - a perfect fit for your business
additional POS and/or BOS locally or
other sites as desired.
Interface to the forecourt –
the Courtmaster
The forecourt controller “Courtmaster”
allows communication of all forecourt
components with the Scheidt & Bach-
mann TMS 30 POS System.
At the Courtmaster several forecourt
components such as petrol pumps,
outdoor payment terminals, price
boards, tank level controllers, etc. are
connected to transmit their data via the
Courtmaster to the Scheidt & Bach-
mann TMS and vice versa.
The Courtmaster allows a common
cabelling of all forecourt components
via LAN, thus being independent from
the location of the POS, what makes
forecourt cabelling to the POS area
obsolete and can be conducted at any
suitable position like a central cable
distribution cabinet instead.
Total control made easy –
the Sitemaster
The Sitemaster allows the communica-
tion of the forecourt components with
the Network Management System
NMS. With this compact system easiest
control of a petrol station becomes
possible. For example suppliers of LPG
fuel can use this system to receive infor-
mation on current sales, tank levels or
prices. With the Sitemaster automated
base price adjustments become pos-
sible. Even the smallest petrol station
without an own shop can use the Site-
master. Simply connect a card terminal
to the Sitemaster, and use it as basic
POS system at the site.
Highlights at a glance
Petrol station management
	 Modular structure that can be
	 adapted to the needs for any station
	
	 Comprehensive merchandise
	 management system
	 Station card processing
	 Intuitive user operation
	 Mobile back office
	 TMS 30 LITE
11
Payment
Secure indoor and outdoor solutions
Product portfolio
Security, compliance and reliability
the cornerstones that underpin all
of our payment solutions. All of our
payment solutions meet and, in
most cases, exceed all local and
national requirements consistently
delivering maximum performance
and reliability.
The foundations to grow your business
and increase your profits. Outdoor
payment solutions offer additional
convenience for your customers
and consequently drives fidelity,
also preventing expensive “drive off”
situations. Deliver pay at pump by
specifying Scheidt & Bachmann CRID
(Card Reader in Dispenser), our EMV
compliant dispenser mounted devices
why not add multimedia to create
maximum impact. This option is also
available to retrofit existing Scheidt &
Bachmann dispensers and some other
leading manufacturers dispensers.
Highlights at a glance
Payment
	 EMV compliant
	 Domestic and international
	approvals
	
	 Processing of all standard card types,
	 including customer cards and loyalty
	cards	
	
	 Membership in domestic and
	 international commissions/boards
	 Cash Management
	
	
Cash Management
Managing and controlling cash presents
many challenges for retailers. Security
and accuracy are two of the biggest
issues - this is why we have developed
a direct interface to a cash recycler
system from the TMS 30 system. This
device counts cash in and out securely
storing all cash transactions in a high
security safe that staff have no access
to. All data is stored in the TMS 30
system and all cash is accurately
managed eliminating cash differences
and significantly removing security risks.
Active involvement in innovative
developments
Our participation in domestic and
international commissions and boards
ensures that we are actively involved
in all matters of statuate change and
regulatory compliance. This means we
help our customers to maintain the
highest standards of compliance and
maintaining market leading payment
systems. Scheidt & Bachmann are
proud to be members of the following
international payment bodies and
commissions:
EPSM - European Association of
	 Payment Service Providers for
	 Merchants www.epsm.eu
EPAS - Electronic Protocols
	 Application Software
IFSF - International Forecourt
	 Standards Forum
	 EPS-POS and EPS-FEP specification
	www.ifsf.org
12
Central management
Total control - deploy, manage and report
Effective management control with
on time accurate reporting delivered
to the key decision makers in your
business – Scheidt & Bachmann’s
NMS (Network Management System)
has been designed to deliver all this
and much, much more.
Manage and control your stations
from a central location. NMS enables
you to adjust all prices, edit products,
suppliers and detailed analysis of all
wet and dry stock sales data.
Management data by exception ensures
the right reports are delivered to the
right people in your organisation in a
variety of formats via email or SMS –
it’s your business you decide!
Detailed KPI reporting
Comprehensive reporting on pre-
defined KPI’s (Key Performance
Indicators) allows you to assess
business performance quickly. No one
knows your business better than you.
Powerful drill-down reports allow
dynamic data interrogation. This
means you can investigate and build
reports on the fly – drag and drop
data on to existing reports or build
new reports as you desire, display
graphically or export to other
applications for further analysis.
Central promotions
Plan your promotional activities
centrally and deploy them to your
connected stations. Use the reporting
and dynamic alerts functionality to
monitor promotion success. Deploy
new promotions to maximise
opportunities e.g. bad weather =
screen wash.
NMS hosting - low cost entry point
Let Scheidt & Bachmann manage
your data services, this means you
have no initial investment into your
own system infrastructure. We take
care of your data – securely and
comprehensively manage data
integrity. A central NMS securely
located with backup co-located server
infrastructure ensures a seamless
operation.
The hosted service provides all
businesses with a choice of how they
maximise the benefits of NMS to their
buiness.
Highlights at a glance
Central management
	 Central merchandise, price and 	
	 promotion management
	 Wet stock management
	
	 Comprehensive analysis and
	 reporting tools
	
	 Location independent thanks to
	 web browser technology
	
	 Alarm and service management
	 Hosting: we take care of the operation
13
The first pay-at-the-pump equipped
and approved fuelling pumps left
our Moenchengladbach plant in
the early 1960s. A lot has happened
since.
Unmanned site systems have to meet
numerous exacting regulations. At an
unsupervised station, the safety and
reliability of the systems and equipment
are paramount.
Protection against vandalism
Sturdy workmanship and the use of
premium quality materials provide
the maximum amount of protection
against vandalism. Electronic door
locks are installed and stations can
be connected to a video surveillance
system and remote CCTV monitoring
centres.
Unmanned stations
Reliable solutions available 24/7
Product portfolio
22
Remote monitoring
To be able to monitor the status of
the systems at your station, we have
connected them to our network
control system, which supervises your
stations remotely. This ensures that any
issues are detected proactively and that
preventative action is taken. Remote
monitoring also allows us to service
the system and update as necessary.
We monitor the heartbeat of your
systems
Utilising our Sign of Life concept, stations
are monitored for activity via signal
checks. If no response is received, a
service request is triggered automatically.
A direct message is sent to our technicians
so they can investigate and resolve any
issues promptly. The process is
completely automated against
pre-defined service level agreements.
Simple, clear operation
Customers have to operate pumps
intuitively and confidently without
the assistance of station staff. The
multimedia system provides guidance
and support in multi-language if
required. Daylight compatible TFT touch
screens guide the customer through
the fuelling process step by step. To
guarantee absolute security for non-cash
payment transactions, all utilised card
processing systems are in compliance
with the latest statutory requirements.
Our terminals do of course accept all
standard ISO compliant card types.
Our systems also make the retrofitting
of stations from attended to unattended
services possible. Our CRID (Card
Reader In Dispenser) retrofitting kits
are available with and without touch
screens.
Highlights at a glance
Unmanned stations
	 Sign of Life
	
	 Central management via NMS
	 Secure card payment in compliance 	
	 with the latest security requirements
	 Daylight compatible screens
	 Integrated video surveillance
	 OPT 240: VdS certified
	 Modular; the perfect solution for 	
	 every station
14
Planning promotions and setting
them up in the system, printing
price signs and displaying them
throughout the shop, preparation
of posters and pump toppers to
attract attention – just to name
a few of the steps you have to
go through to make a successful
promotion – it all takes time and
costs money.
In fact, sometimes you might think
it’s too much work. Consequently, we
developed our Promotion Suite – a
solution that will take the pain out
of the process. Simply plan your
promotions in the TMS 30 system or
centrally from the NMS. The system will
automatically distribute the promotion
to all of your selected stations. The
local system will subsequently store the
latest prices for the promotional period.
The information is automatically sent to
Promotion
Sales & Marketing promotions as easy as 1, 2, 3
the connected displays and shown
throughout the duration of the
promotion.
Variable options
Your customers will see your advertising
message on the multimedia display of
the pump as well as on the promotion
screens in the shop. Regardless of how
many displays you decide to connect,
your advertising message is positioned
in a prime position at the customer’s
eye level. The fuelling data and the
customer display are fully integrated
into the design of the displays. This
means the customer has full view of
the promotion throughout the fuelling
process.
Are my promotions working?
Thanks to the fact that these ads are
now integrated into the management
system of your petrol station, you can
also get your feedback on your
promotions’ effectiveness quickly
and easily. The sales figures, which are
compared with the integrated
promotions, provide detailed data
on sales volumes and margins.
Drive emotions
Grab your customers’ attention with
moving pictures. In addition to static
images, you can also show slide shows
and movies on your displays.
Stimulate your customers senses and
introduce new products and/or
services. Electronic displays allow the
creative retailer endless options to
stimulate sales without the expense of
reprinting materials and ensure prices
and promotions are always current and
accurate.
Highlights at a glance
Promotion
	 Centralised and compatible with 	
	 local planning
	
	 Actuation of multiple displays possible
	
	 Advertising message is always at the 	
	 customer’s eye level
	 Full integration into the 		
	 merchandise management and 	
	 product maintenance solutions of 	
	 our system
	
	 Saves time and money thanks to 	
	 automated display updates	
	 Control of advertisements’
	effectiveness
15
Optimum sales support:
Services from Scheidt & Bachmann
Installation, maintenance, repairs, training
At Scheidt & Bachmann, service is
PRIORITY ONE. We deliver the
complete package of solutions for
petrol stations from a single source.
We make it our business to offer you
services that are tailored to your
needs – including comprehensive
service plans.
Here we are!
Service is just the beginning. Whether
you need consulting, installation,
start-up, maintenance, help desk
services, training or lifecycle
management – we deliver everything
under one umbrella. Quality service
management provided by highly
qualified staff – 365 days a year, 24
hours a day. We are here to serve you
whenever you need us. To do this, we
have access to a wide array of diagnostic
tools so that we can provide support
to you when you need us the most.
Thanks to this state-of-the art technology
we are in a position to diagnose and
eliminate numerous issues before they
can cause any interruption to your
station’s operations.
Training centre
We offer extensive training programmes
for our pumps and systems at our own
modern training facilities in Moenchen-
gladbach. These training facilities are
equipped with the latest systems to
offer participants a practice based
learning environment. Our trainers
have acquired practical experiences
over many years of working with
these tools. Upon request we offer
personally tailored training courses
that can be delivered in the classroom
or at your premises.
Help Desk
If you have any questions or operational
issues in the practical use of our
solutions, our service hotline team
will be pleased to assist you. Our help
desk team have the facility to access
systems remotely in order to locate the
root cause of any issues to provide full
resolution. The majority of all calls are
directly resolved this way.
Network surveillance / alarm
management for early detection
The fully automated surveillance of
all installed systems is an important
tool that helps safeguard your systems
availability and guarantee uptime. Any
issues notified from your system, a
message is sent to our network control
server within seconds. A tracked ticket
is automatically generated and sent to
our help desk, who will investigate the
nature of the notification. The early
detection makes it possible to
eliminate any issues proactively,
without impacting on operations.
If an issue cannot be resolved as a
result of this remote intervention, a
work order is immediately generated,
which is sent directly to our technician’s
mobile device. Alarms sent from pumps
and other forecourt devices are also
recorded and can be transferred to
other contractors.
16
Software update service
All required software updates are
distributed through our download
server. On occasion, this happens
overnight. Depending on the type
and scope of the update, manual
interventions are not required. This
means there is no impact on daily
operations.
Sign of Life
We monitor the heartbeat of your
systems. Proactively responding to
any system issues before they impact
on the operational efficiency of your
business. This is particularly critical for
automated systems and unmanned
stations. Maximum availability = more
sales = optimised profit.
Lifecycle Management
We monitor every component
throughout its entire lifecycle. As a
result, we are in a position to collect
this data and use it to continuously
improve our performance. This
translates into even more reliable
hardware and software.
Territory wide field service  
We regularly train our service
technicians on our systems.
Consequently, they are always familiar
with the latest technology and can
provide the best possible intervention
services. Every service vehicle is
replenished with the most important
spare parts, so that first time fix is
achieved at every opportunity. To
make our assignment planning even
more efficient and to ensure that our
service technicians can get to our
customers in the shortest possible
time, we have equipped all of our
service vehicles with state-of-the
art GPS technology. Consequently,
our dispatchers are always aware
of the current location of all service
technicians and can direct them to
your location as quickly as possible.
This also allows us to plan and
co-ordinate maintenance and repair
assignments more efficiently.
Our planning and analysis tools enable
preventative maintenance programmes
e.g. the preventative replacement of
components or required updates.
Essential maintenance work can be
performed during times when it does
not have an adverse impact on your
business and can consequently be
reduced.
Highlights at a glance
Services
	 Project planning for rollouts
	 Installation, maintenance and repair 	
	services
	 Assignment optimisation thanks to 	
	 modern GPS technology
	 Training centre
	 Remote service
	 Early detection
	 Sign of Life	
	
	 Lifecycle management
	
	
17
Signalling systems
Petrol station systems
We set the world in motion:
System integrators for a mobile world
The system integrator Scheidt & Bachmann
Fare collection systems
Scheidt & Bachmann
Parking systems
Leisure centre systems
From the ticket machine to the fuel pump, from the turnstile
to the level crossing – Scheidt & Bachmann technology
surrounds us everywhere. In order to keep people in motion
day by day, we consistently think systematically.
We develop, produce, distribute and maintain systems for
multi-storey car park and leisure facilities, as well as systems
for signal engineering, fare collection management and
petrol stations, split into four largely independent fields of
distribution.
We always stay true to our philosophy: We systematically
introduce innovative processes so that our customers are
always one step ahead.
Parking and
leisure centre systems
Signalling
systems
Fare collection
systems
Petrol station
systems
2626GB/2-0812/500	©08.2012Scheidt&BachmannGmbH	Subjecttochanges,misprints,errorsandtechnicalchangesexpected.
Scheidt & Bachmann GmbH
Breite Strasse 132
41238 Moenchengladbach
Germany
Phone 	 +49 2166 266-321
Fax 	 +49 2166 266-341
petrolstation@scheidt-bachmann.com
www.scheidt-bachmann.com

Brochure tank en

  • 1.
    Petrol station managementfrom A-Z: Proven solutions for today’s forecourt retailer
  • 3.
    Scheidt & BachmannPetrol station systems
  • 4.
    2 The company: Historyand development Maintaining values to create a sustainable future: Tradition and innovation – trademarks of being a global market leader A company with heritage and character Founded in 1872 Number of employees > 2,000 Developed from a mechanical engineering company to a global systems provider. Global market leader with future- proofed system designs. Continuous investment in innovative production technologies. Continuous investment in highly qualified employees. 2 From the beginning, Scheidt & Bachmann has held high the standard of being a reliable partner to its customers based on continuity and farsighted vision.
  • 5.
    Since its foundingin 1872, Scheidt & Bachmann has become a global solutions provider. The company’s worldwide success is due to its innovative vision and customer-oriented approach. We take development one step further At Scheidt & Bachmann, it is our tradition to plan our company’s development so that it is both consistent and long term. Since our early beginnings as a mechanical engineering company, we have made significant targeted investments in the continuous training of our employees and in highly developed state-of-the-art production technology. From manufacturing of level crossings, signal boxes and signalling systems for railways, the company expanded in the 1930s to the construction of fuel pumps. Since the 1960s the company has been developing and delivering access control systems for multi-storey car parks, swimming pools and leisure facilities. The trend towards automated fare collection systems at the end of the 1970s led to the forming of the company’s fourth division, of Fare collection systems. Systematic driving forward of innovative processes and continuous improvement has enabled Scheidt & Bachmann to evolve into a global leader in its chosen fields. The result is that our system solutions meet all international standards. Also by adopting a modular systems architecture the Scheidt & Bachmann customer has piece of mind that their investment is future-proof to meet the standards of the future. Giving our best, together A pioneering spirit and the continuous improvement of our products have transformed us from what was once a mechanical engineering company to an international system integrator. This success is not just possible thanks to state-of-the-art technology, but our highly qualified employees also contribute to this effective concept. The result: For five generations, the company has been run by the founding family and many of our employees have been connected to the company for generations. 3
  • 6.
    A passion forperfection: Worldwide knowledge delivered for you locally Scheidt & Bachmann is known throughout Europe as the reliable partner of international mineral oil companies and independant forecourt operators. As one of the market leaders in our sector, we are proud to be able to reflect on strong customer relationships forged over many years. Scheidt & Bachmann are recognised throughout the sector as experts in systems for all aspects of forecourt operations. Our solutions are your advantage. Our customers can rely on this promise, for us, it is not only current market standards that count, but much more our customers’ demands. For this, we are continually developing our products so that we can constantly offer our customers modern solutions for successful forecourt management. With our own R&D, production and quality assurance departments, we ensure that our products maintain their position at the leading edge of technology and can offer our customers individual solutions for their forecourt business. Our membership of national and international industry committees means that we are kept informed of legal and legislative requirements relating to technical changes well in advance, and can offer this knowledge as consultative partners to our clients. Chile Canada (S) Mexico USA (S) • Baltimore • Burlington • Houston • New York • Phoenix • San Francisco The company: Organization and structure Egypt Ghana Maghreb (S) Nigeria 4
  • 7.
    Our products aresupplemented by an extensive range of services. These enable our customers to benefit from the expertise of our personnel. We are available 24/7 to provide technical support, whether via our service hotline or on site. Our focus is preventative rather than cure, minimising downtime. Our extensive sales and service network throughout our own subsidiaries and agencies ensure that we are always present nationally and internationally. Scheidt & Bachmann is made up of four – largely independent – business sectors: Luxembourg Morocco Norway Poland (S) Portugal Romania Russia (S) Serbia Slovak Republic (S) China Hong Kong Indonesia Korea Slovenia Spain (S) Sweden Switzerland (S) The Netherlands (S) Turkey Ukraine India Jordan Kazakhstan Lebanon Qatar United Arab Emirates Australia (S) New Zealand Austria (S) Belgium (S) Bulgaria Croatia Denmark Estonia Finland (S) France (S) Germany (S) Great Britain (S) Greece Hungary Iceland Ireland (S) Israel (S) Italy (S) Latvia Lithuania S=Subsidiaries Malaysia Thailand Parking and leisure centre systems Signalling systems Fare collection systems Petrol station systems 5
  • 8.
  • 9.
    The company: Historyand development 02 I 03 Tradition and innovation - trademarks of being a global market leader The company: Organization and structure 04 I 05 Worldwide knowledge delivered for you locally Petrol station systems 08 I 09 Proven solutions for today’s forecourt retailer Product portfolio 10 I 15 The one-stop petrol station management package Installation, maintenance, repairs, training 16 I 17 Services from Scheidt & Bachmann The system integrator Scheidt & Bachmann 18 I 21 System integrators for a mobile world Contents 7
  • 10.
    Petrol station systems Petrolstation systems Proven solutions for today’s forecourt retailer One-stop petrol station management Solutions for individual petrol stations and entire networks From the dispenser to the extensive network management system Service ensures sales readiness These mineral oil companies rely on us: 8
  • 11.
    Since the firstfuel pump left the Moenchengladbach factory in 1932, we have worked continuously on developing and improving our systems to make visits to petrol stations both fast and easy. Stop, fill, drive This is what most customers expect when visiting a petol station. The faster and more straightforward the visit, the happier the customer will be to return. Smooth operation at the dispensers and in the shop along with reliable equipment are essential for a successful petrol station. This is why we offer our customers a complete, one-stop petrol station management package. Petrol station management – from dispensers to data analysis Every petrol station is different, which is why we offer our customers a product portfolio which meets all demands. Along with basic fuel pumps for just one or two fuel types, we offer modern fuel pumps with integrated multimedia touch screens and card payment terminals. Regardless of whether the petrol station has a shop or is operated totally unmanned, our petrol station management system (TMS 30) ensures that the petrol station is kept running, 24/7. The system controls all fuelling points and payment terminals at the petrol station as well as the POS system. All fuel data and information on shop sales are collected in the system and made available for evaluation and daily reconciliation. Moreover, our Network Management System (NMS) makes it possible to monitor and control entire networks from a central office. Extensive reporting functions support the planning and optimisation of business processes. Drive increase sales – with Scheidt & Bachmann solutions Active and innovative sales promotions also help increase revenues. With our multimedia displays at the fuel pumps and promotional displays at the cash desk. This helps the modern retailer position his products effectively. This provides an effective platform to drive promotional campaigns and monitor the results. Extensive range of services Reliable equipment and minimum downtimes are essential for a successful petrol station. We support our customers with a comprehensive range of services tailored to meet their needs. Whether individual training in the use of our fuel pumps and systems or, fastrack help from our service hotline: we have the right service for everyone. In the event of a disruption, our service personnel can correct most issues remotely online by remote access. However, should help be required on site, our experienced service technicians will be on their way to you as soon as possible. Extensive data analysis tools with NMS Training for our system Here we are! Service by Scheidt & Bachmann Dispenser Clou Outdoor Payment Terminal OPT 240 POS system TMS 30 with Touch display 9
  • 12.
    A well maintainedforecourt with modern, easy-to-use dispensers is the showpiece of every petrol station. In keeping with the motto “First impressions count,” the dispensers are your customers’ first contact with the petrol station. Invest in low costs High-quality workmanship, high availability, low service and maintenance costs and a long lifecycle are the out- standing features of dispensers by Scheidt & Bachmann. Moreover, all dispensers are manufactured and tested by us in Moenchengladbach. Invest in the future. The high quality of our pumps guarantees maximum investment security and a low TCO (total cost of ownership). Equipment for every forecourt Our fuel pumps conform with MID (Measuring Instruments Directive) Dispensers Enhancing the customers’ experience Product portfolio and hold national licenses for more than 35 countries in Europe and beyond. This means we have the right dispenser for every forecourt: from the basic version for dispensing just one or two grades of fuel to the fully-equipped multi product multimedia dispenser which can continue to operate in unmanned mode, after the shop has closed. Scheidt & Bachmann dispensers fulfil the requirements of all petrol stations, whether manned or unmanned. Customer-friendly use The audio-visual offers user instructions at our multimedia dispensers presented in different languages for ease of use. The attractive touch screen guides the customer through the petrol procedure step by step and provides instructions for correct use when paying at the dispenser and can help to prevent mis-fuels. Vapour recovery For countries where Stage II vapour recovery and/or vapour recovery monitoring is statutory, this can be factory fitted, we can also supply retro- fitting kits for all Scheidt & Bachmann dispensers already in the field. Automatic temperature compensation Optimisation of costs by means of automatic temperature compensation. With this technology the sold amount of fuel is calculated at the standard temperature of 15°C. This way it is guaranteed that the quantities of fuel purchased and sold at your petrol station are the same. This prevents losses caused by variations in temperatures especially during the colder seasons of the year. Your wet- stock business remains transparent and clear to you at all times. Highlights at a glance Dispensers Vapour recovery monitoring Automatic temperature compensation Multimedia display with integrated tank data display Pay at the pump Various kinds of equipment can be retrofitted at any time 10
  • 13.
    Regardless of whetheryou operate a forecourt with one dispenser or a high-volume motorway petrol station with a busy C-store, the Scheidt & Bachmann petrol station management system TMS 30 is completely scalable ensuring that you have control of your business. Modular system TMS 30 puts you in control of your business maintaining forecourt and C-store, allowing flexibility to operate unmanned if required. TMS 30 is modular in structure, which means that it can flex to meet today’s and tomorrow’s retailers demands, delivering added value to your investment. Alongside the entry level version with a POS (point of sale) and BOS (back office system). This gives the platform to build on our station server concept, where you can seamlessly add Petrol station management Scalable solutions - a perfect fit for your business additional POS and/or BOS locally or other sites as desired. Interface to the forecourt – the Courtmaster The forecourt controller “Courtmaster” allows communication of all forecourt components with the Scheidt & Bach- mann TMS 30 POS System. At the Courtmaster several forecourt components such as petrol pumps, outdoor payment terminals, price boards, tank level controllers, etc. are connected to transmit their data via the Courtmaster to the Scheidt & Bach- mann TMS and vice versa. The Courtmaster allows a common cabelling of all forecourt components via LAN, thus being independent from the location of the POS, what makes forecourt cabelling to the POS area obsolete and can be conducted at any suitable position like a central cable distribution cabinet instead. Total control made easy – the Sitemaster The Sitemaster allows the communica- tion of the forecourt components with the Network Management System NMS. With this compact system easiest control of a petrol station becomes possible. For example suppliers of LPG fuel can use this system to receive infor- mation on current sales, tank levels or prices. With the Sitemaster automated base price adjustments become pos- sible. Even the smallest petrol station without an own shop can use the Site- master. Simply connect a card terminal to the Sitemaster, and use it as basic POS system at the site. Highlights at a glance Petrol station management Modular structure that can be adapted to the needs for any station Comprehensive merchandise management system Station card processing Intuitive user operation Mobile back office TMS 30 LITE 11
  • 14.
    Payment Secure indoor andoutdoor solutions Product portfolio Security, compliance and reliability the cornerstones that underpin all of our payment solutions. All of our payment solutions meet and, in most cases, exceed all local and national requirements consistently delivering maximum performance and reliability. The foundations to grow your business and increase your profits. Outdoor payment solutions offer additional convenience for your customers and consequently drives fidelity, also preventing expensive “drive off” situations. Deliver pay at pump by specifying Scheidt & Bachmann CRID (Card Reader in Dispenser), our EMV compliant dispenser mounted devices why not add multimedia to create maximum impact. This option is also available to retrofit existing Scheidt & Bachmann dispensers and some other leading manufacturers dispensers. Highlights at a glance Payment EMV compliant Domestic and international approvals Processing of all standard card types, including customer cards and loyalty cards Membership in domestic and international commissions/boards Cash Management Cash Management Managing and controlling cash presents many challenges for retailers. Security and accuracy are two of the biggest issues - this is why we have developed a direct interface to a cash recycler system from the TMS 30 system. This device counts cash in and out securely storing all cash transactions in a high security safe that staff have no access to. All data is stored in the TMS 30 system and all cash is accurately managed eliminating cash differences and significantly removing security risks. Active involvement in innovative developments Our participation in domestic and international commissions and boards ensures that we are actively involved in all matters of statuate change and regulatory compliance. This means we help our customers to maintain the highest standards of compliance and maintaining market leading payment systems. Scheidt & Bachmann are proud to be members of the following international payment bodies and commissions: EPSM - European Association of Payment Service Providers for Merchants www.epsm.eu EPAS - Electronic Protocols Application Software IFSF - International Forecourt Standards Forum EPS-POS and EPS-FEP specification www.ifsf.org 12
  • 15.
    Central management Total control- deploy, manage and report Effective management control with on time accurate reporting delivered to the key decision makers in your business – Scheidt & Bachmann’s NMS (Network Management System) has been designed to deliver all this and much, much more. Manage and control your stations from a central location. NMS enables you to adjust all prices, edit products, suppliers and detailed analysis of all wet and dry stock sales data. Management data by exception ensures the right reports are delivered to the right people in your organisation in a variety of formats via email or SMS – it’s your business you decide! Detailed KPI reporting Comprehensive reporting on pre- defined KPI’s (Key Performance Indicators) allows you to assess business performance quickly. No one knows your business better than you. Powerful drill-down reports allow dynamic data interrogation. This means you can investigate and build reports on the fly – drag and drop data on to existing reports or build new reports as you desire, display graphically or export to other applications for further analysis. Central promotions Plan your promotional activities centrally and deploy them to your connected stations. Use the reporting and dynamic alerts functionality to monitor promotion success. Deploy new promotions to maximise opportunities e.g. bad weather = screen wash. NMS hosting - low cost entry point Let Scheidt & Bachmann manage your data services, this means you have no initial investment into your own system infrastructure. We take care of your data – securely and comprehensively manage data integrity. A central NMS securely located with backup co-located server infrastructure ensures a seamless operation. The hosted service provides all businesses with a choice of how they maximise the benefits of NMS to their buiness. Highlights at a glance Central management Central merchandise, price and promotion management Wet stock management Comprehensive analysis and reporting tools Location independent thanks to web browser technology Alarm and service management Hosting: we take care of the operation 13
  • 16.
    The first pay-at-the-pumpequipped and approved fuelling pumps left our Moenchengladbach plant in the early 1960s. A lot has happened since. Unmanned site systems have to meet numerous exacting regulations. At an unsupervised station, the safety and reliability of the systems and equipment are paramount. Protection against vandalism Sturdy workmanship and the use of premium quality materials provide the maximum amount of protection against vandalism. Electronic door locks are installed and stations can be connected to a video surveillance system and remote CCTV monitoring centres. Unmanned stations Reliable solutions available 24/7 Product portfolio 22 Remote monitoring To be able to monitor the status of the systems at your station, we have connected them to our network control system, which supervises your stations remotely. This ensures that any issues are detected proactively and that preventative action is taken. Remote monitoring also allows us to service the system and update as necessary. We monitor the heartbeat of your systems Utilising our Sign of Life concept, stations are monitored for activity via signal checks. If no response is received, a service request is triggered automatically. A direct message is sent to our technicians so they can investigate and resolve any issues promptly. The process is completely automated against pre-defined service level agreements. Simple, clear operation Customers have to operate pumps intuitively and confidently without the assistance of station staff. The multimedia system provides guidance and support in multi-language if required. Daylight compatible TFT touch screens guide the customer through the fuelling process step by step. To guarantee absolute security for non-cash payment transactions, all utilised card processing systems are in compliance with the latest statutory requirements. Our terminals do of course accept all standard ISO compliant card types. Our systems also make the retrofitting of stations from attended to unattended services possible. Our CRID (Card Reader In Dispenser) retrofitting kits are available with and without touch screens. Highlights at a glance Unmanned stations Sign of Life Central management via NMS Secure card payment in compliance with the latest security requirements Daylight compatible screens Integrated video surveillance OPT 240: VdS certified Modular; the perfect solution for every station 14
  • 17.
    Planning promotions andsetting them up in the system, printing price signs and displaying them throughout the shop, preparation of posters and pump toppers to attract attention – just to name a few of the steps you have to go through to make a successful promotion – it all takes time and costs money. In fact, sometimes you might think it’s too much work. Consequently, we developed our Promotion Suite – a solution that will take the pain out of the process. Simply plan your promotions in the TMS 30 system or centrally from the NMS. The system will automatically distribute the promotion to all of your selected stations. The local system will subsequently store the latest prices for the promotional period. The information is automatically sent to Promotion Sales & Marketing promotions as easy as 1, 2, 3 the connected displays and shown throughout the duration of the promotion. Variable options Your customers will see your advertising message on the multimedia display of the pump as well as on the promotion screens in the shop. Regardless of how many displays you decide to connect, your advertising message is positioned in a prime position at the customer’s eye level. The fuelling data and the customer display are fully integrated into the design of the displays. This means the customer has full view of the promotion throughout the fuelling process. Are my promotions working? Thanks to the fact that these ads are now integrated into the management system of your petrol station, you can also get your feedback on your promotions’ effectiveness quickly and easily. The sales figures, which are compared with the integrated promotions, provide detailed data on sales volumes and margins. Drive emotions Grab your customers’ attention with moving pictures. In addition to static images, you can also show slide shows and movies on your displays. Stimulate your customers senses and introduce new products and/or services. Electronic displays allow the creative retailer endless options to stimulate sales without the expense of reprinting materials and ensure prices and promotions are always current and accurate. Highlights at a glance Promotion Centralised and compatible with local planning Actuation of multiple displays possible Advertising message is always at the customer’s eye level Full integration into the merchandise management and product maintenance solutions of our system Saves time and money thanks to automated display updates Control of advertisements’ effectiveness 15
  • 18.
    Optimum sales support: Servicesfrom Scheidt & Bachmann Installation, maintenance, repairs, training At Scheidt & Bachmann, service is PRIORITY ONE. We deliver the complete package of solutions for petrol stations from a single source. We make it our business to offer you services that are tailored to your needs – including comprehensive service plans. Here we are! Service is just the beginning. Whether you need consulting, installation, start-up, maintenance, help desk services, training or lifecycle management – we deliver everything under one umbrella. Quality service management provided by highly qualified staff – 365 days a year, 24 hours a day. We are here to serve you whenever you need us. To do this, we have access to a wide array of diagnostic tools so that we can provide support to you when you need us the most. Thanks to this state-of-the art technology we are in a position to diagnose and eliminate numerous issues before they can cause any interruption to your station’s operations. Training centre We offer extensive training programmes for our pumps and systems at our own modern training facilities in Moenchen- gladbach. These training facilities are equipped with the latest systems to offer participants a practice based learning environment. Our trainers have acquired practical experiences over many years of working with these tools. Upon request we offer personally tailored training courses that can be delivered in the classroom or at your premises. Help Desk If you have any questions or operational issues in the practical use of our solutions, our service hotline team will be pleased to assist you. Our help desk team have the facility to access systems remotely in order to locate the root cause of any issues to provide full resolution. The majority of all calls are directly resolved this way. Network surveillance / alarm management for early detection The fully automated surveillance of all installed systems is an important tool that helps safeguard your systems availability and guarantee uptime. Any issues notified from your system, a message is sent to our network control server within seconds. A tracked ticket is automatically generated and sent to our help desk, who will investigate the nature of the notification. The early detection makes it possible to eliminate any issues proactively, without impacting on operations. If an issue cannot be resolved as a result of this remote intervention, a work order is immediately generated, which is sent directly to our technician’s mobile device. Alarms sent from pumps and other forecourt devices are also recorded and can be transferred to other contractors. 16
  • 19.
    Software update service Allrequired software updates are distributed through our download server. On occasion, this happens overnight. Depending on the type and scope of the update, manual interventions are not required. This means there is no impact on daily operations. Sign of Life We monitor the heartbeat of your systems. Proactively responding to any system issues before they impact on the operational efficiency of your business. This is particularly critical for automated systems and unmanned stations. Maximum availability = more sales = optimised profit. Lifecycle Management We monitor every component throughout its entire lifecycle. As a result, we are in a position to collect this data and use it to continuously improve our performance. This translates into even more reliable hardware and software. Territory wide field service We regularly train our service technicians on our systems. Consequently, they are always familiar with the latest technology and can provide the best possible intervention services. Every service vehicle is replenished with the most important spare parts, so that first time fix is achieved at every opportunity. To make our assignment planning even more efficient and to ensure that our service technicians can get to our customers in the shortest possible time, we have equipped all of our service vehicles with state-of-the art GPS technology. Consequently, our dispatchers are always aware of the current location of all service technicians and can direct them to your location as quickly as possible. This also allows us to plan and co-ordinate maintenance and repair assignments more efficiently. Our planning and analysis tools enable preventative maintenance programmes e.g. the preventative replacement of components or required updates. Essential maintenance work can be performed during times when it does not have an adverse impact on your business and can consequently be reduced. Highlights at a glance Services Project planning for rollouts Installation, maintenance and repair services Assignment optimisation thanks to modern GPS technology Training centre Remote service Early detection Sign of Life Lifecycle management 17
  • 20.
    Signalling systems Petrol stationsystems We set the world in motion: System integrators for a mobile world The system integrator Scheidt & Bachmann
  • 21.
  • 22.
  • 23.
    From the ticketmachine to the fuel pump, from the turnstile to the level crossing – Scheidt & Bachmann technology surrounds us everywhere. In order to keep people in motion day by day, we consistently think systematically. We develop, produce, distribute and maintain systems for multi-storey car park and leisure facilities, as well as systems for signal engineering, fare collection management and petrol stations, split into four largely independent fields of distribution. We always stay true to our philosophy: We systematically introduce innovative processes so that our customers are always one step ahead. Parking and leisure centre systems Signalling systems Fare collection systems Petrol station systems
  • 24.
    2626GB/2-0812/500 ©08.2012Scheidt&BachmannGmbH Subjecttochanges,misprints,errorsandtechnicalchangesexpected. Scheidt & BachmannGmbH Breite Strasse 132 41238 Moenchengladbach Germany Phone +49 2166 266-321 Fax +49 2166 266-341 petrolstation@scheidt-bachmann.com www.scheidt-bachmann.com