The school district allocated $3.75 million in bonds for auditorium renovations. So far $1.99 million has been spent or committed, leaving $1.76 million remaining. The auditorium needs several infrastructure upgrades like a new roof, electrical and HVAC systems, but reopening it temporarily would be problematic due to construction sequencing and safety issues. It is recommended to fully delay further renovations until a local arts non-profit completes fundraising for the remaining $2.5 million needed, estimated to be achieved by early 2013, so that all work can be done efficiently and cost-effectively in one phase.
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...Clay Asbury
An overview of Richmond Primoid's concrete restoration, caulking, and waterproof coating for Virginia Tech's historic Lane Stadium. Deck coating provided by NeoGard.
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
On Wednesday 13 November 2013, Blake Lapthorn's climate change team hosted a green breakfast seminar. Guest speaker Keeran Jugdoyal, Mechanical Engineering Manager at Faithful+Gould, talked about the lessons his company has learnt about the end use of sustainable buildings.
From What to How: BCBC Energy Provisions Compliance and MonitoringTim Ryce
High-level review of the upcoming and already-in-place energy efficiency requirements/regulations in the 2012 BC Building Code. Focus on upcoming Section 9.36
Slide deck from 2014 Community Energy Symposium
An overview of Richmond Primoid's restoration work for Virginia Tech's histor...Clay Asbury
An overview of Richmond Primoid's concrete restoration, caulking, and waterproof coating for Virginia Tech's historic Lane Stadium. Deck coating provided by NeoGard.
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
On Wednesday 13 November 2013, Blake Lapthorn's climate change team hosted a green breakfast seminar. Guest speaker Keeran Jugdoyal, Mechanical Engineering Manager at Faithful+Gould, talked about the lessons his company has learnt about the end use of sustainable buildings.
From What to How: BCBC Energy Provisions Compliance and MonitoringTim Ryce
High-level review of the upcoming and already-in-place energy efficiency requirements/regulations in the 2012 BC Building Code. Focus on upcoming Section 9.36
Slide deck from 2014 Community Energy Symposium
Tangible Property Regulations - an MPS|CPA PresentationKathryn Brill
Learn about tangible property regulations and their applicability, RABI testing, and more in this presentation by MPS|CPA, one of Chicago's leading accounting firms. Check out http://mpscpa.com/ for more accounting solutions.
a presentation on dr. bhim rao ambedkar auditorium and sceintific convention center in the campus of king george medical college located in the Lucknow, U.P.
INDIA
Auditorium Literature Study & Design ConsiderationsVartika Sharma
The presentation includes basic fundamentals to keep in mind while designing an Auditorium.
Source:
• National Building Code (NBC),
• Time Saver Standards-Building Types (TSS),
• Neufert
• IS Code - is.2526.1963
Tangible Property Regulations - an MPS|CPA PresentationKathryn Brill
Learn about tangible property regulations and their applicability, RABI testing, and more in this presentation by MPS|CPA, one of Chicago's leading accounting firms. Check out http://mpscpa.com/ for more accounting solutions.
a presentation on dr. bhim rao ambedkar auditorium and sceintific convention center in the campus of king george medical college located in the Lucknow, U.P.
INDIA
Auditorium Literature Study & Design ConsiderationsVartika Sharma
The presentation includes basic fundamentals to keep in mind while designing an Auditorium.
Source:
• National Building Code (NBC),
• Time Saver Standards-Building Types (TSS),
• Neufert
• IS Code - is.2526.1963
Agenda Item 17: Presentation on the Vision for San Angelo Performance Arts Center, including proposed construction
of a performance arts campus, and renovations and additions to the City Auditorium
a. Discussion on unfunded improvements to the City Auditorium and any action in connection thereto
b. Discussion, consideration, and possible action authorizing staff to negotiate an agreement with
SAPAC for SAPAC to lease and operate the City Auditorium to include Hotel Motel Tax
allocations, revenue sharing, and other possible funding opportunities
(Presentation by Susan Brooks, SAPAC Board President and Matt Lewis, President, San Angelo Area
Foundation-Fiscal Sponsor)
Improving Auditorium and Theatre Safety: Tips for Reducing Risk Facility Masters
Learn how preventive inspections and regular maintenance of auditorium and theatre facilities and equipment protect you from liability issues while also providing a safe learning environment.
This slide show was presented at the November 19, 2015 Haddonfield Board of Education Meeting. This represents the specific projects with estimated costs that will be sent to the state DOE for evaluation of appropriateness as well as a determination of state aid in terms of debt service. The resolution to move forward with these projects at this time was unanimously agreed on by the BOE.
• Electricity Incentivisation Scheme (EIS) at the University of Cambridge
• Design of Engineering’s Data Centre cooling system
• Energy use from 2010 onwards
• Next steps
Casestudy of the HVAC systems for the LEED Platinum IGS Building
A presentation by Joe Ventresca of Max Green
Presented at the Columbus Green Building Forum's 2011 Green Building EXPO
The objective of the webinar was to provide BER assessors an understanding of the National Retrofit programme, what is a one stop shop, key requirements and conditions, a home energy assessment and what Grants are available.
Mayor Rita Albrecht shares information about the City of Bemidji's Guaranteed Energy Savings Performance Contract to do energy efficiency work across 9 city buildings and to install LED street lights. More information at http://www.cleanenergyresourceteams.org/blog/saving-energy-city-wide-bemidji-guaranteed-energy-savings-program.
A printed circuit board (PCB) is a fundamental component in modern electronics that serves as a platform for assembling and connecting electronic components. It provides a solid foundation for the interconnection of various electronic elements, including integrated circuits (ICs), resistors, capacitors, and other passive and active components.
The construction of a PCB typically involves a thin board made of non-conductive material, often fiberglass reinforced with epoxy resin or other laminates. The surface of the board is coated with a layer of copper, which serves as the conductive material for the electrical pathways.
PCB design involves a meticulous layout of conductive traces, which form the pathways for electrical signals to flow between components. These traces are usually etched onto the copper layer through a process of chemical etching or mechanical milling. The layout of the traces is determined by the circuit schematic, aiming to minimize signal interference, optimize signal integrity, and ensure efficient electrical connectivity.
In addition to the conductive traces, a PCB features various other elements. These include pads and vias. Pads are small areas of exposed copper where electronic components are soldered onto the board. Vias are holes drilled through the board that connect different layers of the PCB, facilitating the routing of traces between them.
PCBs can have multiple layers, ranging from single-sided boards with components mounted on one side, to double-sided and multi-layer boards, which have components mounted on both sides and multiple layers of conductive traces sandwiched between insulating layers.
The manufacturing process for PCBs involves several steps, including design and layout, fabrication of the board itself, application of the copper layer, etching or milling of the traces, drilling of holes for components and vias, and finally, assembly of components onto the board through soldering or other methods.
PCBs are essential in a wide range of electronic devices, from simple consumer electronics like calculators and remote controls to complex systems like computers, smartphones, and medical equipment. Their compact design, reliability, and scalability make them indispensable in the world of modern electronics, enabling the creation of increasingly sophisticated and efficient electronic devices.
Chris Crosby's 2013 Uptime Symposium presentation on the inherent inefficiencies (capital, land, natural resources and more) plaguing many of today's data center designs.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
2. Auditorium renovations
• Bond amount $3.75 million
• HVAC costs $1.11 million
• Design services $340,378
• Construction services $496,746
(Mostly related to annex, fire protection, plumbing
renovation column support)
• Total spent/committed $1.99 million
• Balance $1.76 million
3. Auditorium renovations
Needs include:
• Roof
• Electrical infrastructure
• Theatrical rigging/lighting system
• Digital sound system
• Mezzanine restrooms
• Stage HVAC
• Sprinkler system tie-ins
• Security system
4. Auditorium renovations
Needs include:
• Complete annex
• New drapes
• New stage floor
• New elevator for annex
• Dressing room renovations
• Fire sprinkler system
• Seating
• Orchestra pit and operating lift system
5. Auditorium renovations
Venue cannot be temporarily reopened because:
• Construction must occur in a proper sequence. (Roof
first, sound and lighting last.)
• New electrical infrastructure would lack all final
connections because of available funds.
• Some public safety and access issues could not be
adequately addressed because of available funding
and construction sequence.
6. Auditorium renovations
Why waiting is the best approach:
• Improvements could be done in best sequence.
Would avoid work being damaged, destroyed, redone.
• More cost-effective to address all renovations at
once; work would not have to be redone, and should
be economies of scale bidding only once.
• Would minimize disruption to audiences.
• Would increase public’s “wow factor.” Initial
improvements would be hidden infrastructure.
7. Auditorium renovations
SAPAC fundraising:
• Committed to raising $2.5 million for Auditorium.
• Raised $7.3 million of $13.7 million goal for
performing arts campus (including renovated
Auditorium).
• SAPAC must first complete fundraising before any
funds will be available for construction.
• Goal should be reached 4Q of 2012 or 1Q or 2013.
Bidding could begin next year.
8. Auditorium renovations
Almond, SAPAC and City staff, recommend:
• Further renovations be delayed until SAPAC
completes fundraising so all renovations can occur at
once.