SlideShare a Scribd company logo
CHITTARANJAN LOCOMOTIVE WORKS
ModelRailway Society is a cohesivebody madeup of some25 men coming togetherfromvarious
partsof Pune. Having diverse professions,they sharean intenseloveforIndian railways.TheSociety
is now25 years old and haspaid visits to several importantrailway locations in thepast.
Chittaranjan LocomotiveWorkshad been theirsavored dream fora long time. A Sixteen- member-
team communicated withtheChief PRO atCLW, who managed a semiofficialvisit for themembers.
The teamreached Chittaranjan on themorning of 22nd
July 2013 and stayed overnightto continue
the visit on the following day.Thisarticle stemsfromthe actualinformation given by the technical
staff on site and also fromsomeformalpublications,furnished by thePROof the CLW.Every effortis
madeto maintain accuracy in thetechnical information.Wehopethis shortaccountshould help a
railway enthusiastto obtain an overview of whatChittaranjan LocomotiveWorkstoday standsfor.
History of CLW : Before Independence, nearly42 private railway companiesowned the railwaysof
Indiaand they hadtheirownwaysof procuringthe locomotive powerandall were importedfora
longtime.Afterthe greatWorldwars,these companiesfoundit difficulttoprocure locomotives
fromoverseasanda unified needwasfelttohave these locomotivesbuiltindigenously.Howeverit
was onlyafterindependence thatthe unifiedefforttobuildalocomotive plantwasrealized.
ChittaranjanLocomotive Workshada verymodestbeginning,whenthe tinySanthal village inwest
Bengal wasidentifiedasaplace to establishalocomotive factory. The closestrailwaystation tothis
area wasMihijamon the Asansol Patnasection.ThisindigenousLocomotiveplantwas named
“Chittaranjan”topay tribute tothe greatDeshbandhuChittaranjan Das.(There isalegendthatthe
landformerlybelongedtothe Chittaranjanfamily afterwhomthe plantwasnamed).Eventhe
Mihijamrailwaystationwaslaterchristened “Chittaranjan”.
Tata had established TELCO in 1945, which built the some Meter gauge steam locomotives for
Indian railways, but they soon found difficult to cope with the growing demands of the fast
expanding railway industry in India. CLW as it is now called (CHIREKA in Hindi), was thus established
in February 1948 by the Government of India and the first freight Steam locomotive, WG was rolled
out in November 1950. The production soon expanded to build WP’s, WT’s and WL’s. It also built
YG’s for Meter Gauge traffic in India. CLW built a total number of 2351 Steam locomotives for Indian
Railways.
Although the CLW are now renowned for building Electric Locomotives alone, the factory built a
large number of Diesel Locomotives for Indian Railways from 1968 to 1994. They mainly built Diesel
Hydraulic Locomotives including WDS4, WDS8, YDM2 and a number of locos for the narrow gauge
railways. Today the CLW stands proud not only in manufacturing the conventional electric
locomotives with DC traction Motors, but it also builds microprocessor controlled modern mainline
Electric Locomotives using three Phase AC induction Motors. With a modest beginning by building 5
electric Locos in 1961, CLW has increased its tally to 250 locos in the year 2012, taking the total to
4646 ElectricLocomotivestodate.
Our Tour : Model Railway Society, Pune has about 25 members. Sixteen of them had volunteered to join
the trip to Chittaranjan. 14 of them took the Duronto on 20th
July to reach Howrah on 21st
evening. Me
and Pande flew to Kolkata and joined the group on Howrah station on the 22nd
morning to board the
Poorva Express at 08 00 hrs. Poorva was swift enough to take us to Chittaranjan at 11 sharp.
Chittaranjan Station is a beautiful tiny station and is surprisingly clean. Believe or not, but the CLW
officials had arranged a minibus to collect us and take us to the Guest House. After a quick wash we
went and met the Chief PRO Mr. Mantar Singh. He is a very warm and receptive character and was truly
pleased to see a team of 16 people travelling all the way from Pune only to visit CLW. He gave us a plan
of the tour andlaterdirectedusto the mainassemblyshop.
This was a rapid tour which showed us the building of Electric Traction Motors (Both DC and 3 phase AC)
and their alignment over the bearings of the axles. The most exciting part was the alignment of the Spur
gears between the motors and the axles. We saw machining and grinding of the axle rods and the
wheels to ultimate precision. The winding of the stators was a treat to see. Body shells of the
locomotives are either casted as whole or fabricated, depending on the model protptype. The
magnitude of the workand the dimensionof the hardware issimplymindboggling.
Later we visitedthe machiningshop,where we saw the axle turning,wheel machiningandassemblyof
the wheel sets. Modernlocomotivesuse fabricatedbogies.Completemachiningandfabricationof the
bogiesisperformed comprehensively inthisshop.
On the morning of the second day they took us to visit a small loco museum, named Deshbandhu Loco
Park. A number of famous CLW products were on display, notably the last WG (wrongly named Antim
Sitara, since the real Antim Sitara was a YG). We also saw some live steam models, which are currently
out of function. A 1/4th
gauge garden railway exists on the premises, but works only on special
occasions.
Later on that day we visited the “Testing and Quality” lab. The most impressive item was the “Foundry
Master”, a German equipment, which analyses a metal and gives us the constituents (or impurities)
literally in a flash. We also saw various other equipment, which tested and estimated the tensile and
compressive strengths of the metals again in a very short time. Somehow the enthusiasm of the staff
rather exceededoursand thissessionturnedouttostretchour patience abit.
The best part of our trip was yet to arrive. We had asked to see a qualified Electrical Engineer to answer
some of our questions. Mr. Mantar Singh arranged a meeting of ours with Mr. Sahu, who was a true
genius. Just as our session began getting interesting, a person of Managerial level walked in and rudely
interrupted our session. He said he wanted to start an important meeting. Anyhow the session with Mr.
Sahu wasthoroughlyabsorbing.
Steel Foundry
The Steel Foundryisan impressive plant,locatedaboutakm.away fromthe workshop.Establishedin
1963, incollaborationwith M/s.F.H. Lloydof UK in1963, the foundrynow isvirtuallyself sufficientand
casts Bogie Frames,axle rods,axle box housesandsuspensiontubes.Italsocasts a numberof itemsfor
Traction Motors suchas Rotor Clampsand BearingBrackets.Theyare now cast inlightweightsteel and
are transportedtothe Machine Shop formachining,turning,finishingandfinal assembly.
In the heartof the forgingfurnace,the temperature of the moltenmetalis raisedto1620 degree Celsius
by an electrical current of 60 kiloamperesat12 kV to produce a powerful arc. We saw the burning
furnace whichmade a frighteningandcracklingsound.Howeverwe were notable tosee the actual
casting,since thisisperformedonlyatcertaintimesof the day. The temperature laterdropsto 1580
degreeswhilethe metal ispoured intothe moulds. All inall thiswasa thumpingexperience.
As we approached the end of our visit, Mr. Mantar Singh invited us all in his office and presented each
one of us a CLW calendar and a Brochure. We had a wonderful experience all-round. As we bid good bye
to the CLW, we all had a proud feeling about CLW. After a thoroughly informative experience, we drove
back to Asansol Railway Stationtoboardthe 12321 Up to catch our wayback.
While we returnedbyHowrahMumbai Express,everyoneof uscarrieda proudsentimentwithinus.
What a great experience it wasfortwofull days.Nosurprise reallythatthe Electrical energy,when
harnessedandcontrolledbyelectronics,candowondersinthisworld.
Some of my jottingsabout the CLW,which I would love to share with my Railfan Colleagues.
Electric PowerSupply : CLW draws itspowersupplyfromDamodarValleyCorporation(DMC) situatedat
Maithan,a small town15 kmsawayfrom Chittaranjan. DMC hostsa Hydroelectricplantof 40 MW and a
Gas Turbine Unitof 90 MW connectedtothe main grid. Chittaranjanalsohasan in-house generating
capacityof 11.6 MW as a backupfacility.
The Conventional ElectricLocomotives: Conventionallythe electrical circuitiscompletedthroughthe
bodyof the locoand earthedviathe rails. 25 kV single phase ACsupplyisdrawnbythe pantographs
and isfedto the transformers.Thisisfurtherrectifiedto750 V DC and suppliedtothe tractionmotors
througha tap changer (essentiallythroughaseriesof resistances).DCTractionmotorswere believedto
have a higherinitial torque andwere universallyusedinmostsituationsincludingall the diesel electric
locomotives.
The Technologyof ModernLocomotives (as I understood) :The Pantographreceivesthe fixed
frequency (50Hz) alternating currentof 25 kV from the overheadequipment(OHE).Thisisfiltered
throughProtectionCircuitstoremove impuritiesinfrequency.ItissubsequentlyfedtoaTransformer
for steppingdown.There are foursecondarycoils.The outputfromsecondarycoilsisdistributedas
follows.
Coil 1. Fedto Gate Turnoff Circuit(GTO),whichconvertsthe outputtoDC and laterchoppedto
three phase AC,supplying variablefrequencyandvariable voltagetothe TractionMotors. This
technologyisnowgettingupgradedtoIGBT(InsulatedGate BipolarTransistor)
Coil 2. Main CompressorMotors.These are simple ACinductionMotors
Coil 3. BlowerMotors(AC).There are at leastthree setsof these.
Coil 4. Suppliesaccessoryequipmentof the Locomotive.
ConventionalACMotorsare simple inductionmotors,where the statorreceiveselectrical current
thoughradiallyarranged fieldcoils.The electromagneticinductionthusproduced,movesthe Rotorin
the directionopposite of the poles.The speedof rotordependsdirectlyonthe frequencyof currentand
the numberof poles.(e.g.n= Frequency*120 / no.of Poles).Thustheirspeed synchroniseswiththe
frequencyandare therefore calledSynchronousMotors. These motorshave afixedspeedandfixed
torque,whichmakesthemunsuitable astractionmotors,where the demandsof torque andspeedare
variable.
Three Phase AsynchronousMotors : The three phase technologyowesitsrootstoBobardier
TransportationSwitzerland.The Statorinthese motorsissuppliedwithphasesatthree differentpoints
distributedat120 degreesangle witheachother.The inductionthusproducedhasa motive powerat
three pointsina cycle.The resultantspeedandtorque of the rotor dependsonthe frequencyandthe
voltage of the inducedfield.A microprocessormodulatesthe frequency,phase andthe voltage to
generate the requiredtorque andspeed. AsIunderstoodthe voltage variesbetween1and2180 V AC
and the frequencyvariesbetween40and 65 Hz. CLW commencedbuildingof 850 kW and 1150 kW 3-
phase tractionmotorsin 1998 and startedrollingoutmodernelectricLocomotivesin1999.
Traction Motors: This basic motive force is the soul of CLW. It now builds Type 15250A DC series
motor which works on 750 V DC and produces 630 kW of power. These are used for conventional 5000
BHP 25 kV locomotivessuchasWAP 4 and WAG 7. Thistechnologyhas now given way to the modern 3
phase AC asynchronoustractionmotors.CLW thusisnow engagedinbuilding two important types of 3
phase motors, the 850 kW 6FRA 6068 and the 1150 kW 6FXA 7059 for use in WAP 7, WAP 5 and WAG 9.
Current CLW products can be tabulated in the following form
Type
Power
Output
No.
of
Axles
Axle
Load
Traction Motors Purpose
Speed
potential
Technology Bogies Highlights
WAP-
4
5000
BHP
6
18.8
Tonnes
ConventionalDC
Fast
passenger
140
kmph
Tap Changer
Flex-coil
Cast Steel
Hauls Mainline
Superfast Trains
including Rajdhani
Expresses
WAG-
7
5000
BHP
6
19.5
Tonnes
ConventionalDC
Heavy
Freight
100
kmph
Tap Changer
Fabricated
High
Adhesion
Hauls Air Braked Heavy
Freight Stock
WAP-
5
5400
BHP
4
20.8
Tonnes
Three Phase AC
Asynchronous
Superfast
passenger
160
kmph
Microprocessor
(GTO)
Controlled
variable
Frequency
variable
Voltage
Two Axles
per Bogie
Disk
Brakes
Originally ABB
transferredTechnology.
Useful Regenerative
Potential
WAP-
7
6000
BHP
6
20.5
Tonnes
Three Phase AC
Asynchronous
Long Fast
Passenger
Trains
160
kmph
Microprocessor
(GTO)
Controlled
variable
Frequency
variable
Voltage
The only Loco with
Head-on Generation
capability eliminating
the need for End-on
Generator car
WAG-
9
6000
BHP
6
20.5
Tonnes
Three Phase AC
Asynchronous
HeavyDuty
Air Braked
Freight
traffic
100
kmph
Microprocessor
(GTO)
Controlled
variable
Frequency
variable
Voltage
Loco has Air
Conditioned Driver's
Cab
WAG-
9H
5000
BHP
6
20.5
Tonnes?
Three Phase AC
Asynchronous
HeavyDuty
Air Braked
Freight
traffic
100
kmph
Microprocessor
(GTO)
Controlled
variable
Frequency
variable
Voltage
High
Adhesion
Increased Axle load to
improve the wheel
Adhesion. Suitable for
long and heavy Freight
Rakes
WAG-
9i
5000
BHP
6
20.5
Tonnes?
Three Phase AC
Asynchronous
HeavyDuty
Air Braked
Freight
traffic
100
kmph
GTO replaced
by IGBT based
Propulsion
System
Improved performance
and reliability, better
control and
regeneration, reduced
losses. Modular Design
Some Photos taken during our visit
1. AntimSitara”showcasedin the formof a WG
2. Photographof the oldSanthiavillage,wherethe plantwasestablished
3. The majesticbuildingof the Asansol JunctionRailwayStation
4. Entrance to the “DeshbandhuLocoPark”
5. The Furnace of the Steel Plant
6. Sunsettingoverthe ChittaranjanTownship
7. The expanse of the Steel Foundry
8. The freshlyrolledout WAG9H and WAP4
9. The Gang that visitedCLWinJuly2013
Steam Locomotivesbuiltby CLW so far
WG (1908), WP (259), WT (30)
WL (94),YG (60)
Total SteamLocos= 2351
Diesel Locomotivesbuiltby CLW so far
WDS-4,WDS-8,YDM-2
NDM-5, ZDM-3, ZDM-4A, ZDM-5
Electric Locomotivesbuiltby CLW so far
WCG-2, WCM-5
WAG-1, WAM-4, WAG-7
WAP-1,WAP-3,WAP-4,
WAP-5,WAP-7
WAG-9, WAG-9H, WAG-9i
Downside of the CLW
It ispainful towrite these lines afterhavingsuchan exciting tour.Howeverwhile we visitedthe place,
we foundthe followingaspectsratherdisturbing.
1. The machine shopsappearedratherbaronand lookedasif nothingmuchisgoingon there.
There istoo much of space whichisbaronand unutilised.
2. We all feltalot of more workcouldhave beendone inthe plant,particularlywhenwe sawalot
of machinerylyingidle.The numberof workers whoreallyworked appearedveryscarce.
3. It was a pityto see a numberof itemsprocuredbyoutsourcing,especiallythe fabricated body
shellsof locomotives.The fabricationunitinside the plantlookedquite capable of doingthe job.
4. It was ratherhard to findpersons,whowere trulyqualifiedtoanswerthe technical queries
raisedbyour members.
Thisaside,we hada memorable experience all round.CLWisnotonlya heavyindustrial plant;it’salsoa
proudsymbol of a distinguishedand enviableventureof the IndependentIndia.
Acknowledgements: We are extremely indebted to thePRO of CLW, Mr. Mantar Singh,who was
committed to makethis visit a reality. We all owea lot to ourSecretary Mr. Amod Gune,who took
immenseeffortsto make thishappen. Iam also indebted to ourmember Mr.JayantKelkar,who
virtually educated mein the science of Electrical Engineering during theentire courseof our visit.
Shirish D. Yande
5 August2013

More Related Content

What's hot

Diesel loco shed
Diesel loco shedDiesel loco shed
Diesel loco shed
Abhishek dayal
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
Sagardwip das
 
RAILWAYS MANAGMENT
RAILWAYS MANAGMENTRAILWAYS MANAGMENT
RAILWAYS MANAGMENT
Sai Teja
 
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush Singhal
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 201127suraj
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
zakriya furkhan
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
Kaushu Deshwal
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
babai das
 
report on loco workshop ajmer
report on loco workshop ajmerreport on loco workshop ajmer
report on loco workshop ajmer
YashRajSingh41
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
Piyush Saini
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
Mechanical Engineering Student
 
railway report dhiraj
railway report dhirajrailway report dhiraj
railway report dhirajDhiraj Kumar
 
Sandeep mishra
Sandeep mishraSandeep mishra
Sandeep mishra
Shashank Srìvastávʌ
 
5884 vic track display panels a2 final
5884 vic track display panels a2 final5884 vic track display panels a2 final
5884 vic track display panels a2 finalAustralian Steamtrains
 

What's hot (17)

Diesel loco shed
Diesel loco shedDiesel loco shed
Diesel loco shed
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
 
RAILWAYS MANAGMENT
RAILWAYS MANAGMENTRAILWAYS MANAGMENT
RAILWAYS MANAGMENT
 
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 2011
 
electric loco shed lalllguda
electric loco shed lalllgudaelectric loco shed lalllguda
electric loco shed lalllguda
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
 
report on loco workshop ajmer
report on loco workshop ajmerreport on loco workshop ajmer
report on loco workshop ajmer
 
Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
 
railway report dhiraj
railway report dhirajrailway report dhiraj
railway report dhiraj
 
Sandeep mishra
Sandeep mishraSandeep mishra
Sandeep mishra
 
5884 vic track display panels a2 final
5884 vic track display panels a2 final5884 vic track display panels a2 final
5884 vic track display panels a2 final
 
Railway
RailwayRailway
Railway
 

Similar to Chittaranjan locomotive works

Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
Prabjeet Singh
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
Pruthvi Raj
 
Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Arvind Maurya
 
456.pdf
456.pdf456.pdf
456.pdf
HerryHerry33
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
Shivam Prajapati
 
A044010114
A044010114A044010114
A044010114IJMER
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
IJMER
 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
Shivam Prajapati
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
Sameer Shah
 
Sandeep
SandeepSandeep
Sandeep
Sandeep Kumar
 
DLW Summer training report
DLW Summer  training  reportDLW Summer  training  report
DLW Summer training report
Eshver chandra
 
MMTMRTS PowerPoint Presentation
MMTMRTS PowerPoint PresentationMMTMRTS PowerPoint Presentation
MMTMRTS PowerPoint PresentationDhoulatsah M
 
Design & fabrication of Motorised vehicle
Design & fabrication of Motorised vehicleDesign & fabrication of Motorised vehicle
Design & fabrication of Motorised vehicle
Government engineering College- Banswara,Rajasthan
 
PLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAINPLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAIN
Rishab Acharya
 
indian railway matunga carriage workshop
indian railway matunga carriage workshopindian railway matunga carriage workshop
indian railway matunga carriage workshop
Chirag Ramakrishnan
 
Summer Training Report Front page (DLW).
Summer Training Report Front page (DLW).Summer Training Report Front page (DLW).
Summer Training Report Front page (DLW).
Vivek Yadav
 
INDIAN RAILWAYS-1-1 traning ggi (2).docx
INDIAN RAILWAYS-1-1 traning ggi (2).docxINDIAN RAILWAYS-1-1 traning ggi (2).docx
INDIAN RAILWAYS-1-1 traning ggi (2).docx
HarshkumarShrivastav1
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat Shukla
 

Similar to Chittaranjan locomotive works (20)

Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01
 
456.pdf
456.pdf456.pdf
456.pdf
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
A044010114
A044010114A044010114
A044010114
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
 
an
anan
an
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
 
Sandeep
SandeepSandeep
Sandeep
 
DLW Summer training report
DLW Summer  training  reportDLW Summer  training  report
DLW Summer training report
 
MMTMRTS PowerPoint Presentation
MMTMRTS PowerPoint PresentationMMTMRTS PowerPoint Presentation
MMTMRTS PowerPoint Presentation
 
Design & fabrication of Motorised vehicle
Design & fabrication of Motorised vehicleDesign & fabrication of Motorised vehicle
Design & fabrication of Motorised vehicle
 
PLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAINPLC CNTROLLED METRO TRAIN
PLC CNTROLLED METRO TRAIN
 
indian railway matunga carriage workshop
indian railway matunga carriage workshopindian railway matunga carriage workshop
indian railway matunga carriage workshop
 
Summer Training Report Front page (DLW).
Summer Training Report Front page (DLW).Summer Training Report Front page (DLW).
Summer Training Report Front page (DLW).
 
INDIAN RAILWAYS-1-1 traning ggi (2).docx
INDIAN RAILWAYS-1-1 traning ggi (2).docxINDIAN RAILWAYS-1-1 traning ggi (2).docx
INDIAN RAILWAYS-1-1 traning ggi (2).docx
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILURE
 
RWFfinal
RWFfinalRWFfinal
RWFfinal
 

More from Parvez Pathan

Lupus Treatment in Pune By Dr. Pravin Patil
Lupus Treatment in Pune By Dr. Pravin PatilLupus Treatment in Pune By Dr. Pravin Patil
Lupus Treatment in Pune By Dr. Pravin Patil
Parvez Pathan
 
Kohinoor precision component ltd Introduction
Kohinoor precision component ltd IntroductionKohinoor precision component ltd Introduction
Kohinoor precision component ltd Introduction
Parvez Pathan
 
Mtx marathi final
Mtx marathi finalMtx marathi final
Mtx marathi final
Parvez Pathan
 
Oral cancer by Dr Amol Dumbre
Oral cancer  by Dr Amol DumbreOral cancer  by Dr Amol Dumbre
Oral cancer by Dr Amol Dumbre
Parvez Pathan
 
Rerouting of the mumbai pune traffic
Rerouting of the mumbai pune trafficRerouting of the mumbai pune traffic
Rerouting of the mumbai pune traffic
Parvez Pathan
 
Swiss railways a technical account
Swiss railways a technical accountSwiss railways a technical account
Swiss railways a technical account
Parvez Pathan
 
Hyderabad trip report
Hyderabad trip reportHyderabad trip report
Hyderabad trip report
Parvez Pathan
 
Goa excursion of the model railway society
Goa excursion of the model railway societyGoa excursion of the model railway society
Goa excursion of the model railway society
Parvez Pathan
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
Parvez Pathan
 
Diva vasai section
Diva vasai sectionDiva vasai section
Diva vasai section
Parvez Pathan
 
Daund railway station
Daund railway stationDaund railway station
Daund railway station
Parvez Pathan
 
August kranti express
August kranti expressAugust kranti express
August kranti express
Parvez Pathan
 
Project on the centre for incontinence & neurourology
Project on the centre for incontinence & neurourology Project on the centre for incontinence & neurourology
Project on the centre for incontinence & neurourology
Parvez Pathan
 
Urologic illogic today
Urologic illogic todayUrologic illogic today
Urologic illogic today
Parvez Pathan
 
Urinary incontinenece in women
Urinary incontinenece in womenUrinary incontinenece in women
Urinary incontinenece in women
Parvez Pathan
 
Bladder outlet obstruction in women
Bladder outlet obstruction in womenBladder outlet obstruction in women
Bladder outlet obstruction in women
Parvez Pathan
 
Key Facts over HIV by Dr. Milind Kulkarni
Key Facts over HIV by Dr. Milind KulkarniKey Facts over HIV by Dr. Milind Kulkarni
Key Facts over HIV by Dr. Milind Kulkarni
Parvez Pathan
 
Dr yande-resume
Dr yande-resumeDr yande-resume
Dr yande-resume
Parvez Pathan
 
Tenofovir and kidney
Tenofovir and kidneyTenofovir and kidney
Tenofovir and kidneyParvez Pathan
 
Antiretroviral therapy what a general practitioner must know
Antiretroviral therapy what a general practitioner must knowAntiretroviral therapy what a general practitioner must know
Antiretroviral therapy what a general practitioner must know
Parvez Pathan
 

More from Parvez Pathan (20)

Lupus Treatment in Pune By Dr. Pravin Patil
Lupus Treatment in Pune By Dr. Pravin PatilLupus Treatment in Pune By Dr. Pravin Patil
Lupus Treatment in Pune By Dr. Pravin Patil
 
Kohinoor precision component ltd Introduction
Kohinoor precision component ltd IntroductionKohinoor precision component ltd Introduction
Kohinoor precision component ltd Introduction
 
Mtx marathi final
Mtx marathi finalMtx marathi final
Mtx marathi final
 
Oral cancer by Dr Amol Dumbre
Oral cancer  by Dr Amol DumbreOral cancer  by Dr Amol Dumbre
Oral cancer by Dr Amol Dumbre
 
Rerouting of the mumbai pune traffic
Rerouting of the mumbai pune trafficRerouting of the mumbai pune traffic
Rerouting of the mumbai pune traffic
 
Swiss railways a technical account
Swiss railways a technical accountSwiss railways a technical account
Swiss railways a technical account
 
Hyderabad trip report
Hyderabad trip reportHyderabad trip report
Hyderabad trip report
 
Goa excursion of the model railway society
Goa excursion of the model railway societyGoa excursion of the model railway society
Goa excursion of the model railway society
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
 
Diva vasai section
Diva vasai sectionDiva vasai section
Diva vasai section
 
Daund railway station
Daund railway stationDaund railway station
Daund railway station
 
August kranti express
August kranti expressAugust kranti express
August kranti express
 
Project on the centre for incontinence & neurourology
Project on the centre for incontinence & neurourology Project on the centre for incontinence & neurourology
Project on the centre for incontinence & neurourology
 
Urologic illogic today
Urologic illogic todayUrologic illogic today
Urologic illogic today
 
Urinary incontinenece in women
Urinary incontinenece in womenUrinary incontinenece in women
Urinary incontinenece in women
 
Bladder outlet obstruction in women
Bladder outlet obstruction in womenBladder outlet obstruction in women
Bladder outlet obstruction in women
 
Key Facts over HIV by Dr. Milind Kulkarni
Key Facts over HIV by Dr. Milind KulkarniKey Facts over HIV by Dr. Milind Kulkarni
Key Facts over HIV by Dr. Milind Kulkarni
 
Dr yande-resume
Dr yande-resumeDr yande-resume
Dr yande-resume
 
Tenofovir and kidney
Tenofovir and kidneyTenofovir and kidney
Tenofovir and kidney
 
Antiretroviral therapy what a general practitioner must know
Antiretroviral therapy what a general practitioner must knowAntiretroviral therapy what a general practitioner must know
Antiretroviral therapy what a general practitioner must know
 

Recently uploaded

2137ad - Characters that live in Merindol and are at the center of main stories
2137ad - Characters that live in Merindol and are at the center of main stories2137ad - Characters that live in Merindol and are at the center of main stories
2137ad - Characters that live in Merindol and are at the center of main stories
luforfor
 
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
iraqartsandculture
 
Codes n Conventionss copy (2).pptx new new
Codes n Conventionss copy (2).pptx new newCodes n Conventionss copy (2).pptx new new
Codes n Conventionss copy (2).pptx new new
ZackSpencer3
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
zeyhe
 
Memory Rental Store - The Chase (Storyboard)
Memory Rental Store - The Chase (Storyboard)Memory Rental Store - The Chase (Storyboard)
Memory Rental Store - The Chase (Storyboard)
SuryaKalyan3
 
Memory Rental Store - The Ending(Storyboard)
Memory Rental Store - The Ending(Storyboard)Memory Rental Store - The Ending(Storyboard)
Memory Rental Store - The Ending(Storyboard)
SuryaKalyan3
 
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
taqyed
 
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...
2137ad  Merindol Colony Interiors where refugee try to build a seemengly norm...2137ad  Merindol Colony Interiors where refugee try to build a seemengly norm...
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...
luforfor
 
IrishWritersCtrsPersonalEssaysMay29.pptx
IrishWritersCtrsPersonalEssaysMay29.pptxIrishWritersCtrsPersonalEssaysMay29.pptx
IrishWritersCtrsPersonalEssaysMay29.pptx
Aine Greaney Ellrott
 
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
zeyhe
 
ashokathegreat project class 12 presentation
ashokathegreat project class 12 presentationashokathegreat project class 12 presentation
ashokathegreat project class 12 presentation
aditiyad2020
 
A Brief Introduction About Hadj Ounis
A Brief  Introduction  About  Hadj OunisA Brief  Introduction  About  Hadj Ounis
A Brief Introduction About Hadj Ounis
Hadj Ounis
 
Inter-Dimensional Girl Boards Segment (Act 3)
Inter-Dimensional Girl Boards Segment (Act 3)Inter-Dimensional Girl Boards Segment (Act 3)
Inter-Dimensional Girl Boards Segment (Act 3)
CristianMestre
 
ART FORMS OF KERALA: TRADITIONAL AND OTHERS
ART FORMS OF KERALA: TRADITIONAL AND OTHERSART FORMS OF KERALA: TRADITIONAL AND OTHERS
ART FORMS OF KERALA: TRADITIONAL AND OTHERS
Sandhya J.Nair
 
一比一原版(DU毕业证)迪肯大学毕业证成绩单
一比一原版(DU毕业证)迪肯大学毕业证成绩单一比一原版(DU毕业证)迪肯大学毕业证成绩单
一比一原版(DU毕业证)迪肯大学毕业证成绩单
zvaywau
 
acting board rough title here lolaaaaaaa
acting board rough title here lolaaaaaaaacting board rough title here lolaaaaaaa
acting board rough title here lolaaaaaaa
angelicafronda7
 
Caffeinated Pitch Bible- developed by Claire Wilson
Caffeinated Pitch Bible- developed by Claire WilsonCaffeinated Pitch Bible- developed by Claire Wilson
Caffeinated Pitch Bible- developed by Claire Wilson
ClaireWilson398082
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
zvaywau
 
Fed by curiosity and beauty - Remembering Myrsine Zorba
Fed by curiosity and beauty - Remembering Myrsine ZorbaFed by curiosity and beauty - Remembering Myrsine Zorba
Fed by curiosity and beauty - Remembering Myrsine Zorba
mariavlachoupt
 

Recently uploaded (19)

2137ad - Characters that live in Merindol and are at the center of main stories
2137ad - Characters that live in Merindol and are at the center of main stories2137ad - Characters that live in Merindol and are at the center of main stories
2137ad - Characters that live in Merindol and are at the center of main stories
 
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
The Last Polymath: Muntadher Saleh‎‎‎‎‎‎‎‎‎‎‎‎
 
Codes n Conventionss copy (2).pptx new new
Codes n Conventionss copy (2).pptx new newCodes n Conventionss copy (2).pptx new new
Codes n Conventionss copy (2).pptx new new
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单如何办理
 
Memory Rental Store - The Chase (Storyboard)
Memory Rental Store - The Chase (Storyboard)Memory Rental Store - The Chase (Storyboard)
Memory Rental Store - The Chase (Storyboard)
 
Memory Rental Store - The Ending(Storyboard)
Memory Rental Store - The Ending(Storyboard)Memory Rental Store - The Ending(Storyboard)
Memory Rental Store - The Ending(Storyboard)
 
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
一比一原版(qut毕业证)昆士兰科技大学毕业证如何办理
 
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...
2137ad  Merindol Colony Interiors where refugee try to build a seemengly norm...2137ad  Merindol Colony Interiors where refugee try to build a seemengly norm...
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...
 
IrishWritersCtrsPersonalEssaysMay29.pptx
IrishWritersCtrsPersonalEssaysMay29.pptxIrishWritersCtrsPersonalEssaysMay29.pptx
IrishWritersCtrsPersonalEssaysMay29.pptx
 
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
一比一原版(UniSA毕业证)南澳大学毕业证成绩单如何办理
 
ashokathegreat project class 12 presentation
ashokathegreat project class 12 presentationashokathegreat project class 12 presentation
ashokathegreat project class 12 presentation
 
A Brief Introduction About Hadj Ounis
A Brief  Introduction  About  Hadj OunisA Brief  Introduction  About  Hadj Ounis
A Brief Introduction About Hadj Ounis
 
Inter-Dimensional Girl Boards Segment (Act 3)
Inter-Dimensional Girl Boards Segment (Act 3)Inter-Dimensional Girl Boards Segment (Act 3)
Inter-Dimensional Girl Boards Segment (Act 3)
 
ART FORMS OF KERALA: TRADITIONAL AND OTHERS
ART FORMS OF KERALA: TRADITIONAL AND OTHERSART FORMS OF KERALA: TRADITIONAL AND OTHERS
ART FORMS OF KERALA: TRADITIONAL AND OTHERS
 
一比一原版(DU毕业证)迪肯大学毕业证成绩单
一比一原版(DU毕业证)迪肯大学毕业证成绩单一比一原版(DU毕业证)迪肯大学毕业证成绩单
一比一原版(DU毕业证)迪肯大学毕业证成绩单
 
acting board rough title here lolaaaaaaa
acting board rough title here lolaaaaaaaacting board rough title here lolaaaaaaa
acting board rough title here lolaaaaaaa
 
Caffeinated Pitch Bible- developed by Claire Wilson
Caffeinated Pitch Bible- developed by Claire WilsonCaffeinated Pitch Bible- developed by Claire Wilson
Caffeinated Pitch Bible- developed by Claire Wilson
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
 
Fed by curiosity and beauty - Remembering Myrsine Zorba
Fed by curiosity and beauty - Remembering Myrsine ZorbaFed by curiosity and beauty - Remembering Myrsine Zorba
Fed by curiosity and beauty - Remembering Myrsine Zorba
 

Chittaranjan locomotive works

  • 1. CHITTARANJAN LOCOMOTIVE WORKS ModelRailway Society is a cohesivebody madeup of some25 men coming togetherfromvarious partsof Pune. Having diverse professions,they sharean intenseloveforIndian railways.TheSociety is now25 years old and haspaid visits to several importantrailway locations in thepast. Chittaranjan LocomotiveWorkshad been theirsavored dream fora long time. A Sixteen- member- team communicated withtheChief PRO atCLW, who managed a semiofficialvisit for themembers. The teamreached Chittaranjan on themorning of 22nd July 2013 and stayed overnightto continue the visit on the following day.Thisarticle stemsfromthe actualinformation given by the technical staff on site and also fromsomeformalpublications,furnished by thePROof the CLW.Every effortis madeto maintain accuracy in thetechnical information.Wehopethis shortaccountshould help a railway enthusiastto obtain an overview of whatChittaranjan LocomotiveWorkstoday standsfor. History of CLW : Before Independence, nearly42 private railway companiesowned the railwaysof Indiaand they hadtheirownwaysof procuringthe locomotive powerandall were importedfora longtime.Afterthe greatWorldwars,these companiesfoundit difficulttoprocure locomotives fromoverseasanda unified needwasfelttohave these locomotivesbuiltindigenously.Howeverit was onlyafterindependence thatthe unifiedefforttobuildalocomotive plantwasrealized. ChittaranjanLocomotive Workshada verymodestbeginning,whenthe tinySanthal village inwest Bengal wasidentifiedasaplace to establishalocomotive factory. The closestrailwaystation tothis area wasMihijamon the Asansol Patnasection.ThisindigenousLocomotiveplantwas named “Chittaranjan”topay tribute tothe greatDeshbandhuChittaranjan Das.(There isalegendthatthe landformerlybelongedtothe Chittaranjanfamily afterwhomthe plantwasnamed).Eventhe Mihijamrailwaystationwaslaterchristened “Chittaranjan”. Tata had established TELCO in 1945, which built the some Meter gauge steam locomotives for Indian railways, but they soon found difficult to cope with the growing demands of the fast expanding railway industry in India. CLW as it is now called (CHIREKA in Hindi), was thus established in February 1948 by the Government of India and the first freight Steam locomotive, WG was rolled out in November 1950. The production soon expanded to build WP’s, WT’s and WL’s. It also built YG’s for Meter Gauge traffic in India. CLW built a total number of 2351 Steam locomotives for Indian Railways. Although the CLW are now renowned for building Electric Locomotives alone, the factory built a large number of Diesel Locomotives for Indian Railways from 1968 to 1994. They mainly built Diesel Hydraulic Locomotives including WDS4, WDS8, YDM2 and a number of locos for the narrow gauge railways. Today the CLW stands proud not only in manufacturing the conventional electric locomotives with DC traction Motors, but it also builds microprocessor controlled modern mainline Electric Locomotives using three Phase AC induction Motors. With a modest beginning by building 5
  • 2. electric Locos in 1961, CLW has increased its tally to 250 locos in the year 2012, taking the total to 4646 ElectricLocomotivestodate. Our Tour : Model Railway Society, Pune has about 25 members. Sixteen of them had volunteered to join the trip to Chittaranjan. 14 of them took the Duronto on 20th July to reach Howrah on 21st evening. Me and Pande flew to Kolkata and joined the group on Howrah station on the 22nd morning to board the Poorva Express at 08 00 hrs. Poorva was swift enough to take us to Chittaranjan at 11 sharp. Chittaranjan Station is a beautiful tiny station and is surprisingly clean. Believe or not, but the CLW officials had arranged a minibus to collect us and take us to the Guest House. After a quick wash we went and met the Chief PRO Mr. Mantar Singh. He is a very warm and receptive character and was truly pleased to see a team of 16 people travelling all the way from Pune only to visit CLW. He gave us a plan of the tour andlaterdirectedusto the mainassemblyshop. This was a rapid tour which showed us the building of Electric Traction Motors (Both DC and 3 phase AC) and their alignment over the bearings of the axles. The most exciting part was the alignment of the Spur gears between the motors and the axles. We saw machining and grinding of the axle rods and the wheels to ultimate precision. The winding of the stators was a treat to see. Body shells of the locomotives are either casted as whole or fabricated, depending on the model protptype. The magnitude of the workand the dimensionof the hardware issimplymindboggling. Later we visitedthe machiningshop,where we saw the axle turning,wheel machiningandassemblyof the wheel sets. Modernlocomotivesuse fabricatedbogies.Completemachiningandfabricationof the bogiesisperformed comprehensively inthisshop. On the morning of the second day they took us to visit a small loco museum, named Deshbandhu Loco Park. A number of famous CLW products were on display, notably the last WG (wrongly named Antim Sitara, since the real Antim Sitara was a YG). We also saw some live steam models, which are currently out of function. A 1/4th gauge garden railway exists on the premises, but works only on special occasions. Later on that day we visited the “Testing and Quality” lab. The most impressive item was the “Foundry Master”, a German equipment, which analyses a metal and gives us the constituents (or impurities) literally in a flash. We also saw various other equipment, which tested and estimated the tensile and compressive strengths of the metals again in a very short time. Somehow the enthusiasm of the staff rather exceededoursand thissessionturnedouttostretchour patience abit. The best part of our trip was yet to arrive. We had asked to see a qualified Electrical Engineer to answer some of our questions. Mr. Mantar Singh arranged a meeting of ours with Mr. Sahu, who was a true genius. Just as our session began getting interesting, a person of Managerial level walked in and rudely interrupted our session. He said he wanted to start an important meeting. Anyhow the session with Mr. Sahu wasthoroughlyabsorbing.
  • 3. Steel Foundry The Steel Foundryisan impressive plant,locatedaboutakm.away fromthe workshop.Establishedin 1963, incollaborationwith M/s.F.H. Lloydof UK in1963, the foundrynow isvirtuallyself sufficientand casts Bogie Frames,axle rods,axle box housesandsuspensiontubes.Italsocasts a numberof itemsfor Traction Motors suchas Rotor Clampsand BearingBrackets.Theyare now cast inlightweightsteel and are transportedtothe Machine Shop formachining,turning,finishingandfinal assembly. In the heartof the forgingfurnace,the temperature of the moltenmetalis raisedto1620 degree Celsius by an electrical current of 60 kiloamperesat12 kV to produce a powerful arc. We saw the burning furnace whichmade a frighteningandcracklingsound.Howeverwe were notable tosee the actual casting,since thisisperformedonlyatcertaintimesof the day. The temperature laterdropsto 1580 degreeswhilethe metal ispoured intothe moulds. All inall thiswasa thumpingexperience. As we approached the end of our visit, Mr. Mantar Singh invited us all in his office and presented each one of us a CLW calendar and a Brochure. We had a wonderful experience all-round. As we bid good bye to the CLW, we all had a proud feeling about CLW. After a thoroughly informative experience, we drove back to Asansol Railway Stationtoboardthe 12321 Up to catch our wayback. While we returnedbyHowrahMumbai Express,everyoneof uscarrieda proudsentimentwithinus. What a great experience it wasfortwofull days.Nosurprise reallythatthe Electrical energy,when harnessedandcontrolledbyelectronics,candowondersinthisworld. Some of my jottingsabout the CLW,which I would love to share with my Railfan Colleagues. Electric PowerSupply : CLW draws itspowersupplyfromDamodarValleyCorporation(DMC) situatedat Maithan,a small town15 kmsawayfrom Chittaranjan. DMC hostsa Hydroelectricplantof 40 MW and a Gas Turbine Unitof 90 MW connectedtothe main grid. Chittaranjanalsohasan in-house generating capacityof 11.6 MW as a backupfacility. The Conventional ElectricLocomotives: Conventionallythe electrical circuitiscompletedthroughthe bodyof the locoand earthedviathe rails. 25 kV single phase ACsupplyisdrawnbythe pantographs and isfedto the transformers.Thisisfurtherrectifiedto750 V DC and suppliedtothe tractionmotors througha tap changer (essentiallythroughaseriesof resistances).DCTractionmotorswere believedto have a higherinitial torque andwere universallyusedinmostsituationsincludingall the diesel electric locomotives.
  • 4. The Technologyof ModernLocomotives (as I understood) :The Pantographreceivesthe fixed frequency (50Hz) alternating currentof 25 kV from the overheadequipment(OHE).Thisisfiltered throughProtectionCircuitstoremove impuritiesinfrequency.ItissubsequentlyfedtoaTransformer for steppingdown.There are foursecondarycoils.The outputfromsecondarycoilsisdistributedas follows. Coil 1. Fedto Gate Turnoff Circuit(GTO),whichconvertsthe outputtoDC and laterchoppedto three phase AC,supplying variablefrequencyandvariable voltagetothe TractionMotors. This technologyisnowgettingupgradedtoIGBT(InsulatedGate BipolarTransistor) Coil 2. Main CompressorMotors.These are simple ACinductionMotors Coil 3. BlowerMotors(AC).There are at leastthree setsof these. Coil 4. Suppliesaccessoryequipmentof the Locomotive. ConventionalACMotorsare simple inductionmotors,where the statorreceiveselectrical current thoughradiallyarranged fieldcoils.The electromagneticinductionthusproduced,movesthe Rotorin the directionopposite of the poles.The speedof rotordependsdirectlyonthe frequencyof currentand the numberof poles.(e.g.n= Frequency*120 / no.of Poles).Thustheirspeed synchroniseswiththe frequencyandare therefore calledSynchronousMotors. These motorshave afixedspeedandfixed torque,whichmakesthemunsuitable astractionmotors,where the demandsof torque andspeedare variable. Three Phase AsynchronousMotors : The three phase technologyowesitsrootstoBobardier TransportationSwitzerland.The Statorinthese motorsissuppliedwithphasesatthree differentpoints distributedat120 degreesangle witheachother.The inductionthusproducedhasa motive powerat three pointsina cycle.The resultantspeedandtorque of the rotor dependsonthe frequencyandthe voltage of the inducedfield.A microprocessormodulatesthe frequency,phase andthe voltage to generate the requiredtorque andspeed. AsIunderstoodthe voltage variesbetween1and2180 V AC and the frequencyvariesbetween40and 65 Hz. CLW commencedbuildingof 850 kW and 1150 kW 3- phase tractionmotorsin 1998 and startedrollingoutmodernelectricLocomotivesin1999. Traction Motors: This basic motive force is the soul of CLW. It now builds Type 15250A DC series motor which works on 750 V DC and produces 630 kW of power. These are used for conventional 5000 BHP 25 kV locomotivessuchasWAP 4 and WAG 7. Thistechnologyhas now given way to the modern 3 phase AC asynchronoustractionmotors.CLW thusisnow engagedinbuilding two important types of 3 phase motors, the 850 kW 6FRA 6068 and the 1150 kW 6FXA 7059 for use in WAP 7, WAP 5 and WAG 9.
  • 5. Current CLW products can be tabulated in the following form Type Power Output No. of Axles Axle Load Traction Motors Purpose Speed potential Technology Bogies Highlights WAP- 4 5000 BHP 6 18.8 Tonnes ConventionalDC Fast passenger 140 kmph Tap Changer Flex-coil Cast Steel Hauls Mainline Superfast Trains including Rajdhani Expresses WAG- 7 5000 BHP 6 19.5 Tonnes ConventionalDC Heavy Freight 100 kmph Tap Changer Fabricated High Adhesion Hauls Air Braked Heavy Freight Stock WAP- 5 5400 BHP 4 20.8 Tonnes Three Phase AC Asynchronous Superfast passenger 160 kmph Microprocessor (GTO) Controlled variable Frequency variable Voltage Two Axles per Bogie Disk Brakes Originally ABB transferredTechnology. Useful Regenerative Potential WAP- 7 6000 BHP 6 20.5 Tonnes Three Phase AC Asynchronous Long Fast Passenger Trains 160 kmph Microprocessor (GTO) Controlled variable Frequency variable Voltage The only Loco with Head-on Generation capability eliminating the need for End-on Generator car WAG- 9 6000 BHP 6 20.5 Tonnes Three Phase AC Asynchronous HeavyDuty Air Braked Freight traffic 100 kmph Microprocessor (GTO) Controlled variable Frequency variable Voltage Loco has Air Conditioned Driver's Cab WAG- 9H 5000 BHP 6 20.5 Tonnes? Three Phase AC Asynchronous HeavyDuty Air Braked Freight traffic 100 kmph Microprocessor (GTO) Controlled variable Frequency variable Voltage High Adhesion Increased Axle load to improve the wheel Adhesion. Suitable for long and heavy Freight Rakes WAG- 9i 5000 BHP 6 20.5 Tonnes? Three Phase AC Asynchronous HeavyDuty Air Braked Freight traffic 100 kmph GTO replaced by IGBT based Propulsion System Improved performance and reliability, better control and regeneration, reduced losses. Modular Design
  • 6. Some Photos taken during our visit 1. AntimSitara”showcasedin the formof a WG 2. Photographof the oldSanthiavillage,wherethe plantwasestablished 3. The majesticbuildingof the Asansol JunctionRailwayStation 4. Entrance to the “DeshbandhuLocoPark” 5. The Furnace of the Steel Plant 6. Sunsettingoverthe ChittaranjanTownship 7. The expanse of the Steel Foundry 8. The freshlyrolledout WAG9H and WAP4 9. The Gang that visitedCLWinJuly2013
  • 7. Steam Locomotivesbuiltby CLW so far WG (1908), WP (259), WT (30) WL (94),YG (60) Total SteamLocos= 2351 Diesel Locomotivesbuiltby CLW so far WDS-4,WDS-8,YDM-2 NDM-5, ZDM-3, ZDM-4A, ZDM-5 Electric Locomotivesbuiltby CLW so far WCG-2, WCM-5 WAG-1, WAM-4, WAG-7 WAP-1,WAP-3,WAP-4, WAP-5,WAP-7 WAG-9, WAG-9H, WAG-9i
  • 8. Downside of the CLW It ispainful towrite these lines afterhavingsuchan exciting tour.Howeverwhile we visitedthe place, we foundthe followingaspectsratherdisturbing. 1. The machine shopsappearedratherbaronand lookedasif nothingmuchisgoingon there. There istoo much of space whichisbaronand unutilised. 2. We all feltalot of more workcouldhave beendone inthe plant,particularlywhenwe sawalot of machinerylyingidle.The numberof workers whoreallyworked appearedveryscarce. 3. It was a pityto see a numberof itemsprocuredbyoutsourcing,especiallythe fabricated body shellsof locomotives.The fabricationunitinside the plantlookedquite capable of doingthe job. 4. It was ratherhard to findpersons,whowere trulyqualifiedtoanswerthe technical queries raisedbyour members. Thisaside,we hada memorable experience all round.CLWisnotonlya heavyindustrial plant;it’salsoa proudsymbol of a distinguishedand enviableventureof the IndependentIndia. Acknowledgements: We are extremely indebted to thePRO of CLW, Mr. Mantar Singh,who was committed to makethis visit a reality. We all owea lot to ourSecretary Mr. Amod Gune,who took immenseeffortsto make thishappen. Iam also indebted to ourmember Mr.JayantKelkar,who virtually educated mein the science of Electrical Engineering during theentire courseof our visit. Shirish D. Yande 5 August2013