Map -1: study area
Jahangirnagar University
(JU)
Identification of waste disposal sites:
Location of the sampling point was identified by GPS and marked
it on the location map(map-2).
Map-2
25. House hold waste management: Comparative scenario
Before After
You don’t find any dumping place in JU campus now.
Solution?
Solution through
Clean
Development
Mechanism
(CDM)
26. This plant is commissioned since July 2012.
Before that we had 30 waste dumping
sites in JU campus
Total Solid waste Collection in JU Campus
Students’ Hall: 14 (Male & Female)
Restaurants/Shops: 120
House: 200
Dean offices/Departments/Administrative Offices: 50
27. Biogas plant in Jahangirnagar University (JU) at a glance
This project is situated at Rangamati the
northern area of JU campus.
Total area of the project: 10,584 square ft.
Volume of the plant: 50 cubic meter each (2
plants are in operation)
Number of gas connected house: 30
Monthly fee for each connection: 500 BDT
Gas distribution time:
6.00 am – 7.30 am : 1.5 hours
11.00 am – 1.00pm: 2 hours
6.00pm – 7.30 pm: 1.5 hours
Total supplied time- 5 hours
Bio Gas plant area, bismile, J.U.
28. Source segregation is the pre requisite for solid waste management.
3 different types of colored baskets are provided to the teachers,
officers & shops and students halls.
One bucket contains degradable wastes that are covered by an extra
lid.
The other two are indicated by red & green color baskets. The green
one is used for putting recyclable wastes while the red basket
contains toxic wastes.
Transportation system for collecting wastes:
6van with 12van drivers
1 Co-Ordinator
Collection time: 10:00 – 13:00 from Halls, shops and offices
13.00 – 15.00 from houses of Teachers and Officers.
13 poor peoples have got job in this plant
(This type of plant may act as poverty reduction)
29. Students participation
Five MS students were worked on solid waste management
from JU in last six year.
Four B. Sc. students were worked in this plant from BUET in
2013.
Five B. Sc. students were worked on solid waste
management from JU in last six year.
One student MS students from She-re- Bangla Agricultural
University is working on this plant.
One Ph. D. student, four MS students and four B. Sc.
students are working on this plant.
All the students are directly participating in
this plant which might implement their
professional life in future and these manpower
might enhance CDM in Bangladesh.
30. J.U. biogas plant at a glance
Waste
collection
Source
segregation
Chopping
machine
inlet
digester
Gas production
Gas
distribution
31. An MoU has been signed up with
BPATC for house hold waste
management
BPATC provides segregated house hold
waste to JU waste management plant and
Tk. 5000 for maintenance cost per month.
We will provide a portion of fertilizer on the
ratio of their waste.
32. Another MoU has been signed up with
Arunapolli (JU Housing Society) for house hold
waste management
Arunapolli provides segregated house hold
waste to JU waste management plant and Tk.
13000 for maintenance cost per month.
Two more communities are interested to
provide us their waste and MoU will be signed
up very soon.
33. Reduction of global warming by management of methane
gas.
2000 kg per month organic fertilizer is produced by this
plant which may meet the demand of chemical fertilizer
This model will play a good role in waste management in all
the public university campuses and all the semi urban and
urban region in Bangladesh.
Poverty might be reduced by implemented this plant.