Chapter 1:
Tourism Planning
Basic Concepts,
Approaches and
Techniques
2
Learning Objectives:
Define planning
Understand the need for tourism planning
Describe the tourism planning approaches and techniques
Explain the different levels of tourism planning
At the end of this chapter, you are expected to:
Be acquainted with the types of tourism planning
Discuss the process for tourism planning
Explain the major elements in planning a tourist destination
Describe the stages of tourism development
3
Planning is the process of setting goals, selecting
alternative courses or action to achieve those goals,
implementing the chosen alternative and evaluating
the choices to find out if it is successful.
Planning is the key to the success of any activity.
Meaning of Planning
4
• In tourism, success is neither guaranteed nor permanent.
• Many areas have experienced tourism cycles which start with
few rich visitors, proceed through a series of expansion
programs, attain saturation, then go into decline.
• If an eventual decline is to be avoided, responsible planning
and management are essential.
The Need for Tourism Planning
5
Many success stories describe tourist destinations
which have undergone through planning supported by
strong commitments for their attainment.
6
“Planning, Commitment and Management are
principal elements in determining the decline or
success of a tourist destination.”
7
A tourism plan and development program can provide
guidelines for areas in which government and the
private sectors have little or no experience on how to
develop these areas.
8
Since tourism is a complex, multisectoral activity, a
tourism plan is necessary to coordinate the different
sectors to better service the needs of tourism and the
general public.
9
Through an integrated tourism plan, the various direct
and indirect economic benefits of tourism can be
achieved.
10
A responsible tourism plan is a means to attain
environmental conservation objectives through the
development of tourist attractions, facilities, and
infrastructure.
11
A careful tourism plan is a means to achieve cultural
conservation objectives and produce sociocultural
benefits.
12
A good tourism plan is a means in which the natural
and cultural resources for tourism are maintained, not
destroyed, in the development process.
13
The right type of tourism plan can be used to invigorate
poorly developed tourism destinations.
14
Careful planning is necessary to develop specialized
training facilities for the education and training for
particular manpower skills and abilities.
15
1. Systems Approach
2. Comprehensive Approach
3. Integrated Approach
4. Environmental and Sustainable Approach
5. Community Approach
6. Implementable Approach
7. Systematic Approach
Tourism Planning Approaches and Techniques
16
1. SYSTEMS APPROACH
Requires that adequate information about the system is
available to understand and analyze it.
Computer technology is needed to collect and analyze this
data.
17
2. COMPREHENSIVE APPROACH
All aspects of tourism development are analyzed and
planned on a broad scope.
18
3. INTEGRATED APPROACH
Tourism is planned and developed as an integrated system
within itself and integrated into the overall plan and
development pattern of the area.
19
4. ENVIRONMENTAL AND SUSTAINABLE APPROACH
Tourism is planned, developed and managed in such a way
that the natural and cultural resources are not used up so that
they are available for continuous and permanent use in the
future.
Carrying capacity analysis is an important technique used
in the environmental and sustainable approach.
20
5. COMMUNITY APPROACH
Planning is for the residents of the area. The local residents
should be given the opportunity to participate in the planning
of their community’s future development and express their
opinion on the type of community they want to live in.
21
6. IMPLEMENTABLE APPROACH
Tourism plan, policies and recommendations are expressed
in a practical and achievable manner.
22
6. SYSTEMATIC APPROACH
Tourism planning is based on an orderly arrangement of
activities.
23
1. International Planning
2. National Planning
3. Regional Planning
4. Subregional Planning
Levels of Tourism Planning
24
International Planning
• Involves:
– International transportation services;
– The movement and scheduling of the tours of tourists
among different countries;
– The development of major tourist attractions and facilities in
neighboring countries as well as the working strategies and
promotional programs of the many countries.
25
• Usually takes place through:
– World Tourism Organization (WTO) and its regional commissions;
– International Civil Aviation Organization (ICAO);
– International Air Transport Association (IATA);
– Pacific Asia Travel Association (PATA)
– Caribbean Tourism Organization (CTO)
– Tourism Council of the South Pacific (TCSP)
– Sub-Committee on Tourism (SCOT) of the Association of the Southeast Asian
Nations (ASEAN)
– Tourism Coordination Unit (TCU) of the Southeast Africa Development Coordination
Conference (SADCC); and the
– Tourism Committee of the Organization for the Economic Cooperation and
Development (OECD).
26
National Planning
• Concerned with the following components:
– Tourism policy
– Infrastructure facilities
– A physical structure plan which includes important tourist attractions,
selected tourism development regions, international entry points,
facilities, and services
– The amount, kinds, and quality of accommodation and other required
tourist facilities and services
27
– The important tour routes in the country and their regional
connections
– Tourism organizational entities, laws, and investment policies
– Tourism marketing strategies and promotion
– Education and training programs
– Design standards and facility development
– Environmental, economic, and socio-cultural analyses
– National level implementation methods including the short-term
development plan and project scheduling.
28
Regional Planning
• The regional level of tourism planning is for one region of a
country, usually a state or province or an island.
• It is often devised within the framework of an existing national
policy.
• The regional level of tourism planning is more specific than the
national planning level.
29
• Emphasizes the following:
– Regional policy
– Regional entry points and transportation facilities and
services
– Kinds of tourist attractions and their locations
– The amount, kinds, and location of tourist accommodation
and other tourist facilities, and services
– Location of tourist development areas including resort
areas.
30
– Socio-cultural, environmental, economic, and impact
analyses
– Education and training programs on the regional level
– Marketing techniques and promotion
– Organizational establishments, laws, regulations, and
investment policies
– Implementation methods which include project plans and
regional zoning regulations.
31
Subregional Planning
• There is a need for subregional planning in some countries or regions.
• This level of planning is more specific than the regional level. However,
it is not as detailed as the resort land use planning.
• The elements of the subregional plan usually include tourist attractions,
location of accommodation and other tourist facilities and services,
entry points to the sub region, transportation facilities, and
infrastructure.
32
• Land Use Planning
• Facility Site Planning
• Facility Design
• Special Studies
Types of Tourism Planning
33
Land Use Planning
Tourist development areas selected as tourist resorts,
resort towns, tourist attractions, and urban tourism
impose land use plans.
This level of planning is more detailed and shows the
specific areas for hotels, and other types of
accommodation.
34
Facility Site Planning
Site planning is planning for individual buildings such as hotels,
commercial centers, and visitor facilities.
The actual location of buildings, recreation areas, streets,
walkways, parking, landscaping areas, and other land uses are
shown min maps.
35
Facility Design
Designs for landscaping, architecture, infrastructure, and
engineering must be prepared for resorts, hotels, restaurants,
attractions, archaeological and historic sites, information and
cultural centers, visitor facilities at national parks and other
tourist facilities.
These designs may be based on good international standards.
36
Special Studies
Special studies on tourism are often undertaken based on the
needs of the area.
These studies pertain to environmental, socio-cultural, economic
impact analyses, marketing analysis and promotion programs.
Special planning studies can also be done on specific types of
tourism development such as health and youth tourism.
37
Ten (10) step structural process:
1. Acquire understanding
2. Preliminary position statement
3. Commitment for tourism study
4. Market and resources analysis
5. Conceptual planning
6. Plan approval
7. Master planning
8. Final Commitment
9. Staged implementation program
10.Evaluation and direction
Process for Tourism Planning
38
Acquire Understanding
• The first step in tourism planning is education.
• Persons who will make the most significant decision must
acquire the understanding necessary to portray a framework
for their decisions.
39
• This will involve securing the services of lecturers or
consultants for a series of presentations.
• It could also involve field trips to areas where tourism planning
and development have already taken place.
• Face-to-face contact should take place between decision
makers in an area, resort, or attraction.
40
Preliminary Position Statement
• The responsible group should develop a formal statement of
interest.
• This would show the objectives they would like to obtain and
the result they wish to achieve.
• Also important are formal statements regarding restrictions on
tourism development.
41
Commitment for Tourism Study
• There should be an intensive study which establishes
feasibility and serves as a basis for actual development.
42
Market and Resources Analysis
• This activity gathers and correlates data on the
overall size of the destination or prospective market
and the share that market is expected to gain.
• This body of information will serve as the basis for a
major investment decision.
43
• In market analysis, data on travel statistics, airline routes, fare
structures and other related reports are needed.
• Other data such as detailed review of the resources in the
prospective destination, surveys of travel origins, markets, as
well as the willingness of airlines to extend their routes are
required.
44
• This activity involves a number of temporary conclusions
which are needed in a market forecast. The market forecast in
the final product of their activity.
• Examples of interim conclusions are:
– The total possibility of travel to the geographic area is or is not
large enough to support the development of a tourism
industry.
– Travel routes are or not adequate to support the development
of tourism
– The local culture in the area will or will not be able to attract
tourists
45
Conceptual Planning
• This activity uses the results of the market forecast to establish
the image and identification for the project area.
• This involves general description of what the area should look
like and how it will function after development has taken place.
46
• Conceptual planning includes definite statements of objectives
and policies for the proposed tourism project. These deal
separately with the following facts:
– The theme or character of the tourism project
– The major resources to be developed
– Environmental, social, and cultural aims and restrictions
– Economic targets and returns
Conceptual planning gives general estimates of benefits and costs
which will be the basis for a major decision on whether to proceed
with the expensive, detailed master plan or to modify, redirect or
cancel it.
47
Plan Approval
• This is a recognition of the necessity of the plan. After a
thorough review of the conceptual plan, the responsible
decision makers should make a decision on whether the
tourism planning process should proceed to the master plan.
48
Master Planning
• Master planning involves expenses of time and money which
are 5 to 10 more expensive than the previous activities.
• The reason for this is because a master plan is more details
and frequent changes take place because of the nature of
cooperation required between the private and public sectors.
49
• Areas which are detailed in a master plan are:
– Performing an in-depth marketing study
– Designation and extent of land uses for tourism
– Planning infrastructure facilities including roads, airports,
walkways, drainage, sewage, water, power and other utilities.
– Selection of sites for tourist facilities including their sizes and
boundaries
– Establishment of architectural designs and standards
– Drawing master, overall landscape plans
– Establishment of zoning and other land-use regulations
50
Final Commitment
• After the completion of a master plan, many commitments
are needed.
• The government must pledge legislation policies, funds and
programs to encourage tourism.
• Final commitment must be closely coordinated.
• Failure to secure commitment within any sector will result in
failure.
51
Staged Implementation Program
• Implementation activities fill the gap between accepted
development plans and the creation of an operational,
integrated tourism industry.
• Continuous planning is needed because tourism and its
elements tend to be dynamic.
52
Evaluation and Direction
• Established operations must be monitored to assure
continuing quality of services and operating success.
• Mechanisms must be established to provide continuous
feedback on tourism volumes and levels of satisfaction
provided.
• Such programs will prevent the decline of resorts,
attractions, or destinations.
53
The major elements in planning a tourist destination are:
1. Market analysis
2. Assessment of available resources
a. Visitor attractions
b. Culture
c. Infrastructure and superstructure
d. Transportation
e. Support services
f. Visitor accommodations
3. Marketing
4. Economic and financial analysis
5. Environment
6. Social impact
Major Elements in Planning a Tourism Destination
54
Types and Quality of
Facilities and Services
Market
Analysis
Available
Resources and
Labor Capital
Infrastructure
Transportation
Superstructure
Economic and
Financial Analysis
Comprehensive
Master Plan
Historic and
Environmental
Constraints
State and Country
Planning and
Zoning
Regulations
Environmental and
Social Impact
Statements
Financing
Package
Construction
Documents
Construction
Starts
Elements involved in developing a destination
55
Marketing Analysis
• Market analysis requires a thorough study of past and present
trends, traveler profiles, traveler performances and habits, market
position, and destination images.
56
Assessment of Available Resources
a. VISITOR ATTRACTIONS – the success of a destination depends
not only on its power to attract visitors but also on its ability to
maintain them. Destination planning must look at existing attractions
plus the possibility of building new ones such as marinas, theme
parks, and others.
b. CULTURE – destination planning encourages the inclusion of
cultural heritage in tourism. Native customs, dance, rituals, foods,
crafts, ceremonies, traditional architecture should be included in
tourism planning to enable a new destination to preserve its native
culture instead of lessening its value.
57
c. MANPOWER – in destination planning, an adequately trained labor
force is required. Tourism as an industry, is not only people oriented
but also people dependent. A pleasant experience for visitors is an
important factor for the success of a tourism destination. Appropriate
training and development are necessary in two specific areas of
employee qualification namely: attitudinal and technical. It may be
necessary to establish hotel and tourism schools and provide
scholarships for some students to study abroad.
58
d. INFRASTRUCTURE and SUPERSTRUCTURE – this term
infrastructure refers to all underground and surface construction of a
region. It includes water supply, electric lines, sewage and drainage
systems, roads and highways, communication and other related
services. Superstructure are the facilities and services that are above
the ground such as hotels, resorts, restaurants, shopping centers,
airports buildings, museums, stores and similar structures.
59
• The infrastructure comes before the superstructure. The lack of an
adequate infrastructure often hinders the development and growth of
a tourism destination. A country may have beautiful beaches but
these are worthless if they are not connected to major markets by
roads or air facilities.
• They are also valueless if adequate water, electricity and sewage
facilities are not available. The development of infrastructure facilities
are generally a government responsibility. Developing nations may
seek assistance from international agencies such as the United
Nations Development Bank in order to develop their infrastructure.
60
e. TRANSPORTATION – a study of the present and future
transportation needs such as air, highways, rail, and water is
necessary in the movement of passengers and goods. This
information can help the government in planning the expansion of air
routes, assessing traffic patterns between terminals and destinations
and measuring the effect of congestion in major tourist attractions,
historical sites, parks and beaches.
61
f. SUPPORT SERVICES – they include services such as maintenance
and repair facilities, police protection, fire protection, retail shops,
sports facilities, gaming, festivals, pharmacies, handicraft facilities,
bookstores, department stores, art galleries, museums and others.
Problems will arise if any of these services is not available. It is
important to plan these services can be provided.
62
g. ACCOMMODATION – accommodation facilities are the places where
tourists stop being travelers and become guests. These are also
places where tourists spend most of their time and money. Thus,
planning for accommodation is very important to the success of a
tourist destination. A careful analysis of visitor accommodations can
help government officials in making decisions such as rezoning,
acquisitions of property, release of public property for other uses,
invitations for private capital investment.
63
Marketing
• Marketing is the process of selecting a target, choosing strategies to
reach the market, establishing objectives, coordinating the efforts of
those involved in promoting the destination and evaluating
successes and failures.
64
Economic and Financial Analysis
• It involves a careful analysis of economic conditions and financial
requirements such as feasibility studies, cash flow, available capital
and interest rates. On the international level, economic analysis also
includes balance of trade from inbound and outbound tourism.
65
Social Impact
• Developers of a tourist destination should consider the effect of
tourist growth on the local population. Too much contact between the
resident population and visitors can lead to internal trouble. This is
the reason why many countries plan and develop resort areas away
from population centers to avoid congestion and to be able to
distribute tourism resources over a wide area.
66
• The product life cycle characterizes the stages of destination
development.
• This theory includes four stages of the product development from
inception to growth to maturity and finally to decline.
Stages of Destination Development
67
• These stages are the following:
– I. Inception – discovery
– II. Growth – local response and initiative
– III. Maturity – institutionalization
– IV. Decline – saturation and alienation
• A knowledge of these four stages will make the planner to
avoid problems related to mass development and ensure
the continuous success of a tourist destination.
68
Visitor
Arrivals
Time
Inception
Growth
Maturity
Decline
Rejuvenation
Hypothetical Evolution of a Tourist Area
69
Stage I – INCEPTION - Discovery
• During this stage of development, a few adventurous tourist visit the
area. These are the allocentric type of tourists. Some of them decide
to stay in the area and become expatriates. These expatriates
establish restaurants, guest residences, souvenir shops and tour
services. Their business usually succeed because they offer services
that are more modern, more sanitary and more reliable than those
offered by the local population. These are the reasons why a greater
number of allocentrics are encouraged to visit the destination.
70
• During stage I, tourists are generally welcomed by the
residents. There is a great amount of interpersonal contact
between the tourists and the residents.
• The tourists adjust to the local environment and the people.
71
Stage II – GROWTH – Local Response
and Initiative
• For stage II, the number of tourists increases. The area has
developed a good reputation by word of mouth. Although tourism is
growing, the facilities and services are owned and controlled by the
residents.
• There is a lack of standardization of facilities. Tourism development
is uncoordinated and spontaneous instead of planned. Tourist
continue to adapt the local culture. However, these are signs that the
tourist industry is beginning to adapt to the needs of the tourist.
Motorboats replace manually propelled boats. Increase attention is
given to sanitation and visitor comfort.
72
• The increased interaction between tourist and residents
result in a desire of residents for better education, increased
awareness of the outside world, trend toward equality, and a
change of traditional lifestyles.
73
Stage III – MATURITY -
Institutionalization
• Maturity is characterized by the increase in the number of tourists
and the formalization of services, itineraries, and roles. There is a
loss of local decision-making and control in the tourist industry.
• Many hotels, airlines and other services are associated with
international corporations who make corporate decisions from offices
outside the country. Hence, the local population are economically
dependent on individuals or corporations who do not reside in the
area and yet own and control many tourist services. This creates a
feeling that outsiders have taken control.
74
• During the Maturity – Institutionalization stage facilities and
procedures are standardized which results in greater efficiency. The
diets of the local residents improve because they are exposed to new
foods. Native crafts are revived since they are in demand by the
tourists. The increased production of native crafts generates more
income for the resident population.
75
Stage IV – DECLINE – Saturation and
Alienation
• In the final stage, the destination has become saturated. The
residents have become disillusioned because tourism has not
produce at all the benefits they expected. For the visitors, the factors
that were responsible for the earlier success of the destination, such
as the hospitality of the residents, the clean and uncongested
environment, and the appeal of the new destination have
disappeared so the tourists begin to look for other unaltered
destinations.
76
• A destination is not expected to pas through all these four stages.
Some do not move beyond stage I. There are destinations that move
directly from Stage I to Stage III as in the case of Guam and Fiji.
• Even in the decline stage, measures can be taken to rejuvinate a
declining destination. An example of this is the repositioning of
Miami, Florida as a gateway city to and from Latin America.

Chapter 1-tourism-planning

  • 1.
    Chapter 1: Tourism Planning BasicConcepts, Approaches and Techniques
  • 2.
    2 Learning Objectives: Define planning Understandthe need for tourism planning Describe the tourism planning approaches and techniques Explain the different levels of tourism planning At the end of this chapter, you are expected to: Be acquainted with the types of tourism planning Discuss the process for tourism planning Explain the major elements in planning a tourist destination Describe the stages of tourism development
  • 3.
    3 Planning is theprocess of setting goals, selecting alternative courses or action to achieve those goals, implementing the chosen alternative and evaluating the choices to find out if it is successful. Planning is the key to the success of any activity. Meaning of Planning
  • 4.
    4 • In tourism,success is neither guaranteed nor permanent. • Many areas have experienced tourism cycles which start with few rich visitors, proceed through a series of expansion programs, attain saturation, then go into decline. • If an eventual decline is to be avoided, responsible planning and management are essential. The Need for Tourism Planning
  • 5.
    5 Many success storiesdescribe tourist destinations which have undergone through planning supported by strong commitments for their attainment.
  • 6.
    6 “Planning, Commitment andManagement are principal elements in determining the decline or success of a tourist destination.”
  • 7.
    7 A tourism planand development program can provide guidelines for areas in which government and the private sectors have little or no experience on how to develop these areas.
  • 8.
    8 Since tourism isa complex, multisectoral activity, a tourism plan is necessary to coordinate the different sectors to better service the needs of tourism and the general public.
  • 9.
    9 Through an integratedtourism plan, the various direct and indirect economic benefits of tourism can be achieved.
  • 10.
    10 A responsible tourismplan is a means to attain environmental conservation objectives through the development of tourist attractions, facilities, and infrastructure.
  • 11.
    11 A careful tourismplan is a means to achieve cultural conservation objectives and produce sociocultural benefits.
  • 12.
    12 A good tourismplan is a means in which the natural and cultural resources for tourism are maintained, not destroyed, in the development process.
  • 13.
    13 The right typeof tourism plan can be used to invigorate poorly developed tourism destinations.
  • 14.
    14 Careful planning isnecessary to develop specialized training facilities for the education and training for particular manpower skills and abilities.
  • 15.
    15 1. Systems Approach 2.Comprehensive Approach 3. Integrated Approach 4. Environmental and Sustainable Approach 5. Community Approach 6. Implementable Approach 7. Systematic Approach Tourism Planning Approaches and Techniques
  • 16.
    16 1. SYSTEMS APPROACH Requiresthat adequate information about the system is available to understand and analyze it. Computer technology is needed to collect and analyze this data.
  • 17.
    17 2. COMPREHENSIVE APPROACH Allaspects of tourism development are analyzed and planned on a broad scope.
  • 18.
    18 3. INTEGRATED APPROACH Tourismis planned and developed as an integrated system within itself and integrated into the overall plan and development pattern of the area.
  • 19.
    19 4. ENVIRONMENTAL ANDSUSTAINABLE APPROACH Tourism is planned, developed and managed in such a way that the natural and cultural resources are not used up so that they are available for continuous and permanent use in the future. Carrying capacity analysis is an important technique used in the environmental and sustainable approach.
  • 20.
    20 5. COMMUNITY APPROACH Planningis for the residents of the area. The local residents should be given the opportunity to participate in the planning of their community’s future development and express their opinion on the type of community they want to live in.
  • 21.
    21 6. IMPLEMENTABLE APPROACH Tourismplan, policies and recommendations are expressed in a practical and achievable manner.
  • 22.
    22 6. SYSTEMATIC APPROACH Tourismplanning is based on an orderly arrangement of activities.
  • 23.
    23 1. International Planning 2.National Planning 3. Regional Planning 4. Subregional Planning Levels of Tourism Planning
  • 24.
    24 International Planning • Involves: –International transportation services; – The movement and scheduling of the tours of tourists among different countries; – The development of major tourist attractions and facilities in neighboring countries as well as the working strategies and promotional programs of the many countries.
  • 25.
    25 • Usually takesplace through: – World Tourism Organization (WTO) and its regional commissions; – International Civil Aviation Organization (ICAO); – International Air Transport Association (IATA); – Pacific Asia Travel Association (PATA) – Caribbean Tourism Organization (CTO) – Tourism Council of the South Pacific (TCSP) – Sub-Committee on Tourism (SCOT) of the Association of the Southeast Asian Nations (ASEAN) – Tourism Coordination Unit (TCU) of the Southeast Africa Development Coordination Conference (SADCC); and the – Tourism Committee of the Organization for the Economic Cooperation and Development (OECD).
  • 26.
    26 National Planning • Concernedwith the following components: – Tourism policy – Infrastructure facilities – A physical structure plan which includes important tourist attractions, selected tourism development regions, international entry points, facilities, and services – The amount, kinds, and quality of accommodation and other required tourist facilities and services
  • 27.
    27 – The importanttour routes in the country and their regional connections – Tourism organizational entities, laws, and investment policies – Tourism marketing strategies and promotion – Education and training programs – Design standards and facility development – Environmental, economic, and socio-cultural analyses – National level implementation methods including the short-term development plan and project scheduling.
  • 28.
    28 Regional Planning • Theregional level of tourism planning is for one region of a country, usually a state or province or an island. • It is often devised within the framework of an existing national policy. • The regional level of tourism planning is more specific than the national planning level.
  • 29.
    29 • Emphasizes thefollowing: – Regional policy – Regional entry points and transportation facilities and services – Kinds of tourist attractions and their locations – The amount, kinds, and location of tourist accommodation and other tourist facilities, and services – Location of tourist development areas including resort areas.
  • 30.
    30 – Socio-cultural, environmental,economic, and impact analyses – Education and training programs on the regional level – Marketing techniques and promotion – Organizational establishments, laws, regulations, and investment policies – Implementation methods which include project plans and regional zoning regulations.
  • 31.
    31 Subregional Planning • Thereis a need for subregional planning in some countries or regions. • This level of planning is more specific than the regional level. However, it is not as detailed as the resort land use planning. • The elements of the subregional plan usually include tourist attractions, location of accommodation and other tourist facilities and services, entry points to the sub region, transportation facilities, and infrastructure.
  • 32.
    32 • Land UsePlanning • Facility Site Planning • Facility Design • Special Studies Types of Tourism Planning
  • 33.
    33 Land Use Planning Touristdevelopment areas selected as tourist resorts, resort towns, tourist attractions, and urban tourism impose land use plans. This level of planning is more detailed and shows the specific areas for hotels, and other types of accommodation.
  • 34.
    34 Facility Site Planning Siteplanning is planning for individual buildings such as hotels, commercial centers, and visitor facilities. The actual location of buildings, recreation areas, streets, walkways, parking, landscaping areas, and other land uses are shown min maps.
  • 35.
    35 Facility Design Designs forlandscaping, architecture, infrastructure, and engineering must be prepared for resorts, hotels, restaurants, attractions, archaeological and historic sites, information and cultural centers, visitor facilities at national parks and other tourist facilities. These designs may be based on good international standards.
  • 36.
    36 Special Studies Special studieson tourism are often undertaken based on the needs of the area. These studies pertain to environmental, socio-cultural, economic impact analyses, marketing analysis and promotion programs. Special planning studies can also be done on specific types of tourism development such as health and youth tourism.
  • 37.
    37 Ten (10) stepstructural process: 1. Acquire understanding 2. Preliminary position statement 3. Commitment for tourism study 4. Market and resources analysis 5. Conceptual planning 6. Plan approval 7. Master planning 8. Final Commitment 9. Staged implementation program 10.Evaluation and direction Process for Tourism Planning
  • 38.
    38 Acquire Understanding • Thefirst step in tourism planning is education. • Persons who will make the most significant decision must acquire the understanding necessary to portray a framework for their decisions.
  • 39.
    39 • This willinvolve securing the services of lecturers or consultants for a series of presentations. • It could also involve field trips to areas where tourism planning and development have already taken place. • Face-to-face contact should take place between decision makers in an area, resort, or attraction.
  • 40.
    40 Preliminary Position Statement •The responsible group should develop a formal statement of interest. • This would show the objectives they would like to obtain and the result they wish to achieve. • Also important are formal statements regarding restrictions on tourism development.
  • 41.
    41 Commitment for TourismStudy • There should be an intensive study which establishes feasibility and serves as a basis for actual development.
  • 42.
    42 Market and ResourcesAnalysis • This activity gathers and correlates data on the overall size of the destination or prospective market and the share that market is expected to gain. • This body of information will serve as the basis for a major investment decision.
  • 43.
    43 • In marketanalysis, data on travel statistics, airline routes, fare structures and other related reports are needed. • Other data such as detailed review of the resources in the prospective destination, surveys of travel origins, markets, as well as the willingness of airlines to extend their routes are required.
  • 44.
    44 • This activityinvolves a number of temporary conclusions which are needed in a market forecast. The market forecast in the final product of their activity. • Examples of interim conclusions are: – The total possibility of travel to the geographic area is or is not large enough to support the development of a tourism industry. – Travel routes are or not adequate to support the development of tourism – The local culture in the area will or will not be able to attract tourists
  • 45.
    45 Conceptual Planning • Thisactivity uses the results of the market forecast to establish the image and identification for the project area. • This involves general description of what the area should look like and how it will function after development has taken place.
  • 46.
    46 • Conceptual planningincludes definite statements of objectives and policies for the proposed tourism project. These deal separately with the following facts: – The theme or character of the tourism project – The major resources to be developed – Environmental, social, and cultural aims and restrictions – Economic targets and returns Conceptual planning gives general estimates of benefits and costs which will be the basis for a major decision on whether to proceed with the expensive, detailed master plan or to modify, redirect or cancel it.
  • 47.
    47 Plan Approval • Thisis a recognition of the necessity of the plan. After a thorough review of the conceptual plan, the responsible decision makers should make a decision on whether the tourism planning process should proceed to the master plan.
  • 48.
    48 Master Planning • Masterplanning involves expenses of time and money which are 5 to 10 more expensive than the previous activities. • The reason for this is because a master plan is more details and frequent changes take place because of the nature of cooperation required between the private and public sectors.
  • 49.
    49 • Areas whichare detailed in a master plan are: – Performing an in-depth marketing study – Designation and extent of land uses for tourism – Planning infrastructure facilities including roads, airports, walkways, drainage, sewage, water, power and other utilities. – Selection of sites for tourist facilities including their sizes and boundaries – Establishment of architectural designs and standards – Drawing master, overall landscape plans – Establishment of zoning and other land-use regulations
  • 50.
    50 Final Commitment • Afterthe completion of a master plan, many commitments are needed. • The government must pledge legislation policies, funds and programs to encourage tourism. • Final commitment must be closely coordinated. • Failure to secure commitment within any sector will result in failure.
  • 51.
    51 Staged Implementation Program •Implementation activities fill the gap between accepted development plans and the creation of an operational, integrated tourism industry. • Continuous planning is needed because tourism and its elements tend to be dynamic.
  • 52.
    52 Evaluation and Direction •Established operations must be monitored to assure continuing quality of services and operating success. • Mechanisms must be established to provide continuous feedback on tourism volumes and levels of satisfaction provided. • Such programs will prevent the decline of resorts, attractions, or destinations.
  • 53.
    53 The major elementsin planning a tourist destination are: 1. Market analysis 2. Assessment of available resources a. Visitor attractions b. Culture c. Infrastructure and superstructure d. Transportation e. Support services f. Visitor accommodations 3. Marketing 4. Economic and financial analysis 5. Environment 6. Social impact Major Elements in Planning a Tourism Destination
  • 54.
    54 Types and Qualityof Facilities and Services Market Analysis Available Resources and Labor Capital Infrastructure Transportation Superstructure Economic and Financial Analysis Comprehensive Master Plan Historic and Environmental Constraints State and Country Planning and Zoning Regulations Environmental and Social Impact Statements Financing Package Construction Documents Construction Starts Elements involved in developing a destination
  • 55.
    55 Marketing Analysis • Marketanalysis requires a thorough study of past and present trends, traveler profiles, traveler performances and habits, market position, and destination images.
  • 56.
    56 Assessment of AvailableResources a. VISITOR ATTRACTIONS – the success of a destination depends not only on its power to attract visitors but also on its ability to maintain them. Destination planning must look at existing attractions plus the possibility of building new ones such as marinas, theme parks, and others. b. CULTURE – destination planning encourages the inclusion of cultural heritage in tourism. Native customs, dance, rituals, foods, crafts, ceremonies, traditional architecture should be included in tourism planning to enable a new destination to preserve its native culture instead of lessening its value.
  • 57.
    57 c. MANPOWER –in destination planning, an adequately trained labor force is required. Tourism as an industry, is not only people oriented but also people dependent. A pleasant experience for visitors is an important factor for the success of a tourism destination. Appropriate training and development are necessary in two specific areas of employee qualification namely: attitudinal and technical. It may be necessary to establish hotel and tourism schools and provide scholarships for some students to study abroad.
  • 58.
    58 d. INFRASTRUCTURE andSUPERSTRUCTURE – this term infrastructure refers to all underground and surface construction of a region. It includes water supply, electric lines, sewage and drainage systems, roads and highways, communication and other related services. Superstructure are the facilities and services that are above the ground such as hotels, resorts, restaurants, shopping centers, airports buildings, museums, stores and similar structures.
  • 59.
    59 • The infrastructurecomes before the superstructure. The lack of an adequate infrastructure often hinders the development and growth of a tourism destination. A country may have beautiful beaches but these are worthless if they are not connected to major markets by roads or air facilities. • They are also valueless if adequate water, electricity and sewage facilities are not available. The development of infrastructure facilities are generally a government responsibility. Developing nations may seek assistance from international agencies such as the United Nations Development Bank in order to develop their infrastructure.
  • 60.
    60 e. TRANSPORTATION –a study of the present and future transportation needs such as air, highways, rail, and water is necessary in the movement of passengers and goods. This information can help the government in planning the expansion of air routes, assessing traffic patterns between terminals and destinations and measuring the effect of congestion in major tourist attractions, historical sites, parks and beaches.
  • 61.
    61 f. SUPPORT SERVICES– they include services such as maintenance and repair facilities, police protection, fire protection, retail shops, sports facilities, gaming, festivals, pharmacies, handicraft facilities, bookstores, department stores, art galleries, museums and others. Problems will arise if any of these services is not available. It is important to plan these services can be provided.
  • 62.
    62 g. ACCOMMODATION –accommodation facilities are the places where tourists stop being travelers and become guests. These are also places where tourists spend most of their time and money. Thus, planning for accommodation is very important to the success of a tourist destination. A careful analysis of visitor accommodations can help government officials in making decisions such as rezoning, acquisitions of property, release of public property for other uses, invitations for private capital investment.
  • 63.
    63 Marketing • Marketing isthe process of selecting a target, choosing strategies to reach the market, establishing objectives, coordinating the efforts of those involved in promoting the destination and evaluating successes and failures.
  • 64.
    64 Economic and FinancialAnalysis • It involves a careful analysis of economic conditions and financial requirements such as feasibility studies, cash flow, available capital and interest rates. On the international level, economic analysis also includes balance of trade from inbound and outbound tourism.
  • 65.
    65 Social Impact • Developersof a tourist destination should consider the effect of tourist growth on the local population. Too much contact between the resident population and visitors can lead to internal trouble. This is the reason why many countries plan and develop resort areas away from population centers to avoid congestion and to be able to distribute tourism resources over a wide area.
  • 66.
    66 • The productlife cycle characterizes the stages of destination development. • This theory includes four stages of the product development from inception to growth to maturity and finally to decline. Stages of Destination Development
  • 67.
    67 • These stagesare the following: – I. Inception – discovery – II. Growth – local response and initiative – III. Maturity – institutionalization – IV. Decline – saturation and alienation • A knowledge of these four stages will make the planner to avoid problems related to mass development and ensure the continuous success of a tourist destination.
  • 68.
  • 69.
    69 Stage I –INCEPTION - Discovery • During this stage of development, a few adventurous tourist visit the area. These are the allocentric type of tourists. Some of them decide to stay in the area and become expatriates. These expatriates establish restaurants, guest residences, souvenir shops and tour services. Their business usually succeed because they offer services that are more modern, more sanitary and more reliable than those offered by the local population. These are the reasons why a greater number of allocentrics are encouraged to visit the destination.
  • 70.
    70 • During stageI, tourists are generally welcomed by the residents. There is a great amount of interpersonal contact between the tourists and the residents. • The tourists adjust to the local environment and the people.
  • 71.
    71 Stage II –GROWTH – Local Response and Initiative • For stage II, the number of tourists increases. The area has developed a good reputation by word of mouth. Although tourism is growing, the facilities and services are owned and controlled by the residents. • There is a lack of standardization of facilities. Tourism development is uncoordinated and spontaneous instead of planned. Tourist continue to adapt the local culture. However, these are signs that the tourist industry is beginning to adapt to the needs of the tourist. Motorboats replace manually propelled boats. Increase attention is given to sanitation and visitor comfort.
  • 72.
    72 • The increasedinteraction between tourist and residents result in a desire of residents for better education, increased awareness of the outside world, trend toward equality, and a change of traditional lifestyles.
  • 73.
    73 Stage III –MATURITY - Institutionalization • Maturity is characterized by the increase in the number of tourists and the formalization of services, itineraries, and roles. There is a loss of local decision-making and control in the tourist industry. • Many hotels, airlines and other services are associated with international corporations who make corporate decisions from offices outside the country. Hence, the local population are economically dependent on individuals or corporations who do not reside in the area and yet own and control many tourist services. This creates a feeling that outsiders have taken control.
  • 74.
    74 • During theMaturity – Institutionalization stage facilities and procedures are standardized which results in greater efficiency. The diets of the local residents improve because they are exposed to new foods. Native crafts are revived since they are in demand by the tourists. The increased production of native crafts generates more income for the resident population.
  • 75.
    75 Stage IV –DECLINE – Saturation and Alienation • In the final stage, the destination has become saturated. The residents have become disillusioned because tourism has not produce at all the benefits they expected. For the visitors, the factors that were responsible for the earlier success of the destination, such as the hospitality of the residents, the clean and uncongested environment, and the appeal of the new destination have disappeared so the tourists begin to look for other unaltered destinations.
  • 76.
    76 • A destinationis not expected to pas through all these four stages. Some do not move beyond stage I. There are destinations that move directly from Stage I to Stage III as in the case of Guam and Fiji. • Even in the decline stage, measures can be taken to rejuvinate a declining destination. An example of this is the repositioning of Miami, Florida as a gateway city to and from Latin America.