Skip to main content
MANPREET SINGH
E-Mail: SPRUCE33.KALSI@GMAIL.COM & MSKALSI@LNTECC.COM
Mobile No: (+91) 8054083026
OBJECTIVE:
I am seeking a responsible position in company where I can Utilizing my skills and experience to advance my Knowledge
so that I keep on working for growth of self & company.
EDUCATION:
• Mehr Chand Polytechnic Collage, Jalandhar (PUNJAB)
Diploma in Mechanical Engineering with 74.5% -With Honour (from 2004-2007).
• Educational Institute Of Management And Engineering Studies (Approved By Govt. of Delhi)
B.E. in Mechanical Engineering (Trough distance learning) with ‘B’ Grade (from 2009-2011).
RELEVENT CERTICATIONS:
• Larsen & Toubro Ltd. (LNT- CONSTRUCTION)
Certificate in Internal Auditor (ISO9001:2008)
Certificate in SDP (Supervisory Development Programme)
PRESENT EMPLOYER:
• Presently working on OFFICER GRADE of CONSTRUCTION PROJECT PLANNING ENGINEER in LARSEN & TOUBRO
LIMITED since 02nd
July’ 2007.
KEY SKILLS SUMMARY:
• Primvera V6, SCHEDULING & CONTROLLING USING MSPROJECT2010AutoCAD2013, L2 L3 LEVEL PROJECT
PLANNING, GANTT CHART/ BAR, SCHEDULING, PROJECT ESTIMATION-BOQ CALCULATION, RATE ANALYSIS FOR
EXTRA ITEMS, CEMENT PLANT PROJECT ENGINEERING, QUANTITY SURVEY, BBS (BAR BENDING SCHEDULING),
FABRICATION & ERECTION OF STEEL STRUCTURES & STEEL VESSELS USING GA/ DETAIL DRAWINGS,
DETAILING/DEVELOPMENT OF SHOP DRAWINGS USING AUTOCAD2013, EQUIPMENT INSTALLATION, SUB-
CONTRACTOR BILLING USING ERP SYSTEM, PROGRESSIVE CLIENT BILLING USING MS OFFICE2010, FACADE JOB-
SHEETING & CLADDING OF BUILDINGS, UTILITY PIPING ENGINEERING
JOB RESPONSIBILITY:
In Larsen & Toubro Ltd. (CONSTRUCTION) My Job responsibilities being PROJECT PLANNING ENGINEER are:-
Expediting Fabrication-Erection and Equipment Installation Work for Cement Plant Projects/PEB
Projects/Wagon Industry Projects i.e. Fabrication & Erection of Cyclones, Stacks, Ducts, Chutes, Risers, Feed Pipes,
Hoppers, Built-up sections and Steel Structures incl. Metal Roof sheeting and Cladding fixing.
Equipment Erection for Crusher, Wobbler feeder, Apron feeder, Bag Filters, EOT Cranes, Stacker, Reclaimer, Belt
Conveyors, VRM, Ball Mill, Roller Press, Bag house, Bucket Elevators, DPC, KILN, Cooler, ESP (Electrostatic Precipitator),
Packers, Air slides, Screw Conveyors and Dedusting Pipe Lines.
• Following Activities carried out by me being Project Planning Engineer to expedite same:-
 Working out for HIRA (Hazard Identification and Risk Assessment) for Activities involved in Fabrication
and Erection, Setting up working environment in line with EHS.
 Preparing WORK METHOD STATEMENTS, explaining to sub-contractors after getting it approved form
authorized personnel.
 Preparing ERECTION SCHEMATIC DRAWINGS for erection of Mills, Kiln, Silos Roof Structures etc. using
AutoCAD2013 and Load charts of concerned Cranes.
 Preparing L3 - GANTT CHART Schedule using MSP2010 and monitoring accomplishment of construction
CV- CONSTRUCTION PROJECT ENGINEER PAGE 1
activities.
 Preparing MANPOWER DEPLOYEMENT SCHEDULE and then Sub-Contractors delegation to work
according to need to project.
 Preparing EQUIPMENT DEPLOYEMENT SCHEDULE.
 Calculation of Steel and other material being required f4or Project and Raising PROCUREMENT ORDERS on
time to sustain hassle free fabrication activities.
 DEVELOPMENT OF PLATE WORK DRAWINGS & DETAILING OF STEEL STRUCTURE DRAWINGS using
AUTOCAD2013 (2D) to minimize expenditure of LMP in time taking layouts.
 Timely SUB-CONTRACTOR BILLING after Analysis of item rates to generate suitable Item Codes with
competitive rate to issue Work Orders to SC. Processing of sub-contractor bills on EIP CeMa SC billing software.
 Implementation of QMS through daily checklists formats to improve Supervision of construction activities for
enhancing their quality and minimizing idle movements of LMP (labour, material and Plant machinery) to give out
work at scheduled date.
 Monitoring DPR from Site and compiling same with resources to check productivity of TNP and MAN HOURS.
 Synchronization with Client’s requirement for Project and hitching L3 Schedule with Front Availability.
• Preparing ACE (Actual Cost Estimated) of project in beginning of commencement of Project.
• Preparing JCR (Job Cost Report) after gathering details of S3 (Cost of Plant machinery), S4 (Cost of staff), S5
(Cost of labour/SC), Admin & Store expenditure, RSV (Revised Sales Value), ETC (Estimated to complete) and S2
(Specialized Agency Cost) incl. liabilities ‘on monthly basis.
• Preparing MRM (Monthly Reconciliation of Material) to control Steel and Sheeting Wastage.
• PROGRESSIVE CLIENT BILLING – Preparing BOQ for Fabrication work, Piping work, Sheeting Work, Painting
Work, Equipment Erection Work getting it certify from client.
• Working out to Maintain Client Sales Cost v/s Sub-Contractor Cost positive.
SKILLS:
• Five years of experience in Planning Engineering.
• Steel Quantity Survey for Steel structure and Steel Vessels.
• Progressive Client Billing.
• Worked for Quality Inspection for
• Proficient in AUTO CAD2014 (2D).
• Proficient in Structure Detailing and Cyclone/Vessels Detailing.
• Proficient in MS PROJECT2010.
• Proficient in MS Office (Window 2010) (Includes MS Word, Excel, Power Point, Picture Manager, Microsoft Outlook
etc.), Adobe Photo shop.
• Experienced in Equipment installation in Cement Projects and Fabrication Erection work of Cement Projects.
• Adequate Knowledge of processes in Cement Plants from Blasting Area to Wagon Loading.
• Gathered Experience in Three Category of Projects i.e. Cement Plant Projects, Wagon Industry Project & PEB
Projects.
WORK EXPERIENCE:
8. FROM MARCH’2016 TO TILL DATE- Presently, I am working at ‘PROPOSED INTEGRATED CONSUMER GOODS
CV- CONSTRUCTION PROJECT ENGINEER PAGE 2
MANUFACTURING AND LOGISTICS FACILITY FOR ITC, Kapurthala, (PUNJAB, India).
7. FROM APRIL’2014 TO FEBRUARY’2016- I had worked at ‘WONDER CEMENT PROJECT LINE-II’ a Project of RK
Group, Nimbahera (Rajasthan, India).
6. FROM JANUARY’2014 TO APRIL’2014- I had worked at ‘ADITIYA LINE-III’ a Project of UTCL CEMENTS,
Shambupurra, Chittorgarh (Rajasthan, India).
5. FROM JULY’2012 TO JANUARY’2014- I had worked at ‘WONDER CEMENT PROJECT LINE-I’ a Project of RK
Group, Nimbahera (Rajasthan, India).
4. FROM AUGUST’2011 TO JULY’2012- I had worked at ‘CIP-5 LAUNDRY TOWER PROJECT’ a project of Procter &
Gamble (P&G), Mandideep (Madhya Pradesh, India).
3. FROM NOVEMBER’2008 TO AUGUST’2011- I had worked at ‘MAHI CEMENT PLANT PROJECT’ a project of
India Cement Ltd, Banswara (Rajasthan).
2. FROM JANUARY’2008 TO NOVEMBER’2008- I had worked at ‘KB & CASTING PROJECT’ a project of Maruti
Suzuki India Ltd, Gurgaon (Haryana).
1. FROM JULY’2007 TO JANUARY’2008- I had worked at ‘EXPANSION PROJECT’ a project of Honda Seil Cars India
Limited, Greater Noida (U.P.)
HONORS AND AWARDS:
• For year of 2015 awarded as Top Performer
• For year of 2014 awarded as Top Performer
• For year of 2013 awarded as Out Standing Performer
• For year of 2012 awarded as Out Standing Performer
• For year of 2011 awarded as Out Standing Performer
• For year of 2010 awarded as Top Performer
• Stood 7th
Position in State Topper List of Mechanical Engineers For Batch (2004-2007)
PERSONAL PROFILE AND ADDRESS:
FATHER’S NAME : S. Tarlochon Singh
MOTHER’S NAME : Smt. Ravinder Kaur
DATE OF BIRTH : 4TH
December, 1987
MARTIAL STATUS : Married
PASSPORT : H1198876
LANGUAGES KNOWN : Punjabi, English and Hindi
NATIONALITY : Indian
RELIGION : Sikh
PRESENT LOCATION : R.K. Colony, Nimbahera, Rajasthan (India)
PERMANENT LOCATION : H.No:- 13792, ST. No: 2ª, Pharbat Nagar, Dholewal, Ludhiana-141003 (Punjab, India)
CTC : 12.9Lakh/ Annum + Medical + House Hold Furniture Provided
EXPECTED CTC :
I hereby declare that the information given above is true to the best of my knowledge.
DATE : 30- MARCH -2016 MANPREET SINGH
CV- CONSTRUCTION PROJECT ENGINEER PAGE 3