Case Study: Mass Production in Small Scale 
Abstract: The case study discuss about production process in Better Castings Company. Consider for a moment what 
it takes to produce a product in manufacturing industry that has to produce different products at various times. 
Major, there are the logistics of scheduling and raw material handling. Then, add the human labour factor affecting 
both quality and efficiency. The production process in the company is similar to the other production process of 
companies where the raw material transfer from foundry to store, store to the lathe machining for parting material, 
from lathe machining to the CNC (computer numerical control) machines where the first operation and the second 
operation are carried out to obtain the final design of the ring joint gaskets. After the final machining the obtained 
product is carried to the quality control where the visual inspection, dimensional inspection, Quality of product & the 
specifications of the product are checked depending on the customer requirement. While machining product the 
tolerance in tool fit will affect the dimensions of product. Due to that product can’t reach its specification limit given 
by customer. So company losing its machining time in the form of reworks and rejections, man power and production. 
This is common problem in many small scale manufacturing industries. In order of considering all these process a 
single change in production process leads better quality and efficiency production of company. The paper shows a 
solution to reduce machining time and man power in order to increase production of a company. 
Keyword: CNC (computer numerical controlled machines), better castings, job, Q.C (quality control), Q.A (quality 
assurance), ring joint gasket, O.D (outer diameter), Quality inspection. 
Page | 29 
Industries 
Velpuri Gopi Krishna 
Department of Mechanical Engineering, Better Castings Company, 
Vijayawada, Andhra Pradesh, India. 
I. Introduction 
A Company named BETTER CASTINGS uses two types of production methods [1]. 
Paper Publications 
 Batch production and 
 Mass production. 
These two productions involve continuous production of the gaskets to the industries. 
Types of Gasket produced are:- 
 R model 
 RX model 
 BX model 
 V-BAND MALE & FEMALE model 
 2'' pre match ball model 
The actual process chart of company is shown below Fig.1
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
RAW 
MATERIAL 
FOUNDRY MACHINING 
QUALITY 
CONTROL 
DISPATCH 
The process chart shown in above Fig.1 shows how an actual process takes place in any manufacturing company. The 
process starts with raw materials to the foundry. The casted material is carried in to the machine shop where lathe operations 
are performed and moved in to CNC machine shop to give an actual shape and finishing for the job with better surface finish 
and accuracy. Then the job is moved to quality control where quality inspection was performed to maintain better quality in 
order to satisfy customer. Defects in the machining section are high due the production cost of company increases due to 
reworks and rejections. So, a small change is made during the machining process particularly during the CNC (COMPUTER 
NUMERICAL CONTROL) Machining. By this idea we can make sure that the BETTER CASTINGS will have great quality 
in quality control of the production. Before looking at change we made let us have a brief look at actual machining process 
taken place in company. 
Page | 30 
Fig. 1. Process chart of a manufacturing company 
MACHININ 
G 
LATHE 
MACHININ 
G 
ACCEPTE 
D 
CNC 
ACCEPTED 
REJECTED 
SCRAP 
REJECTED 
SCRAP 
Paper Publications 
A. Machining 
Machining is a place where casted parts get machined and turns in to the final product required for customer [1]. By using 
various set of operations like turning, facing, and milling etc. 
Q.C 
Fig. 2. Process chart for Machine Shop 
If we have a look at fig.2 shown above it shows us that accepted jobs are shifted to quality control and rejection pieces are 
shifted to scrap. In machine shop rejecting work piece process takes place if it is out of shape (or) subjected to the vibrations 
when the machining process is going on. It is the place where we have to concentrate more in order to reduce rejection in a 
particular industry.
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
Page | 31 
Q.C 
VISUAL 
INSPECTI 
ON 
ACCEPTE 
DIMENSION 
INSPECTION 
REJECTE 
REJECTE 
D 
STORE 
REWORK 
Paper Publications 
B. Quality Control 
Quality control (QC) is a set of procedures anticipated to ensure manufactured product or performed deal surveys to define 
set of quality standards to meet need of customer. It is similar, however not undistinguishable with, quality assurance (QA). 
Quality control in any industry plays a key role to satisfy the customer requirement. Quality control looks at only customer 
satisfaction other than the process [1]. After the final machining the obtained product is carried to the quality control where 
the visual inspection, dimensional inspection, Quality of product & the specifications of the product are checked depending 
on the customer requirement. Where tolerance and non-destructive testing are performed to maintain better quality. After 
these the product is moved for the punching and the final dispatch.Where rejected pieces are moved to store and then to the 
casting as a raw materials. Let’s take a look at quality control process in manufacturing company which is shown in below 
Fig.3. 
D 
AL 
D 
STORE 
REWORK 
CNC 
Fig. 3. Process chart for quality control 
II. Problem Solving 
ACCEPTE 
D 
PUNCHIN 
G 
PACKING 
& 
DISPATC 
H 
The chart show in below fig.4. Shows the analysis and changes I have made during the study on the CNC (computer 
numerical control) machine. Usually a CNC performing operator will know greatly about the job that is machined on the 
machine. When a CNC operator performing the operations on the machine. Whatever the operations may be first or second 
operation. During those operations on a machine a particular cycle time will be set for a job depending upon the material, 
speed, feed & depth of cut.
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
As we know a CNC operator can operate at least 2 machines at a time. But the BETTER CASTINGS industry has total 6 
CNC machines and the 7 operators including supervisors. Here we have required man power to perform the job. So, the CNC 
operator was requested to perform the visual inspection & dimensional inspection during the cycle time of the job performed 
on machine. 
By this method the CNC operator can know & restrict his mistakes by performing visual inspection & dimensional 
inspection. So the operator can maintain a standard value for the Rings produced. And they can learn more from those 
mistakes and never be repeated. The industry can save the tool fixing time for the re work material & save power. If the CNC 
operators are well in performing the visual inspection & dimensional inspection then we can reduce the man power of the 
company. The process was checked by performing a test on RX24 ring. 
Page | 32 
REJECTED REWORK 
Fig. 4. Process chart modified in CNC shop 
Paper Publications 
CNC 
FIRST 
OPERATIO 
N 
VISUAL 
INSPECTIO 
N 
ACCEPTED 
SECOND 
OPERATIO 
N 
VISUAL 
INSPECTIO 
N 
ACCEPTED 
Q.C 
SAMPLE 
VISUAL & 
DIMENSIONAL 
PUNCHING 
PACKING 
& 
DISPATCH 
DIMENSIONAL 
INSPECTION 
CNC 
COORDINATES 
REQUIRED 
ACCEPTED 
During job 
cycle time 
REJECTED 
REWOR 
K 
DIMENSIONAL 
INSPECTION 
CNC 
COORDINATES 
REQUIRED 
ACCEPTED 
During job 
cycle time
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
Considering a RX24 (ring joint gasket) model. The practical analysis for the case study is done by considering various 
parameters like. 
Page | 33 
III. Study with RX-24 model 
Paper Publications 
 Tool setting fixing time. 
 Lead time 
 Cycle time etc. 
In order both the visual inspection and the dimensional inspection is done by the operator and the record of the visual 
inspection and the dimensional inspection is maintained by the operator. 
To maintain the record for the visual inspection & dimensional inspection we have created a separate record sheet for it and it 
is very useful for the company. 
The report sheet involves the following 
 Type of model 
 Operator 
 Supervisor 
 First operation 
 Second operation 
 O.D (with tolerance) 
 width (with tolerance) 
 height (with tolerance) 
 flat ”c” (with tolerance) 
 Visual inspection. 
The following specifications help the operator to easily identify his mistakes and restrict them. 
The actual time taken by an operator to fix the setting is 30 Min. 
The cycle time for a single job is 3Min 30 sec. 
The lead time for a single job is 4min 30 sec. 
The results for the above analysis are shown in the form of dimensional report and the bar chart. 
Fig .5. Dimensional report of study
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
From the above fig.5. Job no 3 is subjected to the rejection that may be visual rejection or dimensional rejection. If the 
operator did not perform the both visual and dimensional inspection then the same program will run for all the remaining 
rings. 
The cycle time taken for the each job is 3 min 30 sec. 
The lead time taken for each job is 4 min 30 sec. 
After the job no 3 total 7 jobs are operated on the CNC machine the total cycle time for all the 7 jobs is 24 min 30 sec. 
And the total lead time taken for all the 7 jobs is 31 min 30 sec 
By this simple example we can say that the company has lost 31 min 30 sec of its valuable time during the production of 
rings with the waste of man power and power supply. 
Suppose if we consider a lot of 300 rings with this kind of production then we can easily imagine what kind of loss will be 
faced by the company. 
To eradicate those losses this type of studies will help the production company to restrict their mistakes during the production 
and to maintain constant check for every ring and change the coordinates of the machine to maintain the same value for every 
ring in order to improve the quality of ring. 
Page | 34 
7 
1 
0 
8 
2 2 
Fig. 6. Chart showing difference between study & actual process of company 
Fig.7. chart shows time utilized and misused by company 
Paper Publications 
10 
8 
6 
4 
2 
0 
CASE STUDY ACTUAL PROCESS 
Rings 
ACCEPTED2 
REWORK/REJECTION 
ACCEPTED 
9 9 
4.3 
36 
31.3 
0 
45 
9 
0 
36 
50 
45 
40 
35 
30 
25 
20 
15 
10 
5 
0 
CASE STUDY ACUAL PROCESS 
Time consumed 
ACCEPTED 
REWORK/REJECTIONS 
ACCEPTED2 
MANPOWER UTILIZED 
MAN POWER MSSUSED
International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 
Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org 
The above chart shown in Fig.6, 7. The differences between the case study and the actual process of the company are clearly 
shown.From the above results we can say that the implementation of the case study in the industry will give better results 
than the actual process of the company. 
By this we can conclude that the methodology shown by the case study has the better results compared to the methodology of 
the company. With this case study we can save: 
Page | 35 
IV. Conclusion and Recommendations 
 Power consumed during rework & tool fixtures. 
 Man power 
 Increase production. 
 Reworks & rejections of the job. 
To have a technically skilled operators to operate a CNC machine. 
References 
Paper Publications 
[1] http://www.bettercastings.com/

More Related Content

What's hot

Quality Management in production system
Quality Management in production systemQuality Management in production system
Quality Management in production systemAshek Farabi
 
Software Testing Process
Software Testing ProcessSoftware Testing Process
Software Testing Processguest1f2740
 
Design engineering 2A report
Design engineering 2A reportDesign engineering 2A report
Design engineering 2A reporttirath prajapati
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deploymentelai1001
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_Swetlina .
 
Six Month Industrial Training Report at Milestone Gears Ltd
Six Month Industrial Training Report  at Milestone Gears LtdSix Month Industrial Training Report  at Milestone Gears Ltd
Six Month Industrial Training Report at Milestone Gears Ltdyogesh thakur
 
Andon system presentation
Andon system presentationAndon system presentation
Andon system presentationMaxpromotion
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line BalancingAlan Wei Teck
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Animesh Khamesra
 
Poka, yoke & jidoka
Poka, yoke & jidokaPoka, yoke & jidoka
Poka, yoke & jidokaAkash Patel
 

What's hot (20)

poka yoke
poka yoke poka yoke
poka yoke
 
Quality Management in production system
Quality Management in production systemQuality Management in production system
Quality Management in production system
 
Tpm
TpmTpm
Tpm
 
Software Testing Process
Software Testing ProcessSoftware Testing Process
Software Testing Process
 
Design engineering 2A report
Design engineering 2A reportDesign engineering 2A report
Design engineering 2A report
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Poka Yoka
Poka Yoka Poka Yoka
Poka Yoka
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_
 
Six Month Industrial Training Report at Milestone Gears Ltd
Six Month Industrial Training Report  at Milestone Gears LtdSix Month Industrial Training Report  at Milestone Gears Ltd
Six Month Industrial Training Report at Milestone Gears Ltd
 
Andon system presentation
Andon system presentationAndon system presentation
Andon system presentation
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
7 QC Tools Training
7 QC Tools Training7 QC Tools Training
7 QC Tools Training
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
7 qc tool training
7 qc tool  training7 qc tool  training
7 qc tool training
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)
 
Quiz
QuizQuiz
Quiz
 
Poka, yoke & jidoka
Poka, yoke & jidokaPoka, yoke & jidoka
Poka, yoke & jidoka
 
Low Cost Automation
Low Cost AutomationLow Cost Automation
Low Cost Automation
 

Viewers also liked

EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...
EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...
EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...paperpublications3
 
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...paperpublications3
 
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...paperpublications3
 
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...paperpublications3
 
Making Management Education in India Meet Global Quality
Making Management Education in India Meet Global QualityMaking Management Education in India Meet Global Quality
Making Management Education in India Meet Global Qualitypaperpublications3
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industriespaperpublications3
 
Face Recognition & Detection Using Image Processing
Face Recognition & Detection Using Image ProcessingFace Recognition & Detection Using Image Processing
Face Recognition & Detection Using Image Processingpaperpublications3
 
Welding Development in ESR modified 15CDV6 material
Welding Development in ESR modified 15CDV6 materialWelding Development in ESR modified 15CDV6 material
Welding Development in ESR modified 15CDV6 materialpaperpublications3
 
Effects Of Internal Organization Communication Channels On Efficiency In The ...
Effects Of Internal Organization Communication Channels On Efficiency In The ...Effects Of Internal Organization Communication Channels On Efficiency In The ...
Effects Of Internal Organization Communication Channels On Efficiency In The ...paperpublications3
 
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDY
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDYMERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDY
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDYpaperpublications3
 
Internal Customer Satisfaction Assessment in the Public sector: A case study ...
Internal Customer Satisfaction Assessment in the Public sector: A case study ...Internal Customer Satisfaction Assessment in the Public sector: A case study ...
Internal Customer Satisfaction Assessment in the Public sector: A case study ...paperpublications3
 
A Study of Performance Appraisal and Dimensions of Organizational climate in ...
A Study of Performance Appraisal and Dimensions of Organizational climate in ...A Study of Performance Appraisal and Dimensions of Organizational climate in ...
A Study of Performance Appraisal and Dimensions of Organizational climate in ...paperpublications3
 
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...paperpublications3
 
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVES
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVESMICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVES
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVESpaperpublications3
 
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...paperpublications3
 

Viewers also liked (15)

EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...
EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...
EMPLOYMENT SITUATION OF SMALL ENTERPRISES IN PAPUM PARE DISTRICT OF ARUNACHAL...
 
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...
Intercropping of Haricot Bean (Phaseolus vulgaris L.) with stevia (Stevia reb...
 
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...
Response of Maize (Zea mays L.) for Moisture Stress Condition at Different Gr...
 
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...
Hybrid Quantum Genetic Particle Swarm Optimization Algorithm For Solving Opti...
 
Making Management Education in India Meet Global Quality
Making Management Education in India Meet Global QualityMaking Management Education in India Meet Global Quality
Making Management Education in India Meet Global Quality
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
Face Recognition & Detection Using Image Processing
Face Recognition & Detection Using Image ProcessingFace Recognition & Detection Using Image Processing
Face Recognition & Detection Using Image Processing
 
Welding Development in ESR modified 15CDV6 material
Welding Development in ESR modified 15CDV6 materialWelding Development in ESR modified 15CDV6 material
Welding Development in ESR modified 15CDV6 material
 
Effects Of Internal Organization Communication Channels On Efficiency In The ...
Effects Of Internal Organization Communication Channels On Efficiency In The ...Effects Of Internal Organization Communication Channels On Efficiency In The ...
Effects Of Internal Organization Communication Channels On Efficiency In The ...
 
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDY
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDYMERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDY
MERGERS AND ACQUISITIONS PROSPECTS: INDIAN BANKS STUDY
 
Internal Customer Satisfaction Assessment in the Public sector: A case study ...
Internal Customer Satisfaction Assessment in the Public sector: A case study ...Internal Customer Satisfaction Assessment in the Public sector: A case study ...
Internal Customer Satisfaction Assessment in the Public sector: A case study ...
 
A Study of Performance Appraisal and Dimensions of Organizational climate in ...
A Study of Performance Appraisal and Dimensions of Organizational climate in ...A Study of Performance Appraisal and Dimensions of Organizational climate in ...
A Study of Performance Appraisal and Dimensions of Organizational climate in ...
 
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...
A Comparative Analysis of HDFC Bank’s Financial Performance before and after ...
 
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVES
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVESMICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVES
MICROBIAL BIODIVERSITY: INNOVATIVE STRATEGIC INITIATIVES
 
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...
FACTORS AFFECTING TAX COMPLIANCE AMONG SMALL AND MEDIUM ENTERPRISES IN KITALE...
 

Similar to Case Study: Mass Production in Small Scale Industries

Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industriespaperpublications3
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industryGopalakrishnan P
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET Journal
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET Journal
 
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...IRJET Journal
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET Journal
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsmAro Ephrem
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 

Similar to Case Study: Mass Production in Small Scale Industries (20)

Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...
STUDY ON THE DEFECTS AND TO IMPROVE THE PROCESS CAPABILITY OF TREAD RUBBER US...
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
A Case Study on Reducing in Lead Time by Using Value Stream MappingA Case Study on Reducing in Lead Time by Using Value Stream Mapping
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Ac04606177183
Ac04606177183Ac04606177183
Ac04606177183
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsm
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 

Recently uploaded

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 

Recently uploaded (20)

INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 

Case Study: Mass Production in Small Scale Industries

  • 1. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org Case Study: Mass Production in Small Scale Abstract: The case study discuss about production process in Better Castings Company. Consider for a moment what it takes to produce a product in manufacturing industry that has to produce different products at various times. Major, there are the logistics of scheduling and raw material handling. Then, add the human labour factor affecting both quality and efficiency. The production process in the company is similar to the other production process of companies where the raw material transfer from foundry to store, store to the lathe machining for parting material, from lathe machining to the CNC (computer numerical control) machines where the first operation and the second operation are carried out to obtain the final design of the ring joint gaskets. After the final machining the obtained product is carried to the quality control where the visual inspection, dimensional inspection, Quality of product & the specifications of the product are checked depending on the customer requirement. While machining product the tolerance in tool fit will affect the dimensions of product. Due to that product can’t reach its specification limit given by customer. So company losing its machining time in the form of reworks and rejections, man power and production. This is common problem in many small scale manufacturing industries. In order of considering all these process a single change in production process leads better quality and efficiency production of company. The paper shows a solution to reduce machining time and man power in order to increase production of a company. Keyword: CNC (computer numerical controlled machines), better castings, job, Q.C (quality control), Q.A (quality assurance), ring joint gasket, O.D (outer diameter), Quality inspection. Page | 29 Industries Velpuri Gopi Krishna Department of Mechanical Engineering, Better Castings Company, Vijayawada, Andhra Pradesh, India. I. Introduction A Company named BETTER CASTINGS uses two types of production methods [1]. Paper Publications  Batch production and  Mass production. These two productions involve continuous production of the gaskets to the industries. Types of Gasket produced are:-  R model  RX model  BX model  V-BAND MALE & FEMALE model  2'' pre match ball model The actual process chart of company is shown below Fig.1
  • 2. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org RAW MATERIAL FOUNDRY MACHINING QUALITY CONTROL DISPATCH The process chart shown in above Fig.1 shows how an actual process takes place in any manufacturing company. The process starts with raw materials to the foundry. The casted material is carried in to the machine shop where lathe operations are performed and moved in to CNC machine shop to give an actual shape and finishing for the job with better surface finish and accuracy. Then the job is moved to quality control where quality inspection was performed to maintain better quality in order to satisfy customer. Defects in the machining section are high due the production cost of company increases due to reworks and rejections. So, a small change is made during the machining process particularly during the CNC (COMPUTER NUMERICAL CONTROL) Machining. By this idea we can make sure that the BETTER CASTINGS will have great quality in quality control of the production. Before looking at change we made let us have a brief look at actual machining process taken place in company. Page | 30 Fig. 1. Process chart of a manufacturing company MACHININ G LATHE MACHININ G ACCEPTE D CNC ACCEPTED REJECTED SCRAP REJECTED SCRAP Paper Publications A. Machining Machining is a place where casted parts get machined and turns in to the final product required for customer [1]. By using various set of operations like turning, facing, and milling etc. Q.C Fig. 2. Process chart for Machine Shop If we have a look at fig.2 shown above it shows us that accepted jobs are shifted to quality control and rejection pieces are shifted to scrap. In machine shop rejecting work piece process takes place if it is out of shape (or) subjected to the vibrations when the machining process is going on. It is the place where we have to concentrate more in order to reduce rejection in a particular industry.
  • 3. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org Page | 31 Q.C VISUAL INSPECTI ON ACCEPTE DIMENSION INSPECTION REJECTE REJECTE D STORE REWORK Paper Publications B. Quality Control Quality control (QC) is a set of procedures anticipated to ensure manufactured product or performed deal surveys to define set of quality standards to meet need of customer. It is similar, however not undistinguishable with, quality assurance (QA). Quality control in any industry plays a key role to satisfy the customer requirement. Quality control looks at only customer satisfaction other than the process [1]. After the final machining the obtained product is carried to the quality control where the visual inspection, dimensional inspection, Quality of product & the specifications of the product are checked depending on the customer requirement. Where tolerance and non-destructive testing are performed to maintain better quality. After these the product is moved for the punching and the final dispatch.Where rejected pieces are moved to store and then to the casting as a raw materials. Let’s take a look at quality control process in manufacturing company which is shown in below Fig.3. D AL D STORE REWORK CNC Fig. 3. Process chart for quality control II. Problem Solving ACCEPTE D PUNCHIN G PACKING & DISPATC H The chart show in below fig.4. Shows the analysis and changes I have made during the study on the CNC (computer numerical control) machine. Usually a CNC performing operator will know greatly about the job that is machined on the machine. When a CNC operator performing the operations on the machine. Whatever the operations may be first or second operation. During those operations on a machine a particular cycle time will be set for a job depending upon the material, speed, feed & depth of cut.
  • 4. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org As we know a CNC operator can operate at least 2 machines at a time. But the BETTER CASTINGS industry has total 6 CNC machines and the 7 operators including supervisors. Here we have required man power to perform the job. So, the CNC operator was requested to perform the visual inspection & dimensional inspection during the cycle time of the job performed on machine. By this method the CNC operator can know & restrict his mistakes by performing visual inspection & dimensional inspection. So the operator can maintain a standard value for the Rings produced. And they can learn more from those mistakes and never be repeated. The industry can save the tool fixing time for the re work material & save power. If the CNC operators are well in performing the visual inspection & dimensional inspection then we can reduce the man power of the company. The process was checked by performing a test on RX24 ring. Page | 32 REJECTED REWORK Fig. 4. Process chart modified in CNC shop Paper Publications CNC FIRST OPERATIO N VISUAL INSPECTIO N ACCEPTED SECOND OPERATIO N VISUAL INSPECTIO N ACCEPTED Q.C SAMPLE VISUAL & DIMENSIONAL PUNCHING PACKING & DISPATCH DIMENSIONAL INSPECTION CNC COORDINATES REQUIRED ACCEPTED During job cycle time REJECTED REWOR K DIMENSIONAL INSPECTION CNC COORDINATES REQUIRED ACCEPTED During job cycle time
  • 5. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org Considering a RX24 (ring joint gasket) model. The practical analysis for the case study is done by considering various parameters like. Page | 33 III. Study with RX-24 model Paper Publications  Tool setting fixing time.  Lead time  Cycle time etc. In order both the visual inspection and the dimensional inspection is done by the operator and the record of the visual inspection and the dimensional inspection is maintained by the operator. To maintain the record for the visual inspection & dimensional inspection we have created a separate record sheet for it and it is very useful for the company. The report sheet involves the following  Type of model  Operator  Supervisor  First operation  Second operation  O.D (with tolerance)  width (with tolerance)  height (with tolerance)  flat ”c” (with tolerance)  Visual inspection. The following specifications help the operator to easily identify his mistakes and restrict them. The actual time taken by an operator to fix the setting is 30 Min. The cycle time for a single job is 3Min 30 sec. The lead time for a single job is 4min 30 sec. The results for the above analysis are shown in the form of dimensional report and the bar chart. Fig .5. Dimensional report of study
  • 6. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org From the above fig.5. Job no 3 is subjected to the rejection that may be visual rejection or dimensional rejection. If the operator did not perform the both visual and dimensional inspection then the same program will run for all the remaining rings. The cycle time taken for the each job is 3 min 30 sec. The lead time taken for each job is 4 min 30 sec. After the job no 3 total 7 jobs are operated on the CNC machine the total cycle time for all the 7 jobs is 24 min 30 sec. And the total lead time taken for all the 7 jobs is 31 min 30 sec By this simple example we can say that the company has lost 31 min 30 sec of its valuable time during the production of rings with the waste of man power and power supply. Suppose if we consider a lot of 300 rings with this kind of production then we can easily imagine what kind of loss will be faced by the company. To eradicate those losses this type of studies will help the production company to restrict their mistakes during the production and to maintain constant check for every ring and change the coordinates of the machine to maintain the same value for every ring in order to improve the quality of ring. Page | 34 7 1 0 8 2 2 Fig. 6. Chart showing difference between study & actual process of company Fig.7. chart shows time utilized and misused by company Paper Publications 10 8 6 4 2 0 CASE STUDY ACTUAL PROCESS Rings ACCEPTED2 REWORK/REJECTION ACCEPTED 9 9 4.3 36 31.3 0 45 9 0 36 50 45 40 35 30 25 20 15 10 5 0 CASE STUDY ACUAL PROCESS Time consumed ACCEPTED REWORK/REJECTIONS ACCEPTED2 MANPOWER UTILIZED MAN POWER MSSUSED
  • 7. International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) Vol. 1, Issue 1, pp: (29-35), Month: April-June 2014, Available at: www.paperpublications.org The above chart shown in Fig.6, 7. The differences between the case study and the actual process of the company are clearly shown.From the above results we can say that the implementation of the case study in the industry will give better results than the actual process of the company. By this we can conclude that the methodology shown by the case study has the better results compared to the methodology of the company. With this case study we can save: Page | 35 IV. Conclusion and Recommendations  Power consumed during rework & tool fixtures.  Man power  Increase production.  Reworks & rejections of the job. To have a technically skilled operators to operate a CNC machine. References Paper Publications [1] http://www.bettercastings.com/