INTRODUCTION
2
• The Problem
• The Express Lane Option
• The Project Specifics
• The EnvironmentalProcess
• What’s ahead
3
DEFINITIONS
•AuxiliaryLane: An outerlanethatis createdat an on-rampand
exitsatthenext off-ramp(“EXIT ONLY”lane)
•HOV:High-Occupancy Vehicle;alsoknown as acarpool
•O&M: Operations and MaintenanceoftheExpress Lanes
facilities
•Rightof Way: theproperty owned bytheStateofCaliforniafor
theStateHighwaySystem
4
BIG PICTURE
• The Caltrain Electrification Project will not fully address projected
demand
• SAMTRANSisstudying expressbus serviceon the 101 corridor
• VTA is in final design to create a 2+ HOV Express Lanes from south
of 85 to the San Mateo County line
• SFCTA is studying an extension of the 101 managed lanes into San
Francisco
• MTC is planning to improve and increase Park and Ride lots
• Municipalities implementing TDM measures
The problem is greater than one project can solve.
5
THE PROBLEM
• Jobs, housingand
population growth
continue
• Vehicle trips to grow
4-7% by 2020
• No incentive to
sharea ride
• Carsavoid the
freeway
The congestion on 101 has been bad and will continue to get worse.
6
THE BACKUPS
TRAFFIC STATION
7
101 Southbound AM HOVs
TRAFFIC STATION
8
101 Northbound AM HOVs
TRAFFIC STATION
9
101 Southbound AM RAMPS
TRAFFIC STATION
10
101 Northbound AM RAMPS
TRAFFIC STATION
11
CROSS CONNECTOR TRAFFIC
TRAFFIC STATION
12
EL CAMINO TRAFFIC
TRAFFIC STATION
13
THE CHALLENGE OVERALL
• Find a solution quickly
• Secure public and political support of the Project
• Secure the requiredfunding
• Minimize environmental impacts
• Stay within the current Right of Way as much as possible
• Don’t make congestion worsein theother lanes
• Reducecommute trips on the local street network
• Build the project as soon as possible
14
LANE TYPES
TRAFFIC STATION
HOW AN EXPRESS LANE OPERATES
15TOLLING STATION
TOLLING SIGN
16
17
HOW A TOLL IS PAID
TOLLING STATION
18
INTEGRATED PROJECT TEAM
Co-Sponsor
Agencies
Integrated Project
Delivery Team
Environmental
Lead Agency
19
THE PROJECT LIMITS
PROJECT STATION
20
PROJECT PURPOSE
ENVIRONMENTAL STATION
• Reducecongestion in the corridor
• Encourage carpooling and transit use
• Provide managed lanes for travel-time reliability
• Minimize operational degradation of the general purposelanes
• Increase personthroughput
• Apply technology and/or design features to help manage traffic
21
THE ALTERNATIVES
ENVIRONMENTAL STATION
• Alternative 1: No project
• Alternative 2: Modify existing auxiliary lanes to make
a new through lane from Whipple Avenue to I-380;
convert median lane to an HOV lane for HOV 2+
• Alternative 3: Convert the existing median lane to an
HOV 3+ Express Lane
• Alternative 4: Modify existing auxiliary lanes to make
a new through lane from Whipple Avenue to l-380;
convert median lane to an HOV 3+ Express Lane
THEALTERNATIVES
22
PRELIMINARY DESIGN CONSIDERATIONS
• Auxiliary lane replacement –Removal of Aux lanes sometimes impacts
local street circulation and needsto bereplacedto preventnegative impacts.
• Right ofWay –In replacing Aux lanes, the team is minimizing right of way
impacts by utilizing design exceptions, shifting alignments, and working with
cities.
• Environmentally sensitive areas –Theteam identifies sensitive areas early
and is working to reduceimpacts.
• Relocation ofexisting sound walls –Design team is working with impacted
Cities tominimize issues associated with sound walls.
23
LANE CONFIGURATION A
Existing Conditions / No Build
DESIGN STATION
24
LANE CONFIGURATION B
MergedLane in Converted No. 1 Lane
DESIGN STATION
25
LANE CONFIGURATION C
Managed Lane with Converted Auxiliary Lanes
DESIGN STATION
26
LANE CONFIGURATION D
Managed Lane with Converted Auxiliary Lanes and Auxiliary Lane Replaced
DESIGN STATION
27
AERIAL VIEW OF LANE SHIFT
DESIGN STATION
28
CHALLENGES WITH THE ALTERNATIVES
PROJECT STATION
• Alternative 2: There is currently a high volume of 2-
person carpools (HOVs) along with Clean Air Vehicles
and HOV violators
• Alternative 3: There is no additional capacity to
accommodate growth, so it is estimated to only work if a
significant amount of people change their travel
behavior.
• Alternative 4: Transitions into and out of the Santa Clara
and San Francisco facilities must be carefully coordinated
with VTA and SFCTA.
CHALLENGESWITHTHEALTERNATIVES
29
TECHNICAL STUDIES
ENVIRONMENTAL STATION
30
KEY SELECTION CRITERIA
ENVIRONMENTAL STATION
KEYSELECTIONCRITERIA
• Vehicle hours of delay: How many hours
each car sits in traffic
• Change in travel times: How long it takes to
get from point A to point B
• Person throughput: How many people can
we move through point A on the way to
point B
• Vehicle miles travelled: How many miles a
vehicle travels in a specific time period
(could mean reduced vehicle travel or could
also mean gridlock)
31
FUNDING & COORDINATION
• $11.5m for Environmental Clearance – This funding is secured
(SMCTA, SAMCEDA)
• $9.5m for Preliminary Design– Partially funded to start the early
stage of the design phase (FederalEarmark).
• Funding to complete Design and go to Construction is not secured.
• Continued coordination with SAMTRANS, Caltrain and cities
32
FUTURE POLICY CONSIDERATIONS
• Which agency will operate these lanes?
• Should this lane openas a 2+ HOV or 3+ HOV Express Lane?
• If it opens as a 3+ HOV Express should 2-person HOVs get a
discount?
• What should be the hours of tolling?
• Tolling generally changes based oncongestion. What should be the
frequencyand increment of change?
• How should excess(revenuebeyond operations and maintenance
cost) revenuebe directed?
The following policy questions have to be answered in the future.
33
PUBLIC ENGAGEMENT SCHEDULE
Scoping Meeting
Two Community Meetings
Public Comment Period
Environmental Clearance
October2016 LateSpring2017 January2018 Fall2018OUTREACHSCHEDULE
34
• Environmental
• Traffic
• Overall Project
• Design
• Toll System
BREAKOUT STATIONS
35
www.dot.ca.gov/d4/
101managedlanes

More Related Content

What's hot

Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
Toronto Public Consultation Unit
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Toronto Public Consultation Unit
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
Toronto Public Consultation Unit
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
Toronto Public Consultation Unit
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
Toronto Public Consultation Unit
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
Toronto Public Consultation Unit
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
Project for Public Spaces & National Center for Biking and Walking
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
Toronto Public Consultation Unit
 
Federal Funding for Active Transportation and Recreation
Federal Funding for Active Transportation and RecreationFederal Funding for Active Transportation and Recreation
Federal Funding for Active Transportation and Recreation
Project for Public Spaces & National Center for Biking and Walking
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
Toronto Public Consultation Unit
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
Toronto Public Consultation Unit
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
Toronto Public Consultation Unit
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Toronto Public Consultation Unit
 
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`iAloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Project for Public Spaces & National Center for Biking and Walking
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
Toronto Public Consultation Unit
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
Toronto Public Consultation Unit
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 

What's hot (20)

Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Federal Funding for Active Transportation and Recreation
Federal Funding for Active Transportation and RecreationFederal Funding for Active Transportation and Recreation
Federal Funding for Active Transportation and Recreation
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`iAloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 

Similar to Caltrans San Mateo county managed lanes

SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
Toronto Public Consultation Unit
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
JumpingJaq
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
Rail~Volution
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
Crosstown TO
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
Adina Levin
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
Crosstown TO
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Crosstown TO
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13Adina Levin
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
Crosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
Crosstown TO
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
Toronto Public Consultation Unit
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019
Steven Simms
 
Paul Fisher Future transport needs of perth
Paul Fisher   Future transport needs of perthPaul Fisher   Future transport needs of perth
Paul Fisher Future transport needs of perth
JumpingJaq
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Toronto Public Consultation Unit
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
SCVTA
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the Beltway
Fairfax County
 

Similar to Caltrans San Mateo county managed lanes (20)

SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
 
Copp.ppt
Copp.pptCopp.ppt
Copp.ppt
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019Georgia Traffic Mega Projects December 2019
Georgia Traffic Mega Projects December 2019
 
Paul Fisher Future transport needs of perth
Paul Fisher   Future transport needs of perthPaul Fisher   Future transport needs of perth
Paul Fisher Future transport needs of perth
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the Beltway
 

More from Adina Levin

Project Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfProject Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdf
Adina Levin
 
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdfSPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
Adina Levin
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
Adina Levin
 
Southeast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain StationsSoutheast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain Stations
Adina Levin
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governance
Adina Levin
 
SF resolution Caltrain sales tax
SF resolution Caltrain sales taxSF resolution Caltrain sales tax
SF resolution Caltrain sales tax
Adina Levin
 
Senator Hill letter SB797 Caltrain
Senator Hill letter SB797 CaltrainSenator Hill letter SB797 Caltrain
Senator Hill letter SB797 Caltrain
Adina Levin
 
Caltrain tax legal opinion
Caltrain tax legal opinionCaltrain tax legal opinion
Caltrain tax legal opinion
Adina Levin
 
West Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measureWest Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measure
Adina Levin
 
Caltrain_Equity_522
Caltrain_Equity_522Caltrain_Equity_522
Caltrain_Equity_522
Adina Levin
 
San Jose Transit first policy nomination
San Jose Transit first policy nominationSan Jose Transit first policy nomination
San Jose Transit first policy nomination
Adina Levin
 
More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20
Adina Levin
 
More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20
Adina Levin
 
More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20
Adina Levin
 
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Adina Levin
 
Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)
Adina Levin
 
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
High speed rail eir preferred alternative   sf-sj - fo c (1) (1)High speed rail eir preferred alternative   sf-sj - fo c (1) (1)
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
Adina Levin
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
Adina Levin
 
San Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance ResolutionSan Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance Resolution
Adina Levin
 
Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18
Adina Levin
 

More from Adina Levin (20)

Project Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfProject Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdf
 
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdfSPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
 
Southeast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain StationsSoutheast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain Stations
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governance
 
SF resolution Caltrain sales tax
SF resolution Caltrain sales taxSF resolution Caltrain sales tax
SF resolution Caltrain sales tax
 
Senator Hill letter SB797 Caltrain
Senator Hill letter SB797 CaltrainSenator Hill letter SB797 Caltrain
Senator Hill letter SB797 Caltrain
 
Caltrain tax legal opinion
Caltrain tax legal opinionCaltrain tax legal opinion
Caltrain tax legal opinion
 
West Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measureWest Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measure
 
Caltrain_Equity_522
Caltrain_Equity_522Caltrain_Equity_522
Caltrain_Equity_522
 
San Jose Transit first policy nomination
San Jose Transit first policy nominationSan Jose Transit first policy nomination
San Jose Transit first policy nomination
 
More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20
 
More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20
 
More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20
 
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
 
Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)
 
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
High speed rail eir preferred alternative   sf-sj - fo c (1) (1)High speed rail eir preferred alternative   sf-sj - fo c (1) (1)
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
San Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance ResolutionSan Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance Resolution
 
Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18
 

Recently uploaded

PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 

Recently uploaded (20)

PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 

Caltrans San Mateo county managed lanes

  • 1. 1
  • 2. INTRODUCTION 2 • The Problem • The Express Lane Option • The Project Specifics • The EnvironmentalProcess • What’s ahead
  • 3. 3 DEFINITIONS •AuxiliaryLane: An outerlanethatis createdat an on-rampand exitsatthenext off-ramp(“EXIT ONLY”lane) •HOV:High-Occupancy Vehicle;alsoknown as acarpool •O&M: Operations and MaintenanceoftheExpress Lanes facilities •Rightof Way: theproperty owned bytheStateofCaliforniafor theStateHighwaySystem
  • 4. 4 BIG PICTURE • The Caltrain Electrification Project will not fully address projected demand • SAMTRANSisstudying expressbus serviceon the 101 corridor • VTA is in final design to create a 2+ HOV Express Lanes from south of 85 to the San Mateo County line • SFCTA is studying an extension of the 101 managed lanes into San Francisco • MTC is planning to improve and increase Park and Ride lots • Municipalities implementing TDM measures The problem is greater than one project can solve.
  • 5. 5 THE PROBLEM • Jobs, housingand population growth continue • Vehicle trips to grow 4-7% by 2020 • No incentive to sharea ride • Carsavoid the freeway The congestion on 101 has been bad and will continue to get worse.
  • 7. 7 101 Southbound AM HOVs TRAFFIC STATION
  • 8. 8 101 Northbound AM HOVs TRAFFIC STATION
  • 9. 9 101 Southbound AM RAMPS TRAFFIC STATION
  • 10. 10 101 Northbound AM RAMPS TRAFFIC STATION
  • 13. 13 THE CHALLENGE OVERALL • Find a solution quickly • Secure public and political support of the Project • Secure the requiredfunding • Minimize environmental impacts • Stay within the current Right of Way as much as possible • Don’t make congestion worsein theother lanes • Reducecommute trips on the local street network • Build the project as soon as possible
  • 15. HOW AN EXPRESS LANE OPERATES 15TOLLING STATION
  • 17. 17 HOW A TOLL IS PAID TOLLING STATION
  • 18. 18 INTEGRATED PROJECT TEAM Co-Sponsor Agencies Integrated Project Delivery Team Environmental Lead Agency
  • 20. 20 PROJECT PURPOSE ENVIRONMENTAL STATION • Reducecongestion in the corridor • Encourage carpooling and transit use • Provide managed lanes for travel-time reliability • Minimize operational degradation of the general purposelanes • Increase personthroughput • Apply technology and/or design features to help manage traffic
  • 21. 21 THE ALTERNATIVES ENVIRONMENTAL STATION • Alternative 1: No project • Alternative 2: Modify existing auxiliary lanes to make a new through lane from Whipple Avenue to I-380; convert median lane to an HOV lane for HOV 2+ • Alternative 3: Convert the existing median lane to an HOV 3+ Express Lane • Alternative 4: Modify existing auxiliary lanes to make a new through lane from Whipple Avenue to l-380; convert median lane to an HOV 3+ Express Lane THEALTERNATIVES
  • 22. 22 PRELIMINARY DESIGN CONSIDERATIONS • Auxiliary lane replacement –Removal of Aux lanes sometimes impacts local street circulation and needsto bereplacedto preventnegative impacts. • Right ofWay –In replacing Aux lanes, the team is minimizing right of way impacts by utilizing design exceptions, shifting alignments, and working with cities. • Environmentally sensitive areas –Theteam identifies sensitive areas early and is working to reduceimpacts. • Relocation ofexisting sound walls –Design team is working with impacted Cities tominimize issues associated with sound walls.
  • 23. 23 LANE CONFIGURATION A Existing Conditions / No Build DESIGN STATION
  • 24. 24 LANE CONFIGURATION B MergedLane in Converted No. 1 Lane DESIGN STATION
  • 25. 25 LANE CONFIGURATION C Managed Lane with Converted Auxiliary Lanes DESIGN STATION
  • 26. 26 LANE CONFIGURATION D Managed Lane with Converted Auxiliary Lanes and Auxiliary Lane Replaced DESIGN STATION
  • 27. 27 AERIAL VIEW OF LANE SHIFT DESIGN STATION
  • 28. 28 CHALLENGES WITH THE ALTERNATIVES PROJECT STATION • Alternative 2: There is currently a high volume of 2- person carpools (HOVs) along with Clean Air Vehicles and HOV violators • Alternative 3: There is no additional capacity to accommodate growth, so it is estimated to only work if a significant amount of people change their travel behavior. • Alternative 4: Transitions into and out of the Santa Clara and San Francisco facilities must be carefully coordinated with VTA and SFCTA. CHALLENGESWITHTHEALTERNATIVES
  • 30. 30 KEY SELECTION CRITERIA ENVIRONMENTAL STATION KEYSELECTIONCRITERIA • Vehicle hours of delay: How many hours each car sits in traffic • Change in travel times: How long it takes to get from point A to point B • Person throughput: How many people can we move through point A on the way to point B • Vehicle miles travelled: How many miles a vehicle travels in a specific time period (could mean reduced vehicle travel or could also mean gridlock)
  • 31. 31 FUNDING & COORDINATION • $11.5m for Environmental Clearance – This funding is secured (SMCTA, SAMCEDA) • $9.5m for Preliminary Design– Partially funded to start the early stage of the design phase (FederalEarmark). • Funding to complete Design and go to Construction is not secured. • Continued coordination with SAMTRANS, Caltrain and cities
  • 32. 32 FUTURE POLICY CONSIDERATIONS • Which agency will operate these lanes? • Should this lane openas a 2+ HOV or 3+ HOV Express Lane? • If it opens as a 3+ HOV Express should 2-person HOVs get a discount? • What should be the hours of tolling? • Tolling generally changes based oncongestion. What should be the frequencyand increment of change? • How should excess(revenuebeyond operations and maintenance cost) revenuebe directed? The following policy questions have to be answered in the future.
  • 33. 33 PUBLIC ENGAGEMENT SCHEDULE Scoping Meeting Two Community Meetings Public Comment Period Environmental Clearance October2016 LateSpring2017 January2018 Fall2018OUTREACHSCHEDULE
  • 34. 34 • Environmental • Traffic • Overall Project • Design • Toll System BREAKOUT STATIONS