SlideShare a Scribd company logo
1 of 37
Robert_Copp@dot.ca.gov
“PREVIOUS SUCCESSES”
 OLYMPIAD XXIII - 1984
 Projections of Huge Traffic Jams /
 Images of Stranded Tourists Missing Events
 Residents “Scared” into Leaving Town
Los Angeles Praised -“Great Planning!”
 SAN FRANCISCO EARTHQUAKE - 1989
 No Advance Warning
 Motorists / Congestion Disappeared
 Diversions Did Not Account for Total
 “Where Did They All Go??”
San Francisco Praised - “Great Work!”
“People are
Resilient
AND
Resourceful!”
STUDY PURPOSE
 Evaluate District compliance with Guidelines
 Evaluate Typical Measures of Effectiveness
 Determine Most Effective Strategies
 Evaluate Cost versus Benefit
 Establish Lessons Learned
 Formulate Recommendations to Improve
TMP Process / Modify Guidelines
8 of 15 of the Most
Congested Cities
are in California
Caltrans’ Mission
“We must get the most
out of the roads we have
before building any new
ones…..well, duh!”
To Improve Mobility
Across California
DEPUTY DIRECTIVE 60 (Eff. 2000)
WHAT’S THE POLICY?
Construction Special
Events
Encroachment
Permits
Maintenance
Caltrans’ commitment
is to: Minimize motorist
delays for ALL activities
on the State highway
system without
compromising public or
worker safety, or the
quality of the work
being performed.
..but with Varying
Levels of Treatment..
TMP CATEGORIES & STRATEGIES
“Blanket” TMP “Major” TMP
(~5% of Projects)
 No expected delays
 Off peak
 Low volume roads
 Moving lane
closures
 Significant impacts
caused by work
 Multiple TMP
strategies
 Multiple contracts
 Minimal impacts
caused by work
 Lane closure
charts required
 Some mitigation
measures required
“Minor” TMP
(Majority)
Portable
CMS, FSP, TMT,
Off-peak hours
Public Awareness
Campaigns, Fixed CMS,
Extended Closures, Moveable
Barriers, COZEEP, Detours,
Reduced Lane Widths,
Website, Helicopter..
Night Work, Portable
& Fixed CMS, COZEEP,
TMT, HAR, FSP, Gawk
Screens..
Six TMP Strategies
• P
• M
• I
• C
• D
• A
ublic Information
otorist Information
ncident Management
onstruction Strategies
emand Management
lternate Routes
TMP Costs for one
Project were estimated
as high as $7,000,000
 Overall Corridor
 Public Awareness
 Motorist Information
 Incident Management
How Would You Measure the
Effectiveness of TMP Strategies?
Personal or Mail-in
Surveys, No. of Calls or
Website Hits, Public
Meeting Attendance ..
Personal or Mail-in
Surveys, Traffic
Observations ..
Accident Response /
Removal Time,
Pre- / Post- Accident
Rates ..
Traffic Volume Counts,
Floating Car Runs,
Queue Lengths,
Transit Ridership,
Video Surveillance ..
 Construction Strategies
 Demand Management
 Alternate Routes
Measurement of Effectiveness
(Cont.)
Trip Mode Distribution,
Park ‘n’ Ride Lot Usage,
Carpooling Surveys,
Employer Surveys ..
Traffic Volume Counts
Floating Car Runs,
Origin/Destination
Surveys ..
Traffic Volume Counts,
Floating Car Runs,
Queue Lengths, Lane
Closures Set / Picked
Up on Time ..
Example of Corridor
Effectiveness Results
 Vehicle Delay
 Traffic Volumes
 Length of Queues
 Safety
District 07
I-10 Long-Life Pavement Project
Traffic Demand on
Interstate10 was
reduced by 57% (from
112,000 to 56,000 veh)
Initial Estimate
= 44 miles
Actual Queue Length
= 1.9 miles
Pre-Const. Estimate
= 1,000,000 veh-hrs
Actual Delay
= 16,000 veh-hrs
No collisions or
Employee injuries
occurredin the
Work Zone Project Characteristics
- Fast-setting Hydraulic Concrete
- Closed 2 of 4 Lanes
- Extended 55-Hour Closures
0
500
1000
1500
2000
2500
3000
3500
10-11PM
Mid-1
AM
2-3
AM
4-5
AM
6-7
AM
8-9
AM
10-11
AM
Noon-1
PM
2-3
PM
4-5
PM
6-7
PM
8-9
PM
10-11
PM
Mid-1
AM
2-3
AM
4-5
AM
6-7
AM
8-9
AM
10-11
AM
Noon-1
PM
2-3
PM
4-5
PM
6-7
PM
8-9
PM
10-11
PM
Mid-1
AM
2-3
AM
4-5
AM
TIME
TOTAL
DELAY
(veh-hr)
Projected
Delay
Actual
Delay
(Initial Projected Delay = 1 Hour / Vehicle)
(Delay in minutes) Sat. Sun.
Rte 30/Foothill Blvd. 9 2
Arrow Highway 7 2
Holt Ave. 6 5
Mission Blvd. 3 2
Detour
Rte 60 Freeway 20 34
District 07
I-10 Long-Life Pavement Project
Actual Delay in Work Zone
With TMP Strategies
But..
WHICH strategies
led to these
Great Results??
MOST EFFECTIVE STRATEGIES
- PUBLIC AWARENESS
Leave Earlier
or Later ..
Use HOV, Bus or Rail
“Which way
should we
go today..?”
“If you drive I-80, you
might want to consider
an alternate route
this morning..”
Telecommute..
Slogans AND Maps
are Good and
Easy to Remember..
Instead of saying
“Bridge Replacement
Project” --...
Advance Awareness of Central Freeway Closure
2%
4%
5%
6%
7%
10%
11%
15%
32%
37%
40%
42%
50%
63%
78%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
Public M eetings
Other
Radio "M an in the Street"
Banners
One--Page Flyers
Billboards
Newsletters
Newspaper Ads
Fold-Out Brochures
Word of M outh
Radio News Reports
Radio Traffic Reports
Freeway Signs
TV News
Newspaper Articles
Percent Remembering
What Did the Public Notice?
Percentage
District 04
Central Freeway Replacement Project
Metro Traffic
Project Characteristics
- Full-freeway Closure
- On- and Off-Ramps Closed
- Extensive Public Info Campaign
- Based on “0” delay (Const.)
- 5 -15 minutes Delay (Maint.)
- According to District Traffic
Managers - eliminates
about 90% of potential
delay
PROBLEMS
- Const. windows reduced
- More Night work
(Urban/Rural)
- Comparative Quality?
- Comparative Safety?
Location:
Remarks:
Legend:
Chart No. _
Lane Requirements and Hours of Work
a.m. p.m.
FROM HOUR TO HOUR 12 1 2 3 4 5 6 7 8 9 1011 12 1 2 3 4 5 6 7 8 9 1011 12
Mondays through Thursdays
Fridays
Saturdays
Sundays
1 Provide at least one through freeway lane open in direction of travel
2 Provide at least two adjacent through freeway lanes open in direction of travel
3 Provide at least three adjacent through freeway lanes open in direction of travel
4 Provide at least four adjacent through freeway lanes open in direction of travel
5 Provide at least five adjacent through freeway lanes open in direction of travel
S No lane closure permitted; work permitted anywhere that does not require lane closure
No lane closure permitted; no work permitted
Effective Construction Strategies
LANE REQUIREMENT CHARTS
Effective Construction
Strategies (Cont.)
• CONSTRUCTION STAGING
• DELAY PENALTY -- “Hammer” for the
RE to charge the Contractor ($$$) for
late pick-up of the closure .
• EXTENDED CLOSURES (e.g. 55-Hour
Weekends or 72-Hour Weekdays)
• NARROW LANE WIDTHS or USE OF
SHOULDERS (PEAK PERIOD)
• MOVEABLE BARRIERS
• CONTRAFLOW (“Crossovers”)
• CONTINGENCY PLANS (Redundancy)
District 08
I-15 Devore PCCP Reconstruction
EXTENDED CLOSURE
- Schedule, Cost &
Delay Comparison
Project Characteristics
- Full-Freeway Closed - one direction
- Extended 72-Hour Closures
Total
Closures
Closure
Hours
User
Delay
Construction
Traffic
Handling
Total
72-Hour
Weekday
8 512 5.6 10.5 2.1 18.2 75
55-Hour
Weekend
10 550 14.2 12.5 2.6 29.3 196
1 Roadbed
Continuous
2 400 6.9 8.9 1.0 16.8 196
10-Hour
Night-time 220 2,200 4.9 19.1 1.3 25.3 36
Max.
Delay
(Min)
Construction
Scenario
Schedule
Comparison Cost Comparison ($Millions)
• NO. OF PEAK HOUR TRIPS
• VAN POOL RIDERS
• BUS TRIPS
• PARK ‘N’ RIDE USAGE
Effective Strategies
-- Demand Management
38% increase
313% Increase
4% Average
Reduction
29% Increase
District 05
Cuesta Grade Project
Strategy Cost
= $3,300,000
Strategy Cost
= $780,000
Project Characteristics
- Addition of NB / SB Truck-Climbing Lanes
- Addition of Eight-foot Shoulders
- Construction of massive Retaining Walls
Alternate Route Strategies
(Info obtained by Survey)
Different Freeway
or Ramp Route - 76%
Freeway /
Transit - 3%
Freeway /
Fewer Trips - 1%
Other - 2%
No Longer
Made Trip - 3%
City Streets
Only - 11%
Public Transit - 2%
Freeway /
Streets - 2%
District 04
Central Freeway Replacement Project
BENEFITS VS. COSTS??
“Bang for the Buck...”
• P
• M
• I
• C
• D
• A
ublic Information
otorist Information
onstruction Strategies
emand Management
lternate Routes
ncident Management
$607,500
$835,000
$2,767,000
---
$400,000
$10,000
District 11
I-5 / I-805 Widening Project
Goal - Increase Van, Carpools, Bus by 5% / Change worktime by 2%
COZEEP Cost = $1,700,000
COMPARE COST VS. DELAY SAVINGS
Strategy Cost
Project Characteristics
- Const. Separate Freeway Bypass
- Const. of new Interchange / Auxiliary Lanes
• PUBLIC AWARENESS
• Newspapers
• TV News Spots
• ADVANCE SIGNAGE
• Before Decision Points
• On Preceding Weeks / Weekends
• ADHERE TO LANE REQ’MT CHARTS
• Real-Time Statusing is Needed
• Penalties for Late Lane Opening
• KEEP LANES OPEN
• Narrow Lane Widths
• Shoulder Usage during Peak
LESSONS LEARNED
PUBLIC
AWARENESS: MOST
Effective Strategies
facilitate Decision-
Making by Driving
Public to avoid Work
Zone
CONSTRUCTION
Strategies are
also very
effective
• CONSIDER OTHER STRATEGIES:
• Extended Closures vs. Night Closures
(“Get in & Stay in -- Get out & Stay out!”)
• Close Coordination w/ Locals (Detours, Signals…)
• Shorten Contract Time through Incentives
• COST VS. BENEFIT
• $$$ on Work Zone Enforcement vs. Benefit ??
• $$$ on Brochures, Ads, Flyers, vs. Benefit ??
(Media Coverage -- no cost for Major Projects)
• Costs of TMP Strategies vs. Delay costs
• OTHER ISSUES
• Truck Restrictions / Closures on Parallel Routes
• Cumulative Impacts due to Multiple Projects
(Combine closures when advantageous)
LESSONS LEARNED (cont.)
Delay cost
to motorists
TMP
Cost
• STREAMLINE TMP PROCESS
• Blanket / Minor Projects (Standardized Forms)
• Major Projects (Brief, Standardized Reports)
• Critical Monitoring Activities - Delay Counts, Runs
• PROPOSED STUDIES
• Detailed TMP Effectiveness - Costs vs. Benefits
• Full-Freeway vs. Night Closures
• Enforcement Practices (Placement, etc.)
• MODIFY TMP GUIDELINES
• Standardize Monitoring Practices
• Standardize Reporting Practices
• Include Non-Motorized Considerations
RECOMMENDATIONS
Robert_Copp@dot.ca.gov
• TMP Process
• Relationship between Project
Characteristics and TMP Strategies
• Sample Unit Costs for TMP Strategies
• TMP Strategies -- Unit cost Info
• Sample Worksheet -- Blanket TMP
• Sample Delay Calculations
HANDOUTS
Project Public Motorist Incident Const. Demand Alternate
Characteristic Information Information Management Strategies Management Routes
Duration Long Long Long
Length Short Short Short Long
Phasing x x x x x
Urbanization x
(Non-Urbanized) x
Average Daily Traffic x x x
Reduced Capacity x x x x x x
Viable Alternate Routes x x x
(No Alternate Routes) x x x
Traffic Delay x x x x x x
Public / Media x x x
Political x x x x
Affected Activity Centers x x x x x
Truck Percentage x
Business Impacts x x x
Increase in Accidents x x x
Steep Inclines x x x
Raised Medians x x x
Relationship between Project Characteristics
and Appropriate TMP Strategies
TMP ELEMENTS- "ROUGH" COSTS
Public Information
$250,000+
$0.5-1.0/1,000 Mailers
$0.34/mailer
$0.1-1.0/1,000
$65/1,000
$2,500/month
$224
$6,000/day
12,000/day
$18,000/day
$8,000/day
$14,000/day
$22,000/day
$0-1,000/day
$3,000
$800/minute
$45/month
$4,000+
$20,000+
$1,200/month
$1,500/month
Motorist Information
$300,000
$10,000
$350/day, $1,500/week,
$3,500/month
$60,000/unit
$70,000/unit
$300 each
Sample Unit Costs for TMP Strategies
Incident Management
$1,000/night
$119.07/hr (reg. Time)
contingency and CHP dispatch) $116.45/hr (Over Time)
$300 each
20000 to $200,000
$0
$0
$600/hour
$0
Range between
$20,000 to 200,000
Construction Strategies
$10-15/lf
$30/lf
$100,000/6 months
$3/lf
$30,000 each
Demand Management
$50/hr
$50,000/location
Alternate Route
$50/hour
Sample Unit Costs for TMP Strategies (Cont.)
TMP STRATEGIES -- UNIT COST INFO Source: TMP Effectiveness Study (Wilbur Smith, 1993)
Strategy Unit Cost Comment
Brochures and Mailers Cost could range between $.40 to $ .50/ brochure
for a large quantity.
Variable depending on the text, graphics and presentation quality
of the materials produced, numbers printed and distribution
methods.
Media Releases Cost varies with labor up to a few hours of labor/
month.
Labor cost associated with TMP personnel interacting with media,
as well as time developing press releases. Cost varies with labor
up to a few hours of labor/ month.
Public Info. Center Basic cost would range from zero to $1.50 per
square foot per month depending on the location.
Basic cost would range from zero to $1.50 per square foot per
month depending on the location. Additional costs could include
staffing, equipment, furnishings and operating costs.
Paid Advertising The cost depends on newspaper rates in the
area, but can range between $100 to $600 for 3
column inches, one time only.
Visual Information Variable
Telephone Hotline Installation: In the range of $100 - $110 for one
line (local access only).
Additional Lines: Approximately $75.00 each.
Monthly Fee: $20.00 plus usage (rates are
discounted if over
Installation: This does not include having the actual line installed
into the location).
Additional Lines: Approximately $75.00 each.
CMS $35,000 to $50,000 to purchase depending upon
whether installation is permanent or portable;
$1,900 to $2,400/ month to lease in 1993 dollars.
Annual operating costs can range from $13,000 to
$22,000 (1989 dollars) per unit.
Signing and Striping Variable
Highway Advisory
Radio
$30,000 to $35,000/ spot; $53,000 for portable unit
Traffic Monitoring
Station
$30,000 per mile
PUBLIC INFORMATION
MOTORIST INFORMATION
INCIDENT MANAGEMENT
TMP STRATEGIES -- UNIT COST INFO (cont.) Source: TMP Effectiveness Study (Wilbur Smith, 1993)
Strategy Unit Cost Comment
Tow Service Cost/ truck hour of service ranges from $50.00 to
$60.00. Annualized cost of $85,000/ vehicle, or
about $250/ day.
Aerial Surveillance Ranges from $5,000 to 6,000 per month (based on
D 12 project) to $12,000/ month (I-95 project in
Florida)
Call Boxes $5,000 to $6,500 for field units (part of construction
cost, not TM cost); $25,000 to $32,000 dispatching
unit; $500 to $600 annual operating cost/ unit.
Cost could also include telephone message charges and
dispatching.
COZEEP $50 to $60/ hour (Construction Zone Enforcement Enhancement Program)
Variable Lanes Temporary concrete barriers: $15 per linear foot
Traffic cones: $10 each
Channelizers: $35 each
Project Phasing Variable depending in the duration of
construction, materials used for the stages
construction, and additional design fees for
preparation of PS & E.
Incentives /
Disincentives
$6,000 per day with maximum 5 percent of construction cost for
incentive $12,000 per day for disincentive (based on the I-45
project in Houston, Texas).
Cost + Time Bidding Not Available
Owner- Imposed
Physical Restrictions
Not Available
Use of Owner-
Supplied or Stockpiled
Materials
Not Available
Value Engineering
Incentive
Not Available
Surveillance Not Available
Lane/Ramp Closures $2,800 per direction per count location Counts may already be available in District's inventory section
CONSTRUCTION STRATEGIES
TMP STRATEGIES -- UNIT COST INFO (cont.) Source: TMP Effectiveness Study (Wilbur Smith, 1993)
Strategy Unit Cost Comment
Glare/ Gawk Screens $10 per linear foot to lease, $15 per linear foot to
purchase
Truck Traffic
Restrictions
None
Total Facility Closure Cost for COZEEP depends on extent of closure
Lane-By-Lane Rental Varies, depending on construction engineering costs, traffic
control costs and road user costs. This element would typically be
funded as part of the construction contract, rather than the TMP.
Rideshare Incentives Vanpooling incentives range from $.19 to $ .62
per vehicle using the corridor (based on ADT).
Rideshare Marketing Unknown. TMP costs do not differentiate between overall marketing costs
and rideshare marketing costs.
Park-and Ride Lots Temporary at- grade parking would cost $1,000
per space with $50/ space with annual
maintenance cost.
Variable, depending whether new lots must be acquired or built.
Transit Service
Improvements
$5.00/ vehicle mile.
Transit Incentives Depends on level of incentive, up to $60/ month is
not tax- free
High Occupancy
Vehicle Lanes
$6,000 per mile for temporary HOV lane.
Parking Management/
Pricing
Minimal
Ramp Closure and
Ramp Metering
$80,000 to $100,000 per ramp for ramp metering.
Street Improvements Approximately $10,000 per intersection. Variable depending on the magnitude of geometric changes.
Traffic Control
Improvements
$10,000 to 25,000 per temporary signal or signal
modification.
DEMAND MANAGEMENT
ALTERNATE ROUTES
TRANSPORTATION
MANAGEMENT PLANS
“BLANKET CLOSURE” FORM F
District County
Route Postmile(s)
No. of Lanes Affected Length of Segment
Location Description
Work Description
Initial Date / Time Ending Date / Time
Expected Duration Expected Delay (minutes)
BLANKET TMP ACTIVITIES -- Please check the appropriate box(es):
Bridge inspection / repair Lighting repairs / relamping Restriping
Culvert / drainage – cleanout
/ inspection / repairs
Non-landscaped area
tree/brush/vegetation work
Right-of-Way Fence repair
Delineator / Postmile marker
repairs / replacement
Electrical maintenance Safety and Accident
investigations
Ditch and channel work Median barrier / attenuator
repairs (off traveled way)
Shoulder area grading for
lateral support
Driveway construction Pavement coring / testing Sign repairs / replacement
Debris / litter removal Pavement - minor repairs /
replacement
Sump pump repairs / cleaning
Facility patrols and
surveillance
Pavement – grinding operations
(AC digouts)
Surveying
Graffiti abatement/clean-up
on walls / signs / equipment
cabinets
Roadside Facilities (Rest Area /
Vista Points)
Tree maintenance (trimming /
pruning)
Landscaping (irrigation /
vegetation control – spraying,
mowing)
Roadside Facilities (Weigh
Station / Park and Ride Lot)
Utilities placement /
maintenance
FACILITY TYPE OF CLOSURE
Mainline Bridge Lane One-way
Auxiliary lane On-ramp Full Freeway Various
Median Off-ramp Moving
Shoulder Connector
ADDITIONAL INFORMATION
Did you prepare Lane Closure Charts? Yes No
Was “Zero delay” goal accomplished? (If not, be
sure to specify the expected delay above.)
Yes No
Are there adjacent Lane Closures in the same corridor? Yes No
If Yes, what is the spacing?
Contact Person: _________________________
Phone: __________________(office)
____________________(cel)
Percent Truck: 0.0% Cost per Truck: $24/Veh-Hr
Percent Passenger Cars: 100.0% Cost per Passenger Car: $9/Veh-Hr
Number of Lanes Existing: 4 Lanes Cost for Mixed Flow Traffic: $9/Veh-Hr
Number of Lanes Open: 2 Lanes Single-Lane Capacity: 1500 Veh/Hr
Open-Lane Capacity: 3000 Veh/Hr
Time
Demand
(Veh)
Cumulative
Demand
(Veh)
Cumulative
Capacity
(Veh)
Difference
(Veh)
Area
(Veh-Hr)
Queue
Length
(mile)
Individual
Delay
(minutes)
6 AM 0 0 0 0 0 0.0
7 AM 5309 5309 3000 2309 1154.5 2.7 46
8 AM 6945 12254 6000 6254 4281.5 7.4 125
Max. Individual Delay: 125 minutes 0.0
Vehicle DelayHours: 5,436 veh-hr
Total Cost of Delay: $48,924
DelayCost/10min: $4,077
Operation: Multilane Closure
Count Date: 5-3-2001
RTE
Location: Demand vs. Capacity
0
2000
4000
6000
8000
10000
12000
14000
6
AM
7
AM
8
AM
TIME
CUMULATIVE
VEHICLES
Demand Capacity
Sample Delay Calculations

More Related Content

Similar to Effective TMP Strategies for Reducing Work Zone Delays

Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa Nisenson
 
Future of Traffic Management and ITS
Future of Traffic Management and ITSFuture of Traffic Management and ITS
Future of Traffic Management and ITSSerge Hoogendoorn
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
San Jose DOT VMT presentation 7.14.17
San Jose DOT VMT presentation 7.14.17San Jose DOT VMT presentation 7.14.17
San Jose DOT VMT presentation 7.14.17Adina Levin
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updatedpyoungkyova
 
Wynn Transportation Plan
Wynn Transportation PlanWynn Transportation Plan
Wynn Transportation PlanEverettUnited
 
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...WSP
 
How to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceHow to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceGurjap Birring
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersBecarAsset
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereBRTCoE
 
role of tdm in urban deveopment
role of tdm in urban deveopment role of tdm in urban deveopment
role of tdm in urban deveopment ICLEI
 
Traffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportTraffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportUtah Department of Transportation
 
Anthony Fransos
Anthony FransosAnthony Fransos
Anthony FransosJumpingJaq
 
Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...seamsltd
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iamNikki Peacock
 

Similar to Effective TMP Strategies for Reducing Work Zone Delays (20)

Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
 
Future of Traffic Management and ITS
Future of Traffic Management and ITSFuture of Traffic Management and ITS
Future of Traffic Management and ITS
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
San Jose DOT VMT presentation 7.14.17
San Jose DOT VMT presentation 7.14.17San Jose DOT VMT presentation 7.14.17
San Jose DOT VMT presentation 7.14.17
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updated
 
Wynn Transportation Plan
Wynn Transportation PlanWynn Transportation Plan
Wynn Transportation Plan
 
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
 
How to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceHow to Design an On-Demand Transit Service
How to Design an On-Demand Transit Service
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick Reniers
 
Innovative intersection-ppt
Innovative intersection-pptInnovative intersection-ppt
Innovative intersection-ppt
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 
role of tdm in urban deveopment
role of tdm in urban deveopment role of tdm in urban deveopment
role of tdm in urban deveopment
 
dr. cal
dr. caldr. cal
dr. cal
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
Pedestrian planning and modelling
Pedestrian planning and modellingPedestrian planning and modelling
Pedestrian planning and modelling
 
Traffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportTraffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs Report
 
Transportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all ModesTransportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all Modes
 
Anthony Fransos
Anthony FransosAnthony Fransos
Anthony Fransos
 
Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...Embedding integrated asset investment planning - The Dunea journey for Distri...
Embedding integrated asset investment planning - The Dunea journey for Distri...
 
Embedding integrated asset investment planning dunea and seams iam
Embedding integrated asset investment planning   dunea and seams iamEmbedding integrated asset investment planning   dunea and seams iam
Embedding integrated asset investment planning dunea and seams iam
 

More from 605BlessinaShetty

jindalsteelandpower-140921030747-phpapp01.pdf
jindalsteelandpower-140921030747-phpapp01.pdfjindalsteelandpower-140921030747-phpapp01.pdf
jindalsteelandpower-140921030747-phpapp01.pdf605BlessinaShetty
 
timemanagement-141203110713-conversion-gate01.pdf
timemanagement-141203110713-conversion-gate01.pdftimemanagement-141203110713-conversion-gate01.pdf
timemanagement-141203110713-conversion-gate01.pdf605BlessinaShetty
 
rmid-seminar-210812163212.pdf
rmid-seminar-210812163212.pdfrmid-seminar-210812163212.pdf
rmid-seminar-210812163212.pdf605BlessinaShetty
 
timemanagement-pp-190603084001.pdf
timemanagement-pp-190603084001.pdftimemanagement-pp-190603084001.pdf
timemanagement-pp-190603084001.pdf605BlessinaShetty
 
tutorial_ch7fiscalpolicy.ppt
tutorial_ch7fiscalpolicy.ppttutorial_ch7fiscalpolicy.ppt
tutorial_ch7fiscalpolicy.ppt605BlessinaShetty
 
Time Management presentation.pptx
Time Management presentation.pptxTime Management presentation.pptx
Time Management presentation.pptx605BlessinaShetty
 
timemanagement-papireddy-180926102332.pdf
timemanagement-papireddy-180926102332.pdftimemanagement-papireddy-180926102332.pdf
timemanagement-papireddy-180926102332.pdf605BlessinaShetty
 
Time Management Powerpoint (1).pptx
Time Management Powerpoint (1).pptxTime Management Powerpoint (1).pptx
Time Management Powerpoint (1).pptx605BlessinaShetty
 

More from 605BlessinaShetty (13)

Anger Management.ppt
Anger Management.pptAnger Management.ppt
Anger Management.ppt
 
1sttraining.pptx
1sttraining.pptx1sttraining.pptx
1sttraining.pptx
 
14mba082-160322040615.pdf
14mba082-160322040615.pdf14mba082-160322040615.pdf
14mba082-160322040615.pdf
 
jindalsteelandpower-140921030747-phpapp01.pdf
jindalsteelandpower-140921030747-phpapp01.pdfjindalsteelandpower-140921030747-phpapp01.pdf
jindalsteelandpower-140921030747-phpapp01.pdf
 
timemanagement-141203110713-conversion-gate01.pdf
timemanagement-141203110713-conversion-gate01.pdftimemanagement-141203110713-conversion-gate01.pdf
timemanagement-141203110713-conversion-gate01.pdf
 
rmid-seminar-210812163212.pdf
rmid-seminar-210812163212.pdfrmid-seminar-210812163212.pdf
rmid-seminar-210812163212.pdf
 
GDP (1).ppt
GDP (1).pptGDP (1).ppt
GDP (1).ppt
 
timemanagement-pp-190603084001.pdf
timemanagement-pp-190603084001.pdftimemanagement-pp-190603084001.pdf
timemanagement-pp-190603084001.pdf
 
tutorial_ch7fiscalpolicy.ppt
tutorial_ch7fiscalpolicy.ppttutorial_ch7fiscalpolicy.ppt
tutorial_ch7fiscalpolicy.ppt
 
TimeManagement2.pptx
TimeManagement2.pptxTimeManagement2.pptx
TimeManagement2.pptx
 
Time Management presentation.pptx
Time Management presentation.pptxTime Management presentation.pptx
Time Management presentation.pptx
 
timemanagement-papireddy-180926102332.pdf
timemanagement-papireddy-180926102332.pdftimemanagement-papireddy-180926102332.pdf
timemanagement-papireddy-180926102332.pdf
 
Time Management Powerpoint (1).pptx
Time Management Powerpoint (1).pptxTime Management Powerpoint (1).pptx
Time Management Powerpoint (1).pptx
 

Recently uploaded

Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 

Effective TMP Strategies for Reducing Work Zone Delays

  • 2. “PREVIOUS SUCCESSES”  OLYMPIAD XXIII - 1984  Projections of Huge Traffic Jams /  Images of Stranded Tourists Missing Events  Residents “Scared” into Leaving Town Los Angeles Praised -“Great Planning!”  SAN FRANCISCO EARTHQUAKE - 1989  No Advance Warning  Motorists / Congestion Disappeared  Diversions Did Not Account for Total  “Where Did They All Go??” San Francisco Praised - “Great Work!” “People are Resilient AND Resourceful!”
  • 3. STUDY PURPOSE  Evaluate District compliance with Guidelines  Evaluate Typical Measures of Effectiveness  Determine Most Effective Strategies  Evaluate Cost versus Benefit  Establish Lessons Learned  Formulate Recommendations to Improve TMP Process / Modify Guidelines
  • 4. 8 of 15 of the Most Congested Cities are in California Caltrans’ Mission “We must get the most out of the roads we have before building any new ones…..well, duh!” To Improve Mobility Across California
  • 5. DEPUTY DIRECTIVE 60 (Eff. 2000) WHAT’S THE POLICY? Construction Special Events Encroachment Permits Maintenance Caltrans’ commitment is to: Minimize motorist delays for ALL activities on the State highway system without compromising public or worker safety, or the quality of the work being performed. ..but with Varying Levels of Treatment..
  • 6. TMP CATEGORIES & STRATEGIES “Blanket” TMP “Major” TMP (~5% of Projects)  No expected delays  Off peak  Low volume roads  Moving lane closures  Significant impacts caused by work  Multiple TMP strategies  Multiple contracts  Minimal impacts caused by work  Lane closure charts required  Some mitigation measures required “Minor” TMP (Majority) Portable CMS, FSP, TMT, Off-peak hours Public Awareness Campaigns, Fixed CMS, Extended Closures, Moveable Barriers, COZEEP, Detours, Reduced Lane Widths, Website, Helicopter.. Night Work, Portable & Fixed CMS, COZEEP, TMT, HAR, FSP, Gawk Screens..
  • 7. Six TMP Strategies • P • M • I • C • D • A ublic Information otorist Information ncident Management onstruction Strategies emand Management lternate Routes TMP Costs for one Project were estimated as high as $7,000,000
  • 8.  Overall Corridor  Public Awareness  Motorist Information  Incident Management How Would You Measure the Effectiveness of TMP Strategies? Personal or Mail-in Surveys, No. of Calls or Website Hits, Public Meeting Attendance .. Personal or Mail-in Surveys, Traffic Observations .. Accident Response / Removal Time, Pre- / Post- Accident Rates .. Traffic Volume Counts, Floating Car Runs, Queue Lengths, Transit Ridership, Video Surveillance ..
  • 9.  Construction Strategies  Demand Management  Alternate Routes Measurement of Effectiveness (Cont.) Trip Mode Distribution, Park ‘n’ Ride Lot Usage, Carpooling Surveys, Employer Surveys .. Traffic Volume Counts Floating Car Runs, Origin/Destination Surveys .. Traffic Volume Counts, Floating Car Runs, Queue Lengths, Lane Closures Set / Picked Up on Time ..
  • 10. Example of Corridor Effectiveness Results  Vehicle Delay  Traffic Volumes  Length of Queues  Safety District 07 I-10 Long-Life Pavement Project Traffic Demand on Interstate10 was reduced by 57% (from 112,000 to 56,000 veh) Initial Estimate = 44 miles Actual Queue Length = 1.9 miles Pre-Const. Estimate = 1,000,000 veh-hrs Actual Delay = 16,000 veh-hrs No collisions or Employee injuries occurredin the Work Zone Project Characteristics - Fast-setting Hydraulic Concrete - Closed 2 of 4 Lanes - Extended 55-Hour Closures
  • 11. 0 500 1000 1500 2000 2500 3000 3500 10-11PM Mid-1 AM 2-3 AM 4-5 AM 6-7 AM 8-9 AM 10-11 AM Noon-1 PM 2-3 PM 4-5 PM 6-7 PM 8-9 PM 10-11 PM Mid-1 AM 2-3 AM 4-5 AM 6-7 AM 8-9 AM 10-11 AM Noon-1 PM 2-3 PM 4-5 PM 6-7 PM 8-9 PM 10-11 PM Mid-1 AM 2-3 AM 4-5 AM TIME TOTAL DELAY (veh-hr) Projected Delay Actual Delay (Initial Projected Delay = 1 Hour / Vehicle) (Delay in minutes) Sat. Sun. Rte 30/Foothill Blvd. 9 2 Arrow Highway 7 2 Holt Ave. 6 5 Mission Blvd. 3 2 Detour Rte 60 Freeway 20 34 District 07 I-10 Long-Life Pavement Project Actual Delay in Work Zone With TMP Strategies
  • 12. But.. WHICH strategies led to these Great Results??
  • 13. MOST EFFECTIVE STRATEGIES - PUBLIC AWARENESS Leave Earlier or Later .. Use HOV, Bus or Rail “Which way should we go today..?” “If you drive I-80, you might want to consider an alternate route this morning..” Telecommute..
  • 14. Slogans AND Maps are Good and Easy to Remember.. Instead of saying “Bridge Replacement Project” --...
  • 15. Advance Awareness of Central Freeway Closure 2% 4% 5% 6% 7% 10% 11% 15% 32% 37% 40% 42% 50% 63% 78% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% Public M eetings Other Radio "M an in the Street" Banners One--Page Flyers Billboards Newsletters Newspaper Ads Fold-Out Brochures Word of M outh Radio News Reports Radio Traffic Reports Freeway Signs TV News Newspaper Articles Percent Remembering What Did the Public Notice? Percentage District 04 Central Freeway Replacement Project Metro Traffic Project Characteristics - Full-freeway Closure - On- and Off-Ramps Closed - Extensive Public Info Campaign
  • 16. - Based on “0” delay (Const.) - 5 -15 minutes Delay (Maint.) - According to District Traffic Managers - eliminates about 90% of potential delay PROBLEMS - Const. windows reduced - More Night work (Urban/Rural) - Comparative Quality? - Comparative Safety? Location: Remarks: Legend: Chart No. _ Lane Requirements and Hours of Work a.m. p.m. FROM HOUR TO HOUR 12 1 2 3 4 5 6 7 8 9 1011 12 1 2 3 4 5 6 7 8 9 1011 12 Mondays through Thursdays Fridays Saturdays Sundays 1 Provide at least one through freeway lane open in direction of travel 2 Provide at least two adjacent through freeway lanes open in direction of travel 3 Provide at least three adjacent through freeway lanes open in direction of travel 4 Provide at least four adjacent through freeway lanes open in direction of travel 5 Provide at least five adjacent through freeway lanes open in direction of travel S No lane closure permitted; work permitted anywhere that does not require lane closure No lane closure permitted; no work permitted Effective Construction Strategies LANE REQUIREMENT CHARTS
  • 17. Effective Construction Strategies (Cont.) • CONSTRUCTION STAGING • DELAY PENALTY -- “Hammer” for the RE to charge the Contractor ($$$) for late pick-up of the closure . • EXTENDED CLOSURES (e.g. 55-Hour Weekends or 72-Hour Weekdays) • NARROW LANE WIDTHS or USE OF SHOULDERS (PEAK PERIOD) • MOVEABLE BARRIERS • CONTRAFLOW (“Crossovers”) • CONTINGENCY PLANS (Redundancy)
  • 18. District 08 I-15 Devore PCCP Reconstruction EXTENDED CLOSURE - Schedule, Cost & Delay Comparison Project Characteristics - Full-Freeway Closed - one direction - Extended 72-Hour Closures Total Closures Closure Hours User Delay Construction Traffic Handling Total 72-Hour Weekday 8 512 5.6 10.5 2.1 18.2 75 55-Hour Weekend 10 550 14.2 12.5 2.6 29.3 196 1 Roadbed Continuous 2 400 6.9 8.9 1.0 16.8 196 10-Hour Night-time 220 2,200 4.9 19.1 1.3 25.3 36 Max. Delay (Min) Construction Scenario Schedule Comparison Cost Comparison ($Millions)
  • 19. • NO. OF PEAK HOUR TRIPS • VAN POOL RIDERS • BUS TRIPS • PARK ‘N’ RIDE USAGE Effective Strategies -- Demand Management 38% increase 313% Increase 4% Average Reduction 29% Increase District 05 Cuesta Grade Project Strategy Cost = $3,300,000 Strategy Cost = $780,000 Project Characteristics - Addition of NB / SB Truck-Climbing Lanes - Addition of Eight-foot Shoulders - Construction of massive Retaining Walls
  • 20. Alternate Route Strategies (Info obtained by Survey) Different Freeway or Ramp Route - 76% Freeway / Transit - 3% Freeway / Fewer Trips - 1% Other - 2% No Longer Made Trip - 3% City Streets Only - 11% Public Transit - 2% Freeway / Streets - 2% District 04 Central Freeway Replacement Project
  • 21. BENEFITS VS. COSTS?? “Bang for the Buck...” • P • M • I • C • D • A ublic Information otorist Information onstruction Strategies emand Management lternate Routes ncident Management $607,500 $835,000 $2,767,000 --- $400,000 $10,000 District 11 I-5 / I-805 Widening Project Goal - Increase Van, Carpools, Bus by 5% / Change worktime by 2% COZEEP Cost = $1,700,000 COMPARE COST VS. DELAY SAVINGS Strategy Cost Project Characteristics - Const. Separate Freeway Bypass - Const. of new Interchange / Auxiliary Lanes
  • 22. • PUBLIC AWARENESS • Newspapers • TV News Spots • ADVANCE SIGNAGE • Before Decision Points • On Preceding Weeks / Weekends • ADHERE TO LANE REQ’MT CHARTS • Real-Time Statusing is Needed • Penalties for Late Lane Opening • KEEP LANES OPEN • Narrow Lane Widths • Shoulder Usage during Peak LESSONS LEARNED PUBLIC AWARENESS: MOST Effective Strategies facilitate Decision- Making by Driving Public to avoid Work Zone CONSTRUCTION Strategies are also very effective
  • 23. • CONSIDER OTHER STRATEGIES: • Extended Closures vs. Night Closures (“Get in & Stay in -- Get out & Stay out!”) • Close Coordination w/ Locals (Detours, Signals…) • Shorten Contract Time through Incentives • COST VS. BENEFIT • $$$ on Work Zone Enforcement vs. Benefit ?? • $$$ on Brochures, Ads, Flyers, vs. Benefit ?? (Media Coverage -- no cost for Major Projects) • Costs of TMP Strategies vs. Delay costs • OTHER ISSUES • Truck Restrictions / Closures on Parallel Routes • Cumulative Impacts due to Multiple Projects (Combine closures when advantageous) LESSONS LEARNED (cont.) Delay cost to motorists TMP Cost
  • 24. • STREAMLINE TMP PROCESS • Blanket / Minor Projects (Standardized Forms) • Major Projects (Brief, Standardized Reports) • Critical Monitoring Activities - Delay Counts, Runs • PROPOSED STUDIES • Detailed TMP Effectiveness - Costs vs. Benefits • Full-Freeway vs. Night Closures • Enforcement Practices (Placement, etc.) • MODIFY TMP GUIDELINES • Standardize Monitoring Practices • Standardize Reporting Practices • Include Non-Motorized Considerations RECOMMENDATIONS
  • 26.
  • 27.
  • 28. • TMP Process • Relationship between Project Characteristics and TMP Strategies • Sample Unit Costs for TMP Strategies • TMP Strategies -- Unit cost Info • Sample Worksheet -- Blanket TMP • Sample Delay Calculations HANDOUTS
  • 29.
  • 30. Project Public Motorist Incident Const. Demand Alternate Characteristic Information Information Management Strategies Management Routes Duration Long Long Long Length Short Short Short Long Phasing x x x x x Urbanization x (Non-Urbanized) x Average Daily Traffic x x x Reduced Capacity x x x x x x Viable Alternate Routes x x x (No Alternate Routes) x x x Traffic Delay x x x x x x Public / Media x x x Political x x x x Affected Activity Centers x x x x x Truck Percentage x Business Impacts x x x Increase in Accidents x x x Steep Inclines x x x Raised Medians x x x Relationship between Project Characteristics and Appropriate TMP Strategies
  • 31. TMP ELEMENTS- "ROUGH" COSTS Public Information $250,000+ $0.5-1.0/1,000 Mailers $0.34/mailer $0.1-1.0/1,000 $65/1,000 $2,500/month $224 $6,000/day 12,000/day $18,000/day $8,000/day $14,000/day $22,000/day $0-1,000/day $3,000 $800/minute $45/month $4,000+ $20,000+ $1,200/month $1,500/month Motorist Information $300,000 $10,000 $350/day, $1,500/week, $3,500/month $60,000/unit $70,000/unit $300 each Sample Unit Costs for TMP Strategies
  • 32. Incident Management $1,000/night $119.07/hr (reg. Time) contingency and CHP dispatch) $116.45/hr (Over Time) $300 each 20000 to $200,000 $0 $0 $600/hour $0 Range between $20,000 to 200,000 Construction Strategies $10-15/lf $30/lf $100,000/6 months $3/lf $30,000 each Demand Management $50/hr $50,000/location Alternate Route $50/hour Sample Unit Costs for TMP Strategies (Cont.)
  • 33. TMP STRATEGIES -- UNIT COST INFO Source: TMP Effectiveness Study (Wilbur Smith, 1993) Strategy Unit Cost Comment Brochures and Mailers Cost could range between $.40 to $ .50/ brochure for a large quantity. Variable depending on the text, graphics and presentation quality of the materials produced, numbers printed and distribution methods. Media Releases Cost varies with labor up to a few hours of labor/ month. Labor cost associated with TMP personnel interacting with media, as well as time developing press releases. Cost varies with labor up to a few hours of labor/ month. Public Info. Center Basic cost would range from zero to $1.50 per square foot per month depending on the location. Basic cost would range from zero to $1.50 per square foot per month depending on the location. Additional costs could include staffing, equipment, furnishings and operating costs. Paid Advertising The cost depends on newspaper rates in the area, but can range between $100 to $600 for 3 column inches, one time only. Visual Information Variable Telephone Hotline Installation: In the range of $100 - $110 for one line (local access only). Additional Lines: Approximately $75.00 each. Monthly Fee: $20.00 plus usage (rates are discounted if over Installation: This does not include having the actual line installed into the location). Additional Lines: Approximately $75.00 each. CMS $35,000 to $50,000 to purchase depending upon whether installation is permanent or portable; $1,900 to $2,400/ month to lease in 1993 dollars. Annual operating costs can range from $13,000 to $22,000 (1989 dollars) per unit. Signing and Striping Variable Highway Advisory Radio $30,000 to $35,000/ spot; $53,000 for portable unit Traffic Monitoring Station $30,000 per mile PUBLIC INFORMATION MOTORIST INFORMATION INCIDENT MANAGEMENT
  • 34. TMP STRATEGIES -- UNIT COST INFO (cont.) Source: TMP Effectiveness Study (Wilbur Smith, 1993) Strategy Unit Cost Comment Tow Service Cost/ truck hour of service ranges from $50.00 to $60.00. Annualized cost of $85,000/ vehicle, or about $250/ day. Aerial Surveillance Ranges from $5,000 to 6,000 per month (based on D 12 project) to $12,000/ month (I-95 project in Florida) Call Boxes $5,000 to $6,500 for field units (part of construction cost, not TM cost); $25,000 to $32,000 dispatching unit; $500 to $600 annual operating cost/ unit. Cost could also include telephone message charges and dispatching. COZEEP $50 to $60/ hour (Construction Zone Enforcement Enhancement Program) Variable Lanes Temporary concrete barriers: $15 per linear foot Traffic cones: $10 each Channelizers: $35 each Project Phasing Variable depending in the duration of construction, materials used for the stages construction, and additional design fees for preparation of PS & E. Incentives / Disincentives $6,000 per day with maximum 5 percent of construction cost for incentive $12,000 per day for disincentive (based on the I-45 project in Houston, Texas). Cost + Time Bidding Not Available Owner- Imposed Physical Restrictions Not Available Use of Owner- Supplied or Stockpiled Materials Not Available Value Engineering Incentive Not Available Surveillance Not Available Lane/Ramp Closures $2,800 per direction per count location Counts may already be available in District's inventory section CONSTRUCTION STRATEGIES
  • 35. TMP STRATEGIES -- UNIT COST INFO (cont.) Source: TMP Effectiveness Study (Wilbur Smith, 1993) Strategy Unit Cost Comment Glare/ Gawk Screens $10 per linear foot to lease, $15 per linear foot to purchase Truck Traffic Restrictions None Total Facility Closure Cost for COZEEP depends on extent of closure Lane-By-Lane Rental Varies, depending on construction engineering costs, traffic control costs and road user costs. This element would typically be funded as part of the construction contract, rather than the TMP. Rideshare Incentives Vanpooling incentives range from $.19 to $ .62 per vehicle using the corridor (based on ADT). Rideshare Marketing Unknown. TMP costs do not differentiate between overall marketing costs and rideshare marketing costs. Park-and Ride Lots Temporary at- grade parking would cost $1,000 per space with $50/ space with annual maintenance cost. Variable, depending whether new lots must be acquired or built. Transit Service Improvements $5.00/ vehicle mile. Transit Incentives Depends on level of incentive, up to $60/ month is not tax- free High Occupancy Vehicle Lanes $6,000 per mile for temporary HOV lane. Parking Management/ Pricing Minimal Ramp Closure and Ramp Metering $80,000 to $100,000 per ramp for ramp metering. Street Improvements Approximately $10,000 per intersection. Variable depending on the magnitude of geometric changes. Traffic Control Improvements $10,000 to 25,000 per temporary signal or signal modification. DEMAND MANAGEMENT ALTERNATE ROUTES
  • 36. TRANSPORTATION MANAGEMENT PLANS “BLANKET CLOSURE” FORM F District County Route Postmile(s) No. of Lanes Affected Length of Segment Location Description Work Description Initial Date / Time Ending Date / Time Expected Duration Expected Delay (minutes) BLANKET TMP ACTIVITIES -- Please check the appropriate box(es): Bridge inspection / repair Lighting repairs / relamping Restriping Culvert / drainage – cleanout / inspection / repairs Non-landscaped area tree/brush/vegetation work Right-of-Way Fence repair Delineator / Postmile marker repairs / replacement Electrical maintenance Safety and Accident investigations Ditch and channel work Median barrier / attenuator repairs (off traveled way) Shoulder area grading for lateral support Driveway construction Pavement coring / testing Sign repairs / replacement Debris / litter removal Pavement - minor repairs / replacement Sump pump repairs / cleaning Facility patrols and surveillance Pavement – grinding operations (AC digouts) Surveying Graffiti abatement/clean-up on walls / signs / equipment cabinets Roadside Facilities (Rest Area / Vista Points) Tree maintenance (trimming / pruning) Landscaping (irrigation / vegetation control – spraying, mowing) Roadside Facilities (Weigh Station / Park and Ride Lot) Utilities placement / maintenance FACILITY TYPE OF CLOSURE Mainline Bridge Lane One-way Auxiliary lane On-ramp Full Freeway Various Median Off-ramp Moving Shoulder Connector ADDITIONAL INFORMATION Did you prepare Lane Closure Charts? Yes No Was “Zero delay” goal accomplished? (If not, be sure to specify the expected delay above.) Yes No Are there adjacent Lane Closures in the same corridor? Yes No If Yes, what is the spacing? Contact Person: _________________________ Phone: __________________(office) ____________________(cel)
  • 37. Percent Truck: 0.0% Cost per Truck: $24/Veh-Hr Percent Passenger Cars: 100.0% Cost per Passenger Car: $9/Veh-Hr Number of Lanes Existing: 4 Lanes Cost for Mixed Flow Traffic: $9/Veh-Hr Number of Lanes Open: 2 Lanes Single-Lane Capacity: 1500 Veh/Hr Open-Lane Capacity: 3000 Veh/Hr Time Demand (Veh) Cumulative Demand (Veh) Cumulative Capacity (Veh) Difference (Veh) Area (Veh-Hr) Queue Length (mile) Individual Delay (minutes) 6 AM 0 0 0 0 0 0.0 7 AM 5309 5309 3000 2309 1154.5 2.7 46 8 AM 6945 12254 6000 6254 4281.5 7.4 125 Max. Individual Delay: 125 minutes 0.0 Vehicle DelayHours: 5,436 veh-hr Total Cost of Delay: $48,924 DelayCost/10min: $4,077 Operation: Multilane Closure Count Date: 5-3-2001 RTE Location: Demand vs. Capacity 0 2000 4000 6000 8000 10000 12000 14000 6 AM 7 AM 8 AM TIME CUMULATIVE VEHICLES Demand Capacity Sample Delay Calculations