1. Profile Synopsis
B.Tech in Civil Engineering from IIT/Kanpur 1987
IRSE 1988 Exam Batch, Joined in January, 1990 – more than
26 years of service.
M.Tech from IIT Kanpur in Environmental Engineering, May
1989.
Was President of Society of Civil Engineers at IIT Kanpur
1986-87.
Received Best Project Award in Civil Engineering at IIT
Kanpur as undergraduate student.
God fearing person, believe in the principal of “work is
worship” and very passionate.
Able to take bold decision within the ambient of the
contract.
Posted in Railways in various capacities in Operation &
Maintenance, Construction, Bridge design and General
Administration.
Joined RVNL on deputation as Chief Project Manager in
January 2010 and now working as Chief Project Manager
cum Group General Manager for implementation of
projects.
Executing Metro works in one of the most busy road in
heart of Kolkata City. Have executed three major workshops
and also executing a cable stayed bridge.
2. Achievements and work experience
Successfully completed probation period.
AEN and Sectional Sr. DEN in Rajdhani Route.
Sr.DEN/Co-ordination for more than 4 years at Sealdah
(Suburban Traffic)
Dy. CE Construction/Howrah for about 2.5 years Howrah (in and
around Kolkata)
Received Railway Minister’s Award twice 2005 (for AMP Project)
and 2009 for outstanding services.
GM Award – 1996, 1997, 2003, 2008
Best construction shield – 2007 and 2008
Overall Engg. Efficiency Shield – 2004 and 2006
Engineering Runners up, Bridge Shields etc. – 6 Nos.
In RVNL - 7 Nos. of Shields (including Most Innovative Project)
- Certificate of Merit – 4 Nos.
- Group Awards and certificates – 7 Nos.
Planning and DPR of 66 Kms of Metro Projects.
Execution of two Metro Corridors- Joka – Majerhat & Noapara –
Dakshineswar.
Timely Completion of 3 workshops in time-DLCF/Dankuni, DMU
Factory/Haldia, Electric Loco factory/Dankuni and handed over.
More than 12 Nos. of appreciation letters, latest by CMD/RVNL –
“I am happy to note that this has won appreciation from various
agencies and sections of the society including State Government,
General public and media. This commendable work has served
to enhance the image of RVNL as a technically competent
organization”.
1 of 3
3. Have got vast experience of leading Multi-disciplinary team and
execution of works in Urban Environment.
CSR Projects – very actively involved in last 5 years.
Having the qualities like: Sincerity, Integrity, Experience of
leading Multi disciplinary team in urban environment,
Confidence, Passion and keen to implement the project.
APRs from 2001-02 to 2015-16 :- All Outstanding
Few quotes recorded in APR
2006-07 :- “Entrust an assignment to this officer and before you
settle down, he is ready with dazzling results. He is an asset
amongst assets”.
2011-12 :– “His remarkable contribution in implementation of
metro projects. He is highly motivated and upright officer”.
2010-11 :- “He is a work alcoholic person to shoulder any
responsibility assigned to him. He believes in perfection and
drive pride and satisfaction by achieving the goals”.
2012–13 :– “He is one of the most efficient, brilliant, hard
working and highly motivated officer I’ve ever worked with. He
is a good planner, outstanding Engineer and efficient
Manager.”
2013-14 :- “He is an ever motivated, hard working and a
dynamic officer. He is a good engineer as well as a top class
manager.
2014-15 :- “He is a highly motivated, technically competent,
delving oriented successful manager. He has handled the issues
much beyond his level.”
2 of 3
Achievements and work experience
4. 3 of 3
Achievements and work experience
More than 30 technical papers written and published.
Electric Loco Factory, Cable stayed bridge and Joka Metro
projects have given maximum satisfaction in terms of
challenges and achievement.
Coffee Table Books were made on completion of Projects:-
Handbook cum Coffee Table Book titled Staying with Cables- A
modern construction in new era is at:
http://www.slideshare.net/slideshow/embed_code/key/2sfp4L
bZIXl1so
Coffee Table Book titled Electric Loco Assembly and Ancillary
unit of CLW is at:
http://www.slideshare.net/slideshow/embed_code/key/2H52
UCfDjzCJ0O
Coffee Table Book titled Diesel Multiple Unit Factory Haldia,
South Eastern Railway is at:
http://www.slideshare.net/slideshow/embed_code/key/3FiRjJ
OFYf4UnO
Coffee Table Book titled Diesel Loco Component Factory,
Dankuni, South Eastern Railway is at:
http://www.slideshare.net/slideshow/embed_code/key/dwXh
0Ni6DgpYK9
5. Strengths and Weaknesses
Have all kinds of experiences in Railway and Metro
construction works.
Having huge experience and successful implementation of
Projects in West Bengal (Eastern Part of the countary).
Have got experience in Commissioning of Railway Line,
various yard remodeling works, Major Bridges etc.
Have got experience in Track Layout, Track Laying &
Maintenance procedure.
Experience in Contract Management.
Experience of working as a team in Construction/Open line
of Railways and RVNL. Able to interface with all
departments to implement the project .
Huge experience of working in Urban Environment and
Multi disciplinary Projects in successful manner.
Experience of getting CTE’s inspection done and all the
paras got concluded in short period.
Take bold and timely decisions and aggressive approach for
implementation of projects. Work only for implementation
of Projects.
6. How can I contribute
Having my own vast experience and knowledge of various
aspects of construction and Railway working along with
successful co-ordination with the State Government &
various utility owning agencies, I can help in
implementation of various kinds of projects.
Execute the project in targeted time schedule and
estimated cost based on the experience of completed
projects (three nos of workshops) and two on going Metro
projects. Develop the system and procedure for design &
timely working.
Develop the procedure and set up the quality control
system and proper documentation of quality control
system.
Developing internal vigilance mechanism for adopting
better quality control system.
To implement the project in a very safe manner based on
the experience and of execution of the work in very busy &
congested roads of Kolkata
To plan the property development at suitable location along
the alignment.
To plan and develop training facilities at needed location.
Design of structures to optimize faster construction, space
requirement, improved passenger dispersal system,
develop area having proper business potential, Kiosks,
advertisement etc.
Can handle and lead multidisciplinary team in time to come
as proven in past.
7. Performance as per ACRs at a glance
S.No Year Achievement
Special Remarks
Recorded in ACRs
Rating
1 2001-02 All targets achieved. All time
records for rehabilitation of bridges
and expenditure was achieved by
Eastern Railway. All SRSF bridge
works were finalized, planned.
- Outstanding
2 2002-03 All time records for Track Renewal
was achieved, Engineering
Efficiency Runners Cup and
Certificate of Merit (Individual
Award & Certificate of Merit – GM
Award) was received.
He always tried to improve upon
the performance to excel in his
standard of work and he is very
fast in implementation.
Outstanding
3 2003-04 Got the overall Engineering
Efficiency Shield for the first time in
the history of Sealdah Division.
Due to his committed and hard
working to achieve targets
performance of Engineering
Department was excellent in all
field.
Outstanding
4 2004-05 Received Track Maintenance
Shield and overall Runners Cup.
He is a very hard working officer
and takes keen initiative and
prompt actions for compliance
of instructions and has been
rated as the best Sr. DEN of the
Railway.
Outstanding
5 2005-06 Received overall Engineering
Efficiency Shield (second time in
history of Sealdah Division) and
Track Maintenance Shield.
Received Railway Minister’s Award
for Best Project of the year for
Advance Management Programme
for a Project on Sealdah Division.
He is a sincere and hard
working officer and has good
skill for monitoring of works and
use of computers and
presentations.
Outstanding
6 2006-07 Received Best Construction
District Shield for the first time in
Howrah-II District.
Entrust an assignment to this
officer, - and before you settle
down, he is ready with dazzling
results. He is an asset amongst
assets.
Outstanding
7 2007-08 Received Best Construction
District Shield – for the Second
time in Howrah-II District.
He plans his work in a very
systematic and methodical
manner to complete them in
time.
Outstanding
8. 8 2008-09 Received Service Medal and
Hon’ble MR’s Award.
He is very intelligent, sincere and
conscientious officer. I consider him an
asset to the Organization.
Outstanding
9 2009-10 All targets achieved Very intelligent, capable and hard working
officer, is trustworthy and is an asset for the
organization.
Outstanding
10 2010-11 Received Certificate of Merit from
CRB/Railway Board during RVNL’s
Annual Day Function in April 2011
He believes in performance and derives
pride and satisfaction by achieving the
goals.
Outstanding
11 2011-12 Received Project Shields for
Dankuni Factory and for Joka Metro
work, during RVNL’s Annual Day
Function in April 2012
He is an extremely bright highly motivated
and upright officer.
Outstanding
.
12 2012-13 Received the Project Shield for
DMU Factory at Haldia and also for
Joka-Majerhat Metro Project.
He is one of the most efficient, brilliant,
hardworking and highly motivated officer I
have ever worked with. He is a good
planner, outstanding engineer and efficient
manager.
Outstanding
13 2013-14 Received the best workshop shield
for Electric Loco Factory at Dankuni
He is sharp in analyzing the issues and
addresses them with speed & accuracy.
His compliance to instructions are not only
faster than expected, he anticipates well in
advance the issues which are likely to
arise. He has great potential to shoulder
higher responsibility.
He is an ever motivated, hard working and
a dynamic officer. He is a good engineer as
well as a top class manager.
Outstanding
14 2014-15 1. Certification of Merit for Signing
MOU and developing a new
model for execution of a project
from State Govt.
2. Certificate of Merit and a group
award for Electric Loco Factory,
Dankuni.
3. Received the Best Innovative
Project Shield for Barddhaman
Cable Stayed Bridge.
He is a highly motivated, technically
competent, result oriented successful
manager. He has handed the issues much
beyond his level.
Outstanding
15 2015-16 Received the Best Special Structure
Completed Shield for Barddhaman
Cable Stayed Bridge.
He is a man of extra-ordinary caliber who is
always willing to take up challenging time
bound delivery tasks which are technically
and managerially difficult and environment
is not conducive.
Outstanding
9. Morning starts with sharing self
designed quote images and quote
to more than 1000 persons…
Active in social media and stay positive ..
12. Unfortunately either their parents are no
more or they have abandoned them..
Spending time and having dinner with these
sweet children at Oxford Mission..
14. Release of CTBs
Coffee table book for Electric Loco Factory Dankuni is at:
www.slideshare.net/slideshow/embed_code/key/2H52UCfDjzCJ0
O
Coffee table book for Diesel Component Factory, Dankuni is
at:
https://www.slideshare.net/slideshow/embed_code/key/dwXh0Ni6
DgpYK9
Coffee table book for DMU Factory, Haldia is at:
https://www.slideshare.net/slideshow/embed_code/key/3FiRjJOF
Yf4UnO
Handbook cum Coffee Table Book titled "Staying with Cables-
A modern construction in new era” is at:
www.slideshare.net/slideshow/embed_code/key/2sfp4LbZIXl1so
15. A lecture on Fast Track Project at IRICEN
Fast track project at IRICEN,
the presentation is at:
http://www.slideshare.net/
slideshow/embed_code/409
63256
Innovative solution for crossing larger
spaces like Railway Yard - A case study on
Barddhaman Cable Stayed ROB
16. 5th Annual Metro Rail India Summit held at SHANGRI-LA,
New Delhi on 11.03.2016 is at:
www.slideshare.net/rajesh83196/5th-metro-rail-summit-
at-shangri-la-cp-new-delhi-on-11032016
IPWE Seminar 2016- The paper presented was declared as the
best technical paper and will get a certificate from MR and
ME in January 2017, detailed presentation, it is at slide share
at:
www.slideshare.net/slideshow/embed_code/key/nIurFSvRWy
17. A lecture on Fast Track
Project at IRICEN
Fast track project at IRICEN, the presentation is at:
http://www.slideshare.net/slideshow/embed_cod
e/40963256
18. 5th
Metro Rail Summit2016
5th Annual Metro Rail India Summit held at SHANGRI-LA,
New Delhi on 11.03.2016 is at:
www.slideshare.net/rajesh83196/5th-metro-rail-summit-
at-shangri-la-cp-new-delhi-on-11032016
20. IPWE Seminar 2016- The paper presented
was declared as the best technical paper
and will get a certificate from MR and ME
in January 2017, detailed presentation, it is
at slide share at:
www.slideshare.net/slideshow/embed_co
de/key/nIurFSvRWyIDjG
Total 30 Technical Papers written and
presented in different forums
21. Diesel Loco Component Factory – conceived, implemented,
handed over, final bill paid, completion report drawn.
,
,
,
II