1. Resume
Akash Verma S/ o Mr. Rakesh Verma
DOB- 16th
October, 1991 D-11/2 Aadarsh Nagar,
Mob +91-8393099977 near Gol Gurudwara,
Email: akashsre1@gmail.com Jwalapur Haridwar (U.K.)
General:
Perseverant with goals, objectives set out for the completion of target.
Strong base of Conceptual knowledge, design, execution and Planning
Skilled in learning new concepts quickly, working well in under pressure & communicating
ideas clearly & effectively.
Curious & Adaptive application of new concept learned
Enthusiastic, Self- Motivated & Work Oriented.
Education:
B.Tech Degree in Civil Engineering (2008-2012)
(Maharishi Markandeshwar Engineering College, Mullana Town, Ambala)
Result: Ist Class With Distinction (79.92% or 8.9 Pointers)
A.I.S.S.C.E from CBSE board (2007-2008) (70.2%)
A.I.S.S.E from CBSE board (2005-2006) (65.6%)
Software:
AutoCAD 2013
Basics of C & C++
Primavera Contractor 6.1
STAAD Pro v8i
Microsoft Office 2013 (Functioning)
Microsoft Project 2013 (Functioning)
Calquan
Trainings
L&T- Planning for Excellence
L&T- Finance for Non Finance
L&T Institute of Project Management (L0),
L&T- Centre for Technology & Engineering Applications.
L&T recommended- Himalayan Geology Training in joint venture of L&T and UPES University
Dehradun.
L&T- Excellence in Project Planning
Six weeks Industrial Training- Specialization in Industrial Shed,
B.H.E.L. Haridwar
Summer Camp of Surveying at Dalhousie in 2010 for two weeks organized by college as a
Group Leader
2. Career History & Accomplishment
Broad details of my current working
L&T Construction Aug 2014 to present
Project: Western Dedicated Freight Corridor, CTP 1 & 2- (Rajasthan)
Role: Planning In charge of 342 Km (IR Ch. 285.77 to 631) Railway Project (Earthwork, Structures &
Track Works)
Details of Responsibilities:
My role is Planning & Management for execution of the project to ensure timeliness, safety and
quality.
This is going through:
•Tracking, monitoring and coordinating on-site activities for projects with Project Management
Consultants/ Sub Contractors
•Value Engineering
•Driving Project by taking approvals from High Power Committee
•Driving adherence to the project plans, Quality norms & as per FIDIC Contractor
•Timely resolution of Site based issues
•Implementation of all quality and safety initiatives at site
Project Planning & Tracking
•Prepared ACE- Accepted Cost Estimated for a Project
•Preparing JSTD- Job Status till Date
•Conducts weekly review meetings with Contractors / Project Management consultants on work
progress, construction schedule, design or quality issues
•Identifies issues hampering project progress
•Resolves project related issues or bottlenecks
•Selecting vendors for Material Procurement including negotiations for critical items
•Selecting sub-contractors for Earthworks, Structures, Track Works
•Prepares Weekly/ Monthly report of Project
•Complies with company defined guidelines and processes
• Adheres to project timelines
Sub-contractor Bills and Payments
•Fund Disbursement
•Certifies the bills of Sub contractor
•Follows up with Accounts to ensure that the payments to sub-contractor are made in a timely
manner
3. Selection of Contractor/vendors
•Prepares Requests for Proposals for services that need to be outsourced locally such as Civil Item
rate contractors
•Identifies suitable vendors for various mini contracts
•Conducts a comparative analysis of shortlisted vendors and makes recommendations
•Provides technical/work scope inputs to Contracts to prepare the contract
•Follows up with Contracts for sign off on the agreement / Letter of Intent (LOI)/work order
Senior Engineer in Ratle Hydro- Electric Project (Jammu & Kashmir)
L&T Construction Aug 2013 to Aug 2014
Execution of Civil works (Access roads, Water tanks) as per Technical Specifications ensuring Safety
and Quality
Constructed Abutments for 110m span Steel Truss Bridge connecting two banks of river Chenab.
Site Level Planning & Daily Progress monitoring
Client billing and Sub- Contractor billing
Training to fresh Graduate Engineer Trainees
Adopting various practical means to minimize wastage, scrap steel etc.
GET in Ratle Hydro-Electric Project (Jammu & Kashmir)
L&T Construction Dec 2012 to Aug 2013
Trainee under 85m span Truss bridge connecting two banks of river Chenab
Execution of Civil works (Access roads) as per Technical Specifications ensuring Safety and Quality
Site Level Planning & Daily progress monitoring
Coordination with sub-contract agency for the success of Project
Troubleshooting various technical issues coming at the execution front in direct consultation with
Client’s representative
Client billing and Sub- Contractor billing
GET in Srinagar Hydro-Electric Project (Uttarakhand)
L&T Construction Jul 2012 to Dec 2012
Worked in planning department primarily for Construction drawing coordination, Construction
Schedule monitoring, quantity estimation, Client Billing, Material reconciliation
-----------------------------------------------------------------------------------------------------------------------------------