SlideShare a Scribd company logo
1 of 3
Download to read offline
Resume
Akash Verma S/ o Mr. Rakesh Verma
DOB- 16th
October, 1991 D-11/2 Aadarsh Nagar,
Mob +91-8393099977 near Gol Gurudwara,
Email: akashsre1@gmail.com Jwalapur Haridwar (U.K.)
General:
 Perseverant with goals, objectives set out for the completion of target.
 Strong base of Conceptual knowledge, design, execution and Planning
 Skilled in learning new concepts quickly, working well in under pressure & communicating
ideas clearly & effectively.
 Curious & Adaptive application of new concept learned
 Enthusiastic, Self- Motivated & Work Oriented.
Education:
 B.Tech Degree in Civil Engineering (2008-2012)
(Maharishi Markandeshwar Engineering College, Mullana Town, Ambala)
Result: Ist Class With Distinction (79.92% or 8.9 Pointers)
 A.I.S.S.C.E from CBSE board (2007-2008) (70.2%)
 A.I.S.S.E from CBSE board (2005-2006) (65.6%)
Software:
 AutoCAD 2013
 Basics of C & C++
 Primavera Contractor 6.1
 STAAD Pro v8i
 Microsoft Office 2013 (Functioning)
 Microsoft Project 2013 (Functioning)
 Calquan
Trainings
 L&T- Planning for Excellence
 L&T- Finance for Non Finance
 L&T Institute of Project Management (L0),
 L&T- Centre for Technology & Engineering Applications.
 L&T recommended- Himalayan Geology Training in joint venture of L&T and UPES University
Dehradun.
 L&T- Excellence in Project Planning
 Six weeks Industrial Training- Specialization in Industrial Shed,
 B.H.E.L. Haridwar
 Summer Camp of Surveying at Dalhousie in 2010 for two weeks organized by college as a
Group Leader
Career History & Accomplishment
Broad details of my current working
L&T Construction Aug 2014 to present
Project: Western Dedicated Freight Corridor, CTP 1 & 2- (Rajasthan)
Role: Planning In charge of 342 Km (IR Ch. 285.77 to 631) Railway Project (Earthwork, Structures &
Track Works)
Details of Responsibilities:
My role is Planning & Management for execution of the project to ensure timeliness, safety and
quality.
This is going through:
•Tracking, monitoring and coordinating on-site activities for projects with Project Management
Consultants/ Sub Contractors
•Value Engineering
•Driving Project by taking approvals from High Power Committee
•Driving adherence to the project plans, Quality norms & as per FIDIC Contractor
•Timely resolution of Site based issues
•Implementation of all quality and safety initiatives at site
Project Planning & Tracking
•Prepared ACE- Accepted Cost Estimated for a Project
•Preparing JSTD- Job Status till Date
•Conducts weekly review meetings with Contractors / Project Management consultants on work
progress, construction schedule, design or quality issues
•Identifies issues hampering project progress
•Resolves project related issues or bottlenecks
•Selecting vendors for Material Procurement including negotiations for critical items
•Selecting sub-contractors for Earthworks, Structures, Track Works
•Prepares Weekly/ Monthly report of Project
•Complies with company defined guidelines and processes
• Adheres to project timelines
Sub-contractor Bills and Payments
•Fund Disbursement
•Certifies the bills of Sub contractor
•Follows up with Accounts to ensure that the payments to sub-contractor are made in a timely
manner
Selection of Contractor/vendors
•Prepares Requests for Proposals for services that need to be outsourced locally such as Civil Item
rate contractors
•Identifies suitable vendors for various mini contracts
•Conducts a comparative analysis of shortlisted vendors and makes recommendations
•Provides technical/work scope inputs to Contracts to prepare the contract
•Follows up with Contracts for sign off on the agreement / Letter of Intent (LOI)/work order
Senior Engineer in Ratle Hydro- Electric Project (Jammu & Kashmir)
L&T Construction Aug 2013 to Aug 2014
Execution of Civil works (Access roads, Water tanks) as per Technical Specifications ensuring Safety
and Quality
Constructed Abutments for 110m span Steel Truss Bridge connecting two banks of river Chenab.
Site Level Planning & Daily Progress monitoring
Client billing and Sub- Contractor billing
Training to fresh Graduate Engineer Trainees
Adopting various practical means to minimize wastage, scrap steel etc.
GET in Ratle Hydro-Electric Project (Jammu & Kashmir)
L&T Construction Dec 2012 to Aug 2013
Trainee under 85m span Truss bridge connecting two banks of river Chenab
Execution of Civil works (Access roads) as per Technical Specifications ensuring Safety and Quality
Site Level Planning & Daily progress monitoring
Coordination with sub-contract agency for the success of Project
Troubleshooting various technical issues coming at the execution front in direct consultation with
Client’s representative
Client billing and Sub- Contractor billing
GET in Srinagar Hydro-Electric Project (Uttarakhand)
L&T Construction Jul 2012 to Dec 2012
Worked in planning department primarily for Construction drawing coordination, Construction
Schedule monitoring, quantity estimation, Client Billing, Material reconciliation
-----------------------------------------------------------------------------------------------------------------------------------

More Related Content

What's hot (19)

Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
Rama_Resume
Rama_Resume Rama_Resume
Rama_Resume
 
Brevard, Chris Resume - General Purpose
Brevard, Chris Resume - General PurposeBrevard, Chris Resume - General Purpose
Brevard, Chris Resume - General Purpose
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
vineeth p v( CV)
vineeth p v( CV)vineeth p v( CV)
vineeth p v( CV)
 
HVAC Estimation engineer
HVAC Estimation engineerHVAC Estimation engineer
HVAC Estimation engineer
 
tnsmCV
tnsmCVtnsmCV
tnsmCV
 
shahul HVAC - new 1
shahul HVAC - new 1shahul HVAC - new 1
shahul HVAC - new 1
 
Diploma in civil engineering with 31 years experience both in project & main...
Diploma in civil engineering with 31 years experience both in project  & main...Diploma in civil engineering with 31 years experience both in project  & main...
Diploma in civil engineering with 31 years experience both in project & main...
 
CV - K.D.S.Kumara
CV - K.D.S.KumaraCV - K.D.S.Kumara
CV - K.D.S.Kumara
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Hari -QA-QC Engineer
Hari -QA-QC EngineerHari -QA-QC Engineer
Hari -QA-QC Engineer
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CV
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Umar
UmarUmar
Umar
 

Viewers also liked

Tudo começou no clube das insónias
Tudo começou no clube das insóniasTudo começou no clube das insónias
Tudo começou no clube das insóniasHelder Carvalho
 
Lehrgang Computersicherheit
Lehrgang ComputersicherheitLehrgang Computersicherheit
Lehrgang ComputersicherheitMarc Ruef
 
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...moriainformatica
 
Série Aprendendo com Outros: Avaliação de Equipes
Série Aprendendo com Outros: Avaliação de EquipesSérie Aprendendo com Outros: Avaliação de Equipes
Série Aprendendo com Outros: Avaliação de EquipesMoacir Medrado
 
CRO Prozesse mit Data Mining Optimieren
CRO Prozesse mit Data Mining OptimierenCRO Prozesse mit Data Mining Optimieren
CRO Prozesse mit Data Mining OptimierenLaurent Müllender
 
Apresentaçaõ de redes atual
Apresentaçaõ de redes atualApresentaçaõ de redes atual
Apresentaçaõ de redes atualMilena Rebouças
 
Globo.com - Porque amamos open-source?
Globo.com - Porque amamos open-source?Globo.com - Porque amamos open-source?
Globo.com - Porque amamos open-source?Igor Macaubas
 
Data Science & Big Data, made in Switzerland
Data Science & Big Data, made in SwitzerlandData Science & Big Data, made in Switzerland
Data Science & Big Data, made in SwitzerlandThilo Stadelmann
 
Jardim Francês
Jardim FrancêsJardim Francês
Jardim FrancêsARQ210AN
 
Cancers cutanées hm 14 01 14
Cancers cutanées hm 14 01 14Cancers cutanées hm 14 01 14
Cancers cutanées hm 14 01 14raymondteyrouz
 
Solutions de Paiement sur facture - Bilan 2013 et perspectives
Solutions de Paiement sur facture - Bilan 2013 et perspectives Solutions de Paiement sur facture - Bilan 2013 et perspectives
Solutions de Paiement sur facture - Bilan 2013 et perspectives AFMM
 
Pmbok 5édition change 2013
Pmbok 5édition change   2013Pmbok 5édition change   2013
Pmbok 5édition change 2013Marc Bonnemains
 

Viewers also liked (20)

Tudo começou no clube das insónias
Tudo começou no clube das insóniasTudo começou no clube das insónias
Tudo começou no clube das insónias
 
Klemens Fuchs: Zoonosen und ihre Erreger
Klemens Fuchs: Zoonosen und ihre Erreger Klemens Fuchs: Zoonosen und ihre Erreger
Klemens Fuchs: Zoonosen und ihre Erreger
 
Lehrgang Computersicherheit
Lehrgang ComputersicherheitLehrgang Computersicherheit
Lehrgang Computersicherheit
 
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...
Samsung - Câmera Digital - PL120 - 14.2 Megapixels - Duplo LCD - LCD Frontal ...
 
Heimo Laßnig: Salmonella-Überwachung in Österreich
Heimo Laßnig: Salmonella-Überwachung in ÖsterreichHeimo Laßnig: Salmonella-Überwachung in Österreich
Heimo Laßnig: Salmonella-Überwachung in Österreich
 
Ruidos
RuidosRuidos
Ruidos
 
Ppt ww vale
Ppt ww valePpt ww vale
Ppt ww vale
 
Série Aprendendo com Outros: Avaliação de Equipes
Série Aprendendo com Outros: Avaliação de EquipesSérie Aprendendo com Outros: Avaliação de Equipes
Série Aprendendo com Outros: Avaliação de Equipes
 
19 - CPC 24 - Eventos Subsequentes
19 - CPC 24 - Eventos Subsequentes19 - CPC 24 - Eventos Subsequentes
19 - CPC 24 - Eventos Subsequentes
 
CRO Prozesse mit Data Mining Optimieren
CRO Prozesse mit Data Mining OptimierenCRO Prozesse mit Data Mining Optimieren
CRO Prozesse mit Data Mining Optimieren
 
Campos da serra catarinense
Campos da serra catarinenseCampos da serra catarinense
Campos da serra catarinense
 
Apresentaçaõ de redes atual
Apresentaçaõ de redes atualApresentaçaõ de redes atual
Apresentaçaõ de redes atual
 
Tumores anexiais
Tumores anexiaisTumores anexiais
Tumores anexiais
 
Globo.com - Porque amamos open-source?
Globo.com - Porque amamos open-source?Globo.com - Porque amamos open-source?
Globo.com - Porque amamos open-source?
 
Markenfuehrung im digitalen Zeitalter
Markenfuehrung im digitalen ZeitalterMarkenfuehrung im digitalen Zeitalter
Markenfuehrung im digitalen Zeitalter
 
Data Science & Big Data, made in Switzerland
Data Science & Big Data, made in SwitzerlandData Science & Big Data, made in Switzerland
Data Science & Big Data, made in Switzerland
 
Jardim Francês
Jardim FrancêsJardim Francês
Jardim Francês
 
Cancers cutanées hm 14 01 14
Cancers cutanées hm 14 01 14Cancers cutanées hm 14 01 14
Cancers cutanées hm 14 01 14
 
Solutions de Paiement sur facture - Bilan 2013 et perspectives
Solutions de Paiement sur facture - Bilan 2013 et perspectives Solutions de Paiement sur facture - Bilan 2013 et perspectives
Solutions de Paiement sur facture - Bilan 2013 et perspectives
 
Pmbok 5édition change 2013
Pmbok 5édition change   2013Pmbok 5édition change   2013
Pmbok 5édition change 2013
 

Similar to Resume_Akash Verma (20)

SHIVAM KUMAR
SHIVAM KUMARSHIVAM KUMAR
SHIVAM KUMAR
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
CV Engr Saad Ahmed Khan(Wapda)
CV Engr Saad Ahmed Khan(Wapda)CV Engr Saad Ahmed Khan(Wapda)
CV Engr Saad Ahmed Khan(Wapda)
 
Manish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experience
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copy
 
CV _ Md Badruddoza Biswas
CV _ Md Badruddoza BiswasCV _ Md Badruddoza Biswas
CV _ Md Badruddoza Biswas
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)
 
Krishna Updated Resume
Krishna Updated ResumeKrishna Updated Resume
Krishna Updated Resume
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
CV
CVCV
CV
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 

Resume_Akash Verma

  • 1. Resume Akash Verma S/ o Mr. Rakesh Verma DOB- 16th October, 1991 D-11/2 Aadarsh Nagar, Mob +91-8393099977 near Gol Gurudwara, Email: akashsre1@gmail.com Jwalapur Haridwar (U.K.) General:  Perseverant with goals, objectives set out for the completion of target.  Strong base of Conceptual knowledge, design, execution and Planning  Skilled in learning new concepts quickly, working well in under pressure & communicating ideas clearly & effectively.  Curious & Adaptive application of new concept learned  Enthusiastic, Self- Motivated & Work Oriented. Education:  B.Tech Degree in Civil Engineering (2008-2012) (Maharishi Markandeshwar Engineering College, Mullana Town, Ambala) Result: Ist Class With Distinction (79.92% or 8.9 Pointers)  A.I.S.S.C.E from CBSE board (2007-2008) (70.2%)  A.I.S.S.E from CBSE board (2005-2006) (65.6%) Software:  AutoCAD 2013  Basics of C & C++  Primavera Contractor 6.1  STAAD Pro v8i  Microsoft Office 2013 (Functioning)  Microsoft Project 2013 (Functioning)  Calquan Trainings  L&T- Planning for Excellence  L&T- Finance for Non Finance  L&T Institute of Project Management (L0),  L&T- Centre for Technology & Engineering Applications.  L&T recommended- Himalayan Geology Training in joint venture of L&T and UPES University Dehradun.  L&T- Excellence in Project Planning  Six weeks Industrial Training- Specialization in Industrial Shed,  B.H.E.L. Haridwar  Summer Camp of Surveying at Dalhousie in 2010 for two weeks organized by college as a Group Leader
  • 2. Career History & Accomplishment Broad details of my current working L&T Construction Aug 2014 to present Project: Western Dedicated Freight Corridor, CTP 1 & 2- (Rajasthan) Role: Planning In charge of 342 Km (IR Ch. 285.77 to 631) Railway Project (Earthwork, Structures & Track Works) Details of Responsibilities: My role is Planning & Management for execution of the project to ensure timeliness, safety and quality. This is going through: •Tracking, monitoring and coordinating on-site activities for projects with Project Management Consultants/ Sub Contractors •Value Engineering •Driving Project by taking approvals from High Power Committee •Driving adherence to the project plans, Quality norms & as per FIDIC Contractor •Timely resolution of Site based issues •Implementation of all quality and safety initiatives at site Project Planning & Tracking •Prepared ACE- Accepted Cost Estimated for a Project •Preparing JSTD- Job Status till Date •Conducts weekly review meetings with Contractors / Project Management consultants on work progress, construction schedule, design or quality issues •Identifies issues hampering project progress •Resolves project related issues or bottlenecks •Selecting vendors for Material Procurement including negotiations for critical items •Selecting sub-contractors for Earthworks, Structures, Track Works •Prepares Weekly/ Monthly report of Project •Complies with company defined guidelines and processes • Adheres to project timelines Sub-contractor Bills and Payments •Fund Disbursement •Certifies the bills of Sub contractor •Follows up with Accounts to ensure that the payments to sub-contractor are made in a timely manner
  • 3. Selection of Contractor/vendors •Prepares Requests for Proposals for services that need to be outsourced locally such as Civil Item rate contractors •Identifies suitable vendors for various mini contracts •Conducts a comparative analysis of shortlisted vendors and makes recommendations •Provides technical/work scope inputs to Contracts to prepare the contract •Follows up with Contracts for sign off on the agreement / Letter of Intent (LOI)/work order Senior Engineer in Ratle Hydro- Electric Project (Jammu & Kashmir) L&T Construction Aug 2013 to Aug 2014 Execution of Civil works (Access roads, Water tanks) as per Technical Specifications ensuring Safety and Quality Constructed Abutments for 110m span Steel Truss Bridge connecting two banks of river Chenab. Site Level Planning & Daily Progress monitoring Client billing and Sub- Contractor billing Training to fresh Graduate Engineer Trainees Adopting various practical means to minimize wastage, scrap steel etc. GET in Ratle Hydro-Electric Project (Jammu & Kashmir) L&T Construction Dec 2012 to Aug 2013 Trainee under 85m span Truss bridge connecting two banks of river Chenab Execution of Civil works (Access roads) as per Technical Specifications ensuring Safety and Quality Site Level Planning & Daily progress monitoring Coordination with sub-contract agency for the success of Project Troubleshooting various technical issues coming at the execution front in direct consultation with Client’s representative Client billing and Sub- Contractor billing GET in Srinagar Hydro-Electric Project (Uttarakhand) L&T Construction Jul 2012 to Dec 2012 Worked in planning department primarily for Construction drawing coordination, Construction Schedule monitoring, quantity estimation, Client Billing, Material reconciliation -----------------------------------------------------------------------------------------------------------------------------------