Curriculum vitae
1. Family name: Anki
2. First names: Anton Hanna
3. Date of birth: 28-5-1963
4. Marital Status: Married
5. Nationality: Jordanian
6. Education:
Institution Degree(s) or Diploma(s) obtained:
Loughborough University of Technology
U.K, 1988
M.Sc. in Construction
University of Jordan
Jordan, 1987
M.Sc. in Environmental Engineering
University of Jordan
Jordan, 1985
B.Sc. in Civil Engineering
7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
Language Reading Speaking Writing
Arabic 1 1 1
English 1 1 1
8. Membership of professional bodies: Jordan Engineers Association
British Council Chevening Association
9. Positions: Director of Supervision Department & Director of Roads and Traffic Department
10. Contact Address: P.O Box 811943, Postal Code 11181 Amman-Jordan
E-Mail: anton63anki@yahoo.co.uk
Tel.: ++ 962 79 5229080
2 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
11.Working Experience:
11.1 Summary
Worked at Consulting Engineering Center (CEC) – Sajdi & Partners – Amman/ Jordan from 24 July 2005 till August 2016 as
Senior Infrastructure Engineer / Senior Highways Engineer with more than 30 years of experience in Highways, Roads, Bridges &
infrastructure projects in Middle East, Africa and Europe possessing high potentials in managing huge projects (in different
geographic areas) with wise leadership, team work, strategic planning & close communications with stakeholders. Fields of expertise
covers design, construction supervisor and maintenance entailing conducting Feasibility Studies, Highways Geometric Design,
Contract Administration, Risk Assessment and Site Supervision of Roads, Transportation Projects, as well as preparation of Tender
Documents and preparation of Technical Proposals to many prospect project in the fields of transportation and Infrastructures.
My story of success with Consulting Engineering Center (CEC) has contributed significantly to company prosperity, achievement of
its strategic objectives / goals; “Double Revenue within 5 years time" for two consecutive rounds (10 years) and to excel and be
distinguished in the local and international market; through contribution as a key leadership / top management member in
monitoring the strategic plan, progress and projects successful completion to customer’s satisfaction (customers intimacy).
During my service at CEC, I had empowered the company to obtain the award of Excellence of His Majesty, King Abdullah the 2nd
of Jordan for four consecutive rounds and be recognized for excellence by EFQM with a 3 stars, maintain company performance to
be on line with ISO 9001 procedures adopted by CEC since 1996 and through the implementation of theBalance Scorecard for
Strategic Planning, cascaded to company departments and branches entailing Supervision, Roads &Traffic Department.
In addition to international experience in the United Kingdom as researcher in Construction at Loughborough University of
Technology, I had worked worldwide as Team leader / Senior Highway & Infrastructure Engineer including Albania, Gambia,
Uganda, Lesotho, Tanzania, Zambia Maldives, Tajikistan, Saudi Arabia, Syria, Libya, and Yemen and in Jordan.
Worked in the Ministry of Public Works & Housing (MPWH) in many technical & managerial positions from the year 1985 to 2005
briefed hereunder, with my last position as the Director of Road Maintenance Department / Ministry Secretary General Advisor for
Road Affairs. During my service, I had been able to achieve Ministry / Department goals and schedules for the improvement and
maintenance of road network in Jordan and had introduced new / advanced technologies to practice such as the use of High
Performance Hot Mix Asphalt utilizing Modified Asphalt Binder and develop Pavement Management System (PMS) for setting
maintenance policies & strategies and develop priorities for annual maintenance programs using HDM 4 software. In addition, I had
been appointed as a Key management member in the Jordanian /Swedish agreements for Road Sector Development Project performed
by SWE ROAD subsidiary to the Swedish National Road (1998 – 2003), as well as been appointed a key member in the Committee for
the Foundation of the Road Fund Management in Jordan.
My contribution towards training and exchange of knowledge as a Instructor on Contract Documents - FIDIC 99; Red Book,
Technical Writings …. for different stakeholders (such as Syrian Road Agency staff - Ministry of Transportation Syria – Damascus -
June 2005, the Libyan Delegation -2014, MIYAHUNA - Ministry of Water & Irrigation – Jordan, 2012 and for Albania Road
Directorate (ARD) - Tirana – 2008), has empowered clients and local staff capabilities to perform their duties more efficiently, as well
as participation in many advanced courses, conferences as a speaker and attendee.
3 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
11.2 Professional Experience
A. Consulting Engineering Center (CEC) – Sajdi & Partners – Amman/ Jordan
(1) March 2016 – Aug. 2016:
Director of Supervision Department in the Consulting Engineering Center (CEC) – Sajdi & Partners; one of the leading
Consulting Companies in Jordan with 35 years in the market, specialized in infrastructure works in the fields of roads, bridges,
water, wastewater, electro-mechanical…etc. and working internationally in 28 countries in Europe, Asia & Africa. My role
and duties involves:
 Supervise running projects to the satisfaction of Clients and donors (such as league of Arab States, World Bank
(USAID), European Banks….etc.) in terms of quality, time (to the highest standards and to the requirements of the
Contract Documents),
 Leadership: leading more than 100 person- staff at home office and projects ( internal and external) and directing them on
work procedures and standards, technical issues and problem solving through meetings, training courses and direct visits,
 Monitor Company Strategic Map & goals / objectives as a key member in the Strategy Management Leadership team, and
in company accreditation by EFQM as well as in internal and external Audits,
 Achieve supervision department strategic goals and had contributed significantly to CEC strategic objective; “Double
Revenue within 5 years time"
 Maintaining a good relationship and trust with Employers through co-ordination meetings, discussion, presentations and
needed support as part of our strategic goal ; “Customer Intimacy”,
 Carry out awareness session to supervision staff entailing project's kick off meeting and progress meetings.
 Verify survey control works entailing Control Reference Points / Bench Marks (tied to the National Net Work) are
undertaken in the early stage of the project and limits of the Right of Way are defined and needed expropriations are
undertaken,
 Ensure that utilities inventory and proper solutions are undertaken in co-ordination with utilities owners and stakeholders
as an important step for work progress and project completion.
 Safety work and Measures to ensure traffic safety, workers safety and third party safety,
 Contracts administrations and management including management of Contract Claims & Resolution of Disputes with
respect to the applicable Conditions of Contract (FIDIC, PPDA or any other Contract Conditions either local or
international), advising Client’s and fulfilling contractual requirements,
 Managing Staff and ensure compliance to Work Procedures and Standards; this entails appointing and managing
supervision staff in the main office, branches and projects staff (working locally and internationally) through the utilization
of a well home tailored and designated CEC Quality Procedures and Manuals such as Resident Engineer’s Manual as well
as ISO 9001.
4 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
 Quality Control and Quality Assurance of the constructions works, checking, meetings ...etc.
 Verify contractor's payments certificates and variation orders,
 Verify O & M manuals,
 Participate in training programs and transfer of knowledge to Client's staff
 Make sure that all defects are completed on time,
 Issue projects completion certificates and closing out procedures,
 Participate as a key management member in company monthly progress meetings, strategic meetings and project
governance committee.
 Technical proposals preparation for prospect projects,
Recent projects supervised by Supervision Department at CEC includes infrastructure project running in Uganda, Albania,
Malawi, Mozambique, Saudi Arabia, Turkey, Palestine, Lesotho, Syria and in Jordan.
Works supervised under these Consultancy Services includes (but not limited to the following):
 Roads/ /Highways and Bridges Projects,
 Road maintenance projects,
 Water (net works), Water Tanks and Pumping Station projects,
 Wastewater and Treatment Plants Projects,
 Structures entailing concrete and steel structures, Drainage Structures (Box and pipe Culverts),
 Protection Works entailing Reinforced Concrete & Soil Reinforced Retaining Walls, Gabions, Rip-rap…
 Environmental Impact Assessment, monitoring and mitigation.
(2) July 2005 – Feb. 2016:
Director of Roads & Traffic Department at the Consulting Engineering Center (CEC) – Sajdi & Partners:
My role and duties involves:
 Conducting Detailed Engineering Design for Roads and Highways (Geometric Design), Feasibility
Studies, Design Reviews and Tender Documents to all projects awarded to CEC with high quality that
meets Client's satisfaction or exceeds (recommendation letters been awarded for good performance),
 Leadership: I had worked as a team leader for many projects, leading more than 100 person- staff at
home office and projects ( internal and external) and directing them on work procedures and
standards, technical issues and problem solving, through meetings, training courses and direct visits,
 Develop the Strategic Plan for Consulting Engineering Center utilizing the Balance Score Card as the
new Strategic Tool For Planning and monitor goals / objectives as a key member in the Strategy
Management Leadership and Core teams, in addition of being the initiative owner; “Standardize
technical and Design” in the internal processes perspective.
5 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
 Achieve Roads & Traffic Department strategic goals and had contributed to the overall strategic
objective; "Double Revenue within 5 years time".
 Participate in the development of company mission, vision and core values,
 Implement company quality procedure manual and company standards successfully as a team leader
for new awarded design projects (entailing the preparation of Project Quality Plan) and been able to
accomplish these mission successfully with in time and allocated resources,
 I had participated as a key member / key role in the management meetings and negotiations for
company accreditation by EFQM and for obtaining King Abdulla the Second Award for Excellence
(Highest Performance Award for performance in Jordan),
 Preparation of Tender Documents entailing the invitation to tenders, conditions, specifications, BoQ,
drawings and participate in tender evaluations and client assistance in contractual procedures and
award of contracts,
 key role in the preparation of Technical Proposals to prospect project (mainly in the fields of
transportation and Infrastructures projects taking place in 28 countries in Europe, Asia & Africa) has
led to many success stories in winning these projects ,
 Representing Clients and donors successfully as a third party consultant in outside missions such as
Project Progress evaluation, Forensic Expert ...etc, and been able to solve pending problems and
provide precious advice to Clients which was well appreciated.
 Engineering support for running project and problem solving for running projects,
 Participate as a team leader/ in the Preparation of Road Design Manual and Manual on Uniform
Traffic Control Devices for the use of Roads & Bridges Authority in the Republic of Greater Libya.
 Participate in training programs and transfer of knowledge to Client's staff and CEC employees as
requested,
 Participate as a key management member in company monthly progress meetings, strategic meetings
and project governance committee.
Through the past eleven years, I had worked at CEC on the following projects listed hereunder:
No. Project Name Location Duration Position Description
1. Design Review and
Construction Supervision of
the Upgrading from Gravel to
Paved (Bituminous) Standard
of Musita- Lumino / Busia –
Majanji Road, (104km)
Uganda 3 years
starting on
2015
Design Review Team
Leader / Senior
Highway Design
Engineer
The project road, “Upgrading Lot 4: Musita- Lumino / Busia-Majanji
Road (104km)”, from Gravel to Bitumen Surfaced Standard is located
in the eastern part of Uganda and is composed of two main sections;
Musita - Lumino Road Section (77.13 Km) and Busia - Majanji Road
Section (26.874 Km) - Financed by the Government of Uganda and
managed by Uganda National Road Authority (UNRA).
6 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
2. Construction of “QUKËS-
QAFË PLLOCË, Section of
the Tirana – Korca Road
Corridor - Albania
Albania 3 years
starting on
2014
Design Review Team
Leader / Senior
Highway Design
Engineer
The project is located in the East-West transport corridor within
“Tirana-Elbasan- Qafe Plloca-Korca Road Corridor” (Corridor 8). The
road passes through Governor of Elbasan and Governor of Korca
where the road terrain encounters rough mountainous areas.
The project consists of construction of 33.8 km road section including
16 highly elevated Bridges / Viaducts and a Tunnel in addition to
many box culverts, long and high retaining walls as well as other
protection works and safety measures. Financed by the Islamic
Development Bank (IBD).
3. Rehabilitation and
Improvements of Water
Supply in 6 Towns
Zambia 14 months
starting
2014
Contract Engineer Rehabilitation and Improvement of water supply and sanitation
systems in 6 Towns of Kasama, Mbala, Mpika, Kawambwa, Mansa
and Chililabombwe - Financed by the Arab Bank for Economic
Development in Africa (BADEA).
4. New harbour facilities at
Obhor, Jeddah
Marine structures
Saudi
Arabia
12 months
Starting in
2014
Senior Road Design
Engineer / Contract
Engineer
The Faculty of Maritime Studies at the University of King Abdulaziz,
Jeddah - Saudi Arabia has appointed CEC Sadji and Partners as the
main and NIRAS as the sub consultant, for the design of new marine
facilities in their existing harbour located at Obhor, Jeddah, Saudi
Arabia.
The project must provide harbour facilities for a 43 m long new ship
by modifying the existing harbour facilities in the proper way.
5. Infrastructure Development
of two Historical Areas in
Saudi Arabia - Uhud Area
and Al-Khandeq Area
Saudi
Arabia
12 months
Starting in
2014
Senior Transportation
Engineer
The project include urban and infrastructure planning and
development to the ancient area, Uhud, and linking it to other
surrounding religious and historical places entailing use of advanced
transport systems such as under-grounds (metro), BRT, on- grade and
intersections and interchanges. The work includes the design of central
transport stations and underground parking in addition to the
geometric design of roads and bridges, all in line the with master plan
of the whole area. The project is implement in JV with IMAR of Saudi
Arabia – Financed by the government of Saudi Arabia
6. Development and extension
of Humus waste water
treatment plant
Syria 2013 /
2014
Senior Road Design
Engineer / Contract
Engineer
Detailed Design for the extension of the existing waste water
treatment plant for the short term and new design for a new future
waste water treatment plant for the long term - Financed by the
Government of the Republic of Syria.
7 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
7. Consultancy Services for
Forensic Expert on the
Construction of Likalaneng to
Thaba-Tseka Road Project
(From Ha Matsooana to
Thaba-Tseka)
Lesotho 4 months
starting in
2013
Forensic Expert –
Team leader / Senior
Highway Engineer
The Objective of this project is to undertake engineering, technical and
forensic investigations to determine the real causes of the failure
(uplifting of asphalt and flooding) that occurred on Lot 3 of the
Likalaneng to Thaba Tseka road in January, 2011.
The outcome of these investigations and finding will guide the Client,
“The Ministry of Public Works and Transport represented by Road
Directorate” on the type of remedial measures to be instituted in order
to minimize or preclude future occurrence of failures of similar nature.
In addition, the consultant shall furnish also a preliminary cost
estimate for the reconstruction at around 15% accuracy based on his
findings and analysis.
8. Consultancy services for
Construction Supervision for
Seventeen Bridges and their
Connection Roads
Uganda 24 months,
starting in
2013
Team Leader / Senior
Highway Design
Engineer
The scope of work entails carrying out general design review
verification for Contract Drawings and other related Documents for all
the Bridges and Roads to ensure structural adequacy and safety,
concluding the Consultant recommendation for all related technical
and contractual aspects. The implementation of the project includes
civil works and ancillaries for the construction of seventeen bridges to
be built in Northern and North Eastern Uganda, in addition to the road
connecting each bridge with existing highway. The project is financed
by the Islamic Development Bank (IBD) and managed by Ministry of
Works and Transport as the Client.
9. The Construction of Tikoe
Industrial Estate
infrastructure and factory
shells
Lesotho 18
calendar
months,
starting in
2013
Senior Road Design
Engineer / Contract
Engineer
The project lies at Tikoe, around 10 km south-east of the center of the
capital city, Maseru. The project includes the civil works and
ancillaries for the construction of roads and storm water, utilities
infrastructure for a total area of 270,000 m² of which a net let-able
area of 67,000 m² shall become available for industrial shells
construction or for rental. This phase involves construction of around
30,000 m² of industrial shells as part of the 67,000 m² area referred to
above and the remaining 37000 m² will remain for lease or further
construction of shells as demand and finance become available. –
Financed by the the Arab Bank for Economic Development in Africa
and managed by Lesotho National Development Corporation (LNDC).
8 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
10. Design of Hael Bridge Saudi
Arabia
12 months,
starting in
2012
Project Manager/
Senior Road Design
Engineer
Detailed Design of 700 m bridge with approach roads of 600m length
including roundabouts, street lighting, traffic and safety facilities. –
Financed by the government of Saudi Arabia and managed by the
municipality of Hael in the Kingdom of Saudi Arabia.
11. Consulting Services for AI
Azraq to Omary Road- Sub–
UK for provision of technical
assistance - Due Diligence
Study, Financial Review and
Projection along with
Transaction Report
Jordan 6 months,
starting in
2011
Senior Highway
Engineer
Sub-Consultancy Services with Halcrow Group Limited {HGL} to
provide technical support to carry out the technical Due Diligence
Studies through evaluations of the existing road conditions, traffic
studies and analysis and local market appraisal including costing data
and information.
HGL has been commissioned to undertake Consultancy Services for
the Executive Privatization Committee (EPC) to determine the
feasibility and approach of a possible Public Private Partnership
{PPP} for an upgrade to the existing AI Azraq - AI Omary highway,
ultimately defining the highway project concept to facilitate private
sector involvement for the right to design, build, finance and operate
an upgraded highway for a concession period of at least twenty years.
Halcrow's remit focuses on the feasibility of a PPP scheme to
facilitate Government decisions to proceed with the scheme.
The Due Diligence Study comprises:
 Technical Due Diligence for Capital Expenditure
 Technical Due Diligence for Operational Expenditure
 Traffic and Financial Revenue
 Legal Due Diligence
The existing Al Azraq to Al Omary road is a 48km dual lane single
carriageway highway connecting the Hashemite Kingdom of Jordan
with Kingdom of Saudi Arabia and forms a strategic route connecting
Turkey, Lebanon and Syria with Saudi Arabia and the Gulf region.
12. Preparation of Road Design
Manual in Libya and Manual
on Uniform Traffic Control
Devices
Libya 12 months,
starting in
2010
Project Manager Managing the preparation of Road Design Manual and Manual on
Uniform Traffic Control Devices tailored for the use of Roads &
Bridges Authority in the Republic of Greater Libya and will set a
uniform standards and design criterion to be the guidance for road
design projects and traffic safety appliances in Libya.
9 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
13. Barqish wastewater treatment
plant and lifting stations
Jordan 12 months
starting on
2010
Senior Road Design
Engineer / Contract
Engineer
Design of new wastewater treatment plant at the city of Barqish in the
northern part of Jordan including natural WWTP, access roads, and
infrastructural services.
14. Review of Detailed Design
and Supervision for
Construction of Durres By-
Pass and Vora Interchange
Road
Albania 2009 Team Leader /
Highway Design
Engineer
The Consultancy services under this assignment include the following
components:
1. Review of the existing Detailed Design for Durres By-Pass.
2. Preparation of Detailed Design for approximately 2 km linking
road.
3. Review of Detailed Design of Vora Interchange Project and
fixing, correcting all the available mistakes.
4. Supervision for “Construction of Durres By-Pass and Vora
Interchange Road Project”, with length approximately 5 Km for
Durres By Pass with 4 lines highway with affiliated service
roads, roundabouts, underpasses and 2 km of linking road 4 lines
and Vora Interchange with approximately of 2 km road stretch of
the Durres - Tirana highway, and about 3 km road parallel
network.
These projects will include construction of a new road of Durres By-
pass starting with junctions on the existing Tirane - Durres motorway.
The road will be a dual 2-lane carriageway with two lanes of 2x2x3.75
meters provided plus 2x0.5 meters asphalt shoulder in both directions
and separated by a green stretch 1.8 m width and pedestrian on both
sides 2x1.8 m widths, in addition of two parallel road on each side
with 2x5.5 m width and sidewalks g 2x1.5 m width. On total is a road
with 35.4 m width. In addition will be construction of 4 new
roundabouts, one railway underpass and will be rehabilitation of the 2
km linking road from Durres port to Rash-bull hills.
The Vora Road interchange will include the construction of about 3
km parallel roads of Tirana - Durres motorway, roundabout,
underpass, and improving same parts of the existing motorway.
The project is financed by the Kuwait Fund for Arab Economic
Development (KFAED) and managed by The General Road
Directorate (GRD)/(PIU) of the Ministry of Public Works Transport
and Telecommunication.
11 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
15 Construction of Al Shallalah
Road -Aqaba
Jordan 36 months,
starting on
2009
Highway Design
Engineer / Redesign
for certain sections,
supervision support
and construction
follow up
 Removal of the existing road at project area section and
starting construction the new road.
 Construction of pavement layers, topping, sub-base coarse,
base coarse, cement-treated base coarse, asphalt binder coarse
and asphalt wearing coarse for the roadway, shoulders and
climbing lanes.
 Relocation of (2200m) of Disi water and re-alignment of
railway approximately (880m) construction including
retaining walls, drainage, Earth works, etc
 Constructions of interchange bridges and all necessary
structures. Construction a Valley Bridge. Traffic signals and
lighting…etc.
16. Construction Supervision for
the Execution and
Maintenance of a Separate
Bridge on Ein Al-Basha
Intersection
Jordan 2009 Highway Design
Engineer / Design
Review, Supervision
support and
construction follow up
The project includes Construction Supervision Services for the
Execution and Maintenance of:
1. An Upper Bridge on Amman / Jerash Road,
2. Two service roads.
3. New road connecting the intersection to Baqa'a Camp.
17 Consultancy services for the
Islamic Development Bank
(IDB) to prepare an
Evaluation for the Physical
Progress of Shagon to Zigar
Road Construction Project -
(Phase-II) - from km 19.25
to km 29.00
Tajikistan 2009 Senior Highway
Expert / Project
Evaluator – Advisor to
the IDB
The subject road section, Shagon - Zigar road (Phase-II) from km
19.25 to km 29.00 (34.2 km) is under implementation with more than
80% physical progress.
IDB has appointed CEC for this consultancy services with the main
objectives are to evaluate the physical progress of the construction
(Quality and Quantity) entailing Visit the project site, Interview the
Contractor, Consultant and the Project Implementation Unit (PIU).
Quantity:
- Review the progress of works in light of the project reports
submitted by the contractor and consultant.
- Validate the amount and % of works completed against the
design, Bill of Quantity (BOQ) and contract.
- Estimate the expected date of completion in light of the amount
level of mobilization of the contractor.
11 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
Quality:
- Asses the quality of construction against the project specifications
as per the approved design.
- Estimate the percentage (%) compliance of the completed works
with the technical specifications of the project.
Conclusion and Recommendations
- Technical soundness of the physical progress.
- Reasonable date of the project physical completion,
Eng. Anton Anki has represented CEC in this mission and completed
successfully and has granted a letter of appreciation from the IDB.
18. Construction Supervision of
Muwaqqar Industrial Estate
Jordan 2008 Senior Road Design
Engineer/ Design
Review, Supervision
support and
construction follow up
The project is located 15km to the east of Al-Muwaqqaar towards Al-
Azraq. The works include construction of roads, infrastructure
networks (water, sanitation, electricity, telephone civil works, street
lighting and rain water drainage), land leveling, buildings
(management, offices, and facilities), water reservoirs and a
wastewater treatment plant.
19. Amman Development
Corridor (Ring Road) – Phase
1 – Contract (1) (Design
Review & Supervision)
Jordan 2008 Senior Highway
Engineer / Design
Review, Supervision
Support and
construction follow up
 The project consisted of design review & construction
supervision of dual carriageway with 2*3.65m shoulders, plus
0.50m verge and central median of 4.5 wide with the new-
jerseys barrier. The total roadway width is 26.10m with
minimum right of way of 30m climbing lanes are added where
applicable.
 Construction of a fully directional interchange at the desert
highway road. Construction of full cloverleaf interchanges
between Sahab - Mwaqqar Road.
 Construction of three Diamond interchange between the desert
highway and Sahab-Mwaqqar.
 Relocation, realignment diversion of existing Utilities.
Construction of approximately 40km of service roads on both
sides at Amman Ring-Road, Construction of 3 box girders, five
(5) post-tensional slab overpass, three (3) reinforced concrete
underpass and box culverts.
12 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
20 Light Rail System Project
(LRS) from Amman to Zarqa
- Lenders' Technical Advisor
– Sub - consultancy services
for provision of technical
assistance to Mott
MacDonald– USA
Jordan 2008 Senior Road Design
Engineer
Mott MacDonald was appointed by the International Financial
Corporation on 16 September 2008 to undertake both a Traffic and
Technical Audit of the Jordan Light Rail System between Amman and
Zarqa in the Hashemite Kingdom of Jordan.
Mott MacDonald has appointed CEC for Sub - consultancy services
for provision technical assistance to the said project.
The project aims to provide Light Rail Transport System for
passengers between Amman city (Raghadan CBD) and New Zarqa (in
both directions) utilizing electrical power moving on rail line of 1435
mm width and according to the international specifications.
International investors will be invited to submit proposal to the Client;
Public Transport Regulatory Commission in the form of BOT system
with a return period of 30 years.
The total length of the project is about 25.90km; running between
New Zarqa station at 199 K 850 and Raghadan CBD station at 225 K
600 with the following minimum requirements:
1. Minimum velocity 90 km/hr.
2. Electrical motor supplied by 600 V DC overhead line.
3. Provision of protection works along the Rail R.O.W as well as
safety measures for pedestrians and vehicles.
The alignment of the new rail system will generally follow the
existing track of the Hedjaz Rail between New Zarqa and Mahatta,
while a new track will be proposed by the investor for the section
between Mahatta and Raghadan station given the following two
options:
Option (1): Construct new rail line in the middle of the existing old
road connecting Mahatta to Raghadan; King Abdulla street.
Option (2): Elevated track (Bridge) over Mahattra – Amman road with
an approximate length of 2.5 km.
21 Preparation of Technical
Studies and Designs and
Tender Documents for Al-
Feedan Irrigation Project
Jordan 2007 Senior Road Design
Engineer
The work comprises of the Preparation of Technical Studies, Design
and Tender Documents for Al-Feedan Irrigation Project in order to
utilize the water of 6 wells were drilled in the area. The project
includes:
13 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
 Agricultural roads, Service roads and land use planning
 Submerged pumps for pumping water from the wells
 Transmission Pipelines from wells to the terminal reservoir
 Terminal reservoir
 Irrigation network to irrigate agricultural land.
22 Reconstruction & Repair of
Harbor Infrastructure for 16
Islands
Maldives 2007 Senior Infrastructure
Engineer
Pre-feasibility study for the reconstruction of 16 harbors damaged by
the Tsunami of 2004.
The project entails physical assessment to the damage and needed
protection work and repairs to each harbor with cost estimate.
The Project is financed by the Islamic Development Bank, Saudi Fund
& OPEC Fund.
23 The Gambia Artisanal
Fisheries Development
Project
Gambia 2007 Project Manager -
Road Design Engineer
& Contract Engineer
The Project includes Detailed Design and Supervision in respect of
Banjul Fisheries Jetty, Bakoteh Central Fish Market and
Rehabilitation of the Bintang, Tendaba and Albreda CFCs under the
Gambia Artisanal Fisheries Development Project in Gambia. This
includes road design, jetties, marine works and infrastructure works
related to water and electro-mechanical work.
24 South Amman Waste Water
Collection System
Jordan 2007 Contract Engineer The Project is located within the southern part of greater Amman and
serve 12 different regions with infra- structures (sewerage) facilities.
The work includes the construction of main trunk pipeline that convey
wastewater collected from the collection system in South Amman
regions carry it to the proposed wastewater treatment plant,
wastewater collection system that includes gravity sewer networks,
house connections and manholes.
25 Water Supply Improvement
Project for Singida Township
United
Republic
of
Tanzania
2007 Contract Engineer The work to be performed under this Contract consists of restructuring
water supply system, create new distribution and district zones in
order to achieve a proper level of service in the area and replace the
old tertiary network which comprises mostly of GI pipes, with new
polyethylene pipes and PVC-O pipes.
14 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
26 Supervision of Construction
of Dead Sea Coastal Road -
Sweimeh D2
Jordan 2006 Road Design Engineer
/ Design support as
well as re-design to
sections of the road
The work includes Construction Supervision for the Dead Sea Coastal
Road and construction supervision of side roads attached to the
coastal road.
The work includes road construction, drainage structure such as box
and pipe culverts and storm water facilities and manholes and the
needed protection and traffic safety.
27 Study for Thuba – Taung –
Mokhotlong – Sani Pass
Road, Lesotho (Africa)
having a length of 150Km
Lesotho 12 months
Starting in
2005
Highway Design
Engineer
The road covers an area of about 250,000 populations and it is a very
important road in the Kingdom of Lesotho with 150m long. The
project includes feasibility study.
28 Techno-Economic study and
Detailed Design for Sana’a
Eastern Ring Road consisting
of Tunnel and road of a total
length 40Km
Yemen 2005 Quality Assurance
Engineer
The project consisted of Geotechnical and Site Investigation,
Feasibility Study, Design and Tendering for Sana’a East Ring Road
with a total length of 45 km including connecting roads and tunnel
(With 1500m Length).
The scope of work consisted of:
 Geotechnical and Site Investigation.
 Feasibility Study.
 Design and Tender Documents.
 Traffic and Transport Planning.
 Drainage Facilities.
29 Preparation of Feasibility
Studies and Detailed Design
for Several Rural Roads in
Taiz & Ibb Governorates,
having a total length of
320Km
Yemen 2005 Senior Road Engineer
& Quality Assurance
Engineer
The project is a techno-economic study and detailed engineering
design for the components which consisted of:
 Cumulative Length of 360Km in Ibb & Taiz.
 Full Environment Study (EIA for Each Road)
 Roads Protections Structures (R.Walls, Culvert, Gabions,…)
 Full Techno-economic studies for each road.
 Traffic Studies
 Underpass culvert passing street Intersection.
15 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
B. Ministry of Public Works & Housing (MPWH) – Amman/ Jordan
Employee in the Ministry of Public Works & Housing (MPWH) during the period from June 1985 to June 2005 in many engineering
and managerial positions ( material & quality control engineer, site engineer, head of road studies section, head of road maintenance
sector...etc.) with my last position as Director of Road Maintenance Department / Ministry Secretary General Advisory for Road
Affairs. My role at MPWH involves:
 Setting out road maintenance polices, budget allocation, strategies and plans for road network in Jordan,
 Leadership: leading more than 200 person- staff at home office, maintenance stations, districts and projects and directing them
on work procedures and standards, technical issues and problem solving through meetings, training courses and direct visits,
 Participate in projects tendering processes including approving of tender Documents, tenders evaluations and award of contracts,
 Direct supervision of home projects as well as managing projects supervised by the private sector ,
 Managing Roads & Bridges maintenance activities and projects (entailing Preventive & Routine Maintenance as well as
Rehabilitation & Re - Construction Works) for Jordan road network,
 Participated as task leader for Pavement Management System (PMS) in the Swedish / Jordanian co-operation agreements for
Road Sector Development in Jordan and been able to achieve and implement this system on ground.
 I had also been appointed a member in the Road Fund and Management Committee in Jordan.
 Achieved Road Maintenance Department yearly scheduled plans for maintaining Road Network in Jordan in accordance to
priorities and allocated budget utilizing HDM4,
 Achieved Ministry goals and programs for the improvement and maintenance of road network in Jordan and had introduced
new / advanced technologies such as the use of High Performance Hot Mix Asphalt utilizing Modified Asphalt Binder,
 Carry out the Geometric Design, Contract Documents (Drawing, B.O.Q and Specifications) for road projects in the Central
Region of Jordan,
 Participated as a Material, Quality Control & Research Engineer at MPWH main laboratory in the development of new
technologies, Quality Control System and improved practices in the Road Sector,
 Site Engineer in many Major Road/ Highways Projects as part of MPWH direct supervision for running projects
The details of the undertaken positions at MPWH along with duties are briefed in the following table.
16 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
Employee in the Ministry of Public Works & Housing (MPWH) in the following Positions and duties:
No.
Position Duration
Description / Duties
From To
1 Director of Road Maintenance
Department / Ministry Secretary
General Advisor for Road
Affairs
April,
2004
June,
2005
Setting out Department polices, strategies, planning, tendering and approving Contract
Documents, projects supervision …etc. This involves setting maintenance strategies,
managing roads & Bridges maintenance activities and projects (entailing Preventive &
Routine Maintenance as well as Rehabilitation & Re - Construction Works) for Jordan road
network, listing hereunder some projects of high importance took place on primary roads at
that time:
 Desert road (rehabilitation & Reconstruction 40 Km).
 Amman/Jerash / Irbid Highway
 King’s Road
 Naor/Dead Sea Highway
 Ma’an /Saudi Border road
 Zerka / Mafreq / Syrian Border Highway
 Mafreq/Safawi /Rewashid/ Iraqi Borders Highway
2 Head of Road Maintenance
Section for the Northern and
Southern Parts of Kingdom of
Jordan
February
1997
March
2004
This include the following tasks and projects:
 Road condition evaluation, maintenance prioritization, budget allocation, contract
documents, supervision of work, advising Contractor Claims, Disputes Settlement
…etc.
 Reconstruction & Rehabilitation for sections of Jordan primary & secondary roads
including contract document preparation, follow up…etc.
 Recommend Annual Road Preventive Maintenance Works according to evaluation
results entailing milling & resurfacing, overlays…etc.) for main and secondary roads.
 Preparation of Contract Documents for road projects entailing Design Drawings,
Specifications & B.O.Q's in coordination with Studies Department and related Districts.
Nominating hereunder some of the executed arterial road projects of high importance:
 King’s Road – Primary road # 35
 Mafraq /Safawi – Primary road # 10
 Desert Road – Primary / tertiary road # 15
 Maa’n / Mudawara – primary road # 5
 Jurf Darawiesh /Tafila– primary road #60
17 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
No.
Position Duration
Description / Duties
From To
 Supervise the reconstruction of a major highway project (Amman / Yajouz / Zarqa)
 Pavement Management System (PMS) Task leader in the Jordanian /Swedish
agreements for Road Sector Development Project performed by SWE ROAD
subsidiary to the Swedish National Road (1998 – 2003).
 Committee member for the Foundation of the proposed Road Fund Management in
Jordan.
 Employer (MPWH) Representative in following up & managing the performance of the
Contractor & Consultant in Amman / Yajouz / Zarqa highway project.
3 Head of Road Studies Dept. in
Amman District Public Works
October
1988
January
1997
This Post includes Geometric Design, Drawing and Preparing Contract Documents and
Specifications for road projects in the Central Region of Jordan such as:
 Jubiha/ Yajouz /Tareq Intersection - primary road (6km)
 Madaba (west) / Amman road – secondary road (10km)
 Seyaga/ Al Agouar road – secondary road (30km)
 Sahab rural roads (Manaker / Madouna, Al-Kashafieh, Al-Faissalieh, Zimalat,
Hatemieh,….) around (100) km
 Muwaqer rural roads
 Jizza rural roads (30km)
 Madaba /Theeban/ Mujeb – primary road (sections of 30 km length)
 Others
4 Post-Graduate Student /
Researcher
September
1987
September
1988
M.Sc. in Construction at Loughborough University of Technology - U.K.
Practical training at the Construction Industry Training Board & Rycote Wood College
5. Material and Quality Control
Engineers
July
1985
August
1987
Material, Quality Control & Research Engineer at MPWH main laboratory.
18 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
11.3 Other Relevant Experiences:
 Design support and follow up for Supervision Department for executed and
undergoing projects (international and local projects) entailing carrying out
additional designs, improvements and alterations. Listing some of these
projects such as but not limited to Kark - Al Thanieh High way – Jordan,
Zarqa Balama-Irbid highway – Jordan, Madaba – Jallooul Road – Jordan,
Raqa-Der Al zour highway (150 km) in Syria, Construction Supervision of
the Upgrading from Gravel to Paved (Bituminous) Standard of Musita-
Lumino / Busia – Majanji Road (104 km), Construction of “QUKËS-QAFË
PLLOCË, Section of the Tirana – Korca Road Corridor – Albania, Madaba
Um Al Basateen Road -Um al- Amad interchange development Project …etc.
 Road Designer for many village roads for private sector in Jordan such as Al-
ktiefeh Equestrian village, South Aqaba labour village.
 Preparation of Contract Documents for many projects based on FIDIC 99 -
5TH
edition, considering the financiers conditions and Regulations such as
Regulations league of Arab States (The Arab Bank for Economic
Development in Africa (BADEA), Islamic Development Bank (IDB),
Kuwait Fund for Arab Economic Development (KFAED)) and World Bank
(USAID), European Banks….etc. entailing invitation to tenders,
prequalification of Contractors, instruction to Bidders, Forms, Particular
Conditions, Evaluation of Tenders ( Bids Evaluations)…etc.
 Technical Report Writing: Enrolled in the technical report writing for all road
projects partially or fully including design reports, design review report,
contract documents review reports in addition to the preparation of
addendums to consultancy service agreements, sub-consultancy agreements
with free-lancers, JV agreements, surveying and geotechnical investigation
agreements, Bids Evaluation reports ….etc.
 Technical proposals: participate in the preparation of technical proposal for
roads and infra-structure projects to be submitted by CEC.
C. Additional Tasks:
 Trainer / Lecturer / Tutor:
 Lecturer for CEC staff - Internal short course on Report /Technical
Writing, 2014,
 Participate in the Syrian Second Annual Conference for Road; “Towards
Safe and Sustainable Roads” in a working paper entitled, “Pavement
Maintenance Systems & Management in Jordan” – Damascus, Nov. 2009
 Course Instructor on Contract Documents - FIDIC 99; Red Book, for: The
Libyan Delegate visiting CEC ,2014 (in doors), MIYAHUNA - Ministry of
Water & Irrigation – Jordan - 2012 (in doors) , For Albania Road Directorate
(ARD) - Tirana - 2008, for Ministry of Transportation Syria – Damascus -
June 2005 and internal course for Supervision Department project managers
at CEC.
 Participations / Support Activities at CEC:
 Key leadership member in CEC New Strategic Plan utilizing Balance Score
Card (BSC) as a strategic tool being owner of the initiative for CEC Standard
Specifications and in the implementation of the Project Quality Plan,
19 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
 Key member in CEC Quality Assurance System being a member in the
Governance Committee, Verifier and Reviewer.
 Quality Control & Internal Auditing of CEC procedures, being appointed as
internal auditor to audit the compliance of other departments with CEC
Procedural Manual.
 Contribute to CEC success in obtaining King Abdulla the Second (KAII)
Award for Excellence for the 5Th
time and in the European Foundation for
Quality Management (EFQM) for excellence being a key staff member
through participating in meetings, interviews with award panel and in
conducting awareness sessions to CEC employees. Noting that CEC had
obtained the award of Excellence of His Majesty, King Abdullah the 2nd of
Jordan for four consecutive rounds and recognized for excellence by EFQM
with 3 stars. As well our performance is on line with ISO 9001 procedures
adopted by CEC since 1996 as well as the Balance Score Card for Strategic
Planning cascaded to Roads & Studies Department.
 Develop CEC core values, vision and mission statements.
 Key member in CEC Management committee / team for monitoring
progress and strategic goals, participate in the ongoing CEC periodic
scheduled meetings; monthly progress meetings and strategy monitoring
meetings …etc
D. Courses, Workshops & Conferences:
 Participate in the Jordanian Fourth International Road & Traffic Conference
in title, “Transportation Sector Future Challenges” – University of Jordan,
Amman, 2014.
 Workshop entitled “Improving the Sustainability of Asphalt Roads through
QA/QC, Durability, Recycling, and Surface Texture”, at the University of
Jordan, Amman, 2013.
 Civil 3D Training course at Consulting Engineering Center, 2011.
 Participate in the Syrian Second Annual Conference for Road; “Towards
Safe and Sustainable Roads" in a working paper entitled, “Pavement
Maintenance Systems & Management in Jordan” – Damascus, Nov. 2009.
 Civil 3D Training course at Consulting Engineering Center, 2011.
 Highway Design Using AutoCAD Land Development Desktop 2004, Jordan
Engineering Center - Engineering Training Center – Jordan, November 2007
 Professional FIDIC Training Programme on the Practical Management of
Contract Claims & Resolution of Disputes by EVC Consultant; "Robert
Cochrane", organized by Jordan Engineers Association, Amman- Jordan
(6/7 – 7/7/2007).
 Training Course in title "Executing Strategy with the Balance Scorecard" by
Balance Scorecard Collaborative /Palladium through Euro – Jordanian
action for the development of enterprise, Amman (26/9/2005 – 16/2/2006)
 Claims & Counterclaims course, Jordan Engineers Association -
Engineering Training Center, Amman - Jordan (18/4 – 5/5/2004).
21 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e
 Polymer Modified Asphalt 5TH Annual Conference by the Association of
Modified Asphalt Producers (A.M.A.P), Nashville TN, U.S.A, February
2004.
 Project Management Course" Primavera III", Jordan Engineers Association
- Engineering Training Center, (Dec.2003 – Jan.2004).
 International Computer Driving License (IT, Word, Windows, Internet,
Excel, Access, PowerPoint), 2003.
 Training Course on Asphalt Modifiers produced by ITERCHEMICA,
Bergamo – Italy, December 2002.
 “Higher Management Program”, the Institute of Public Administration,
Amman –Jordan, August – October 2001.
 Highway Design & Management program (HDM 4) course, Performed by
SWE ROAD subsidiary to the Swedish - National Road, June 2001.
 Project Management Training Course by SIDA; "Swedish International
Development Cooperation Agency, Sweden, (August 17 – Sep.18 1998).
 Course in Building knowledge and Expertise Infrastructure Finance by the
Economic Development Institute of the World Bank, Lebanon, 1998.
 Water Network Design Course, Jordan Engineers Association, August 1997.
 Training course in “Using Computer in Project Management”, The Institute
of Public Administration, 1994.
 An advanced course in Reinforced & Pre- stressed Concrete Bridge Design
in the M.P.W.H, 1989.
 A practical training course at the Construction Industry Training Board
(C.I.T.B) and Rycote-Wood College, U.K, 1988.
 ISO training course at Customer Success & Progress, Middle East
(subsidiary of CSP SA) – Beirut – Lebanon 1999.
 Technical Writing for Engineers, Jordan Engineers Association, 1/6-20/6,
1999.
E. Publications:
 Paper in title 'Corrosion of Reinforcement Steel, Jordanian Engineer
magazine, VOL.50, April 1993.
 Paper in title 'Commercial Solid Waste Generation in Amman Area',
Jordanian Engineer Magazine; Vol.44, Sept. 1989.
F. References:
 References and transcript will be supplied upon request.

More Related Content

What's hot

What's hot (19)

Cv nilo clemeno_jr
Cv nilo clemeno_jrCv nilo clemeno_jr
Cv nilo clemeno_jr
 
Wajeeh_CV-2014 (4)
Wajeeh_CV-2014 (4)Wajeeh_CV-2014 (4)
Wajeeh_CV-2014 (4)
 
Jahic Ifeta CV (NKE-J consultant)
Jahic Ifeta CV (NKE-J consultant)Jahic Ifeta CV (NKE-J consultant)
Jahic Ifeta CV (NKE-J consultant)
 
HamedHasanHarati
HamedHasanHaratiHamedHasanHarati
HamedHasanHarati
 
Coordinator Curriculum Development
Coordinator Curriculum DevelopmentCoordinator Curriculum Development
Coordinator Curriculum Development
 
Ys cv jan 2018
Ys cv jan 2018Ys cv jan 2018
Ys cv jan 2018
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
 
C v
C vC v
C v
 
2015 UPDATE CV rev 1
2015 UPDATE CV rev 12015 UPDATE CV rev 1
2015 UPDATE CV rev 1
 
20170210_Clements_Jeffrey_resume (updated)
20170210_Clements_Jeffrey_resume (updated)20170210_Clements_Jeffrey_resume (updated)
20170210_Clements_Jeffrey_resume (updated)
 
Gagnant company limited our operations
Gagnant company limited our operationsGagnant company limited our operations
Gagnant company limited our operations
 
Latest CV
Latest CVLatest CV
Latest CV
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1
 
Greco International-Company Profile
Greco International-Company ProfileGreco International-Company Profile
Greco International-Company Profile
 
Rizwan CV - execution
Rizwan CV - executionRizwan CV - execution
Rizwan CV - execution
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 

Viewers also liked (11)

jamal zain c.v -
jamal zain c.v -jamal zain c.v -
jamal zain c.v -
 
Hosam Hosni Al.docx
Hosam Hosni Al.docxHosam Hosni Al.docx
Hosam Hosni Al.docx
 
Curriculum Vitae QS
Curriculum Vitae QSCurriculum Vitae QS
Curriculum Vitae QS
 
CV.English. omar ababneh (1)
CV.English. omar ababneh (1)CV.English. omar ababneh (1)
CV.English. omar ababneh (1)
 
Naim CV on 19.04.2015
Naim CV on 19.04.2015Naim CV on 19.04.2015
Naim CV on 19.04.2015
 
Sur.C.V 2016-11-2
Sur.C.V 2016-11-2Sur.C.V 2016-11-2
Sur.C.V 2016-11-2
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CV
 
C.V.civil,,,,, m'omena yahya . 2014
C.V.civil,,,,, m'omena yahya . 2014C.V.civil,,,,, m'omena yahya . 2014
C.V.civil,,,,, m'omena yahya . 2014
 
cv civil eng
cv civil engcv civil eng
cv civil eng
 
YS CV Jan 2017
YS CV Jan 2017YS CV Jan 2017
YS CV Jan 2017
 
CV-Jeff Chan 2016
CV-Jeff Chan 2016CV-Jeff Chan 2016
CV-Jeff Chan 2016
 

Similar to Anton CV - Revised - 10- 2016

Similar to Anton CV - Revised - 10- 2016 (20)

Njood Majid Resume
Njood Majid ResumeNjood Majid Resume
Njood Majid Resume
 
falah omoush cv new
falah omoush cv newfalah omoush cv new
falah omoush cv new
 
MOHAMMED BADER_CV
MOHAMMED BADER_CV MOHAMMED BADER_CV
MOHAMMED BADER_CV
 
RAED CV
RAED CVRAED CV
RAED CV
 
CV (Document Controller)
CV (Document Controller)CV (Document Controller)
CV (Document Controller)
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa Tsemtsidis
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
Mohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad MansourCivil Engineer
Mohanad MansourCivil Engineer
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Eng jabir cv..
Eng jabir cv..Eng jabir cv..
Eng jabir cv..
 
thiangthong CV_20160727
thiangthong CV_20160727thiangthong CV_20160727
thiangthong CV_20160727
 
Hafez CV
Hafez CVHafez CV
Hafez CV
 
Fawad cv a
Fawad cv aFawad cv a
Fawad cv a
 
UPDATED RESUME (13)
UPDATED RESUME (13)UPDATED RESUME (13)
UPDATED RESUME (13)
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Humaid Al Sharji SCC_CV
Humaid Al Sharji SCC_CVHumaid Al Sharji SCC_CV
Humaid Al Sharji SCC_CV
 
Brief about self through ppt
Brief about self through pptBrief about self through ppt
Brief about self through ppt
 

Anton CV - Revised - 10- 2016

  • 1. 1 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e Curriculum vitae 1. Family name: Anki 2. First names: Anton Hanna 3. Date of birth: 28-5-1963 4. Marital Status: Married 5. Nationality: Jordanian 6. Education: Institution Degree(s) or Diploma(s) obtained: Loughborough University of Technology U.K, 1988 M.Sc. in Construction University of Jordan Jordan, 1987 M.Sc. in Environmental Engineering University of Jordan Jordan, 1985 B.Sc. in Civil Engineering 7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language Reading Speaking Writing Arabic 1 1 1 English 1 1 1 8. Membership of professional bodies: Jordan Engineers Association British Council Chevening Association 9. Positions: Director of Supervision Department & Director of Roads and Traffic Department 10. Contact Address: P.O Box 811943, Postal Code 11181 Amman-Jordan E-Mail: anton63anki@yahoo.co.uk Tel.: ++ 962 79 5229080
  • 2. 2 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 11.Working Experience: 11.1 Summary Worked at Consulting Engineering Center (CEC) – Sajdi & Partners – Amman/ Jordan from 24 July 2005 till August 2016 as Senior Infrastructure Engineer / Senior Highways Engineer with more than 30 years of experience in Highways, Roads, Bridges & infrastructure projects in Middle East, Africa and Europe possessing high potentials in managing huge projects (in different geographic areas) with wise leadership, team work, strategic planning & close communications with stakeholders. Fields of expertise covers design, construction supervisor and maintenance entailing conducting Feasibility Studies, Highways Geometric Design, Contract Administration, Risk Assessment and Site Supervision of Roads, Transportation Projects, as well as preparation of Tender Documents and preparation of Technical Proposals to many prospect project in the fields of transportation and Infrastructures. My story of success with Consulting Engineering Center (CEC) has contributed significantly to company prosperity, achievement of its strategic objectives / goals; “Double Revenue within 5 years time" for two consecutive rounds (10 years) and to excel and be distinguished in the local and international market; through contribution as a key leadership / top management member in monitoring the strategic plan, progress and projects successful completion to customer’s satisfaction (customers intimacy). During my service at CEC, I had empowered the company to obtain the award of Excellence of His Majesty, King Abdullah the 2nd of Jordan for four consecutive rounds and be recognized for excellence by EFQM with a 3 stars, maintain company performance to be on line with ISO 9001 procedures adopted by CEC since 1996 and through the implementation of theBalance Scorecard for Strategic Planning, cascaded to company departments and branches entailing Supervision, Roads &Traffic Department. In addition to international experience in the United Kingdom as researcher in Construction at Loughborough University of Technology, I had worked worldwide as Team leader / Senior Highway & Infrastructure Engineer including Albania, Gambia, Uganda, Lesotho, Tanzania, Zambia Maldives, Tajikistan, Saudi Arabia, Syria, Libya, and Yemen and in Jordan. Worked in the Ministry of Public Works & Housing (MPWH) in many technical & managerial positions from the year 1985 to 2005 briefed hereunder, with my last position as the Director of Road Maintenance Department / Ministry Secretary General Advisor for Road Affairs. During my service, I had been able to achieve Ministry / Department goals and schedules for the improvement and maintenance of road network in Jordan and had introduced new / advanced technologies to practice such as the use of High Performance Hot Mix Asphalt utilizing Modified Asphalt Binder and develop Pavement Management System (PMS) for setting maintenance policies & strategies and develop priorities for annual maintenance programs using HDM 4 software. In addition, I had been appointed as a Key management member in the Jordanian /Swedish agreements for Road Sector Development Project performed by SWE ROAD subsidiary to the Swedish National Road (1998 – 2003), as well as been appointed a key member in the Committee for the Foundation of the Road Fund Management in Jordan. My contribution towards training and exchange of knowledge as a Instructor on Contract Documents - FIDIC 99; Red Book, Technical Writings …. for different stakeholders (such as Syrian Road Agency staff - Ministry of Transportation Syria – Damascus - June 2005, the Libyan Delegation -2014, MIYAHUNA - Ministry of Water & Irrigation – Jordan, 2012 and for Albania Road Directorate (ARD) - Tirana – 2008), has empowered clients and local staff capabilities to perform their duties more efficiently, as well as participation in many advanced courses, conferences as a speaker and attendee.
  • 3. 3 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 11.2 Professional Experience A. Consulting Engineering Center (CEC) – Sajdi & Partners – Amman/ Jordan (1) March 2016 – Aug. 2016: Director of Supervision Department in the Consulting Engineering Center (CEC) – Sajdi & Partners; one of the leading Consulting Companies in Jordan with 35 years in the market, specialized in infrastructure works in the fields of roads, bridges, water, wastewater, electro-mechanical…etc. and working internationally in 28 countries in Europe, Asia & Africa. My role and duties involves:  Supervise running projects to the satisfaction of Clients and donors (such as league of Arab States, World Bank (USAID), European Banks….etc.) in terms of quality, time (to the highest standards and to the requirements of the Contract Documents),  Leadership: leading more than 100 person- staff at home office and projects ( internal and external) and directing them on work procedures and standards, technical issues and problem solving through meetings, training courses and direct visits,  Monitor Company Strategic Map & goals / objectives as a key member in the Strategy Management Leadership team, and in company accreditation by EFQM as well as in internal and external Audits,  Achieve supervision department strategic goals and had contributed significantly to CEC strategic objective; “Double Revenue within 5 years time"  Maintaining a good relationship and trust with Employers through co-ordination meetings, discussion, presentations and needed support as part of our strategic goal ; “Customer Intimacy”,  Carry out awareness session to supervision staff entailing project's kick off meeting and progress meetings.  Verify survey control works entailing Control Reference Points / Bench Marks (tied to the National Net Work) are undertaken in the early stage of the project and limits of the Right of Way are defined and needed expropriations are undertaken,  Ensure that utilities inventory and proper solutions are undertaken in co-ordination with utilities owners and stakeholders as an important step for work progress and project completion.  Safety work and Measures to ensure traffic safety, workers safety and third party safety,  Contracts administrations and management including management of Contract Claims & Resolution of Disputes with respect to the applicable Conditions of Contract (FIDIC, PPDA or any other Contract Conditions either local or international), advising Client’s and fulfilling contractual requirements,  Managing Staff and ensure compliance to Work Procedures and Standards; this entails appointing and managing supervision staff in the main office, branches and projects staff (working locally and internationally) through the utilization of a well home tailored and designated CEC Quality Procedures and Manuals such as Resident Engineer’s Manual as well as ISO 9001.
  • 4. 4 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e  Quality Control and Quality Assurance of the constructions works, checking, meetings ...etc.  Verify contractor's payments certificates and variation orders,  Verify O & M manuals,  Participate in training programs and transfer of knowledge to Client's staff  Make sure that all defects are completed on time,  Issue projects completion certificates and closing out procedures,  Participate as a key management member in company monthly progress meetings, strategic meetings and project governance committee.  Technical proposals preparation for prospect projects, Recent projects supervised by Supervision Department at CEC includes infrastructure project running in Uganda, Albania, Malawi, Mozambique, Saudi Arabia, Turkey, Palestine, Lesotho, Syria and in Jordan. Works supervised under these Consultancy Services includes (but not limited to the following):  Roads/ /Highways and Bridges Projects,  Road maintenance projects,  Water (net works), Water Tanks and Pumping Station projects,  Wastewater and Treatment Plants Projects,  Structures entailing concrete and steel structures, Drainage Structures (Box and pipe Culverts),  Protection Works entailing Reinforced Concrete & Soil Reinforced Retaining Walls, Gabions, Rip-rap…  Environmental Impact Assessment, monitoring and mitigation. (2) July 2005 – Feb. 2016: Director of Roads & Traffic Department at the Consulting Engineering Center (CEC) – Sajdi & Partners: My role and duties involves:  Conducting Detailed Engineering Design for Roads and Highways (Geometric Design), Feasibility Studies, Design Reviews and Tender Documents to all projects awarded to CEC with high quality that meets Client's satisfaction or exceeds (recommendation letters been awarded for good performance),  Leadership: I had worked as a team leader for many projects, leading more than 100 person- staff at home office and projects ( internal and external) and directing them on work procedures and standards, technical issues and problem solving, through meetings, training courses and direct visits,  Develop the Strategic Plan for Consulting Engineering Center utilizing the Balance Score Card as the new Strategic Tool For Planning and monitor goals / objectives as a key member in the Strategy Management Leadership and Core teams, in addition of being the initiative owner; “Standardize technical and Design” in the internal processes perspective.
  • 5. 5 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e  Achieve Roads & Traffic Department strategic goals and had contributed to the overall strategic objective; "Double Revenue within 5 years time".  Participate in the development of company mission, vision and core values,  Implement company quality procedure manual and company standards successfully as a team leader for new awarded design projects (entailing the preparation of Project Quality Plan) and been able to accomplish these mission successfully with in time and allocated resources,  I had participated as a key member / key role in the management meetings and negotiations for company accreditation by EFQM and for obtaining King Abdulla the Second Award for Excellence (Highest Performance Award for performance in Jordan),  Preparation of Tender Documents entailing the invitation to tenders, conditions, specifications, BoQ, drawings and participate in tender evaluations and client assistance in contractual procedures and award of contracts,  key role in the preparation of Technical Proposals to prospect project (mainly in the fields of transportation and Infrastructures projects taking place in 28 countries in Europe, Asia & Africa) has led to many success stories in winning these projects ,  Representing Clients and donors successfully as a third party consultant in outside missions such as Project Progress evaluation, Forensic Expert ...etc, and been able to solve pending problems and provide precious advice to Clients which was well appreciated.  Engineering support for running project and problem solving for running projects,  Participate as a team leader/ in the Preparation of Road Design Manual and Manual on Uniform Traffic Control Devices for the use of Roads & Bridges Authority in the Republic of Greater Libya.  Participate in training programs and transfer of knowledge to Client's staff and CEC employees as requested,  Participate as a key management member in company monthly progress meetings, strategic meetings and project governance committee. Through the past eleven years, I had worked at CEC on the following projects listed hereunder: No. Project Name Location Duration Position Description 1. Design Review and Construction Supervision of the Upgrading from Gravel to Paved (Bituminous) Standard of Musita- Lumino / Busia – Majanji Road, (104km) Uganda 3 years starting on 2015 Design Review Team Leader / Senior Highway Design Engineer The project road, “Upgrading Lot 4: Musita- Lumino / Busia-Majanji Road (104km)”, from Gravel to Bitumen Surfaced Standard is located in the eastern part of Uganda and is composed of two main sections; Musita - Lumino Road Section (77.13 Km) and Busia - Majanji Road Section (26.874 Km) - Financed by the Government of Uganda and managed by Uganda National Road Authority (UNRA).
  • 6. 6 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 2. Construction of “QUKËS- QAFË PLLOCË, Section of the Tirana – Korca Road Corridor - Albania Albania 3 years starting on 2014 Design Review Team Leader / Senior Highway Design Engineer The project is located in the East-West transport corridor within “Tirana-Elbasan- Qafe Plloca-Korca Road Corridor” (Corridor 8). The road passes through Governor of Elbasan and Governor of Korca where the road terrain encounters rough mountainous areas. The project consists of construction of 33.8 km road section including 16 highly elevated Bridges / Viaducts and a Tunnel in addition to many box culverts, long and high retaining walls as well as other protection works and safety measures. Financed by the Islamic Development Bank (IBD). 3. Rehabilitation and Improvements of Water Supply in 6 Towns Zambia 14 months starting 2014 Contract Engineer Rehabilitation and Improvement of water supply and sanitation systems in 6 Towns of Kasama, Mbala, Mpika, Kawambwa, Mansa and Chililabombwe - Financed by the Arab Bank for Economic Development in Africa (BADEA). 4. New harbour facilities at Obhor, Jeddah Marine structures Saudi Arabia 12 months Starting in 2014 Senior Road Design Engineer / Contract Engineer The Faculty of Maritime Studies at the University of King Abdulaziz, Jeddah - Saudi Arabia has appointed CEC Sadji and Partners as the main and NIRAS as the sub consultant, for the design of new marine facilities in their existing harbour located at Obhor, Jeddah, Saudi Arabia. The project must provide harbour facilities for a 43 m long new ship by modifying the existing harbour facilities in the proper way. 5. Infrastructure Development of two Historical Areas in Saudi Arabia - Uhud Area and Al-Khandeq Area Saudi Arabia 12 months Starting in 2014 Senior Transportation Engineer The project include urban and infrastructure planning and development to the ancient area, Uhud, and linking it to other surrounding religious and historical places entailing use of advanced transport systems such as under-grounds (metro), BRT, on- grade and intersections and interchanges. The work includes the design of central transport stations and underground parking in addition to the geometric design of roads and bridges, all in line the with master plan of the whole area. The project is implement in JV with IMAR of Saudi Arabia – Financed by the government of Saudi Arabia 6. Development and extension of Humus waste water treatment plant Syria 2013 / 2014 Senior Road Design Engineer / Contract Engineer Detailed Design for the extension of the existing waste water treatment plant for the short term and new design for a new future waste water treatment plant for the long term - Financed by the Government of the Republic of Syria.
  • 7. 7 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 7. Consultancy Services for Forensic Expert on the Construction of Likalaneng to Thaba-Tseka Road Project (From Ha Matsooana to Thaba-Tseka) Lesotho 4 months starting in 2013 Forensic Expert – Team leader / Senior Highway Engineer The Objective of this project is to undertake engineering, technical and forensic investigations to determine the real causes of the failure (uplifting of asphalt and flooding) that occurred on Lot 3 of the Likalaneng to Thaba Tseka road in January, 2011. The outcome of these investigations and finding will guide the Client, “The Ministry of Public Works and Transport represented by Road Directorate” on the type of remedial measures to be instituted in order to minimize or preclude future occurrence of failures of similar nature. In addition, the consultant shall furnish also a preliminary cost estimate for the reconstruction at around 15% accuracy based on his findings and analysis. 8. Consultancy services for Construction Supervision for Seventeen Bridges and their Connection Roads Uganda 24 months, starting in 2013 Team Leader / Senior Highway Design Engineer The scope of work entails carrying out general design review verification for Contract Drawings and other related Documents for all the Bridges and Roads to ensure structural adequacy and safety, concluding the Consultant recommendation for all related technical and contractual aspects. The implementation of the project includes civil works and ancillaries for the construction of seventeen bridges to be built in Northern and North Eastern Uganda, in addition to the road connecting each bridge with existing highway. The project is financed by the Islamic Development Bank (IBD) and managed by Ministry of Works and Transport as the Client. 9. The Construction of Tikoe Industrial Estate infrastructure and factory shells Lesotho 18 calendar months, starting in 2013 Senior Road Design Engineer / Contract Engineer The project lies at Tikoe, around 10 km south-east of the center of the capital city, Maseru. The project includes the civil works and ancillaries for the construction of roads and storm water, utilities infrastructure for a total area of 270,000 m² of which a net let-able area of 67,000 m² shall become available for industrial shells construction or for rental. This phase involves construction of around 30,000 m² of industrial shells as part of the 67,000 m² area referred to above and the remaining 37000 m² will remain for lease or further construction of shells as demand and finance become available. – Financed by the the Arab Bank for Economic Development in Africa and managed by Lesotho National Development Corporation (LNDC).
  • 8. 8 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 10. Design of Hael Bridge Saudi Arabia 12 months, starting in 2012 Project Manager/ Senior Road Design Engineer Detailed Design of 700 m bridge with approach roads of 600m length including roundabouts, street lighting, traffic and safety facilities. – Financed by the government of Saudi Arabia and managed by the municipality of Hael in the Kingdom of Saudi Arabia. 11. Consulting Services for AI Azraq to Omary Road- Sub– UK for provision of technical assistance - Due Diligence Study, Financial Review and Projection along with Transaction Report Jordan 6 months, starting in 2011 Senior Highway Engineer Sub-Consultancy Services with Halcrow Group Limited {HGL} to provide technical support to carry out the technical Due Diligence Studies through evaluations of the existing road conditions, traffic studies and analysis and local market appraisal including costing data and information. HGL has been commissioned to undertake Consultancy Services for the Executive Privatization Committee (EPC) to determine the feasibility and approach of a possible Public Private Partnership {PPP} for an upgrade to the existing AI Azraq - AI Omary highway, ultimately defining the highway project concept to facilitate private sector involvement for the right to design, build, finance and operate an upgraded highway for a concession period of at least twenty years. Halcrow's remit focuses on the feasibility of a PPP scheme to facilitate Government decisions to proceed with the scheme. The Due Diligence Study comprises:  Technical Due Diligence for Capital Expenditure  Technical Due Diligence for Operational Expenditure  Traffic and Financial Revenue  Legal Due Diligence The existing Al Azraq to Al Omary road is a 48km dual lane single carriageway highway connecting the Hashemite Kingdom of Jordan with Kingdom of Saudi Arabia and forms a strategic route connecting Turkey, Lebanon and Syria with Saudi Arabia and the Gulf region. 12. Preparation of Road Design Manual in Libya and Manual on Uniform Traffic Control Devices Libya 12 months, starting in 2010 Project Manager Managing the preparation of Road Design Manual and Manual on Uniform Traffic Control Devices tailored for the use of Roads & Bridges Authority in the Republic of Greater Libya and will set a uniform standards and design criterion to be the guidance for road design projects and traffic safety appliances in Libya.
  • 9. 9 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 13. Barqish wastewater treatment plant and lifting stations Jordan 12 months starting on 2010 Senior Road Design Engineer / Contract Engineer Design of new wastewater treatment plant at the city of Barqish in the northern part of Jordan including natural WWTP, access roads, and infrastructural services. 14. Review of Detailed Design and Supervision for Construction of Durres By- Pass and Vora Interchange Road Albania 2009 Team Leader / Highway Design Engineer The Consultancy services under this assignment include the following components: 1. Review of the existing Detailed Design for Durres By-Pass. 2. Preparation of Detailed Design for approximately 2 km linking road. 3. Review of Detailed Design of Vora Interchange Project and fixing, correcting all the available mistakes. 4. Supervision for “Construction of Durres By-Pass and Vora Interchange Road Project”, with length approximately 5 Km for Durres By Pass with 4 lines highway with affiliated service roads, roundabouts, underpasses and 2 km of linking road 4 lines and Vora Interchange with approximately of 2 km road stretch of the Durres - Tirana highway, and about 3 km road parallel network. These projects will include construction of a new road of Durres By- pass starting with junctions on the existing Tirane - Durres motorway. The road will be a dual 2-lane carriageway with two lanes of 2x2x3.75 meters provided plus 2x0.5 meters asphalt shoulder in both directions and separated by a green stretch 1.8 m width and pedestrian on both sides 2x1.8 m widths, in addition of two parallel road on each side with 2x5.5 m width and sidewalks g 2x1.5 m width. On total is a road with 35.4 m width. In addition will be construction of 4 new roundabouts, one railway underpass and will be rehabilitation of the 2 km linking road from Durres port to Rash-bull hills. The Vora Road interchange will include the construction of about 3 km parallel roads of Tirana - Durres motorway, roundabout, underpass, and improving same parts of the existing motorway. The project is financed by the Kuwait Fund for Arab Economic Development (KFAED) and managed by The General Road Directorate (GRD)/(PIU) of the Ministry of Public Works Transport and Telecommunication.
  • 10. 11 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 15 Construction of Al Shallalah Road -Aqaba Jordan 36 months, starting on 2009 Highway Design Engineer / Redesign for certain sections, supervision support and construction follow up  Removal of the existing road at project area section and starting construction the new road.  Construction of pavement layers, topping, sub-base coarse, base coarse, cement-treated base coarse, asphalt binder coarse and asphalt wearing coarse for the roadway, shoulders and climbing lanes.  Relocation of (2200m) of Disi water and re-alignment of railway approximately (880m) construction including retaining walls, drainage, Earth works, etc  Constructions of interchange bridges and all necessary structures. Construction a Valley Bridge. Traffic signals and lighting…etc. 16. Construction Supervision for the Execution and Maintenance of a Separate Bridge on Ein Al-Basha Intersection Jordan 2009 Highway Design Engineer / Design Review, Supervision support and construction follow up The project includes Construction Supervision Services for the Execution and Maintenance of: 1. An Upper Bridge on Amman / Jerash Road, 2. Two service roads. 3. New road connecting the intersection to Baqa'a Camp. 17 Consultancy services for the Islamic Development Bank (IDB) to prepare an Evaluation for the Physical Progress of Shagon to Zigar Road Construction Project - (Phase-II) - from km 19.25 to km 29.00 Tajikistan 2009 Senior Highway Expert / Project Evaluator – Advisor to the IDB The subject road section, Shagon - Zigar road (Phase-II) from km 19.25 to km 29.00 (34.2 km) is under implementation with more than 80% physical progress. IDB has appointed CEC for this consultancy services with the main objectives are to evaluate the physical progress of the construction (Quality and Quantity) entailing Visit the project site, Interview the Contractor, Consultant and the Project Implementation Unit (PIU). Quantity: - Review the progress of works in light of the project reports submitted by the contractor and consultant. - Validate the amount and % of works completed against the design, Bill of Quantity (BOQ) and contract. - Estimate the expected date of completion in light of the amount level of mobilization of the contractor.
  • 11. 11 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e Quality: - Asses the quality of construction against the project specifications as per the approved design. - Estimate the percentage (%) compliance of the completed works with the technical specifications of the project. Conclusion and Recommendations - Technical soundness of the physical progress. - Reasonable date of the project physical completion, Eng. Anton Anki has represented CEC in this mission and completed successfully and has granted a letter of appreciation from the IDB. 18. Construction Supervision of Muwaqqar Industrial Estate Jordan 2008 Senior Road Design Engineer/ Design Review, Supervision support and construction follow up The project is located 15km to the east of Al-Muwaqqaar towards Al- Azraq. The works include construction of roads, infrastructure networks (water, sanitation, electricity, telephone civil works, street lighting and rain water drainage), land leveling, buildings (management, offices, and facilities), water reservoirs and a wastewater treatment plant. 19. Amman Development Corridor (Ring Road) – Phase 1 – Contract (1) (Design Review & Supervision) Jordan 2008 Senior Highway Engineer / Design Review, Supervision Support and construction follow up  The project consisted of design review & construction supervision of dual carriageway with 2*3.65m shoulders, plus 0.50m verge and central median of 4.5 wide with the new- jerseys barrier. The total roadway width is 26.10m with minimum right of way of 30m climbing lanes are added where applicable.  Construction of a fully directional interchange at the desert highway road. Construction of full cloverleaf interchanges between Sahab - Mwaqqar Road.  Construction of three Diamond interchange between the desert highway and Sahab-Mwaqqar.  Relocation, realignment diversion of existing Utilities. Construction of approximately 40km of service roads on both sides at Amman Ring-Road, Construction of 3 box girders, five (5) post-tensional slab overpass, three (3) reinforced concrete underpass and box culverts.
  • 12. 12 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 20 Light Rail System Project (LRS) from Amman to Zarqa - Lenders' Technical Advisor – Sub - consultancy services for provision of technical assistance to Mott MacDonald– USA Jordan 2008 Senior Road Design Engineer Mott MacDonald was appointed by the International Financial Corporation on 16 September 2008 to undertake both a Traffic and Technical Audit of the Jordan Light Rail System between Amman and Zarqa in the Hashemite Kingdom of Jordan. Mott MacDonald has appointed CEC for Sub - consultancy services for provision technical assistance to the said project. The project aims to provide Light Rail Transport System for passengers between Amman city (Raghadan CBD) and New Zarqa (in both directions) utilizing electrical power moving on rail line of 1435 mm width and according to the international specifications. International investors will be invited to submit proposal to the Client; Public Transport Regulatory Commission in the form of BOT system with a return period of 30 years. The total length of the project is about 25.90km; running between New Zarqa station at 199 K 850 and Raghadan CBD station at 225 K 600 with the following minimum requirements: 1. Minimum velocity 90 km/hr. 2. Electrical motor supplied by 600 V DC overhead line. 3. Provision of protection works along the Rail R.O.W as well as safety measures for pedestrians and vehicles. The alignment of the new rail system will generally follow the existing track of the Hedjaz Rail between New Zarqa and Mahatta, while a new track will be proposed by the investor for the section between Mahatta and Raghadan station given the following two options: Option (1): Construct new rail line in the middle of the existing old road connecting Mahatta to Raghadan; King Abdulla street. Option (2): Elevated track (Bridge) over Mahattra – Amman road with an approximate length of 2.5 km. 21 Preparation of Technical Studies and Designs and Tender Documents for Al- Feedan Irrigation Project Jordan 2007 Senior Road Design Engineer The work comprises of the Preparation of Technical Studies, Design and Tender Documents for Al-Feedan Irrigation Project in order to utilize the water of 6 wells were drilled in the area. The project includes:
  • 13. 13 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e  Agricultural roads, Service roads and land use planning  Submerged pumps for pumping water from the wells  Transmission Pipelines from wells to the terminal reservoir  Terminal reservoir  Irrigation network to irrigate agricultural land. 22 Reconstruction & Repair of Harbor Infrastructure for 16 Islands Maldives 2007 Senior Infrastructure Engineer Pre-feasibility study for the reconstruction of 16 harbors damaged by the Tsunami of 2004. The project entails physical assessment to the damage and needed protection work and repairs to each harbor with cost estimate. The Project is financed by the Islamic Development Bank, Saudi Fund & OPEC Fund. 23 The Gambia Artisanal Fisheries Development Project Gambia 2007 Project Manager - Road Design Engineer & Contract Engineer The Project includes Detailed Design and Supervision in respect of Banjul Fisheries Jetty, Bakoteh Central Fish Market and Rehabilitation of the Bintang, Tendaba and Albreda CFCs under the Gambia Artisanal Fisheries Development Project in Gambia. This includes road design, jetties, marine works and infrastructure works related to water and electro-mechanical work. 24 South Amman Waste Water Collection System Jordan 2007 Contract Engineer The Project is located within the southern part of greater Amman and serve 12 different regions with infra- structures (sewerage) facilities. The work includes the construction of main trunk pipeline that convey wastewater collected from the collection system in South Amman regions carry it to the proposed wastewater treatment plant, wastewater collection system that includes gravity sewer networks, house connections and manholes. 25 Water Supply Improvement Project for Singida Township United Republic of Tanzania 2007 Contract Engineer The work to be performed under this Contract consists of restructuring water supply system, create new distribution and district zones in order to achieve a proper level of service in the area and replace the old tertiary network which comprises mostly of GI pipes, with new polyethylene pipes and PVC-O pipes.
  • 14. 14 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 26 Supervision of Construction of Dead Sea Coastal Road - Sweimeh D2 Jordan 2006 Road Design Engineer / Design support as well as re-design to sections of the road The work includes Construction Supervision for the Dead Sea Coastal Road and construction supervision of side roads attached to the coastal road. The work includes road construction, drainage structure such as box and pipe culverts and storm water facilities and manholes and the needed protection and traffic safety. 27 Study for Thuba – Taung – Mokhotlong – Sani Pass Road, Lesotho (Africa) having a length of 150Km Lesotho 12 months Starting in 2005 Highway Design Engineer The road covers an area of about 250,000 populations and it is a very important road in the Kingdom of Lesotho with 150m long. The project includes feasibility study. 28 Techno-Economic study and Detailed Design for Sana’a Eastern Ring Road consisting of Tunnel and road of a total length 40Km Yemen 2005 Quality Assurance Engineer The project consisted of Geotechnical and Site Investigation, Feasibility Study, Design and Tendering for Sana’a East Ring Road with a total length of 45 km including connecting roads and tunnel (With 1500m Length). The scope of work consisted of:  Geotechnical and Site Investigation.  Feasibility Study.  Design and Tender Documents.  Traffic and Transport Planning.  Drainage Facilities. 29 Preparation of Feasibility Studies and Detailed Design for Several Rural Roads in Taiz & Ibb Governorates, having a total length of 320Km Yemen 2005 Senior Road Engineer & Quality Assurance Engineer The project is a techno-economic study and detailed engineering design for the components which consisted of:  Cumulative Length of 360Km in Ibb & Taiz.  Full Environment Study (EIA for Each Road)  Roads Protections Structures (R.Walls, Culvert, Gabions,…)  Full Techno-economic studies for each road.  Traffic Studies  Underpass culvert passing street Intersection.
  • 15. 15 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e B. Ministry of Public Works & Housing (MPWH) – Amman/ Jordan Employee in the Ministry of Public Works & Housing (MPWH) during the period from June 1985 to June 2005 in many engineering and managerial positions ( material & quality control engineer, site engineer, head of road studies section, head of road maintenance sector...etc.) with my last position as Director of Road Maintenance Department / Ministry Secretary General Advisory for Road Affairs. My role at MPWH involves:  Setting out road maintenance polices, budget allocation, strategies and plans for road network in Jordan,  Leadership: leading more than 200 person- staff at home office, maintenance stations, districts and projects and directing them on work procedures and standards, technical issues and problem solving through meetings, training courses and direct visits,  Participate in projects tendering processes including approving of tender Documents, tenders evaluations and award of contracts,  Direct supervision of home projects as well as managing projects supervised by the private sector ,  Managing Roads & Bridges maintenance activities and projects (entailing Preventive & Routine Maintenance as well as Rehabilitation & Re - Construction Works) for Jordan road network,  Participated as task leader for Pavement Management System (PMS) in the Swedish / Jordanian co-operation agreements for Road Sector Development in Jordan and been able to achieve and implement this system on ground.  I had also been appointed a member in the Road Fund and Management Committee in Jordan.  Achieved Road Maintenance Department yearly scheduled plans for maintaining Road Network in Jordan in accordance to priorities and allocated budget utilizing HDM4,  Achieved Ministry goals and programs for the improvement and maintenance of road network in Jordan and had introduced new / advanced technologies such as the use of High Performance Hot Mix Asphalt utilizing Modified Asphalt Binder,  Carry out the Geometric Design, Contract Documents (Drawing, B.O.Q and Specifications) for road projects in the Central Region of Jordan,  Participated as a Material, Quality Control & Research Engineer at MPWH main laboratory in the development of new technologies, Quality Control System and improved practices in the Road Sector,  Site Engineer in many Major Road/ Highways Projects as part of MPWH direct supervision for running projects The details of the undertaken positions at MPWH along with duties are briefed in the following table.
  • 16. 16 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e Employee in the Ministry of Public Works & Housing (MPWH) in the following Positions and duties: No. Position Duration Description / Duties From To 1 Director of Road Maintenance Department / Ministry Secretary General Advisor for Road Affairs April, 2004 June, 2005 Setting out Department polices, strategies, planning, tendering and approving Contract Documents, projects supervision …etc. This involves setting maintenance strategies, managing roads & Bridges maintenance activities and projects (entailing Preventive & Routine Maintenance as well as Rehabilitation & Re - Construction Works) for Jordan road network, listing hereunder some projects of high importance took place on primary roads at that time:  Desert road (rehabilitation & Reconstruction 40 Km).  Amman/Jerash / Irbid Highway  King’s Road  Naor/Dead Sea Highway  Ma’an /Saudi Border road  Zerka / Mafreq / Syrian Border Highway  Mafreq/Safawi /Rewashid/ Iraqi Borders Highway 2 Head of Road Maintenance Section for the Northern and Southern Parts of Kingdom of Jordan February 1997 March 2004 This include the following tasks and projects:  Road condition evaluation, maintenance prioritization, budget allocation, contract documents, supervision of work, advising Contractor Claims, Disputes Settlement …etc.  Reconstruction & Rehabilitation for sections of Jordan primary & secondary roads including contract document preparation, follow up…etc.  Recommend Annual Road Preventive Maintenance Works according to evaluation results entailing milling & resurfacing, overlays…etc.) for main and secondary roads.  Preparation of Contract Documents for road projects entailing Design Drawings, Specifications & B.O.Q's in coordination with Studies Department and related Districts. Nominating hereunder some of the executed arterial road projects of high importance:  King’s Road – Primary road # 35  Mafraq /Safawi – Primary road # 10  Desert Road – Primary / tertiary road # 15  Maa’n / Mudawara – primary road # 5  Jurf Darawiesh /Tafila– primary road #60
  • 17. 17 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e No. Position Duration Description / Duties From To  Supervise the reconstruction of a major highway project (Amman / Yajouz / Zarqa)  Pavement Management System (PMS) Task leader in the Jordanian /Swedish agreements for Road Sector Development Project performed by SWE ROAD subsidiary to the Swedish National Road (1998 – 2003).  Committee member for the Foundation of the proposed Road Fund Management in Jordan.  Employer (MPWH) Representative in following up & managing the performance of the Contractor & Consultant in Amman / Yajouz / Zarqa highway project. 3 Head of Road Studies Dept. in Amman District Public Works October 1988 January 1997 This Post includes Geometric Design, Drawing and Preparing Contract Documents and Specifications for road projects in the Central Region of Jordan such as:  Jubiha/ Yajouz /Tareq Intersection - primary road (6km)  Madaba (west) / Amman road – secondary road (10km)  Seyaga/ Al Agouar road – secondary road (30km)  Sahab rural roads (Manaker / Madouna, Al-Kashafieh, Al-Faissalieh, Zimalat, Hatemieh,….) around (100) km  Muwaqer rural roads  Jizza rural roads (30km)  Madaba /Theeban/ Mujeb – primary road (sections of 30 km length)  Others 4 Post-Graduate Student / Researcher September 1987 September 1988 M.Sc. in Construction at Loughborough University of Technology - U.K. Practical training at the Construction Industry Training Board & Rycote Wood College 5. Material and Quality Control Engineers July 1985 August 1987 Material, Quality Control & Research Engineer at MPWH main laboratory.
  • 18. 18 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e 11.3 Other Relevant Experiences:  Design support and follow up for Supervision Department for executed and undergoing projects (international and local projects) entailing carrying out additional designs, improvements and alterations. Listing some of these projects such as but not limited to Kark - Al Thanieh High way – Jordan, Zarqa Balama-Irbid highway – Jordan, Madaba – Jallooul Road – Jordan, Raqa-Der Al zour highway (150 km) in Syria, Construction Supervision of the Upgrading from Gravel to Paved (Bituminous) Standard of Musita- Lumino / Busia – Majanji Road (104 km), Construction of “QUKËS-QAFË PLLOCË, Section of the Tirana – Korca Road Corridor – Albania, Madaba Um Al Basateen Road -Um al- Amad interchange development Project …etc.  Road Designer for many village roads for private sector in Jordan such as Al- ktiefeh Equestrian village, South Aqaba labour village.  Preparation of Contract Documents for many projects based on FIDIC 99 - 5TH edition, considering the financiers conditions and Regulations such as Regulations league of Arab States (The Arab Bank for Economic Development in Africa (BADEA), Islamic Development Bank (IDB), Kuwait Fund for Arab Economic Development (KFAED)) and World Bank (USAID), European Banks….etc. entailing invitation to tenders, prequalification of Contractors, instruction to Bidders, Forms, Particular Conditions, Evaluation of Tenders ( Bids Evaluations)…etc.  Technical Report Writing: Enrolled in the technical report writing for all road projects partially or fully including design reports, design review report, contract documents review reports in addition to the preparation of addendums to consultancy service agreements, sub-consultancy agreements with free-lancers, JV agreements, surveying and geotechnical investigation agreements, Bids Evaluation reports ….etc.  Technical proposals: participate in the preparation of technical proposal for roads and infra-structure projects to be submitted by CEC. C. Additional Tasks:  Trainer / Lecturer / Tutor:  Lecturer for CEC staff - Internal short course on Report /Technical Writing, 2014,  Participate in the Syrian Second Annual Conference for Road; “Towards Safe and Sustainable Roads” in a working paper entitled, “Pavement Maintenance Systems & Management in Jordan” – Damascus, Nov. 2009  Course Instructor on Contract Documents - FIDIC 99; Red Book, for: The Libyan Delegate visiting CEC ,2014 (in doors), MIYAHUNA - Ministry of Water & Irrigation – Jordan - 2012 (in doors) , For Albania Road Directorate (ARD) - Tirana - 2008, for Ministry of Transportation Syria – Damascus - June 2005 and internal course for Supervision Department project managers at CEC.  Participations / Support Activities at CEC:  Key leadership member in CEC New Strategic Plan utilizing Balance Score Card (BSC) as a strategic tool being owner of the initiative for CEC Standard Specifications and in the implementation of the Project Quality Plan,
  • 19. 19 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e  Key member in CEC Quality Assurance System being a member in the Governance Committee, Verifier and Reviewer.  Quality Control & Internal Auditing of CEC procedures, being appointed as internal auditor to audit the compliance of other departments with CEC Procedural Manual.  Contribute to CEC success in obtaining King Abdulla the Second (KAII) Award for Excellence for the 5Th time and in the European Foundation for Quality Management (EFQM) for excellence being a key staff member through participating in meetings, interviews with award panel and in conducting awareness sessions to CEC employees. Noting that CEC had obtained the award of Excellence of His Majesty, King Abdullah the 2nd of Jordan for four consecutive rounds and recognized for excellence by EFQM with 3 stars. As well our performance is on line with ISO 9001 procedures adopted by CEC since 1996 as well as the Balance Score Card for Strategic Planning cascaded to Roads & Studies Department.  Develop CEC core values, vision and mission statements.  Key member in CEC Management committee / team for monitoring progress and strategic goals, participate in the ongoing CEC periodic scheduled meetings; monthly progress meetings and strategy monitoring meetings …etc D. Courses, Workshops & Conferences:  Participate in the Jordanian Fourth International Road & Traffic Conference in title, “Transportation Sector Future Challenges” – University of Jordan, Amman, 2014.  Workshop entitled “Improving the Sustainability of Asphalt Roads through QA/QC, Durability, Recycling, and Surface Texture”, at the University of Jordan, Amman, 2013.  Civil 3D Training course at Consulting Engineering Center, 2011.  Participate in the Syrian Second Annual Conference for Road; “Towards Safe and Sustainable Roads" in a working paper entitled, “Pavement Maintenance Systems & Management in Jordan” – Damascus, Nov. 2009.  Civil 3D Training course at Consulting Engineering Center, 2011.  Highway Design Using AutoCAD Land Development Desktop 2004, Jordan Engineering Center - Engineering Training Center – Jordan, November 2007  Professional FIDIC Training Programme on the Practical Management of Contract Claims & Resolution of Disputes by EVC Consultant; "Robert Cochrane", organized by Jordan Engineers Association, Amman- Jordan (6/7 – 7/7/2007).  Training Course in title "Executing Strategy with the Balance Scorecard" by Balance Scorecard Collaborative /Palladium through Euro – Jordanian action for the development of enterprise, Amman (26/9/2005 – 16/2/2006)  Claims & Counterclaims course, Jordan Engineers Association - Engineering Training Center, Amman - Jordan (18/4 – 5/5/2004).
  • 20. 21 , Mobile: +962795229080anton63anki@yahoo.co.ukmail :-Contact Address: e  Polymer Modified Asphalt 5TH Annual Conference by the Association of Modified Asphalt Producers (A.M.A.P), Nashville TN, U.S.A, February 2004.  Project Management Course" Primavera III", Jordan Engineers Association - Engineering Training Center, (Dec.2003 – Jan.2004).  International Computer Driving License (IT, Word, Windows, Internet, Excel, Access, PowerPoint), 2003.  Training Course on Asphalt Modifiers produced by ITERCHEMICA, Bergamo – Italy, December 2002.  “Higher Management Program”, the Institute of Public Administration, Amman –Jordan, August – October 2001.  Highway Design & Management program (HDM 4) course, Performed by SWE ROAD subsidiary to the Swedish - National Road, June 2001.  Project Management Training Course by SIDA; "Swedish International Development Cooperation Agency, Sweden, (August 17 – Sep.18 1998).  Course in Building knowledge and Expertise Infrastructure Finance by the Economic Development Institute of the World Bank, Lebanon, 1998.  Water Network Design Course, Jordan Engineers Association, August 1997.  Training course in “Using Computer in Project Management”, The Institute of Public Administration, 1994.  An advanced course in Reinforced & Pre- stressed Concrete Bridge Design in the M.P.W.H, 1989.  A practical training course at the Construction Industry Training Board (C.I.T.B) and Rycote-Wood College, U.K, 1988.  ISO training course at Customer Success & Progress, Middle East (subsidiary of CSP SA) – Beirut – Lebanon 1999.  Technical Writing for Engineers, Jordan Engineers Association, 1/6-20/6, 1999. E. Publications:  Paper in title 'Corrosion of Reinforcement Steel, Jordanian Engineer magazine, VOL.50, April 1993.  Paper in title 'Commercial Solid Waste Generation in Amman Area', Jordanian Engineer Magazine; Vol.44, Sept. 1989. F. References:  References and transcript will be supplied upon request.