• Boring is the process of enlarging pre existing hole.
G85 Description
• Rapid motion to hole position
• Rapid motion to R point
• Feed rate motion to Z depth
• Feed rate motion back to R level
G85 boring cycle
• G85 X...Y…Z…R…F…K…
• Hole position in X & Y axis.
• R = Reference position.
• Z = Final depth.
• F = Feed rate Spec.
• K = No. of Repeats.
G86 and G76 Description
• G86
• After positioning along the X–
and Y–axes, rapid traverse is
performed to point R.
• Drilling is performed from
point R to point Z.
• When the spindle is stopped at
the bottom of the hole, the
tool is retracted in rapid
traverse.
• G76
• When the bottom of the hole
has been reached, the spindle
is stopped at the fixed rotation
position, and the tool is moved
in the direction opposite to the
tool tip and retracted. This
ensures that the machined
surface is not damaged and
enables precise and efficient
boring to be performed.
G86 roughing G76 finishing cycle
• G86 X...Y…Z…R…F…K…
• G76 X...Y…Z…R…P…Q…F…K…
• Hole position in X & Y axis.
• Q = Amount of shift for boring
• R = Reference position.
• Z = Final depth.
• F = Feed rate Spec.
• K = No. of Repeats.
• P = Dwell time
G88 Description
• Rapid motion to hole position
• Rapid motion to R point
• Feed rate motion to Z depth
• Dwell at the depth in milliseconds
• Spindle rotation stops(CNC operator switch to
manual operation mode and perform a manual task
then switch back to prog.)
• Rapid retract to safety position
• Spindle rotation ON
G88 boring cycle
• G88 X...Y…Z…R…P…F…K…
• Hole position in X & Y axis.
• R = Reference position.
• Z = Final depth.
• F = Feed rate Spec.
• K = No. of Repeats.
• P = Dwell time
G89 Description
• Rapid motion to hole position
• Rapid motion to R point
• Feed rate motion to Z depth
• Dwell at the depth in milliseconds
• Feed rate motion back to safety position
G88 boring cycle
• G89 X...Y…Z…R…P…F…K…
• Hole position in X & Y axis.
• R = Reference position.
• Z = Final depth.
• F = Feed rate Spec.
• K = No. of Repeats.
• P = Dwell time
Boring cycle

More Related Content

What's hot

METAL CUTTING
METAL CUTTINGMETAL CUTTING
METAL CUTTING
Kunj Thummar
 
Mechanics of chips formation
Mechanics of chips formationMechanics of chips formation
Mechanics of chips formation
Hashim Hasnain Hadi
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixture
Naman Dave
 
Lathe machine
Lathe machineLathe machine
Lathe machine
Raju D
 
Reaming ppt
 Reaming ppt Reaming ppt
Reaming ppt
Naman Jain
 
Various work holding devices
Various work holding devicesVarious work holding devices
Various work holding devices
Raj Parekh
 
Jigs & Fixtures
Jigs & Fixtures Jigs & Fixtures
Jigs & Fixtures
Susheel Dhale
 
Turning fixtures
Turning  fixturesTurning  fixtures
Turning fixtures
Guhan M
 
Drawing and Extrusion
Drawing and ExtrusionDrawing and Extrusion
Drawing and Extrusion
Akhileshwar Nirala
 
machining operations and machine tools.
machining operations and machine tools.machining operations and machine tools.
machining operations and machine tools.
Mihir Dixit
 
Milling Fixture
Milling FixtureMilling Fixture
Milling Fixture
Amruta Rane
 
Chip formation and types
Chip formation and typesChip formation and types
Chip formation and types
KANNANS94
 
PRESS TOOL OPERATIONS
PRESS TOOL OPERATIONSPRESS TOOL OPERATIONS
PRESS TOOL OPERATIONS
RAKESH VENKATESAN
 
Unit 3A1 Lathe turning and related operations
Unit 3A1 Lathe turning and related operationsUnit 3A1 Lathe turning and related operations
Unit 3A1 Lathe turning and related operations
Mechbytes
 
Drill bushes
Drill bushesDrill bushes
Drill bushes
Amruta Rane
 
Non convention machining process,Advanced Machining Process,Production Techn...
Non  convention machining process,Advanced Machining Process,Production Techn...Non  convention machining process,Advanced Machining Process,Production Techn...
Non convention machining process,Advanced Machining Process,Production Techn...
Prof.Mayur Modi
 
Theory of metal cutting
Theory of metal cuttingTheory of metal cutting
Theory of metal cutting
Sahebrao Deshmukh
 
Uint 2 jigs and fixtures
Uint 2 jigs and fixturesUint 2 jigs and fixtures
Uint 2 jigs and fixtures
S.DHARANI KUMAR
 
Coining process
Coining processCoining process
Coining process
Avinash Navin
 
Theory of metal cutting
Theory of metal cuttingTheory of metal cutting
Theory of metal cutting
Muhammad Muddassir
 

What's hot (20)

METAL CUTTING
METAL CUTTINGMETAL CUTTING
METAL CUTTING
 
Mechanics of chips formation
Mechanics of chips formationMechanics of chips formation
Mechanics of chips formation
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixture
 
Lathe machine
Lathe machineLathe machine
Lathe machine
 
Reaming ppt
 Reaming ppt Reaming ppt
Reaming ppt
 
Various work holding devices
Various work holding devicesVarious work holding devices
Various work holding devices
 
Jigs & Fixtures
Jigs & Fixtures Jigs & Fixtures
Jigs & Fixtures
 
Turning fixtures
Turning  fixturesTurning  fixtures
Turning fixtures
 
Drawing and Extrusion
Drawing and ExtrusionDrawing and Extrusion
Drawing and Extrusion
 
machining operations and machine tools.
machining operations and machine tools.machining operations and machine tools.
machining operations and machine tools.
 
Milling Fixture
Milling FixtureMilling Fixture
Milling Fixture
 
Chip formation and types
Chip formation and typesChip formation and types
Chip formation and types
 
PRESS TOOL OPERATIONS
PRESS TOOL OPERATIONSPRESS TOOL OPERATIONS
PRESS TOOL OPERATIONS
 
Unit 3A1 Lathe turning and related operations
Unit 3A1 Lathe turning and related operationsUnit 3A1 Lathe turning and related operations
Unit 3A1 Lathe turning and related operations
 
Drill bushes
Drill bushesDrill bushes
Drill bushes
 
Non convention machining process,Advanced Machining Process,Production Techn...
Non  convention machining process,Advanced Machining Process,Production Techn...Non  convention machining process,Advanced Machining Process,Production Techn...
Non convention machining process,Advanced Machining Process,Production Techn...
 
Theory of metal cutting
Theory of metal cuttingTheory of metal cutting
Theory of metal cutting
 
Uint 2 jigs and fixtures
Uint 2 jigs and fixturesUint 2 jigs and fixtures
Uint 2 jigs and fixtures
 
Coining process
Coining processCoining process
Coining process
 
Theory of metal cutting
Theory of metal cuttingTheory of metal cutting
Theory of metal cutting
 

Recently uploaded

Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
PIMR BHOPAL
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 

Recently uploaded (20)

Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 

Boring cycle

  • 2. What is boring? • Boring is the process of enlarging pre existing hole.
  • 3. G85 Description • Rapid motion to hole position • Rapid motion to R point • Feed rate motion to Z depth • Feed rate motion back to R level
  • 4. G85 boring cycle • G85 X...Y…Z…R…F…K… • Hole position in X & Y axis. • R = Reference position. • Z = Final depth. • F = Feed rate Spec. • K = No. of Repeats.
  • 5. G86 and G76 Description • G86 • After positioning along the X– and Y–axes, rapid traverse is performed to point R. • Drilling is performed from point R to point Z. • When the spindle is stopped at the bottom of the hole, the tool is retracted in rapid traverse. • G76 • When the bottom of the hole has been reached, the spindle is stopped at the fixed rotation position, and the tool is moved in the direction opposite to the tool tip and retracted. This ensures that the machined surface is not damaged and enables precise and efficient boring to be performed.
  • 6. G86 roughing G76 finishing cycle • G86 X...Y…Z…R…F…K… • G76 X...Y…Z…R…P…Q…F…K… • Hole position in X & Y axis. • Q = Amount of shift for boring • R = Reference position. • Z = Final depth. • F = Feed rate Spec. • K = No. of Repeats. • P = Dwell time
  • 7. G88 Description • Rapid motion to hole position • Rapid motion to R point • Feed rate motion to Z depth • Dwell at the depth in milliseconds • Spindle rotation stops(CNC operator switch to manual operation mode and perform a manual task then switch back to prog.) • Rapid retract to safety position • Spindle rotation ON
  • 8. G88 boring cycle • G88 X...Y…Z…R…P…F…K… • Hole position in X & Y axis. • R = Reference position. • Z = Final depth. • F = Feed rate Spec. • K = No. of Repeats. • P = Dwell time
  • 9. G89 Description • Rapid motion to hole position • Rapid motion to R point • Feed rate motion to Z depth • Dwell at the depth in milliseconds • Feed rate motion back to safety position
  • 10. G88 boring cycle • G89 X...Y…Z…R…P…F…K… • Hole position in X & Y axis. • R = Reference position. • Z = Final depth. • F = Feed rate Spec. • K = No. of Repeats. • P = Dwell time