How to Create a Timeline for Digital Transformation
EVERY JOURNEY NEEDS
A NAVIGATOR AND A DRIVER
D
igital transformation is like any journey: before
you begin, there has to be a plan. You need a
timeline mapping out what happens when, who
does what, and the key milestones. Crucially, a timeline
must identify the crunch points when you think things
could become difficult. Knowing where the pain points
are likely to be in advance allows you to allocate the
additional time or resource needed to push through
them and prevent the whole project from stalling.
What’s more, the timeline must acknowledge that those
crunch points are going to happen for different people
at different times.
For most, business leaders are the navigators. They
decide where to go and how to get there. Before setting
out, they have to plan a route that avoids hazards and
blocks. They usually provide some direction along
the way, especially if things take an unexpected detour.
IT leaders are the drivers. They are the ones in control
of the actual journey, going in the strategic direction
planned by the business. They are the ones that make
sure you get to where you’re going.
Each has their own unique pressures and will work to
different timelines. Yet transformation is never a simple,
single speed journey.
Some of it will be steady cruising. Some of it will
be a slow crawl. But to reach their destination, both
parties have to perfectly synthesize strategy and
implementation.
The key to this is looking at the digital transformation
timelines of the business leader and the IT leader.
By finding where pressure points occur and devising
solutions to overcome them, the organization as a whole
can get to its destination on time.
The secret to a successful digital
transformation is truly effective
collaboration between business
leaders and IT leaders.
image
3bizagi.com
How to Create a Timeline for Digital Transformation
THE TIMELINE FOR
DIGITAL TRANSFORMATION
Visualizing the most common pressure points on the digital transformation journey.
Strategy ScalabilityResistance
87% 70% 82%
What is your vision for the
future of the business and
where will you start?
Badly managed innovation initiatives,
without proper IT involvement, can't
scale as required - so progress stalls
believe digital transformation is
currently a significant strategic
challenge for their business*
agree that efforts to transform the
business externally are undermined
by the internal complexity of the
organisation*
agree that business agility is critical to
delivering the transformation that will
improve the customer experience*
Change can lead to short term
disruption, so people often
create barriers
Business leader
IT leader
Pace InnovationTechnology
73% 63% 81%
Board expectations are a world
away from the actual time
required for the development
and testing of new solutions
With an increasingly rapid pace of
change, it is a challenge to build the
teams with the right skills for agile
and rapid experimentation
agree that digital transformation
requires a rapid response to avoid
commercial failure*
feel the business neglects the depth of
systems change needed when trying to
build engaging services*
agree that the pace of change in their
industry is increasing due to shifts
in customer expectation around
innovation, service and delivery*
Entrenched legacy systems are
rigid and not built for change -
making innovation problematic
*Source: The Agility Trap Report, Bizagi
4bizagi.com
How to Create a Timeline for Digital Transformation
T
he digital transformation journey
starts for business leaders long
before most of their colleagues. In
fact, in the initial stages, they’re the ones
who will pull together the strategy for how
it’s all going to be accomplished. And it’s
down to them to decide how to use new
technology to put the customer at the
heart of what the organization does.
However, getting started can sometimes
be the hardest part. Which is why the
business leader is often confronted with
some of the biggest challenges. Like…
Strategy: Coming up with a plan
When tasked with making a radical
change, it can be a real headache to
figure out how and where to begin.
There’s an urge to start straight away
on disparate pilot programs, risking a
lack of control and scalability. The other
option is to meticulously craft the perfect
transformation plan, but by then months
could have passed with no results to	
show for it.
Digital transformation will be a long
and complicated journey. So having a
strategy with a clear end-goal is an
obvious pre-requisite. But building
regular, manageable milestones into
that plan can be harder than it seems.
Resistance: Winning
hearts and minds
The first reaction to change is resistance.
Very few teams or departments will be
doing a celebratory dance when you
announce your digital transformation
initiative. Some people will consider it
a nice-to-have – shiny and cool but
not essential. Others will see it as
another bright idea cooked up by senior
management to make their jobs
more complicated.
A minority will stubbornly cling to the
things they’re doing right now and refuse
to change. The business leader will need
to convince them all that transformation
is crucial to survival, and that they all
have a significant role to play in making
it happen.
Scalability: Finding a
repeatable solution
It’s usually a good approach to start
small and then go big. But this comes
with its own set of challenges. It’s
one thing to successfully execute a
trial transformation initiative in one
small team. It’s quite another to roll
that change out across the whole
organization, to all its core systems
and critical processes.
The business leader needs to make
sure that the chosen solutions scale to
the entire business without disrupting
operations or compromising the
customer experience. Not only that,
it’s their responsibility to make sure it
has the right governance and there’s a
seasoned team in place to execute plans.
THE BUSINESS LEADER’S PRESSURE POINTS
5bizagi.com
How to Create a Timeline for Digital Transformation
Pace: The board wants
everything now
Once it’s time to roll out digital change,
the pressure to get it done is intense.
The board wants to see results quickly.
But IT leaders task of delivering rapid
pace of change is hamstrung by siloed,
rigid legacy systems. Usually this clunky
tech isn’t built to facilitate rapid change,
so a rethink of IT’s architectural blueprint
is often required to encourage agility.
It’s incredibly easy for IT to become
tied up by ever-growing business
requirements with tight timelines and
endless unforeseen complications to
solve. When this happens the end result
is a complete lack of progress and
execution, perpetuating strain on
the IT-business relationship.
I
t’s at this transitional moment that the
IT Leader becomes much more heavily
involved in the digital transformation
journey. They will have been involved in
implementing some trial programs, but
once it’s time to roll it out to the rest
of the organization, they need to start
concentrating on the road ahead. The
change to the business has been defined,
now it’s time to make it happen.
Implementation is just as important to
success as strategy, but it comes with
a set of pressures. Like…
Technology: Legacy			
systems streamlined
A lot of the tech that companies use is
outdated, inflexible and so isolated that
the right hand doesn’t even know that
there is a left hand, let alone what it’s
doing. The challenge for IT is that they
now have to streamline these business
systems to better serve customers,
but they don’t have the tools to
connect them.
Scalability is a pain point for IT leaders
too, especially during the transition
from strategy to implementation. The
risk of problems occurring multiplies
exponentially as the business moves
from small experiments to large-scale
execution.
Innovation: Creating a culture
of continuous improvement
Digital transformation is a lifestyle,
not a diet. There is no end date, and
specific goals will change over time. This
means that IT leaders must break free
from traditional thinking and forego
outdated development methods that are
incompatible with rapid experimentation.
The right technology will help kick-start
this cultural change. Agile technology
platforms can bring new, innovative
products and services to market much
more quickly, easily and cheaply.
Now that we’ve outlined the main
pressure points facing IT leaders
and business leaders on the
transformation journey, we can start
to think about how to resolve them…
THE IT LEADER’S PRESSURE POINTS
6bizagi.com
How to Create a Timeline for Digital Transformation
Coming up with a plan
Quick Wins: Devise a transformation plan that builds
momentum through a series of incremental quick wins.
These mini-milestones guarantee that things keep
moving and there are frequent results to share with the
board. It reassures them that theory is becoming reality.
Winning hearts and minds
Get Buy-In: Share the vision for digital transformation
with department heads and get their buy-in. Show
them the role they have to play and how their input will
contribute to the wider business. This has to come from
the top; if senior managers evangelize the change, it will
trickle down to all levels of the organization.
Finding a repeatable solution
Leverage Platforms: Businesses need a new kind of
technology to remain competitive in a digital world –
a technology based on a platform, not on products, and
one that can connect people, devices, data and things to
bring agility into how a business operates.
HOW BUSINESS LEADERS
CAN EASE THE PRESSURE
7bizagi.com
How to Create a Timeline for Digital Transformation
The board wants everything now
Think lean: Look at light technologies that drive
change and avoid large-scale implementations. Your
goal should be to build momentum by rapidly delivering
results (however small) through minimum viable product
(MVP) projects. It should follow a cycle of experiment,
optimize and iterate. But this requires all stakeholders
to understand that the “time to digital” is different from
usual delivery timelines.
Legacy systems need to be streamlined
Add an agile layer: Enhance your existing systems
rather than replacing them. A Digital Business
Platform can bring disconnected systems together and
consolidate fragmented data. It’s about empowering
employees with connected systems and information.
Delivering this information to employees at the right
time is the way to create a superior customer experience
that will generate competitive advantage.
Creating a culture of continuous improvement
Experiment and iterate: Say goodbye to traditional
requirements documents. Be a champion of agile
experimentation, empowered by model-driven
development technologies that drastically reduce the
time to market of new solutions. Such technologies
enable you to collaborate directly with the business
when creating solutions - in an environment where
you retain ultimate control.
HOW IT LEADERS CAN
EASE THE PRESSURE
8bizagi.com
How to Create a Timeline for Digital Transformation
1
Agile - Quickly develop and
adopt new operating models that
create competitive advantage.
2
Engaging - Use data, content
and context intelligently across
the moments that define the
customer experience.
3
Connected - Seamlessly
orchestrate people, processes,
applications and “things” on
a global scale.
Business leaders and IT leaders face different timelines
when it comes to turning digital transformation strategy
into reality. As part of those distinct timelines, there
are a range of challenges they need to overcome and a
range of activities they need to get right to deliver rapid,
repeatable change for their businesses.
What we’ve outlined here is a set of simple, practical
approaches that can help these two key players create
real change. But whichever you relate to the most,
you should be looking for solutions that can help the
business to be more:
THE NEXT STEPS TO DRIVING
THE BUSINESS FORWARD
Delivering all three will mean IT and business leaders are steering their businesses in the right
direction. But achieving any of this is going to be an uphill battle unless you improve improve
the relationship between IT and the business.
Below you’ll find information about just a few of the organizations that
have seen huge benefits from using these strategies outlined above
SUCCESS STORIES YOU
CAN LEARN FROM
9bizagi.com
How to Create a Timeline for Digital Transformation
Below you’ll find information about just a few of the organizations that
have seen huge benefits from using these strategies outlined above
SUCCESS STORIES YOU
CAN LEARN FROM
An innovative team automated a complex
global supply chain across 500 sales
operations and 400 factories, leading to
a 60% reduction in operating costs.
Learn more Learn more Learn more
CTO Morgan Porter championed agile
experimentation, automating the organization’s
most critical process in just 90 days, leading
to a 21% increase in customers.
This retail banking and insurance provider
connected the organization’s disparate
systems and data, leading to a significant
reduction in customer waiting times.
10bizagi.com
How to Create a Timeline for Digital Transformation
Discover how specific approaches and technologies can help you
in overcoming the challenges we've discussed in this e-book
go to bizagi.com/Kick-Start go to bizagi.com/DBP
WHAT NEXT?
10bizagi.com
For Business Leaders
Read 'How to Kick-Start Your
Digital Transformation'
Read 'What is a Digital
Business Platform?'
For IT Leaders

Bizagi how create timeline for digital transformation

  • 1.
    How to Createa Timeline for Digital Transformation Planning for the pain points you'll experience on your transformation journey
  • 2.
    2bizagi.com How to Createa Timeline for Digital Transformation EVERY JOURNEY NEEDS A NAVIGATOR AND A DRIVER D igital transformation is like any journey: before you begin, there has to be a plan. You need a timeline mapping out what happens when, who does what, and the key milestones. Crucially, a timeline must identify the crunch points when you think things could become difficult. Knowing where the pain points are likely to be in advance allows you to allocate the additional time or resource needed to push through them and prevent the whole project from stalling. What’s more, the timeline must acknowledge that those crunch points are going to happen for different people at different times. For most, business leaders are the navigators. They decide where to go and how to get there. Before setting out, they have to plan a route that avoids hazards and blocks. They usually provide some direction along the way, especially if things take an unexpected detour. IT leaders are the drivers. They are the ones in control of the actual journey, going in the strategic direction planned by the business. They are the ones that make sure you get to where you’re going. Each has their own unique pressures and will work to different timelines. Yet transformation is never a simple, single speed journey. Some of it will be steady cruising. Some of it will be a slow crawl. But to reach their destination, both parties have to perfectly synthesize strategy and implementation. The key to this is looking at the digital transformation timelines of the business leader and the IT leader. By finding where pressure points occur and devising solutions to overcome them, the organization as a whole can get to its destination on time. The secret to a successful digital transformation is truly effective collaboration between business leaders and IT leaders. image
  • 3.
    3bizagi.com How to Createa Timeline for Digital Transformation THE TIMELINE FOR DIGITAL TRANSFORMATION Visualizing the most common pressure points on the digital transformation journey. Strategy ScalabilityResistance 87% 70% 82% What is your vision for the future of the business and where will you start? Badly managed innovation initiatives, without proper IT involvement, can't scale as required - so progress stalls believe digital transformation is currently a significant strategic challenge for their business* agree that efforts to transform the business externally are undermined by the internal complexity of the organisation* agree that business agility is critical to delivering the transformation that will improve the customer experience* Change can lead to short term disruption, so people often create barriers Business leader IT leader Pace InnovationTechnology 73% 63% 81% Board expectations are a world away from the actual time required for the development and testing of new solutions With an increasingly rapid pace of change, it is a challenge to build the teams with the right skills for agile and rapid experimentation agree that digital transformation requires a rapid response to avoid commercial failure* feel the business neglects the depth of systems change needed when trying to build engaging services* agree that the pace of change in their industry is increasing due to shifts in customer expectation around innovation, service and delivery* Entrenched legacy systems are rigid and not built for change - making innovation problematic *Source: The Agility Trap Report, Bizagi
  • 4.
    4bizagi.com How to Createa Timeline for Digital Transformation T he digital transformation journey starts for business leaders long before most of their colleagues. In fact, in the initial stages, they’re the ones who will pull together the strategy for how it’s all going to be accomplished. And it’s down to them to decide how to use new technology to put the customer at the heart of what the organization does. However, getting started can sometimes be the hardest part. Which is why the business leader is often confronted with some of the biggest challenges. Like… Strategy: Coming up with a plan When tasked with making a radical change, it can be a real headache to figure out how and where to begin. There’s an urge to start straight away on disparate pilot programs, risking a lack of control and scalability. The other option is to meticulously craft the perfect transformation plan, but by then months could have passed with no results to show for it. Digital transformation will be a long and complicated journey. So having a strategy with a clear end-goal is an obvious pre-requisite. But building regular, manageable milestones into that plan can be harder than it seems. Resistance: Winning hearts and minds The first reaction to change is resistance. Very few teams or departments will be doing a celebratory dance when you announce your digital transformation initiative. Some people will consider it a nice-to-have – shiny and cool but not essential. Others will see it as another bright idea cooked up by senior management to make their jobs more complicated. A minority will stubbornly cling to the things they’re doing right now and refuse to change. The business leader will need to convince them all that transformation is crucial to survival, and that they all have a significant role to play in making it happen. Scalability: Finding a repeatable solution It’s usually a good approach to start small and then go big. But this comes with its own set of challenges. It’s one thing to successfully execute a trial transformation initiative in one small team. It’s quite another to roll that change out across the whole organization, to all its core systems and critical processes. The business leader needs to make sure that the chosen solutions scale to the entire business without disrupting operations or compromising the customer experience. Not only that, it’s their responsibility to make sure it has the right governance and there’s a seasoned team in place to execute plans. THE BUSINESS LEADER’S PRESSURE POINTS
  • 5.
    5bizagi.com How to Createa Timeline for Digital Transformation Pace: The board wants everything now Once it’s time to roll out digital change, the pressure to get it done is intense. The board wants to see results quickly. But IT leaders task of delivering rapid pace of change is hamstrung by siloed, rigid legacy systems. Usually this clunky tech isn’t built to facilitate rapid change, so a rethink of IT’s architectural blueprint is often required to encourage agility. It’s incredibly easy for IT to become tied up by ever-growing business requirements with tight timelines and endless unforeseen complications to solve. When this happens the end result is a complete lack of progress and execution, perpetuating strain on the IT-business relationship. I t’s at this transitional moment that the IT Leader becomes much more heavily involved in the digital transformation journey. They will have been involved in implementing some trial programs, but once it’s time to roll it out to the rest of the organization, they need to start concentrating on the road ahead. The change to the business has been defined, now it’s time to make it happen. Implementation is just as important to success as strategy, but it comes with a set of pressures. Like… Technology: Legacy systems streamlined A lot of the tech that companies use is outdated, inflexible and so isolated that the right hand doesn’t even know that there is a left hand, let alone what it’s doing. The challenge for IT is that they now have to streamline these business systems to better serve customers, but they don’t have the tools to connect them. Scalability is a pain point for IT leaders too, especially during the transition from strategy to implementation. The risk of problems occurring multiplies exponentially as the business moves from small experiments to large-scale execution. Innovation: Creating a culture of continuous improvement Digital transformation is a lifestyle, not a diet. There is no end date, and specific goals will change over time. This means that IT leaders must break free from traditional thinking and forego outdated development methods that are incompatible with rapid experimentation. The right technology will help kick-start this cultural change. Agile technology platforms can bring new, innovative products and services to market much more quickly, easily and cheaply. Now that we’ve outlined the main pressure points facing IT leaders and business leaders on the transformation journey, we can start to think about how to resolve them… THE IT LEADER’S PRESSURE POINTS
  • 6.
    6bizagi.com How to Createa Timeline for Digital Transformation Coming up with a plan Quick Wins: Devise a transformation plan that builds momentum through a series of incremental quick wins. These mini-milestones guarantee that things keep moving and there are frequent results to share with the board. It reassures them that theory is becoming reality. Winning hearts and minds Get Buy-In: Share the vision for digital transformation with department heads and get their buy-in. Show them the role they have to play and how their input will contribute to the wider business. This has to come from the top; if senior managers evangelize the change, it will trickle down to all levels of the organization. Finding a repeatable solution Leverage Platforms: Businesses need a new kind of technology to remain competitive in a digital world – a technology based on a platform, not on products, and one that can connect people, devices, data and things to bring agility into how a business operates. HOW BUSINESS LEADERS CAN EASE THE PRESSURE
  • 7.
    7bizagi.com How to Createa Timeline for Digital Transformation The board wants everything now Think lean: Look at light technologies that drive change and avoid large-scale implementations. Your goal should be to build momentum by rapidly delivering results (however small) through minimum viable product (MVP) projects. It should follow a cycle of experiment, optimize and iterate. But this requires all stakeholders to understand that the “time to digital” is different from usual delivery timelines. Legacy systems need to be streamlined Add an agile layer: Enhance your existing systems rather than replacing them. A Digital Business Platform can bring disconnected systems together and consolidate fragmented data. It’s about empowering employees with connected systems and information. Delivering this information to employees at the right time is the way to create a superior customer experience that will generate competitive advantage. Creating a culture of continuous improvement Experiment and iterate: Say goodbye to traditional requirements documents. Be a champion of agile experimentation, empowered by model-driven development technologies that drastically reduce the time to market of new solutions. Such technologies enable you to collaborate directly with the business when creating solutions - in an environment where you retain ultimate control. HOW IT LEADERS CAN EASE THE PRESSURE
  • 8.
    8bizagi.com How to Createa Timeline for Digital Transformation 1 Agile - Quickly develop and adopt new operating models that create competitive advantage. 2 Engaging - Use data, content and context intelligently across the moments that define the customer experience. 3 Connected - Seamlessly orchestrate people, processes, applications and “things” on a global scale. Business leaders and IT leaders face different timelines when it comes to turning digital transformation strategy into reality. As part of those distinct timelines, there are a range of challenges they need to overcome and a range of activities they need to get right to deliver rapid, repeatable change for their businesses. What we’ve outlined here is a set of simple, practical approaches that can help these two key players create real change. But whichever you relate to the most, you should be looking for solutions that can help the business to be more: THE NEXT STEPS TO DRIVING THE BUSINESS FORWARD Delivering all three will mean IT and business leaders are steering their businesses in the right direction. But achieving any of this is going to be an uphill battle unless you improve improve the relationship between IT and the business.
  • 9.
    Below you’ll findinformation about just a few of the organizations that have seen huge benefits from using these strategies outlined above SUCCESS STORIES YOU CAN LEARN FROM 9bizagi.com How to Create a Timeline for Digital Transformation Below you’ll find information about just a few of the organizations that have seen huge benefits from using these strategies outlined above SUCCESS STORIES YOU CAN LEARN FROM An innovative team automated a complex global supply chain across 500 sales operations and 400 factories, leading to a 60% reduction in operating costs. Learn more Learn more Learn more CTO Morgan Porter championed agile experimentation, automating the organization’s most critical process in just 90 days, leading to a 21% increase in customers. This retail banking and insurance provider connected the organization’s disparate systems and data, leading to a significant reduction in customer waiting times.
  • 10.
    10bizagi.com How to Createa Timeline for Digital Transformation Discover how specific approaches and technologies can help you in overcoming the challenges we've discussed in this e-book go to bizagi.com/Kick-Start go to bizagi.com/DBP WHAT NEXT? 10bizagi.com For Business Leaders Read 'How to Kick-Start Your Digital Transformation' Read 'What is a Digital Business Platform?' For IT Leaders