SlideShare a Scribd company logo
1 of 4
Unrestricted Page 1 of 4
DATTATRAY BRAHMANE
Mobile: +91 9922352228 ~ E-Mail: dattatray_brahmane@yahoo.co.in
Job Objective: To be associated with professionally managed company which can provide me
with a practical knowledge & dynamic work sphere to extract my inherent skills as a
Professional, use and develop my aptitude to gain managing skills & perfection.
PROFESSIONAL PROFILE
 Diploma in Civil Engineering with nearly 15 years experience in site & construction
management, coordination and team management.
 Currently functioning with Ahuja Group as Asst.Manager Projects.
 Holds the distinction of managing diverse projects for construction of high-rise residential
towers.
 Expertise in preparing standardized schedules for a finishing as well as RCC project
involving quantification of the construction materials & labour activities.
 Strong relationship management, communication skills with the ability to network with
project members, consultants and contractors with consummate ease.
ESSENTIAL FUNCTION & KEY RESPONSIBILITIES.
 Assist PM to manage project development from beginning to end. Time bound execution &
management of project.
 Supervise & manage direct and contract workers.
 Control quality, cost, time & funds.
 Provide progress reports and assist Project Manager in execution
 Site health & safety. Time bound execution.
 Contracts adherence andcompliance.
 Coordinate with suppliers and agencies for timely material supplies.
 Take responsibilityin absence of projectmanagerGenerate MISformanagementonprojectstatus
Enforce operatingdisciplineonsite Safety
ORGANIZATIONAL EXPERIENCE
From August 2014 to Nov.2015 with Runwal Group of Companies, Mulund (W).
Project: Runwal Greens
Role: Senior Engineer
Responsibilities:
 Co-ordination between different agencies to ensure smooth working of the site.
 Control of wastage of construction material.
 Arrange the next day’s work in advance and ensure procurement of material at the site.
 Discuss the practical problem faced during execution with P.M. and find a suitable solution.
 Work out the quantities of each item of work.
 Prepare requirements of material.
 Prepare rate analysis of various items.
 Check daily site progress.
 Prepare necessary R.A. & final bills as per the work stage.
 Check any rectification of structural and finishing work.
 Communicate all necessary information from the senior staff to the junior staff.
 Get the maximum output from the junior staff and labours.
 Address changes suggested by customer.
Unrestricted Page 2 of 4
From April’2010 to August’2014 with Lodha Group of Companies.
Project: Casabella phase -1 (Stilt + 19 storey residential project)
Role: Site Engineer
Responsibilities:
 Technical supervision of the ongoing work.
 Co-ordination between different contractors and agencies to maintain the project speed at
the construction site.
 Control of wastage of construction material.
 Work out the requirements of different materials for construction.
 Prepare indents for different materials on SAP.
 Preparing quality report after quality check of received material.
 Communicate necessary instruction to supervisor and departmental labours.
 Prepare and submit monthly consumption reports, daily progress reports etc. with proper
assistance from storekeeper and supervisor
 Preparation of different contractor bills.
 Discuss technical problems / drawing and execution difficulties with the sector engineer.
Achievements:
 Successfully completed Stilt +19 storey residential towers from excavation to hand over to
customer. (Both RCC as well as finishing) area -1 lakh 35 thousand Sq. ft.
 Competed building services work like plumbing, fire fighting, electrical.
 Successfully completed U.G. tank with complete services including installation of pumps,
electrical and services. (Capacity -3,75,000 litre.)
From Feb’2005 to Feb’2010 with Nirmal Lifestyles Ltd. (Mulund) Mumbai.
Project: 1) Stilt + 2 numbers of 19 storey residential towers.
2) 4 level Podium + two numbers of 21 storey residential towers.
Role: Site Engineer
Responsibilities:
 Technical supervision of the ongoing work.
 Co-ordination between different contractors and agencies to maintain the project speed at
the construction site.
 Control of wastage of construction material.
 Work out the requirements of different materials for construction.
 Prepare indents for different materials on SAP.
 Preparing quality report after quality check of received material.
 Communicate necessary instruction to supervisor and departmental labours.
 Prepare and submit monthly consumption reports, daily progress reports etc. with proper
assistance from storekeeper and supervisor
 Preparation of different contractor bills.
 Discus technical problems / drawing and execution difficulties with the Sr. Project Manager.
Achievements:
 Successfully completed Stilt + 19 storey residential towers finishing work to hand over to
customer.
 Successfully completed 4 level Podium + 21 storey residential towers from excavation to
complete RCC work without any accidents.
From Feb’2004 to Feb’2005 with Confide Creation (site of Hiranandani group at
Powai).
Unrestricted Page 3 of 4
Project: Stilt + 36 storey two residential towers.
Role: Site Engineer
Responsibilities:
 Technical supervision of the ongoing work.
 Control of wastage of construction material.
 Work out the requirements of different materials for construction.
 Preparing quality report after quality check of received material.
 Communicate necessary instruction to supervisor and departmental labours.
 Preparation of different contractor bills.
 Discuss technical problems / drawing and execution difficulties with the client engineers
(Hiranandani Group).
Achievements:
 Successfully completed Stilt + 36 storey residential towers (upto 26th floor) RCC as well
block work, plastering.
From Feb’2001 to Feb’2004 with Saicon Associates (Koapergoan) as site engineer.
Project: Row Houses and Bungalows Project. (Pile Foundation)
Role: Site Engineer
Responsibilities:
 Technical supervision of the ongoing work.
 Control of wastage of construction material.
 Identify the requirements of material for construction.
 Preparing quality report after quality check of received material.
 Communicate necessary instruction to supervisor and departmental labours.
 Preparation of different contractor bills.
 Discus technical problems / drawing and execution difficulties with the Owner.
Achievements:
 Successfully completed three numbers of row houses and 10 bungalows from excavation to
hand over to customer.

EDUCATION
 Diploma in civil Engineering from MSBTE passed in year 2003.
 B. Tech in civil Engineering (Appearing) from Karnataka Open state University.
IT SKILL SET
Well versed with:
 SAP SYSTEM
 AUTO CAD
Unrestricted Page 4 of 4
PERSONAL DETAILS
Name : Dattatray Karbhari Brahmane
Date of Birth : 01/06/1977
Languages Known : English, Marathi and Hindi
Hobbies : Photography
Permanent Address : Kingscross, D-606, Panvelkar Green City, B-cabin road,
Ambernath – E, Thane – 421501
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
Place: Mumbai Dattatray Karbhari Brahmane
Date:

More Related Content

What's hot

Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza Aljabour
 
Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2tarek hassan
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-Adel Alqontar
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008HaythamZidan1
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009guest3e8191
 
Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with PicShadrul Hasan
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
 
Resume_JacobPhillips_2015
Resume_JacobPhillips_2015Resume_JacobPhillips_2015
Resume_JacobPhillips_2015Jacob Phillips
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedulesaieq
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Dateyusuf khan
 

What's hot (19)

Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 
my cv 2
my cv 2my cv 2
my cv 2
 
Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2Tarek Hassn Ibrahim Awad Alla-2-2
Tarek Hassn Ibrahim Awad Alla-2-2
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
Chandan
ChandanChandan
Chandan
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016Len Bettencourt-Resume Oct 2016
Len Bettencourt-Resume Oct 2016
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with Pic
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Resume_JacobPhillips_2015
Resume_JacobPhillips_2015Resume_JacobPhillips_2015
Resume_JacobPhillips_2015
 
Raj CV construction
Raj CV constructionRaj CV construction
Raj CV construction
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
CHAITANYA PS
CHAITANYA PSCHAITANYA PS
CHAITANYA PS
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 

Similar to MY CV (20)

Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
nilesh moon resume
nilesh moon resumenilesh moon resume
nilesh moon resume
 
Resume updated
Resume updatedResume updated
Resume updated
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 
Karan Singh-CV
Karan Singh-CVKaran Singh-CV
Karan Singh-CV
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
J Jagadeesan- CV
J Jagadeesan- CVJ Jagadeesan- CV
J Jagadeesan- CV
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 

Recently uploaded

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfthietkevietthinh
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

MY CV

  • 1. Unrestricted Page 1 of 4 DATTATRAY BRAHMANE Mobile: +91 9922352228 ~ E-Mail: dattatray_brahmane@yahoo.co.in Job Objective: To be associated with professionally managed company which can provide me with a practical knowledge & dynamic work sphere to extract my inherent skills as a Professional, use and develop my aptitude to gain managing skills & perfection. PROFESSIONAL PROFILE  Diploma in Civil Engineering with nearly 15 years experience in site & construction management, coordination and team management.  Currently functioning with Ahuja Group as Asst.Manager Projects.  Holds the distinction of managing diverse projects for construction of high-rise residential towers.  Expertise in preparing standardized schedules for a finishing as well as RCC project involving quantification of the construction materials & labour activities.  Strong relationship management, communication skills with the ability to network with project members, consultants and contractors with consummate ease. ESSENTIAL FUNCTION & KEY RESPONSIBILITIES.  Assist PM to manage project development from beginning to end. Time bound execution & management of project.  Supervise & manage direct and contract workers.  Control quality, cost, time & funds.  Provide progress reports and assist Project Manager in execution  Site health & safety. Time bound execution.  Contracts adherence andcompliance.  Coordinate with suppliers and agencies for timely material supplies.  Take responsibilityin absence of projectmanagerGenerate MISformanagementonprojectstatus Enforce operatingdisciplineonsite Safety ORGANIZATIONAL EXPERIENCE From August 2014 to Nov.2015 with Runwal Group of Companies, Mulund (W). Project: Runwal Greens Role: Senior Engineer Responsibilities:  Co-ordination between different agencies to ensure smooth working of the site.  Control of wastage of construction material.  Arrange the next day’s work in advance and ensure procurement of material at the site.  Discuss the practical problem faced during execution with P.M. and find a suitable solution.  Work out the quantities of each item of work.  Prepare requirements of material.  Prepare rate analysis of various items.  Check daily site progress.  Prepare necessary R.A. & final bills as per the work stage.  Check any rectification of structural and finishing work.  Communicate all necessary information from the senior staff to the junior staff.  Get the maximum output from the junior staff and labours.  Address changes suggested by customer.
  • 2. Unrestricted Page 2 of 4 From April’2010 to August’2014 with Lodha Group of Companies. Project: Casabella phase -1 (Stilt + 19 storey residential project) Role: Site Engineer Responsibilities:  Technical supervision of the ongoing work.  Co-ordination between different contractors and agencies to maintain the project speed at the construction site.  Control of wastage of construction material.  Work out the requirements of different materials for construction.  Prepare indents for different materials on SAP.  Preparing quality report after quality check of received material.  Communicate necessary instruction to supervisor and departmental labours.  Prepare and submit monthly consumption reports, daily progress reports etc. with proper assistance from storekeeper and supervisor  Preparation of different contractor bills.  Discuss technical problems / drawing and execution difficulties with the sector engineer. Achievements:  Successfully completed Stilt +19 storey residential towers from excavation to hand over to customer. (Both RCC as well as finishing) area -1 lakh 35 thousand Sq. ft.  Competed building services work like plumbing, fire fighting, electrical.  Successfully completed U.G. tank with complete services including installation of pumps, electrical and services. (Capacity -3,75,000 litre.) From Feb’2005 to Feb’2010 with Nirmal Lifestyles Ltd. (Mulund) Mumbai. Project: 1) Stilt + 2 numbers of 19 storey residential towers. 2) 4 level Podium + two numbers of 21 storey residential towers. Role: Site Engineer Responsibilities:  Technical supervision of the ongoing work.  Co-ordination between different contractors and agencies to maintain the project speed at the construction site.  Control of wastage of construction material.  Work out the requirements of different materials for construction.  Prepare indents for different materials on SAP.  Preparing quality report after quality check of received material.  Communicate necessary instruction to supervisor and departmental labours.  Prepare and submit monthly consumption reports, daily progress reports etc. with proper assistance from storekeeper and supervisor  Preparation of different contractor bills.  Discus technical problems / drawing and execution difficulties with the Sr. Project Manager. Achievements:  Successfully completed Stilt + 19 storey residential towers finishing work to hand over to customer.  Successfully completed 4 level Podium + 21 storey residential towers from excavation to complete RCC work without any accidents. From Feb’2004 to Feb’2005 with Confide Creation (site of Hiranandani group at Powai).
  • 3. Unrestricted Page 3 of 4 Project: Stilt + 36 storey two residential towers. Role: Site Engineer Responsibilities:  Technical supervision of the ongoing work.  Control of wastage of construction material.  Work out the requirements of different materials for construction.  Preparing quality report after quality check of received material.  Communicate necessary instruction to supervisor and departmental labours.  Preparation of different contractor bills.  Discuss technical problems / drawing and execution difficulties with the client engineers (Hiranandani Group). Achievements:  Successfully completed Stilt + 36 storey residential towers (upto 26th floor) RCC as well block work, plastering. From Feb’2001 to Feb’2004 with Saicon Associates (Koapergoan) as site engineer. Project: Row Houses and Bungalows Project. (Pile Foundation) Role: Site Engineer Responsibilities:  Technical supervision of the ongoing work.  Control of wastage of construction material.  Identify the requirements of material for construction.  Preparing quality report after quality check of received material.  Communicate necessary instruction to supervisor and departmental labours.  Preparation of different contractor bills.  Discus technical problems / drawing and execution difficulties with the Owner. Achievements:  Successfully completed three numbers of row houses and 10 bungalows from excavation to hand over to customer.  EDUCATION  Diploma in civil Engineering from MSBTE passed in year 2003.  B. Tech in civil Engineering (Appearing) from Karnataka Open state University. IT SKILL SET Well versed with:  SAP SYSTEM  AUTO CAD
  • 4. Unrestricted Page 4 of 4 PERSONAL DETAILS Name : Dattatray Karbhari Brahmane Date of Birth : 01/06/1977 Languages Known : English, Marathi and Hindi Hobbies : Photography Permanent Address : Kingscross, D-606, Panvelkar Green City, B-cabin road, Ambernath – E, Thane – 421501 DECLARATION I hereby declare that the information furnished above is true to the best of my knowledge. Place: Mumbai Dattatray Karbhari Brahmane Date: