Curriculum Vitae
JOSE S. ASIS III
Dubai, U.A.E.
Email: kirk_505@yahoo.com
U.A.E Contact No.: +97150-892-1838
WORK EXPERIENCES
• CITY SERVICES CONSULTANCY (Part-Time/Temporary)
Deira, Dubai, U.A.E.
Company Industry: Interior fit-out
(November 29, 2015 – December 29, 2015)
Profession: AutoCAD Designer (2D/3D)
Duties & Responsibilities:
• Space planning /fit-out/ conceptualization of turnkey projects.
• Preparation of plans, elevations, sections, isometric and shop drawings.
• Convert hand drawn sketches/specifications into detailed CAD drawings.
• Prepare submission drawings as per B.O.Q.
• Prepare B.O.Q.
• Produce perspective views (modeling & rendering) of the project for
presentation purposes.
• SPEEEDHOUSE INTERIORS
P.O Box: 627, Ajman U.A.E.
Company Industry: Interior fit-out
(September 23, 2015 – October 26, 2015)
Profession: AutoCAD Designer (2D/3D)
Duties & Responsibilities:
• Assist the design team in space planning /fit-out/ conceptualization of
turnkey projects.
• Preparation of plans, elevations, sections, isometric and shop drawings.
• Preparation of services drawing such as plumbing, water supply, air-con
ducting systems & electrical layouts of buildings.
• Convert hand drawn sketches/specifications into detailed CAD drawings.
• Prepare submission drawings as per B.O.Q.
• Produce perspective views (modeling & rendering) of exterior & interior
such as living, dining, bedrooms, bathroom and kitchen for presentation
purposes.
• Maintain and update CAD drawing database for future use.
• DAELIM INDUSTRIAL COMPANY, LTD.
Jose S. Asis III Page 1
Curriculum Vitae
Jalan Residency, Kampung Sungai Lampai
Jalan Kota Batu, Brunei Darussalam
Project: Cable Stayed Bridge Across Sungai River
(Construction of 800-meter cable stayed bridge with 600-meter main deck, 150-
meter pylon, 5 kilometers of road works, 50-meter box tunnel and a 4-storey car
park building)
(February 2014 – November 2014)
Profession: AutoCAD Drafter (2D/3D)
(Civil, Structural)
Duties & Responsibilities:
• Take directions from engineers to generate 2D / 3D drawings using
AutoCAD in a reasonable amount of time.
• Convert hand drawn sketches/specifications into detailed CAD drawings.
• Prepare submission drawings, shop drawings, as-built drawings and
other bridge / road construction related drawings such as cross sections,
elevations, layout plans and related supplementary details.
• Perform calculations for B.O.Q. such as formwork, concrete & rebar.
• Preparation of sprinkler system layout for the car park building.
• Maintain and update CAD drawing database for future use.
• Self-employed Architectural CAD Designer
Panay Street, Pitogo, Makati City, Philippines
Project: Residential Houses Conceptual Designs
(3 Residential Houses completed)
(December 2013 – February 2014)
Profession: AutoCAD / REVIT Designer (2D/3D)
(Architectural)
Duties & Responsibilities:
• Discuss with the client regarding the design specifications of the house.
• Make schematics/conceptual architectural drawings as per design
preference of the client.
• Revise the drawing designs as per client’s choice.
• Prepare architectural plans, sections, elevations & supplementary details
of the final design.
• Make perspective views (modeling & rendering) of exterior & interior
such as living, dining, bedrooms, bathroom and kitchen of the finalized
design.
• Handover the final design to the client subject for engineer’s calculations.
• Rajeh H. Al-Marri & Sons Company
Ain Nak’l Contractors Compound,
PO Box-1, Abqaiq – 31992
Kingdom of Saudi Arabia
Jose S. Asis III Page 2
Curriculum Vitae
Project: Yanbu Export Refinery Project (MC-7)
(Red Sea Refining Co. / Saudi ARAMCO)
(Re-route of onsite pipelines)
Contract no: 6600025133
Job Order no: KBRJ6491
Yanbu, Saudi Arabia
(November 2010 – May 2011)
Project: Manifa Field Causeway Project
(Saudi ARAMCO Project)
(Pipeline construction for offshore/islands; 34 drill sites with 272 wells)
Contract no: 6600024040
Job Order no: 10-00452-0004 & 10-00452-0003
Manifa & Tanajib regions, Saudi Arabia
(May 2011 – November 2012)
Profession: AutoCAD Operator / Assistant Project Scheduler
(Civil, Mechanical & Electrical)
Duties & Responsibilities:
AUTOCAD OPERATOR:
• Take directions from engineers to generate 2D / 3D models using
AutoCAD in a reasonable amount of time.
• Produce Mechanical/Civil/Electrical Drawings such as layouts, diagrams
and details relating to modifications of existing structures and
installations like oil & gas flow lines, trunk lines and well heads.
• Convert hand drawn sketches/specifications of engineers/foremen into
detailed CAD drawings.
• Perform actual jobsite / fabrication shop measurements and checking.
• Prepare shop drawings, as-built drawings and other oil & gas
construction related drawings.
• Create proposal design drawings such as instrument supports and
wellhead platforms for client’s approval.
• Work closely with the Welding and/or Mechanical QC regarding the
preparation & updating of weldmap drawings.
• Cooperate with surveyors in plotting coordinates using AutoCAD.
• Maintain CAD drawing database for future use.
• Learn & implement Client’s Standard sets for all drawings.
ASSISTANT PROJECT SCHEDULER (February – May 2012)
• Revise the project schedule as per additional projects awarded by
ARAMCO.
• Periodically update the project’s progress using Primavera 6.
• Periodically perform site visit to assess the project’s site developments.
• JCO Construction And Supply
692 Sta. Lucia St, San Antonio Village, Parañaque City
Profession: AutoCAD Operator
(Civil / Architectural)
(June 2009 – July 2010)
Jose S. Asis III Page 3
Curriculum Vitae
Duties & Responsibilities:
• Work directly with engineering team and take instructions from
engineers/ architects to produce two-dimensional or three-dimensional
models using AutoCAD software.
• Preparation of services drawing for buildings such as plumbing, water
supply & electrical layouts of buildings.
• Design and lay-outing for domestic water system, drainage system and
firefighting system.
• Draft general plans, elevations, sections, isometric, perspective &
detailing of different construction projects such as residential buildings
and concrete span bridges using either AutoCAD or REVIT.
• Take detailed hand drawn plans / sketches and use AutoCAD to create
presentable and accurate drawings.
• Perform drawing revisions as directed by the engineer.
• 3D visualizer/modeler using AutoCAD / REVIT Architecture software.
• Maintain CAD document archive and retrieval of project drawings.
• PCCW Teleservices
17TH
floor, Union Bank Plaza, Ortigas Center
Pasig City, Philippines
Profession: Call Center Agent (Customer Service / Technical Support Representative)
Client: NOKIA Consumers (North America & Canada Cluster)
(August 2010 – November 2010)
Duties & Responsibilities:
• Take calls from Nokia consumers all over North America and Canada.
• Assist them regarding their inquiries about Nokia products and services.
• Take care of their concerns or complaints about Nokia products.
• Give them the assurance and the solution to their concerns.
• Give Nokia consumers the maximum satisfaction by solving their
concerns or by granting their inquiries through friendly, responsible &
professional approach.
• Continuously learn new Nokia products/technology that will be released
on global market to be able to assist consumers accordingly regarding
their concerns/inquiry.
• Undergo regular refreshment trainings to maintain the operation
standards in dealing with clients/consumers.
• Social Security System (SSS)
SSS Gil Puyat Avenue Branch,
Makati City, Philippines
Profession: Admin Assistant
On the Job Training (OJT)
(November 2008 – February 2009)
Duties & Responsibilities:
Jose S. Asis III Page 4
Curriculum Vitae
• Make transmittals of incoming documents.
• Encode, sort and xerox documents when instructed by direct supervisor.
• Assist the clients regarding their queries.
• Give clients the right forms for their SSS transactions.
• Administer the system database for fast and easy retrieval of client’s
records.
• Maintenance of documentation.
• Data storage, retrieval and archiving.
SKILLS & QUALIFICATIONS
• Civil Service Board Examination Passer (Professional Level)
• TESDA Certified OXY-ACETYLENE (OAW) welder/Gas welding, Cutting and Brazing.
• TESDA Certified AutoCAD Operator (2D & 3D with Color Rendering)
• Proficient in AutoCAD software versions 2005 to 2015.
• Conversant in drafting 2D & 3D models and interior/exterior color rendering/visualization using
AutoCAD/REVIT.
• Experienced in using REVIT Architecture software.
• Conversant in using MS Office Software & Open Office Software.
• Knowledgeable on using REVIT MEP / Structure & project scheduling using Primavera P6.
• Basic experience in using 3DS Max for rendering.
TRAININGS & SEMINARS
• Autodesk 3DS Max 2014.
Microcadd Technologies Co., Inc.
• Gas Welding Cutting and Brazing Training Course
Meralco Foundation Inc.
• Advanced AutoCAD (Mechanical, Electrical & Plumbing)
Microcadd Technologies Co., Inc.
• AutoCAD 2010
Microcadd Technologies Co., Inc.
• AutoCAD 2009 (2D & 3D with color rendering)
Microcadd Technologies Co., Inc.
• Autodesk REVIT M.E.P.
Microcadd Technologies Co., Inc.
• Social Security System On-The-Job Training
SSS Gil Puyat Branch, Gil Puyat Avenue, Makati City, Philippines
• Free & Open Source Software Seminar
University of Makati
• Autocad 2005 – 2 Dimensional
Asia Pacific College
Magallanes Village, Makati City, Philippines
EDUCATIONAL BACKGROUND
COLLEGE : University of Makati
J.P. Rizal Extension, West Rembo, Makati City, Philippines
COURSE: Degree in Computer Applications Technology
Asia Pacific College
Jose S. Asis III Page 5
Curriculum Vitae
Magallanes Village, Makati City, Philippines
COURSE: Systems & Software Engineering
(2nd
year shifter)
SECONDARY : Camarines Norte State College Laboratory High School
Daet, Camarines Norte, Philippines
PERSONAL INFORMATION
Nationality : Filipino
Age : 28
Marital Status : Single
Birth date : March 5, 1987
Religion : Roman Catholic
Height / Weight : 170cm / 65kg
Jose S. Asis III Page 6
Curriculum Vitae
Magallanes Village, Makati City, Philippines
COURSE: Systems & Software Engineering
(2nd
year shifter)
SECONDARY : Camarines Norte State College Laboratory High School
Daet, Camarines Norte, Philippines
PERSONAL INFORMATION
Nationality : Filipino
Age : 28
Marital Status : Single
Birth date : March 5, 1987
Religion : Roman Catholic
Height / Weight : 170cm / 65kg
Jose S. Asis III Page 6

CV_JA3

  • 1.
    Curriculum Vitae JOSE S.ASIS III Dubai, U.A.E. Email: kirk_505@yahoo.com U.A.E Contact No.: +97150-892-1838 WORK EXPERIENCES • CITY SERVICES CONSULTANCY (Part-Time/Temporary) Deira, Dubai, U.A.E. Company Industry: Interior fit-out (November 29, 2015 – December 29, 2015) Profession: AutoCAD Designer (2D/3D) Duties & Responsibilities: • Space planning /fit-out/ conceptualization of turnkey projects. • Preparation of plans, elevations, sections, isometric and shop drawings. • Convert hand drawn sketches/specifications into detailed CAD drawings. • Prepare submission drawings as per B.O.Q. • Prepare B.O.Q. • Produce perspective views (modeling & rendering) of the project for presentation purposes. • SPEEEDHOUSE INTERIORS P.O Box: 627, Ajman U.A.E. Company Industry: Interior fit-out (September 23, 2015 – October 26, 2015) Profession: AutoCAD Designer (2D/3D) Duties & Responsibilities: • Assist the design team in space planning /fit-out/ conceptualization of turnkey projects. • Preparation of plans, elevations, sections, isometric and shop drawings. • Preparation of services drawing such as plumbing, water supply, air-con ducting systems & electrical layouts of buildings. • Convert hand drawn sketches/specifications into detailed CAD drawings. • Prepare submission drawings as per B.O.Q. • Produce perspective views (modeling & rendering) of exterior & interior such as living, dining, bedrooms, bathroom and kitchen for presentation purposes. • Maintain and update CAD drawing database for future use. • DAELIM INDUSTRIAL COMPANY, LTD. Jose S. Asis III Page 1
  • 2.
    Curriculum Vitae Jalan Residency,Kampung Sungai Lampai Jalan Kota Batu, Brunei Darussalam Project: Cable Stayed Bridge Across Sungai River (Construction of 800-meter cable stayed bridge with 600-meter main deck, 150- meter pylon, 5 kilometers of road works, 50-meter box tunnel and a 4-storey car park building) (February 2014 – November 2014) Profession: AutoCAD Drafter (2D/3D) (Civil, Structural) Duties & Responsibilities: • Take directions from engineers to generate 2D / 3D drawings using AutoCAD in a reasonable amount of time. • Convert hand drawn sketches/specifications into detailed CAD drawings. • Prepare submission drawings, shop drawings, as-built drawings and other bridge / road construction related drawings such as cross sections, elevations, layout plans and related supplementary details. • Perform calculations for B.O.Q. such as formwork, concrete & rebar. • Preparation of sprinkler system layout for the car park building. • Maintain and update CAD drawing database for future use. • Self-employed Architectural CAD Designer Panay Street, Pitogo, Makati City, Philippines Project: Residential Houses Conceptual Designs (3 Residential Houses completed) (December 2013 – February 2014) Profession: AutoCAD / REVIT Designer (2D/3D) (Architectural) Duties & Responsibilities: • Discuss with the client regarding the design specifications of the house. • Make schematics/conceptual architectural drawings as per design preference of the client. • Revise the drawing designs as per client’s choice. • Prepare architectural plans, sections, elevations & supplementary details of the final design. • Make perspective views (modeling & rendering) of exterior & interior such as living, dining, bedrooms, bathroom and kitchen of the finalized design. • Handover the final design to the client subject for engineer’s calculations. • Rajeh H. Al-Marri & Sons Company Ain Nak’l Contractors Compound, PO Box-1, Abqaiq – 31992 Kingdom of Saudi Arabia Jose S. Asis III Page 2
  • 3.
    Curriculum Vitae Project: YanbuExport Refinery Project (MC-7) (Red Sea Refining Co. / Saudi ARAMCO) (Re-route of onsite pipelines) Contract no: 6600025133 Job Order no: KBRJ6491 Yanbu, Saudi Arabia (November 2010 – May 2011) Project: Manifa Field Causeway Project (Saudi ARAMCO Project) (Pipeline construction for offshore/islands; 34 drill sites with 272 wells) Contract no: 6600024040 Job Order no: 10-00452-0004 & 10-00452-0003 Manifa & Tanajib regions, Saudi Arabia (May 2011 – November 2012) Profession: AutoCAD Operator / Assistant Project Scheduler (Civil, Mechanical & Electrical) Duties & Responsibilities: AUTOCAD OPERATOR: • Take directions from engineers to generate 2D / 3D models using AutoCAD in a reasonable amount of time. • Produce Mechanical/Civil/Electrical Drawings such as layouts, diagrams and details relating to modifications of existing structures and installations like oil & gas flow lines, trunk lines and well heads. • Convert hand drawn sketches/specifications of engineers/foremen into detailed CAD drawings. • Perform actual jobsite / fabrication shop measurements and checking. • Prepare shop drawings, as-built drawings and other oil & gas construction related drawings. • Create proposal design drawings such as instrument supports and wellhead platforms for client’s approval. • Work closely with the Welding and/or Mechanical QC regarding the preparation & updating of weldmap drawings. • Cooperate with surveyors in plotting coordinates using AutoCAD. • Maintain CAD drawing database for future use. • Learn & implement Client’s Standard sets for all drawings. ASSISTANT PROJECT SCHEDULER (February – May 2012) • Revise the project schedule as per additional projects awarded by ARAMCO. • Periodically update the project’s progress using Primavera 6. • Periodically perform site visit to assess the project’s site developments. • JCO Construction And Supply 692 Sta. Lucia St, San Antonio Village, Parañaque City Profession: AutoCAD Operator (Civil / Architectural) (June 2009 – July 2010) Jose S. Asis III Page 3
  • 4.
    Curriculum Vitae Duties &Responsibilities: • Work directly with engineering team and take instructions from engineers/ architects to produce two-dimensional or three-dimensional models using AutoCAD software. • Preparation of services drawing for buildings such as plumbing, water supply & electrical layouts of buildings. • Design and lay-outing for domestic water system, drainage system and firefighting system. • Draft general plans, elevations, sections, isometric, perspective & detailing of different construction projects such as residential buildings and concrete span bridges using either AutoCAD or REVIT. • Take detailed hand drawn plans / sketches and use AutoCAD to create presentable and accurate drawings. • Perform drawing revisions as directed by the engineer. • 3D visualizer/modeler using AutoCAD / REVIT Architecture software. • Maintain CAD document archive and retrieval of project drawings. • PCCW Teleservices 17TH floor, Union Bank Plaza, Ortigas Center Pasig City, Philippines Profession: Call Center Agent (Customer Service / Technical Support Representative) Client: NOKIA Consumers (North America & Canada Cluster) (August 2010 – November 2010) Duties & Responsibilities: • Take calls from Nokia consumers all over North America and Canada. • Assist them regarding their inquiries about Nokia products and services. • Take care of their concerns or complaints about Nokia products. • Give them the assurance and the solution to their concerns. • Give Nokia consumers the maximum satisfaction by solving their concerns or by granting their inquiries through friendly, responsible & professional approach. • Continuously learn new Nokia products/technology that will be released on global market to be able to assist consumers accordingly regarding their concerns/inquiry. • Undergo regular refreshment trainings to maintain the operation standards in dealing with clients/consumers. • Social Security System (SSS) SSS Gil Puyat Avenue Branch, Makati City, Philippines Profession: Admin Assistant On the Job Training (OJT) (November 2008 – February 2009) Duties & Responsibilities: Jose S. Asis III Page 4
  • 5.
    Curriculum Vitae • Maketransmittals of incoming documents. • Encode, sort and xerox documents when instructed by direct supervisor. • Assist the clients regarding their queries. • Give clients the right forms for their SSS transactions. • Administer the system database for fast and easy retrieval of client’s records. • Maintenance of documentation. • Data storage, retrieval and archiving. SKILLS & QUALIFICATIONS • Civil Service Board Examination Passer (Professional Level) • TESDA Certified OXY-ACETYLENE (OAW) welder/Gas welding, Cutting and Brazing. • TESDA Certified AutoCAD Operator (2D & 3D with Color Rendering) • Proficient in AutoCAD software versions 2005 to 2015. • Conversant in drafting 2D & 3D models and interior/exterior color rendering/visualization using AutoCAD/REVIT. • Experienced in using REVIT Architecture software. • Conversant in using MS Office Software & Open Office Software. • Knowledgeable on using REVIT MEP / Structure & project scheduling using Primavera P6. • Basic experience in using 3DS Max for rendering. TRAININGS & SEMINARS • Autodesk 3DS Max 2014. Microcadd Technologies Co., Inc. • Gas Welding Cutting and Brazing Training Course Meralco Foundation Inc. • Advanced AutoCAD (Mechanical, Electrical & Plumbing) Microcadd Technologies Co., Inc. • AutoCAD 2010 Microcadd Technologies Co., Inc. • AutoCAD 2009 (2D & 3D with color rendering) Microcadd Technologies Co., Inc. • Autodesk REVIT M.E.P. Microcadd Technologies Co., Inc. • Social Security System On-The-Job Training SSS Gil Puyat Branch, Gil Puyat Avenue, Makati City, Philippines • Free & Open Source Software Seminar University of Makati • Autocad 2005 – 2 Dimensional Asia Pacific College Magallanes Village, Makati City, Philippines EDUCATIONAL BACKGROUND COLLEGE : University of Makati J.P. Rizal Extension, West Rembo, Makati City, Philippines COURSE: Degree in Computer Applications Technology Asia Pacific College Jose S. Asis III Page 5
  • 6.
    Curriculum Vitae Magallanes Village,Makati City, Philippines COURSE: Systems & Software Engineering (2nd year shifter) SECONDARY : Camarines Norte State College Laboratory High School Daet, Camarines Norte, Philippines PERSONAL INFORMATION Nationality : Filipino Age : 28 Marital Status : Single Birth date : March 5, 1987 Religion : Roman Catholic Height / Weight : 170cm / 65kg Jose S. Asis III Page 6
  • 7.
    Curriculum Vitae Magallanes Village,Makati City, Philippines COURSE: Systems & Software Engineering (2nd year shifter) SECONDARY : Camarines Norte State College Laboratory High School Daet, Camarines Norte, Philippines PERSONAL INFORMATION Nationality : Filipino Age : 28 Marital Status : Single Birth date : March 5, 1987 Religion : Roman Catholic Height / Weight : 170cm / 65kg Jose S. Asis III Page 6