RESUME BHALINDER SINGH RIAR
PERSONAL Date of Birth: 06 April 1965
INFORMATION: Nationality: Indian
EDUCATION: Diploma in Electronic Engineering.
TRAINING COURSES OPITO Approved FOET 10/06/2015, Expiry date – 18/05/2019.
OGUK Offshore Medical Valid till 11/10/18
Yellow Fever Valid till 06 May 2025
PASSPORT: Z 3455087, Expiry – 08 Sep 2026
Flying Hours: 1304 Hrs.
Total ROV experience 12 Years 06 months
Mob: +91 981577 7831
Email : bhalinderriar@yahoo.com
EMPLOYMENT HISTORY:
Projects involved in:
Oct 20 – Nov 07 2016 Seabed surveys & spud can surveys
Client Oxy
Vesel Challenger III, ROV Shark
Woking for Horizon geosciences as ROV Supervisor.
JULY 11 – JUL 21 2016 MFP Installation
Client Qatar Petroleum
Vessel Al wajba, ROV sealion -19
Worked for Fugro Subsea as ROV Supervisor.
Oct 31 – Dec 14 2015 Rigid pipe lay .
Client ADMA / Valentine, location SARB 3
Vessel – MC 300,ROV - Sealion - 20 .
Worked for Fugro, as ROV Supervisor
Oct 15 – Oct 25 2015 Rigid pipe lay .
Client ADMA / Valentine, location Abu Dhabi
Vessel – DLB 1600,ROV - Sealion - 32 .
Worked for Fugro, as ROV Supervisor
Jun 12 – Aug 18 2015 Rigid pipe lay .
Client ADMA / Valentine, location Abu Dhabi
Vessel – DLB 1600,ROV - Sealion - 32 .
Worked for Fugro, as ROV Supervisor
Page 1 of 8
Dec 15 2014 -08 feb ’15 Rigid pipe lay .
Client ADMA / Valentine, location SARB 3
Vessel – MC 300,ROV - Sealion - 20 .
Worked for Fugro, as ROV Supervisor
Jul 26 – 08 Oct 2014 Rigid pipe lay .
Client ADMA / Valentine, location SARB 3
Vessel – DLB 1600,ROV - Sealion - 19 .
Worked for Fugro, as ROV Supervisor
May 09 – May 20 2014 Rigid pipe lay & sleeper installation.
Client ZADCO
Vessel – DLB 648,ROV - Seaeye Tiger .
Worked for NPCC as ROV Supervisor.
Apr 09 – May 09 2014 Rigid pipe lay & sleeper installation.
Client ZADCO
Vessel – DLB 750 Eclipse,ROV - Seaeye panther 908.
Worked for NPCC Abu Dhabi as ROV Supervisor.
Feb 13 – Mar 16 2014 Rigid pipe lay & sleeper installation.
Client ONGC
Vessel – Leighton Eclipse,ROV - Sealion 06.
Worked for Fugro India as Sub Engg.
Nov 22 ‘13 – Jan 09 2014 Rigid pipe lay & sleeper installation.
Client ONG
Vessel – Leighton Eclipse,ROV - Sealion 06.
Worked for Fugro India as Sub Engg.
Aug 25 – Oct 02 2013 Jacket Installation & seabed surveys.
Client IOEC
Vessel – Abouzar 1200,ROV – Sea eye Surveyor.
Worked for Daniel Survey as ROV Supervisor.
Jul 05 – Jul 18 2013 Construction jobs like Dredging, IRM’s,TDU & Valve Ops.
Client BP
Vessel – Subsea Viking , ROV – Hercules 5
Worked for Sub Sea 7 as ROV Sub Engg.
Apr 30 - May 29 2013 Flexi pipelay
Client ONGC
Vessel- GAL Installer,ROV – Sealion 06
Worked for Fugro India as ROV Supervisor.
Apr 15- Apr 22 2013 PLEM installation
Client ONGC
Vessel – 1 MAS 300, ROV – Sealion 20
Worked for Fugro India as ROV Supervisor.
Mar 15 –Apr 11 2013 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops.
Client BP
Vessel – Subsea Viking , ROV – Hercules 5
Worked for Sub Sea 7 as ROV Sub Engg.
Page 2 of 8
Oct 12- Nov 08 2012 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops.
SCM Removal / Installation
Client BP
Vessel – Subsea Viking , ROV – Hercules 4/5
Worked for Sub Sea 7 as ROV Sub Engg.
Jul 19- Aug 29 2012 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops.
Client BP
Vessel – Subsea Viking , ROV – Hercules 4
Worked for Sub Sea 7 as ROV Sub Engg.
Jun 13- Jul 01 2012 Dive support & Survey
Client Maersk
Vessel – Smit Constructor, ROV-Panther+
Worked for N-sea as ROV Supervisor
Mar 29 – Apr 26 2012 Construction jobs like DEMAC Ops, IRM etc.
Client BP
Vessel – Subsea Viking , ROV – Hercules 10
Worked for Sub Sea 7 as ROV Sub Engg.
Jan 20 – Feb 29 2012 Rigid Pipe lay,Touch down monitoring , Sleeper installation
Client ONGC
Vessel – Swiber Concord,ROV- Sealion 28
Worked for Fugro Survey as ROV Supervisor.
Oct 10 – Dec 06 2011 Jacket Installation, Spud Can Surveys
Client – Qatar Gas
Vessel – Gulf 3, ROV – Sealion11
Worked for Fugro ME as ROV Sub Engg.
Aug 05 – Aug 28 2011 Drill Support , Well completion.Demobilization
Client ONGC. .
Vessel – Energy driller, ROV – Panther Plus 910
Worked for Fugro ME as ROV Supervisor
Jun 28 – Jul 20 2011 Drill Support , Assist Lowering of float boxes.
Assist casing & other top side operations.
Client ONGC.
Vessel – Sagar Vijay, ROV – Panther Plus 929
Worked for Fugro ME as ROV Supervisor
Apr 12 – May 11 2011 Drill Support , Assist Lowering of float boxes.
Assist casing & other top side operations.
Client ONGC.
Vessel – Sagar Vijay, ROV – Panther Plus929
Worked for Fugro ME as ROV Supervisor
Apr 04 – Apr 11 2011 Drill Support , Assist Lowering of float boxes.
Assist casing & other top side operations.
client ONGC
Page 3 of 8
Vessel – Energy Driller, ROV – Panher Plus910
Worked for Fugro ME as ROV Supervisor
Mar 10 – 01 Apr 2011 Flow line installation, Dive support , Riser installation,
Survey of installed pipe lines ,Onboard Leighton Eclipse.
Vessel –Leighton Eclipse, ROV – Sea Lion 26
Worked for Fugro ME as ROV Supervisor.
Dec 20 2010-Feb 15 2011 Drill Support , Assist Lowering of float boxes.
Assist casing & other top side operations.
For ONGC on board Sagar Vijay.
Vessel – Sagar Vijay, ROV – Panther Plus 929
Worked for Fugro ME as ROV Supervisor
Nov 17 – Nov 24 2010 Sea growth removal from old PGB & well head
Cutting old guide wires. Installing new guide wires.
BOP Installation & Inspections.
Vessel – Energy Driller, ROV – Panther Plus 910
Worked for Fugro ME as ROV Supervisor
Sep 18 – 12 Nov 2010 Riser removal, Dive support , ‘I’ Tube installation
Stinger Inspection , Pipe line survey
Vessel – Leighton Eclipse, ROV – Sea Lion 26
Worked for Fugro ME as ROV Supervisor.
Jun 11 – Jul 23 2010 Drill Support , BOP Latching & Inspections,
Riser Inspection.For ONGC on Energy Driller.
Vessel – Energy Driller ROV – Panther Plus 910
Worked for Fugro ME as ROV Supervisor
Feb 20-Apr 26 2010 Flow line installation ,Dive support ,Riser installation
Survey of installed pipe lines.
Vessel – Smit Borneo, ROV – SeaLion 6.
Worked for Fugro ME as ROV Sub Engg.
Nov 26- Dec 28 2009 Pipe lay ,Touch down monitoring, Pipe lay initiation
Sleeper inspections & Survey.
Vessel – Leighton Eclipse, ROV – Sea Lion 26.
Worked for Fugro ME as senior ROV Sub Engg.
Aug 20- sep 21 2009 Cable laying , Touch down monitoring.
Prelay & as built surveys.
Vessel - Siem Carrier, ROV – Panther Plus 926
Worked for Fugro ME as senior ROV Sub Engg.
Jul 14 – Aug 03 , 2009 Cable laying , Touch down monitoring.
Prelay & as built surveys.Onboard Siem Carrier.
Vessel - Siem Carrier, ROV - Panther Plus 926
Worked for Fugro ME as senior ROV Sub Engg.
May 07 – Jun 13 , 2009 Drill Support , BOP Latching & Inspections,
Riser Inspection. Client - ONGC
Vessel - Energy Driller, ROV - Panther Plus 910
Worked for Fugro ME as ROV Supervisor.
Mar 14 – Apr 16 , 2009 Flow line installation, Dive support , J-Tube
I – Tube installation.
Vessel - Smit Borneo, ROV – Sea pup 5
Page 4 of 8
Worked for Fugro ME as ROV Supervisor
Dec 26 – Feb 05, 2009 Drill Support , BOP Inspections,
Riser Inspection.Client ONGC
Vessel - Energy Driller, ROV - Panther Plus 910
Worked for Fugro ME as ROV Supervisor.
Sep 05 – Nov 08, 2008 Pipe laying & touch down monitoring.
Sleepers laydown- survey & inspection.
Pre lay & as built survey of pipe line.
Client- McDermott
Vessel – Setia Indah, ROV - Panther Plus 926
Worked for Fugro ME as Senior ROV Pilot Tech
Jun 07 – Jul 25 ,2008 Drill Support , BOP Inspections,
Riser Inspection.Client ONGC .
Vessel – Sagar Vijay, ROV – Panther Plus 929
Worked for Fugro ME as Senior ROV Pilot Tech
Aug 08 – Oct 17,2007 Pipe laydown, Free span inspection, Piling,Chain laydown
Plem installation & Calm buoy installation.Sea bed survey.
Client Qatar Gas.Mcdermott barge KP1, ROV – Panther Plus 903
Worked for Fugro (M.E) as Senoir ROV Pilot Tech
May 06 – Jun 21, 2007 Calm buoy installation for Kuwait oil company , Client HHI,Vessel HD 423..
Seabed survey , Piling operation.Depth of dive 33m.
Location Mina Al Ahmadi.kuwait.
Worked for Fugro as senior ROV Pilot Tech. ROV – Sea Pup
Feb 07 – Mar 21, 2007 Calm buoy installation for Kuwait oil company , Client HHI,Vessel HD 423..
Seabed survey , Piling operations , Pipe recovery / pipe laydown .
Watch Buoys on chain ends.
Location Mina Al Ahmadi.kuwait.
Worked for Fugro as senior ROV pilot Tech. ROV – Sea Pup
Nov 06 – Dec 26, 2006 Cable Laying,for RAS GAS onboard Team Oman. sea bed survey
Assist in cable laying by continuous monitoring. As laid cable survey
light construction.
Location RAS GAS field,Qatar. ROV – Rover MK II
Worked for Fugro as senior ROV Pilot Tech.
Aug 31 – sep 26, 2006 Drill Support ,onboard Deep Water frontier , Client - RIL .General visual
inspection of BOP, Glycol injection. Recovery of defective compatts.
Depth of dive 1945 m .Location – KG – D6 – MG1.India.
Worked for Oceaneering as ROV Pilot Tech.ROV – Sea Lion 36
Jul 03–Aug08,2006 Drill Support, onboard Deep Water frontier, Client-RIL. Mobilisation
installation & commissioning of Sea lion system. Laying of compatts . Watch
the drill bit rotation while drilling .BOP latching. Glycol injection.BOP
inspection . Laying of compatts.
Depth of dive 1945 m. Location - KG – D6 – MG1.India
Worked for Oceaneering as ROV Pilot Tech, ROV – Sea Lion 36
Page 5 of 8
Feb 25 – Mar 21 ,2006 Drill Support , onboard Discoverer 7 seas , Client ONGC. Compatts
deployment . spud in , Monitor drill bit rotation while drilling
Through open hole. BOP latching & inspection. Bulls eye Inspection. Riser
inspection to check for leaks.
Depth of dive 661 m. Location 98 / 2E – 1(shallow) India.
Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11
Feb 03 -24 ,2006 Drill Support , Onboard Discoverer 7 seas ,Client ONGC. Compatts
deployment ,spud in , Monitor drill bit while drilling through open
hole .BOP latching & inspection. Bulls eye Inspection.
Depth of dive 948 m. Location DW – F – 1. India.
Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11
Nov 18 - Dec 09 ,2005 Drill Support , onboard Discoverer 7 seas ,Client ONGC. Compatts recovery
& deployment .Spud in. Monitor drill bit while drilling
through open hole .BOP latching & inspection. Bulls eye Inspection.
Depth of dive 778 m. Location KG – A1 & 98 – 2 A1. India .
Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11
Oct 08 -21,2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Compatts
recovery & deployment .Spud in. Monitor drill bit while drilling
through open hole .BOP latching & inspection. Bulls eye Inspection.
Location KG – A1 . India.
Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11
Sep 09 – Oct 07 2005 Drill Support , onboard Discoverer 7 seas ,Client – ONGC Recovery &
Deployment of Compatts. Monitor drill bit while drilling through open hole
BOP latching & inspection. Bulls eye Inspection.
Glycol injection. Spud in.
Location KG – A1 India.
Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11
ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech
Jul 01-16 2005 Drill Support , onboard Discoverer 7 seas ,Client - ONGC. Recovery &
Deployment of Compatts. Spud in. Monitor drill bit while drilling through open
hole. BOP latching & inspection. Bulls eye Inspection.
Depth of dive 572 m. Location KD 1 -3. India.
ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech
May 28 – Jun 14 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Recovery &
Deployment of Compatts.Spud in. Monitor drill bit while drilling through open
hole. BOP latching & inspection. Bulls eye Inspection.
Depth of dive 572 m. Location KD – 1 - 3 India.
ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech
Apr 29 – May 27 2005 Drill Support ,onboard Discoverer 7 seas , Client - ONGC.
Recovery & Deployment of Compatts.Spud in. Monitor drill bit while drilling
through open hole. BOP latching & inspection. Bulls eye Inspection.
Glycol injection.
Depth of dive 822 m. Location VA – 2 & VA - 3 India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Apr 19 – 27 2005 Client – Hardy Oil. Removal & fitment of flying lead on tree & UTA,
inspection of pipe line for leaks. Torque tool operations.
Depth of dive 325 m. Location Chennai India.
ROV – magnum 72, Worked for Oceaneering as ROV Pilot Tech
Page 6 of 8
Mar 18 - 31 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC Recovery &
Deployment of Compatts. Spud in Monitor drill bit while drilling
through open hole. BOP latching & inspection. Bulls eye Inspection.
Glycol injection.
Depth of dive 700 m. Location VA -1 India.
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Feb 24 - Mar 17 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Recovery &
Deployment of Compatts. Spud in Monitor drill bit while drilling through open
hole. BOP latching & inspection. Bulls eye Inspection, Glycol injection..
Depth of dive 557 m. Location G1 – 12 A India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech.
Dec 30 2004 – Jan 21 2005 Drill Support, onboard Discoverer 7 seas , Client – ONGC Recovery &
Deployment of Compatts. Spud in Monitor drill bit while drilling
through open hole. BOP latching & inspection. Bulls eye Inspection.
Glycol injection.. Depth of dive 850 m. Location G -1 - 12 India.
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech.
Dec 14-22 2004 Drill Support, onboard Discoverer 7 seas, Client – ONGC. Sea bed survey,
Compatts deployment. Monitoring drill when drilling through open hole Bop
latching & inspection . Glycol injection.
Depth of dive 850 m. Location GD 4 -1 India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Nov 04 – Dec 02 2004 Drill Support , onboard Discoverer 7 seas , Client – OONG sea bed survey,
Compatts deployment. Monitoring drill when drilling through open hole.
Bop latching & inspection.
Depth of dive 1154 m. Location KD 4- 1A India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech.
Sep 02 - 23 2004 Drill Support , onboard Discoverer 7 seas ,Client – ONGC.
sea bed survey,Compatts deployment. Monitoring drill when drilling through
open hole. Bop latching & inspection.
Depth of dive 1035 m. Location GB 3 – 1AA India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Aug 21 – 30 2004 Drill Support, onboard Discoverer 7 seas, Client – ONGC. sea bed survey,
Compatts deployment. Monitoring drill when drilling through open hole. Bop
latching & inspection . Glycol injection.
Depth of dive 1035 m. Location GB 3 – 1AA In
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech.
Jul 15 - 29 2004 Drill Support , onboard Discoverer 7 seas , Client – ONGC.
sea bed survey,Compatts deployment. Monitoring drill when drilling through
open hole.Bop latching & inspection. Glycol injection.
Depth of dive 1734 m. Location KD – AE -3 -1A India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Jun 14 –July 14 2004 Drill Support , onboard Discoverer 7 seas ,Client – ONG, sea bed survey,
Compatts deployment. Monitoring drill when drilling through open hole.
Bop latching & inspection . Glycol injection.
Depth of dive 1734 m. Location KD3 – 1A India
ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech
Page 7 of 8
Feb 2003 – Oct 2003 Electrical Officer, On board M.V Amer Everest. Worked as refeer engineer.
Maintenance of Motors , Contactors , Compressors , & accommodation A/C.
Jan 1987 – Jan 2002 Worked in Indian Navy as Senior Supervisor on board Various Ships &
establishments.Having fifteen years of practical experience in the field of
electrical / electronic engineering. Jobs performed ------------
Installation & setting to work . Testing Tuning & Trials.
Operation & maintenance.Circuit Analysis , fault diagnosis & defect
rectification.Planned Preventive & Breakdown Maintenance.
Maintenance of Radars , Sonars , Communication System, Hydraulic
,Electro hydraulic, Electro mechanical & electro pnumetic systems.
Maintenance of various other systems such as , Navigational aids,frequency
converters, AC / DC Motors.
Worked as Instructor at Electrical school of Indian Navy , teaching Radars &
display systems.Practical trainer for Radar.
Utilization of resources , men & material for smooth functioning of
department .Planning & preparing defect lists , Coordination with dockyard.
Maintenance & up keeping of spare gear .Responsible for welfare , moral &
discipline of personal in department.
Planning & conducting in house Training.
EQUIPMENT EXPERIENCE:
ROV’s Sea Eye Surveyor, Hercules , Sea Eye Panther Plus, Sea Eye Panther, Sea
Pup, Rover MK II , Sea Lion , Magnum’s.
Sensors Sonar simrad 900,1000, Imagenex & Sonavision, Gyro’s ,Seven function
conan manipulators,Orion T4 7Fn. Manips,Rig Master,Torque Tools, motors
and pumps , generators , etc.
Page 8 of 8

Bhalinder Riars CV

  • 1.
    RESUME BHALINDER SINGHRIAR PERSONAL Date of Birth: 06 April 1965 INFORMATION: Nationality: Indian EDUCATION: Diploma in Electronic Engineering. TRAINING COURSES OPITO Approved FOET 10/06/2015, Expiry date – 18/05/2019. OGUK Offshore Medical Valid till 11/10/18 Yellow Fever Valid till 06 May 2025 PASSPORT: Z 3455087, Expiry – 08 Sep 2026 Flying Hours: 1304 Hrs. Total ROV experience 12 Years 06 months Mob: +91 981577 7831 Email : bhalinderriar@yahoo.com EMPLOYMENT HISTORY: Projects involved in: Oct 20 – Nov 07 2016 Seabed surveys & spud can surveys Client Oxy Vesel Challenger III, ROV Shark Woking for Horizon geosciences as ROV Supervisor. JULY 11 – JUL 21 2016 MFP Installation Client Qatar Petroleum Vessel Al wajba, ROV sealion -19 Worked for Fugro Subsea as ROV Supervisor. Oct 31 – Dec 14 2015 Rigid pipe lay . Client ADMA / Valentine, location SARB 3 Vessel – MC 300,ROV - Sealion - 20 . Worked for Fugro, as ROV Supervisor Oct 15 – Oct 25 2015 Rigid pipe lay . Client ADMA / Valentine, location Abu Dhabi Vessel – DLB 1600,ROV - Sealion - 32 . Worked for Fugro, as ROV Supervisor Jun 12 – Aug 18 2015 Rigid pipe lay . Client ADMA / Valentine, location Abu Dhabi Vessel – DLB 1600,ROV - Sealion - 32 . Worked for Fugro, as ROV Supervisor Page 1 of 8
  • 2.
    Dec 15 2014-08 feb ’15 Rigid pipe lay . Client ADMA / Valentine, location SARB 3 Vessel – MC 300,ROV - Sealion - 20 . Worked for Fugro, as ROV Supervisor Jul 26 – 08 Oct 2014 Rigid pipe lay . Client ADMA / Valentine, location SARB 3 Vessel – DLB 1600,ROV - Sealion - 19 . Worked for Fugro, as ROV Supervisor May 09 – May 20 2014 Rigid pipe lay & sleeper installation. Client ZADCO Vessel – DLB 648,ROV - Seaeye Tiger . Worked for NPCC as ROV Supervisor. Apr 09 – May 09 2014 Rigid pipe lay & sleeper installation. Client ZADCO Vessel – DLB 750 Eclipse,ROV - Seaeye panther 908. Worked for NPCC Abu Dhabi as ROV Supervisor. Feb 13 – Mar 16 2014 Rigid pipe lay & sleeper installation. Client ONGC Vessel – Leighton Eclipse,ROV - Sealion 06. Worked for Fugro India as Sub Engg. Nov 22 ‘13 – Jan 09 2014 Rigid pipe lay & sleeper installation. Client ONG Vessel – Leighton Eclipse,ROV - Sealion 06. Worked for Fugro India as Sub Engg. Aug 25 – Oct 02 2013 Jacket Installation & seabed surveys. Client IOEC Vessel – Abouzar 1200,ROV – Sea eye Surveyor. Worked for Daniel Survey as ROV Supervisor. Jul 05 – Jul 18 2013 Construction jobs like Dredging, IRM’s,TDU & Valve Ops. Client BP Vessel – Subsea Viking , ROV – Hercules 5 Worked for Sub Sea 7 as ROV Sub Engg. Apr 30 - May 29 2013 Flexi pipelay Client ONGC Vessel- GAL Installer,ROV – Sealion 06 Worked for Fugro India as ROV Supervisor. Apr 15- Apr 22 2013 PLEM installation Client ONGC Vessel – 1 MAS 300, ROV – Sealion 20 Worked for Fugro India as ROV Supervisor. Mar 15 –Apr 11 2013 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops. Client BP Vessel – Subsea Viking , ROV – Hercules 5 Worked for Sub Sea 7 as ROV Sub Engg. Page 2 of 8
  • 3.
    Oct 12- Nov08 2012 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops. SCM Removal / Installation Client BP Vessel – Subsea Viking , ROV – Hercules 4/5 Worked for Sub Sea 7 as ROV Sub Engg. Jul 19- Aug 29 2012 Construction jobs like DEMAC Ops, IRM’s,TDU & Valve Ops. Client BP Vessel – Subsea Viking , ROV – Hercules 4 Worked for Sub Sea 7 as ROV Sub Engg. Jun 13- Jul 01 2012 Dive support & Survey Client Maersk Vessel – Smit Constructor, ROV-Panther+ Worked for N-sea as ROV Supervisor Mar 29 – Apr 26 2012 Construction jobs like DEMAC Ops, IRM etc. Client BP Vessel – Subsea Viking , ROV – Hercules 10 Worked for Sub Sea 7 as ROV Sub Engg. Jan 20 – Feb 29 2012 Rigid Pipe lay,Touch down monitoring , Sleeper installation Client ONGC Vessel – Swiber Concord,ROV- Sealion 28 Worked for Fugro Survey as ROV Supervisor. Oct 10 – Dec 06 2011 Jacket Installation, Spud Can Surveys Client – Qatar Gas Vessel – Gulf 3, ROV – Sealion11 Worked for Fugro ME as ROV Sub Engg. Aug 05 – Aug 28 2011 Drill Support , Well completion.Demobilization Client ONGC. . Vessel – Energy driller, ROV – Panther Plus 910 Worked for Fugro ME as ROV Supervisor Jun 28 – Jul 20 2011 Drill Support , Assist Lowering of float boxes. Assist casing & other top side operations. Client ONGC. Vessel – Sagar Vijay, ROV – Panther Plus 929 Worked for Fugro ME as ROV Supervisor Apr 12 – May 11 2011 Drill Support , Assist Lowering of float boxes. Assist casing & other top side operations. Client ONGC. Vessel – Sagar Vijay, ROV – Panther Plus929 Worked for Fugro ME as ROV Supervisor Apr 04 – Apr 11 2011 Drill Support , Assist Lowering of float boxes. Assist casing & other top side operations. client ONGC Page 3 of 8
  • 4.
    Vessel – EnergyDriller, ROV – Panher Plus910 Worked for Fugro ME as ROV Supervisor Mar 10 – 01 Apr 2011 Flow line installation, Dive support , Riser installation, Survey of installed pipe lines ,Onboard Leighton Eclipse. Vessel –Leighton Eclipse, ROV – Sea Lion 26 Worked for Fugro ME as ROV Supervisor. Dec 20 2010-Feb 15 2011 Drill Support , Assist Lowering of float boxes. Assist casing & other top side operations. For ONGC on board Sagar Vijay. Vessel – Sagar Vijay, ROV – Panther Plus 929 Worked for Fugro ME as ROV Supervisor Nov 17 – Nov 24 2010 Sea growth removal from old PGB & well head Cutting old guide wires. Installing new guide wires. BOP Installation & Inspections. Vessel – Energy Driller, ROV – Panther Plus 910 Worked for Fugro ME as ROV Supervisor Sep 18 – 12 Nov 2010 Riser removal, Dive support , ‘I’ Tube installation Stinger Inspection , Pipe line survey Vessel – Leighton Eclipse, ROV – Sea Lion 26 Worked for Fugro ME as ROV Supervisor. Jun 11 – Jul 23 2010 Drill Support , BOP Latching & Inspections, Riser Inspection.For ONGC on Energy Driller. Vessel – Energy Driller ROV – Panther Plus 910 Worked for Fugro ME as ROV Supervisor Feb 20-Apr 26 2010 Flow line installation ,Dive support ,Riser installation Survey of installed pipe lines. Vessel – Smit Borneo, ROV – SeaLion 6. Worked for Fugro ME as ROV Sub Engg. Nov 26- Dec 28 2009 Pipe lay ,Touch down monitoring, Pipe lay initiation Sleeper inspections & Survey. Vessel – Leighton Eclipse, ROV – Sea Lion 26. Worked for Fugro ME as senior ROV Sub Engg. Aug 20- sep 21 2009 Cable laying , Touch down monitoring. Prelay & as built surveys. Vessel - Siem Carrier, ROV – Panther Plus 926 Worked for Fugro ME as senior ROV Sub Engg. Jul 14 – Aug 03 , 2009 Cable laying , Touch down monitoring. Prelay & as built surveys.Onboard Siem Carrier. Vessel - Siem Carrier, ROV - Panther Plus 926 Worked for Fugro ME as senior ROV Sub Engg. May 07 – Jun 13 , 2009 Drill Support , BOP Latching & Inspections, Riser Inspection. Client - ONGC Vessel - Energy Driller, ROV - Panther Plus 910 Worked for Fugro ME as ROV Supervisor. Mar 14 – Apr 16 , 2009 Flow line installation, Dive support , J-Tube I – Tube installation. Vessel - Smit Borneo, ROV – Sea pup 5 Page 4 of 8
  • 5.
    Worked for FugroME as ROV Supervisor Dec 26 – Feb 05, 2009 Drill Support , BOP Inspections, Riser Inspection.Client ONGC Vessel - Energy Driller, ROV - Panther Plus 910 Worked for Fugro ME as ROV Supervisor. Sep 05 – Nov 08, 2008 Pipe laying & touch down monitoring. Sleepers laydown- survey & inspection. Pre lay & as built survey of pipe line. Client- McDermott Vessel – Setia Indah, ROV - Panther Plus 926 Worked for Fugro ME as Senior ROV Pilot Tech Jun 07 – Jul 25 ,2008 Drill Support , BOP Inspections, Riser Inspection.Client ONGC . Vessel – Sagar Vijay, ROV – Panther Plus 929 Worked for Fugro ME as Senior ROV Pilot Tech Aug 08 – Oct 17,2007 Pipe laydown, Free span inspection, Piling,Chain laydown Plem installation & Calm buoy installation.Sea bed survey. Client Qatar Gas.Mcdermott barge KP1, ROV – Panther Plus 903 Worked for Fugro (M.E) as Senoir ROV Pilot Tech May 06 – Jun 21, 2007 Calm buoy installation for Kuwait oil company , Client HHI,Vessel HD 423.. Seabed survey , Piling operation.Depth of dive 33m. Location Mina Al Ahmadi.kuwait. Worked for Fugro as senior ROV Pilot Tech. ROV – Sea Pup Feb 07 – Mar 21, 2007 Calm buoy installation for Kuwait oil company , Client HHI,Vessel HD 423.. Seabed survey , Piling operations , Pipe recovery / pipe laydown . Watch Buoys on chain ends. Location Mina Al Ahmadi.kuwait. Worked for Fugro as senior ROV pilot Tech. ROV – Sea Pup Nov 06 – Dec 26, 2006 Cable Laying,for RAS GAS onboard Team Oman. sea bed survey Assist in cable laying by continuous monitoring. As laid cable survey light construction. Location RAS GAS field,Qatar. ROV – Rover MK II Worked for Fugro as senior ROV Pilot Tech. Aug 31 – sep 26, 2006 Drill Support ,onboard Deep Water frontier , Client - RIL .General visual inspection of BOP, Glycol injection. Recovery of defective compatts. Depth of dive 1945 m .Location – KG – D6 – MG1.India. Worked for Oceaneering as ROV Pilot Tech.ROV – Sea Lion 36 Jul 03–Aug08,2006 Drill Support, onboard Deep Water frontier, Client-RIL. Mobilisation installation & commissioning of Sea lion system. Laying of compatts . Watch the drill bit rotation while drilling .BOP latching. Glycol injection.BOP inspection . Laying of compatts. Depth of dive 1945 m. Location - KG – D6 – MG1.India Worked for Oceaneering as ROV Pilot Tech, ROV – Sea Lion 36 Page 5 of 8
  • 6.
    Feb 25 –Mar 21 ,2006 Drill Support , onboard Discoverer 7 seas , Client ONGC. Compatts deployment . spud in , Monitor drill bit rotation while drilling Through open hole. BOP latching & inspection. Bulls eye Inspection. Riser inspection to check for leaks. Depth of dive 661 m. Location 98 / 2E – 1(shallow) India. Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11 Feb 03 -24 ,2006 Drill Support , Onboard Discoverer 7 seas ,Client ONGC. Compatts deployment ,spud in , Monitor drill bit while drilling through open hole .BOP latching & inspection. Bulls eye Inspection. Depth of dive 948 m. Location DW – F – 1. India. Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11 Nov 18 - Dec 09 ,2005 Drill Support , onboard Discoverer 7 seas ,Client ONGC. Compatts recovery & deployment .Spud in. Monitor drill bit while drilling through open hole .BOP latching & inspection. Bulls eye Inspection. Depth of dive 778 m. Location KG – A1 & 98 – 2 A1. India . Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11 Oct 08 -21,2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Compatts recovery & deployment .Spud in. Monitor drill bit while drilling through open hole .BOP latching & inspection. Bulls eye Inspection. Location KG – A1 . India. Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11 Sep 09 – Oct 07 2005 Drill Support , onboard Discoverer 7 seas ,Client – ONGC Recovery & Deployment of Compatts. Monitor drill bit while drilling through open hole BOP latching & inspection. Bulls eye Inspection. Glycol injection. Spud in. Location KG – A1 India. Worked for Oceaneering as ROV Pilot Tech, ROV – Magnum 11 ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech Jul 01-16 2005 Drill Support , onboard Discoverer 7 seas ,Client - ONGC. Recovery & Deployment of Compatts. Spud in. Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection. Depth of dive 572 m. Location KD 1 -3. India. ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech May 28 – Jun 14 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Recovery & Deployment of Compatts.Spud in. Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection. Depth of dive 572 m. Location KD – 1 - 3 India. ROV – Magnum 11, Worked for Oceaneering as ROV Pilot Tech Apr 29 – May 27 2005 Drill Support ,onboard Discoverer 7 seas , Client - ONGC. Recovery & Deployment of Compatts.Spud in. Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection. Glycol injection. Depth of dive 822 m. Location VA – 2 & VA - 3 India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Apr 19 – 27 2005 Client – Hardy Oil. Removal & fitment of flying lead on tree & UTA, inspection of pipe line for leaks. Torque tool operations. Depth of dive 325 m. Location Chennai India. ROV – magnum 72, Worked for Oceaneering as ROV Pilot Tech Page 6 of 8
  • 7.
    Mar 18 -31 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC Recovery & Deployment of Compatts. Spud in Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection. Glycol injection. Depth of dive 700 m. Location VA -1 India. ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Feb 24 - Mar 17 2005 Drill Support , onboard Discoverer 7 seas , Client - ONGC. Recovery & Deployment of Compatts. Spud in Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection, Glycol injection.. Depth of dive 557 m. Location G1 – 12 A India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech. Dec 30 2004 – Jan 21 2005 Drill Support, onboard Discoverer 7 seas , Client – ONGC Recovery & Deployment of Compatts. Spud in Monitor drill bit while drilling through open hole. BOP latching & inspection. Bulls eye Inspection. Glycol injection.. Depth of dive 850 m. Location G -1 - 12 India. ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech. Dec 14-22 2004 Drill Support, onboard Discoverer 7 seas, Client – ONGC. Sea bed survey, Compatts deployment. Monitoring drill when drilling through open hole Bop latching & inspection . Glycol injection. Depth of dive 850 m. Location GD 4 -1 India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Nov 04 – Dec 02 2004 Drill Support , onboard Discoverer 7 seas , Client – OONG sea bed survey, Compatts deployment. Monitoring drill when drilling through open hole. Bop latching & inspection. Depth of dive 1154 m. Location KD 4- 1A India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech. Sep 02 - 23 2004 Drill Support , onboard Discoverer 7 seas ,Client – ONGC. sea bed survey,Compatts deployment. Monitoring drill when drilling through open hole. Bop latching & inspection. Depth of dive 1035 m. Location GB 3 – 1AA India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Aug 21 – 30 2004 Drill Support, onboard Discoverer 7 seas, Client – ONGC. sea bed survey, Compatts deployment. Monitoring drill when drilling through open hole. Bop latching & inspection . Glycol injection. Depth of dive 1035 m. Location GB 3 – 1AA In ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech. Jul 15 - 29 2004 Drill Support , onboard Discoverer 7 seas , Client – ONGC. sea bed survey,Compatts deployment. Monitoring drill when drilling through open hole.Bop latching & inspection. Glycol injection. Depth of dive 1734 m. Location KD – AE -3 -1A India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Jun 14 –July 14 2004 Drill Support , onboard Discoverer 7 seas ,Client – ONG, sea bed survey, Compatts deployment. Monitoring drill when drilling through open hole. Bop latching & inspection . Glycol injection. Depth of dive 1734 m. Location KD3 – 1A India ROV – magnum 11, Worked for Oceaneering as ROV Pilot Tech Page 7 of 8
  • 8.
    Feb 2003 –Oct 2003 Electrical Officer, On board M.V Amer Everest. Worked as refeer engineer. Maintenance of Motors , Contactors , Compressors , & accommodation A/C. Jan 1987 – Jan 2002 Worked in Indian Navy as Senior Supervisor on board Various Ships & establishments.Having fifteen years of practical experience in the field of electrical / electronic engineering. Jobs performed ------------ Installation & setting to work . Testing Tuning & Trials. Operation & maintenance.Circuit Analysis , fault diagnosis & defect rectification.Planned Preventive & Breakdown Maintenance. Maintenance of Radars , Sonars , Communication System, Hydraulic ,Electro hydraulic, Electro mechanical & electro pnumetic systems. Maintenance of various other systems such as , Navigational aids,frequency converters, AC / DC Motors. Worked as Instructor at Electrical school of Indian Navy , teaching Radars & display systems.Practical trainer for Radar. Utilization of resources , men & material for smooth functioning of department .Planning & preparing defect lists , Coordination with dockyard. Maintenance & up keeping of spare gear .Responsible for welfare , moral & discipline of personal in department. Planning & conducting in house Training. EQUIPMENT EXPERIENCE: ROV’s Sea Eye Surveyor, Hercules , Sea Eye Panther Plus, Sea Eye Panther, Sea Pup, Rover MK II , Sea Lion , Magnum’s. Sensors Sonar simrad 900,1000, Imagenex & Sonavision, Gyro’s ,Seven function conan manipulators,Orion T4 7Fn. Manips,Rig Master,Torque Tools, motors and pumps , generators , etc. Page 8 of 8