Name William Kane Pustejovsky Address 2627 Caroline St. Houston, Texas 77004
Direct (M) +1 281 639 8613 Email kanepustejovsky@gmail.com Linkedin https://www.linkedin.com/in/captainkane
Date of Birth September 9, 1978
Nationality American
Passport issued/ Date USA/ Texas 12 Dec 2007, Expires 11 Dec 2017
Seamans Book Panama
Place/Date of issuance London on 15 July 2013, Expires 15 July 2018
Airport of Departure George Bush Intercontinental – (IAH)
Competency Level ROV Supervisor
Certifications IMCA ROV Supervisor Certification # CC13-9731
Rigger API RP 2D 6th Edition
UK Vantage number 1077188
TWIC expires July 2020
Survival (FOET) OPITO, (OLF) NOGEPA exp Oct 2018, Compressed Air Emergency Breathing Training (EBS) OPITO
Medical UKOOA Medical Certificate, exp May 2017
System Qualifications
Work Class Inspection Class
Schilling Gen I and II UHD, HD Sub Atrlantic Navajo, Mohican and Comanche
Perry Slingsby Triton XL, XLS, XLX, Lynx, LBV, Outland
SMD’s Quantum, Centurions and Hercules
Summary
A results-driven professional (ROV) Remotely Operated Vehicle specialist with 10 years of experience using work and inspection class vehicles for
Deepwater Drilling Support, Deepwater Field Development including heavy subsea construction, FPSO and Monopod and Riser installations , Deepwater
well work overs using wireline and coiled tubing, pre-lay and pipelay touchdown monitoring, and complete survey kits using multi beam sonar, sub bottom
profiler, mini pos, rov nav and TSS 340 and 440 pipetrackers. An excellent track record of meeting and exceeding expectations and goals; Excellent
communication skills and interpersonal skills; Proven history and success as a contactor in highly competitive market.
EMPLOYMENT HISTORY
IMCA ROV Supervisor, Freelance Agency, WKP Services LLC
November 2015- Current
 Ensured continuity of services as required by industry QHSE standards and participated as well as facilitated JSA’s and daily safety meetings/toolbox
talks/proper PPE.
 Conducted full system mobilizations/demobilizations including any logistical organization of equipment on and off the vessel as well as pre Mobilization
planning regarding the deck layout and safe placement of all relevant equipment to be installed and used for the project.
 Carried out and assisted third party Non destructive Testing (NDT) companies after everything has been secured and welded to the deck, including water
bag load testing to the Launch and Recovery System (LARS) Participates in any Client safety observation card programs and briefs crew of daily safety
procedures.
 Reported accidents/incidents/near misses to ROV Superintendent and vessel OIM. Was liaison with offshore client rep. Observed any unexpected
operational constraints and assessed the ROV’s ability to perform and continue operations in order to eliminate any possible risk to the client assets and
reducing risk of compromising safe recovery of the ROV.
 Assisted ROV superintendent and OIM with pre-task planning to observe conditions and equipment status to develop non-risk procedures in safe
accordance with any contingency plans along with emergency procedures.
 Submitted daily progress reports to onshore mgmt.. Maintains quality dive logs and follows client requested video and annotation requirements including
media release documents signed and approved to be submitted upon project completion.
 Provides quality detailed handovers to the oncoming personnel during shift changes and records a technical log with details from troubleshooting/repairs
to the system
 Experience with Schilling T4, knowledgable using the master controller and all its operating functions as well as providing maintenance.
 Competent to take over operations as a pilot immediately and manage emergency recovery procedures
 Organized and carried out on site training to less experienced personnel and competent to familiarize personnel of power distribution to the system and
emergency procedures, including isolating the system and lock out tag out procedures (LOTO),
 Experience with ODIM and Dynacon LARS and can carry out mechanical umbilical reterminations and tether reterminations in the field,
 Competent with integrating hydraulic and electrical survey tooling to the ROV
 Quality history supervising system Mobilization/Demobilizations
 Assumed overall responsibility of operations/maintenance/repairs
Owner/ operator of Advanced Window Film Solutions
Houston, Texas
October 2015 – Current
 Provides service to several local auto dealerships with aftermarket products
 Specializing in window film installation, electical products such as back up cameras, audio and security upgrades
 Liase with sales staff and clents in regards to product operation and care
 Provides troubleshooting and repairs for valid warranty cases in regards to products previously installed
 Schedules appointments with Sales staff and clents for installations and service
 Carries out all installations
(ES-1) Equipment Technician
Deepocean UK, +44 1224 568450
August 2014 –October 2015
ROV Supervisor
IV Offshore UK, +44 1315 543454
January 2014 – August 2014
ROV Supervisor
EMAS Singapore, +65 6349 8535
February 2013- January 2014
ROV Supervisor
UKPS
March 2012 – January 2013
ROV Pilot Technician
Subserv Pro / Bourbon DNT
July 2011 – February 2012
ROV Trainee/ Pilot Technician / ROV Supervisor
Compass Personnel Katy, Texas, +1 832 321 4529
February 2006- July 2011
Professional Fishing and Hunting Guide
The Redfish Lodge in Rockport, Texas, +1 361 729 8100
April 2007 – January 2008
Please find the following pages as specific career placement and history dated back 10 years.
DATE Contractor Task System Position Vessel
Cllient
27 May – 24 June
2015
Deepocean UK Mattress Installation, Survey Supporter 2 SR PT Surf Ranger
NA
28 Feb -26 Mar 2015 Deepocean UK Windfarm export cable repair and survey, Trenching
support, for Dolw in Alpha in Germany
UHD 54/56 ROV Supv Havilla Phoenix
Tekmar
11 Nov – 21 Nov
2014
Deepocean UK Trenching support UHD 56,54 ROV SUPV Havilla Phoenix
Statoil
16 Sept – 17 Oct
2014
Deepocean UK Trenching support / laid survey UHD 56/54 SR PT/SUPV Havilla Phoenix
Statoil
03 July – 13 Aug
2014
Allseas Julimar 18” CRA Survey and TDM UHD 40 SR PT Audacia
Apache
21 Apr – 24 May 2014 Deep Ocean AS Light Construction, assist and monitor dredging ops,
Survey
UHD 56/54 SR PT/
SUPV
Havilla Phoenix BP
30 Mar – 06 April
2014
Canyon SG Riser Installation w ith (VLS) Vertical Landing System UHD 30/31 SR PT SD2 Statoil
3 Dec 13 – 22 Dec 13 DOF Subsea Brittania 28” Dredging and PRCT/ACFM UHD 03/60 SR PT Geosund Conoco Phillips
6 Nov 13 - 21 Nov 13 DOF Subsea Brittania 28” Dredging and PRCT/ACFM UHD 03/60 SR PT Geosund Conoco Phillips
25 Sept – 24 Oct
2013
DOF Subsea Pipelay / TDM / Inspections UHD 03/60 SR PT Geosund Statoil
20 Aug – 14 Sept Reef Subsea Mattress Installation/ TDM XLX 16/17 ROV SUPV Reef Larissa Saipem/ Chevron
1 May – 4 Jun 2013
Emas Monopod Installation / Survey Construction HD12 ROV SUPV
Sea Horizon (Cal
Dive) Cal Dive / JAB /
Petronas
28 Feb – 19 Apr 2013
Emas Mobilization / Sea Trials / SURF Installation HD12 ROV SUPV
Sea Horizon (Cal
Dive) PT Pan/ Cal Dive
17 Dec 2012 – 10Jan
2013 Smit EOD Recovery
HD17 SR PT MPR4 Boskalis, North Sea,
Germany
11 Oct-22 Oct 2012 TMT System Remod XL 11 ROV SUPV NA
NA
14 Sept-2 Oct 2012 Insite Technologies
Organized assets and spares into new facility, along
w ith assisting for future project planning
Mohaw k,
Outlands
Operations Mgr NA
Insite Technologies
1 Sept-12 Sept 2012 Insite Technologies Dive Support/SalvageEnded in Demob
Demobillization
Outland 163/132 ROV SUPV Captain Topaz
Mammoet
30 July-10 Aug 2012
MMT
Cable Tracking and Identification Comanche ROV SUPV Stril Explorer Quincy/MMT
(Norw ay)
11 Jun – 28 Jun 2012
Subsea7
Asset Inspection/ Survey, valve ops as directed Centurion 24 ROV SUPV/SR PT Pacific Wizard Mobil Exxonl Equatorial
Guinea
30 Apr -31 May 2012
Subsea7
Asset Inspection/ Survey, valve ops as directed Centurion 24 ROV SUPV/SR PT Pacific Wizard Mobil Exxon Equatorial
Guinea
3 Apr – 10 Apr 2012
Subsea7 UWILD
Hercules 19 ROV Supv (sw ing
shift position)
Chole Candies BP
GoM
11 Jan – 15 Feb 2012
Veolia Drill Support XLS 29, 30 Sr PT Normand Pacific BP
GoM
25 Oct – 3 Dec 2011 Bourbon DNT Deepw ater Construction/Field Development UHD 057 Sr PT Bourbon Trieste
Total
(Nigeria)
22 Aug – 24 Sep
2011
Bourbon DNT Deepw ater Construction/Field Development UHD 057 Sr PT Bourbon Trieste Total
(Nigeria)
19 July – 5 Aug 2011 Subsea7 IRM’s, Valve Ops w ith Thunderhorse X:LS 37, 54 Sr PT Ross Candies BP
(GoM)
8 June – 17July 2011 Subsea 7 Construction/Inspections Centurion 24 PT
Pacific Wizard Exxon Mobil Equatorial
Guinea
(MEGI)
20 Oct – 23 Nov 2010 Hibbard Inshore
Hyd-Elec Dam survey/ dye injections
Navajo ROV Supervisor
NA Tennesse, Colorado
River Valley Authorities
Sep 18-Oct 1, 2010 Hibbard Inshore
Hyd-Elec Dam intake fault discovery/ inspection
Navajo ROV Supervisor
NA
AES, (David, Panama)
Aug 15-Sep 9, 2010 Hibbard Inshore
Hyd-Elec Dam intake dredging and survey
Navajo/
LBV
ROV Supervisor
NA
Gas Natural, Spain
Jul-Aug, 2010 Dof Subsea
Deepw ater Field Development
XLX 25 Pilot Tech
Skandi Aker Kosmos Energy
(Ghana)
Mar 1, 10-Mar 9, 10 Mako
Technologies
Dow ned platform survey Lynx Pilot Tech MV Phillip Spencer Deep Quest
Nov 30, 09-Dec 10,
09
Global Industries
Deep w ater w ell w ork overs
UHD 30, 31 SrPT Olympic Challenger
ATP
Nov 10, 09-Nov 16,
09
Global Industries
Deep w ater w ell w ork overs
UHD 30, 31 Sr PT Olympic Challenger
ATP
Oct 30, 09- Nov 6, 09 Global Industries
Metrology, dow ned platform inspection
UHD 30, 31 Sr PT Olympic Challenger
ATP
Oct 6, 09-Oct 13,09 Global Industries Tree installations, deepw ater construction UHD 30, 31 Sr PT Olympic Challenger ATP
Aug17, 09 – Sep 7,
09
Global Industries
IRM’s, Umbilical recovery
UHD 30,31 Sr PT Olympic Challenger
BHPBilliton
Aug 2, 09 – Aug15,
09
Phoenix International Jumper Installation, subsea construction UHD 06 Sr PT MV Anne Candies
BP
July 22,09- July27,09 Phoenix International Site survey of abandoned w ellpre and post explosives UHD 06 Sr PT MV Anne Candies
NA
Jun 09 – Jul 09 Sub Atlantic, Inc Level I and II Platform Inspection Sub Atlantic,
Mohican
Integration/Srv
Tech
MV Baltic
Apache, Oceaneering
Mar 09 – Apr 09 Clough Dive Support, Platform Recovery Triton XLX SrPT REM Clough
Wild Well
Dec 6, 08- Dec 12, 08 Phoenix International Reposition Umbilical and as laid fixes. Jumper
installation
UHD 06 Sr PT Anne Candies NA
Oct 28, 08- Nov 21,
08
Canyon Touchdow n Monitoring(Longhorn Project) XLS 28 Pilot Tech Intrepid Shell
Sep 08 – Oct 08 Phoenix International Mobilisation and demobilisation.
Post hurricane support in deep w ater
UHD 02 Pilot Tech Rigdon Orleans Noble Drilling
Aug 10, 08- Sept 9,
08
Tesla Record Data from Magnotometer, Sidescan Sonar,
Sub bottom Profiler
Tow fish Data Recorder Max Cheramie Superior, Shell,
Chevron
May 26, 08 – July10,
08
Canyon Offshore Dive Support, platform recovery. Job ended in Demob XLS 14 Pilot Tech Atlantic Horizon Devon
Feb 08 – May 08 Texas crew Boats Loading and backloading supplies as w ellas personnel
transfers
NA Deckhand/Riggers/
Engineer
MV Jaqueline Hunt
Petroleum
Mar 07 – Apr 07 Hallin Marine Touchdow n monitoring behind the Solitaire Quantum 4 Pilot Tech Highland Fortess Shell,
All Seas
Oct 06 – Jan 07 Subsea 7 Drill Support Centurion Pilot Tech Sedco 700 Transocean,
Hess
Oct 06 – Nov 06 S.S.I Dive Support, platform recovery and Demobilisation Sub Atlantic,
Comanche
Pilot Tech Toisa Proterus Wild Well
Aug 06 – Sep 06 Subsea 7 Pre-Lay Survey for Shell Tahiti, and Pompano ended in
Demob
Hercules 11 Pilot Tech Manta III Shell,
Enbridge
Jun 06 – Jul 06 Canyon Dive Support, job ended in Demob XL 17 PT II Witch Queen,
Trinidad
OTSL
Apr 06 - May 06 Canyon TD Monitoring/ Construction Support. Job ended in
Demob
XLS 8/10 PT II Express Shell
Mar 06 – Apr 06 Canyon TD Monitoring, Construction Quest 2 PT II Intrepid Shell
Thank you, Kane Pustejovsky Direct (M): + 1 281 639 8613
kanepustejovsky@gmail.com https://www.linkedin.com/in/captainkane
wkpcvsept

wkpcvsept

  • 1.
    Name William KanePustejovsky Address 2627 Caroline St. Houston, Texas 77004 Direct (M) +1 281 639 8613 Email kanepustejovsky@gmail.com Linkedin https://www.linkedin.com/in/captainkane Date of Birth September 9, 1978 Nationality American Passport issued/ Date USA/ Texas 12 Dec 2007, Expires 11 Dec 2017 Seamans Book Panama Place/Date of issuance London on 15 July 2013, Expires 15 July 2018 Airport of Departure George Bush Intercontinental – (IAH) Competency Level ROV Supervisor Certifications IMCA ROV Supervisor Certification # CC13-9731 Rigger API RP 2D 6th Edition UK Vantage number 1077188 TWIC expires July 2020 Survival (FOET) OPITO, (OLF) NOGEPA exp Oct 2018, Compressed Air Emergency Breathing Training (EBS) OPITO Medical UKOOA Medical Certificate, exp May 2017 System Qualifications Work Class Inspection Class Schilling Gen I and II UHD, HD Sub Atrlantic Navajo, Mohican and Comanche Perry Slingsby Triton XL, XLS, XLX, Lynx, LBV, Outland SMD’s Quantum, Centurions and Hercules Summary A results-driven professional (ROV) Remotely Operated Vehicle specialist with 10 years of experience using work and inspection class vehicles for Deepwater Drilling Support, Deepwater Field Development including heavy subsea construction, FPSO and Monopod and Riser installations , Deepwater well work overs using wireline and coiled tubing, pre-lay and pipelay touchdown monitoring, and complete survey kits using multi beam sonar, sub bottom profiler, mini pos, rov nav and TSS 340 and 440 pipetrackers. An excellent track record of meeting and exceeding expectations and goals; Excellent communication skills and interpersonal skills; Proven history and success as a contactor in highly competitive market.
  • 2.
    EMPLOYMENT HISTORY IMCA ROVSupervisor, Freelance Agency, WKP Services LLC November 2015- Current  Ensured continuity of services as required by industry QHSE standards and participated as well as facilitated JSA’s and daily safety meetings/toolbox talks/proper PPE.  Conducted full system mobilizations/demobilizations including any logistical organization of equipment on and off the vessel as well as pre Mobilization planning regarding the deck layout and safe placement of all relevant equipment to be installed and used for the project.  Carried out and assisted third party Non destructive Testing (NDT) companies after everything has been secured and welded to the deck, including water bag load testing to the Launch and Recovery System (LARS) Participates in any Client safety observation card programs and briefs crew of daily safety procedures.  Reported accidents/incidents/near misses to ROV Superintendent and vessel OIM. Was liaison with offshore client rep. Observed any unexpected operational constraints and assessed the ROV’s ability to perform and continue operations in order to eliminate any possible risk to the client assets and reducing risk of compromising safe recovery of the ROV.  Assisted ROV superintendent and OIM with pre-task planning to observe conditions and equipment status to develop non-risk procedures in safe accordance with any contingency plans along with emergency procedures.  Submitted daily progress reports to onshore mgmt.. Maintains quality dive logs and follows client requested video and annotation requirements including media release documents signed and approved to be submitted upon project completion.  Provides quality detailed handovers to the oncoming personnel during shift changes and records a technical log with details from troubleshooting/repairs to the system  Experience with Schilling T4, knowledgable using the master controller and all its operating functions as well as providing maintenance.  Competent to take over operations as a pilot immediately and manage emergency recovery procedures  Organized and carried out on site training to less experienced personnel and competent to familiarize personnel of power distribution to the system and emergency procedures, including isolating the system and lock out tag out procedures (LOTO),  Experience with ODIM and Dynacon LARS and can carry out mechanical umbilical reterminations and tether reterminations in the field,  Competent with integrating hydraulic and electrical survey tooling to the ROV  Quality history supervising system Mobilization/Demobilizations  Assumed overall responsibility of operations/maintenance/repairs Owner/ operator of Advanced Window Film Solutions Houston, Texas October 2015 – Current  Provides service to several local auto dealerships with aftermarket products  Specializing in window film installation, electical products such as back up cameras, audio and security upgrades  Liase with sales staff and clents in regards to product operation and care  Provides troubleshooting and repairs for valid warranty cases in regards to products previously installed  Schedules appointments with Sales staff and clents for installations and service  Carries out all installations
  • 3.
    (ES-1) Equipment Technician DeepoceanUK, +44 1224 568450 August 2014 –October 2015 ROV Supervisor IV Offshore UK, +44 1315 543454 January 2014 – August 2014 ROV Supervisor EMAS Singapore, +65 6349 8535 February 2013- January 2014 ROV Supervisor UKPS March 2012 – January 2013 ROV Pilot Technician Subserv Pro / Bourbon DNT July 2011 – February 2012 ROV Trainee/ Pilot Technician / ROV Supervisor Compass Personnel Katy, Texas, +1 832 321 4529 February 2006- July 2011 Professional Fishing and Hunting Guide The Redfish Lodge in Rockport, Texas, +1 361 729 8100 April 2007 – January 2008 Please find the following pages as specific career placement and history dated back 10 years. DATE Contractor Task System Position Vessel Cllient 27 May – 24 June 2015 Deepocean UK Mattress Installation, Survey Supporter 2 SR PT Surf Ranger NA
  • 4.
    28 Feb -26Mar 2015 Deepocean UK Windfarm export cable repair and survey, Trenching support, for Dolw in Alpha in Germany UHD 54/56 ROV Supv Havilla Phoenix Tekmar 11 Nov – 21 Nov 2014 Deepocean UK Trenching support UHD 56,54 ROV SUPV Havilla Phoenix Statoil 16 Sept – 17 Oct 2014 Deepocean UK Trenching support / laid survey UHD 56/54 SR PT/SUPV Havilla Phoenix Statoil 03 July – 13 Aug 2014 Allseas Julimar 18” CRA Survey and TDM UHD 40 SR PT Audacia Apache 21 Apr – 24 May 2014 Deep Ocean AS Light Construction, assist and monitor dredging ops, Survey UHD 56/54 SR PT/ SUPV Havilla Phoenix BP 30 Mar – 06 April 2014 Canyon SG Riser Installation w ith (VLS) Vertical Landing System UHD 30/31 SR PT SD2 Statoil 3 Dec 13 – 22 Dec 13 DOF Subsea Brittania 28” Dredging and PRCT/ACFM UHD 03/60 SR PT Geosund Conoco Phillips 6 Nov 13 - 21 Nov 13 DOF Subsea Brittania 28” Dredging and PRCT/ACFM UHD 03/60 SR PT Geosund Conoco Phillips 25 Sept – 24 Oct 2013 DOF Subsea Pipelay / TDM / Inspections UHD 03/60 SR PT Geosund Statoil 20 Aug – 14 Sept Reef Subsea Mattress Installation/ TDM XLX 16/17 ROV SUPV Reef Larissa Saipem/ Chevron 1 May – 4 Jun 2013 Emas Monopod Installation / Survey Construction HD12 ROV SUPV Sea Horizon (Cal Dive) Cal Dive / JAB / Petronas 28 Feb – 19 Apr 2013 Emas Mobilization / Sea Trials / SURF Installation HD12 ROV SUPV Sea Horizon (Cal Dive) PT Pan/ Cal Dive 17 Dec 2012 – 10Jan 2013 Smit EOD Recovery HD17 SR PT MPR4 Boskalis, North Sea, Germany 11 Oct-22 Oct 2012 TMT System Remod XL 11 ROV SUPV NA NA 14 Sept-2 Oct 2012 Insite Technologies Organized assets and spares into new facility, along w ith assisting for future project planning Mohaw k, Outlands Operations Mgr NA Insite Technologies 1 Sept-12 Sept 2012 Insite Technologies Dive Support/SalvageEnded in Demob Demobillization Outland 163/132 ROV SUPV Captain Topaz Mammoet 30 July-10 Aug 2012 MMT Cable Tracking and Identification Comanche ROV SUPV Stril Explorer Quincy/MMT (Norw ay) 11 Jun – 28 Jun 2012 Subsea7 Asset Inspection/ Survey, valve ops as directed Centurion 24 ROV SUPV/SR PT Pacific Wizard Mobil Exxonl Equatorial Guinea
  • 5.
    30 Apr -31May 2012 Subsea7 Asset Inspection/ Survey, valve ops as directed Centurion 24 ROV SUPV/SR PT Pacific Wizard Mobil Exxon Equatorial Guinea 3 Apr – 10 Apr 2012 Subsea7 UWILD Hercules 19 ROV Supv (sw ing shift position) Chole Candies BP GoM 11 Jan – 15 Feb 2012 Veolia Drill Support XLS 29, 30 Sr PT Normand Pacific BP GoM 25 Oct – 3 Dec 2011 Bourbon DNT Deepw ater Construction/Field Development UHD 057 Sr PT Bourbon Trieste Total (Nigeria) 22 Aug – 24 Sep 2011 Bourbon DNT Deepw ater Construction/Field Development UHD 057 Sr PT Bourbon Trieste Total (Nigeria) 19 July – 5 Aug 2011 Subsea7 IRM’s, Valve Ops w ith Thunderhorse X:LS 37, 54 Sr PT Ross Candies BP (GoM) 8 June – 17July 2011 Subsea 7 Construction/Inspections Centurion 24 PT Pacific Wizard Exxon Mobil Equatorial Guinea (MEGI) 20 Oct – 23 Nov 2010 Hibbard Inshore Hyd-Elec Dam survey/ dye injections Navajo ROV Supervisor NA Tennesse, Colorado River Valley Authorities Sep 18-Oct 1, 2010 Hibbard Inshore Hyd-Elec Dam intake fault discovery/ inspection Navajo ROV Supervisor NA AES, (David, Panama) Aug 15-Sep 9, 2010 Hibbard Inshore Hyd-Elec Dam intake dredging and survey Navajo/ LBV ROV Supervisor NA Gas Natural, Spain Jul-Aug, 2010 Dof Subsea Deepw ater Field Development XLX 25 Pilot Tech Skandi Aker Kosmos Energy (Ghana) Mar 1, 10-Mar 9, 10 Mako Technologies Dow ned platform survey Lynx Pilot Tech MV Phillip Spencer Deep Quest Nov 30, 09-Dec 10, 09 Global Industries Deep w ater w ell w ork overs UHD 30, 31 SrPT Olympic Challenger ATP Nov 10, 09-Nov 16, 09 Global Industries Deep w ater w ell w ork overs UHD 30, 31 Sr PT Olympic Challenger ATP Oct 30, 09- Nov 6, 09 Global Industries Metrology, dow ned platform inspection UHD 30, 31 Sr PT Olympic Challenger ATP Oct 6, 09-Oct 13,09 Global Industries Tree installations, deepw ater construction UHD 30, 31 Sr PT Olympic Challenger ATP Aug17, 09 – Sep 7, 09 Global Industries IRM’s, Umbilical recovery UHD 30,31 Sr PT Olympic Challenger BHPBilliton Aug 2, 09 – Aug15, 09 Phoenix International Jumper Installation, subsea construction UHD 06 Sr PT MV Anne Candies BP
  • 6.
    July 22,09- July27,09Phoenix International Site survey of abandoned w ellpre and post explosives UHD 06 Sr PT MV Anne Candies NA Jun 09 – Jul 09 Sub Atlantic, Inc Level I and II Platform Inspection Sub Atlantic, Mohican Integration/Srv Tech MV Baltic Apache, Oceaneering Mar 09 – Apr 09 Clough Dive Support, Platform Recovery Triton XLX SrPT REM Clough Wild Well Dec 6, 08- Dec 12, 08 Phoenix International Reposition Umbilical and as laid fixes. Jumper installation UHD 06 Sr PT Anne Candies NA Oct 28, 08- Nov 21, 08 Canyon Touchdow n Monitoring(Longhorn Project) XLS 28 Pilot Tech Intrepid Shell Sep 08 – Oct 08 Phoenix International Mobilisation and demobilisation. Post hurricane support in deep w ater UHD 02 Pilot Tech Rigdon Orleans Noble Drilling Aug 10, 08- Sept 9, 08 Tesla Record Data from Magnotometer, Sidescan Sonar, Sub bottom Profiler Tow fish Data Recorder Max Cheramie Superior, Shell, Chevron May 26, 08 – July10, 08 Canyon Offshore Dive Support, platform recovery. Job ended in Demob XLS 14 Pilot Tech Atlantic Horizon Devon Feb 08 – May 08 Texas crew Boats Loading and backloading supplies as w ellas personnel transfers NA Deckhand/Riggers/ Engineer MV Jaqueline Hunt Petroleum Mar 07 – Apr 07 Hallin Marine Touchdow n monitoring behind the Solitaire Quantum 4 Pilot Tech Highland Fortess Shell, All Seas Oct 06 – Jan 07 Subsea 7 Drill Support Centurion Pilot Tech Sedco 700 Transocean, Hess Oct 06 – Nov 06 S.S.I Dive Support, platform recovery and Demobilisation Sub Atlantic, Comanche Pilot Tech Toisa Proterus Wild Well Aug 06 – Sep 06 Subsea 7 Pre-Lay Survey for Shell Tahiti, and Pompano ended in Demob Hercules 11 Pilot Tech Manta III Shell, Enbridge Jun 06 – Jul 06 Canyon Dive Support, job ended in Demob XL 17 PT II Witch Queen, Trinidad OTSL Apr 06 - May 06 Canyon TD Monitoring/ Construction Support. Job ended in Demob XLS 8/10 PT II Express Shell Mar 06 – Apr 06 Canyon TD Monitoring, Construction Quest 2 PT II Intrepid Shell Thank you, Kane Pustejovsky Direct (M): + 1 281 639 8613 kanepustejovsky@gmail.com https://www.linkedin.com/in/captainkane