Best Practices in CBM Drilling 
Shane A. Lein, Product Manager 
Shallow Oil, Gas and CBM Drilling Equipment 
Garland, Texas
Best Practices in CBM Drilling 
 The key to a successful CBM Drilling Program is Safety, 
the Ability to “Quick Turn” the Wells, Quick Set up, 
Mobility and small Environmental Footprint 
– Safety = good reputation as a Contractor and Employer 
– More wells == mmoorree rreevveennuuee 
– Quick Set Up = more actual drilling time 
– Mobility = more actual drilling time 
– Small Environmental Footprint = “Green” Contractor, less $$ spent 
on location preparation
Best Practices in CBM Drilling 
 Drilling Method requirements are also a consideration 
– Amount of equipment required 
 Mud System 
– Mud Pits, Water Tanks, Mud Pumps, Mud Cleaning EEqquuiippmmeenntt,, MMuudd aanndd 
Mud Treatment Chemicals 
 Air System 
– Auxiliary Compressor, High Pressure Booster, A Few polymers/additives
Unconventional Rigs vs. Conventional Rigs 
 Overall Operating Cost Advantage of Unconventional Rigs 
– Less Crew 
– Fewer Loads to Move 
– Fast Rig Up-Hours, not Days 
– Reduces Non Drilling Time/Cost 
– Increases Drilling Performance 
– Higher Efficiency than Conventional Rigs designed to drill much deeper 
– Physical Size of Drilling Location 
– Less complicated to rig up providing for a safer environment
CBM DRILLING 
Safety, Speed, Mobility, Footage Production, Less 
Environmental Impact
TYPICAL CBM LOCATION 
MOBILE RIG 
DOG 
HOUSE 
MUD PUMP 
(NOT SHOWN) 
MUD TANK 
GEN 
Average Location Size 
40m x 40m or smaller 
VAC 
TRUCK 
SET 
SUB STRUCTURE PIPE TUBS  PIPE RACKS
TYPICAL CBM LOCATION 
Average Location Size 
40m x 40m or smaller 
SLUDGE 
ROLL-BACK 
TRUCK 
LOCATION 
OFFICE 
MUD 
TANK 
MUD 
PUMP 
TANK
Conventional Oilfield Land Rigs 
 Many Loads (average 15-25, costing tens of thousands of $$ per rig move) 
 More components to assemble, set and rig up 
 Larger drilling location required 
 Standard crew of 5 (per shift) x 2-12 hour shifts or 3 x 8 hour shifts 
– 10-15 Crewmembers per shift plus supervisory ppeerrssoonnnneell oonn ssiittee 
– Driller 
– Derrick Hand 
– Motor Hand 
– 2 Floor Hands 
 + Rig Supervisor/Tool Pusher
Conventional Drilling Rig Package 
Rig-MaPst,i stub, 
draw works 
BOP’s 
Choke Manifold 
Degasser 
Mud System 
Pits/Cleaning 
Large Location 
Pad 107m x 107m 
Change House 
Tool House 
Pipe Racks 
Pipe,Collars, 
Casing 
Living Quarters and 
offices 
Diesel Engines 
Gen Sets 
Water Tank 
Diesel Tank 
Mud Pumps 
Mud Mixing House 
Mud/Chemicals 
Reserve 
Pit
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive, better pipe control 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down 
 Few loads to move 
– Saves time and money
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
– Spud sooner 
 High footage production 
–– TToopp DDrriivvee 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down 
 Few loads to move 
– Saves time and money 
– Smaller Environmental Impact-Drilling Location 
 Fewer Crewmembers 
– 3 Per shift typical 
Reduced Non Drilling Activity = More Rotating Hours
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss 
 Smaller scale equipment 
– More keen awareness of the Crew as to the whereabouts of others 
– Fewer Crew Members required to operate the rig
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss 
 Smaller scale equipment 
– More keen awareness of the Crew as to the whereabouts of others 
– Fewer Crew Members required to operate the rig 
 Hands Free Pipe Handling 
– Safer working environment for Crew Members 
 Remain clear of Rotating Pipe
SETTING UP TO DRILL 
RAPID SET UP SAVES TIME  MONEY 
Information from Actual Rig Moves 
 AIR DRILLING - NO SUBSTRUCTURE 
5 TRAILER LOADS - 4 PEOPLE 
1/2 - 1 1/2 HR SET UP UNTIL DRILLING 
AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY
SETTING UP TO DRILL 
RAPID SET UP SAVES TIME  MONEY 
Information from Actual Rig Moves 
 AIR DRILLING - NO SUBSTRUCTURE 
5 TRAILER LOADS - 4 PEOPLE 
1/2 - 1 1/2 HR SET UP UNTIL DRILLING 
AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY 
 MUD DRILLING - FULL HEIGHT SUBSTRUCTURE 
7 TRAILER LOADS - 6 PEOPLE 
2 1/2 - 4 HR SET UP UNTIL DRILLING 
QUICK HOOK UP TO ON-BOARD MUD PIPING
Drilling Methods 
Mud/Air Rotary 
Down Hole Hammer
AIR VS. MUD DRILLING 
AIR 
FASTER  MORE ECONOMICAL IF 
– ROCK FORMATIONS 
MUD 
FASTER  MORE ECONOMICAL IF 
– UNCONSOLIDATED FORMATIONS 
– LESS WATER INFLUX 
– SMALLER HOLES 
– LOST CIRCULATION ZONES NOT A 
PROBLEM 
– LOW PRESSURE GAS DEPOSITS 
– LARGER WATER INFLUX 
– LARGER HOLES 
– NO LOST CIRCULATION ZONES 
– HIGH PRESSURE GAS DEPOSITS
MUD ROTARY - AIR ROTARY - DTH 
 SELECTION CRITERIA 
THE FORMATIONS TO BE DRILLED 
THE HOLE SIZES REQUIRED 
THE HYDRAULICS (WATER) IN THE FORMATIONS 
ECONOMICS
FORMATIONS - DRILLING METHODS 
FORMATION 
TYPES 
SEDIMENTARY ROCKS 
METAMORPHIC ROCKS 
MEDIUM HARD 
IGNEOUS ROCKS 
UNCONSOLIDATED 
UNCONSOLIDATED SOFT 
VERY HARD 
EXAMPLES OF SCHIST QUARTZITE 
FORMATIONS 
VERY HARD GRANITE 
MASSIVE BASALT 
SAND, CLAY, GRAVEL SOFT SHALE 
MED. LIMESTOME 
SOFT SANDSTONE 
MED. SHALE 
GNEISS 
GRANITE 
SOFT LIMESTONE 
SOFT DOLOMITE MED. SANDSTONE 
AQUIFER 
CHARACTERISTICS 
OPTIMUM 
DRILLING FOAM  
METHODS ADDITIVES 
FOAM  
ADDITIVES 
LARGE WATER INFLUX 
WHILE DRILLING 
MODERATE TO LOW 
WATER INFLUX 
DRILLING 
AIR ROTARY 
DRILLING 
MUD 
VERY LOW WATER INFLUX OR NO WATER 
WHILE DRILLING 
AIR DHD 
DRILLING 
WHILE DRILLING
HOLE SIZE 
 GENERALLY, AS HOLE SIZE INCREASES BEYOND A CERTAIN 
POINT, AIR DRILLING WILL BECOME LESS ECONOMICAL 
– CLEANING THE BIT AND HOLE BECOMES A PROBLEM 
 DRILLING SLOWS DOWN 
– ADDITIONAL AIR COMPRESSORS AARREE RREEQQUUIIRREEDD 
 COSTS GO UP
FORMATION HYDRAULICS 
WHEN FORMATIONS ARE SATURATED WITH WATER, AIR 
DRILLING WILL BECOME TOO SLOW TO BE ECONOMICAL 
– WHEN MORE WATER COMES INTO THE HOLE THAN THE AIR LIFT 
SYSTEM CAN EVACUATE, DRILLING RATE SLOWS DOWN AND 
EVENTUALLY STOPS 
– ADDING ANOTHER COMPRESSOR AND A BOOSTER 
COMPRESSOR WILL OVERCOME THE WATER PRESSURE BUT 
WILL ADD OPERATING COST
ECONOMICS 
WHEN SUB SURFACE CONDITIONS SLOW DOWN THE DRILLING RATE 
WHEN ADDITIONAL EQUIPMENT REQUIREMENTS ADD COST 
AIR DRILLING WILL NOT BE ECONOMICALLY FFEEAASSIIBBLLEE
TYPICAL AIR ROTARY 
OR DTH-PERCUSSION 
DRILLING SET UP
Mud 
Drilling
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Alberta, CA) 
 800m Depth CBM Well (Water/Bentonite Flush) 
– Move on Location and Rig Up 
 4 Hours 
– Drill 100m of 9 7/8” Surface hole and set 7” Surface Casing 
 10 Hours 
– Drill 700m of 6 1/8“ Production hole and set 4 ½” Production Casing 
 18 Hours 
– Rig Down 
 2 Hours 
 Total Well, 34 Hours (Excludes BOP Test at Rig Up and Logging Production Hole)
MUD DRILLING LOCATION, ALBERTA CANADA
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 China 
– Mud Drill 12 ¼” to 40m, set 9 5/8” casing 
– Air Drilling (DTH) to 350m set 5 ½” casing 
– Total Time-5 days
CBM Location in China
CBM Location in China
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 India - Air Drilling 
– Conductor - Drill 17 ½” to 15m, set 13 3/8” casing 
– Surface - Drill 12 ¼” to 150m, set 9 5/8” casing 
– Production - 7” to 1000 m, set 5 ½” casing 
– Total Time-5 days
Compact CBM Location in 
West Bengal, India
Compact CBM Location in 
West Bengal, India
Compact CBM Location in 
West Bengal, India
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 Australia 
– Water Flush Drill and set 9 5/8” surface casing to 120m 
– Water Flush Drill to TD at 1000m and set 8 ½” production casing 
– Total Time-3 days
CBM Location in Queensland, Australia
CBM Location in Queensland, Australia
CBM Location in Queensland, Australia
Additional Photographs of Unconventional 
Rigs in CBM Application 
Safe, Mobile Equipment, Quick Moving, Quick Rig Up/Down 
Small Environmental Footprint
CBM WELL IN WESTERN VIRGINIA
CBM WELL IN WESTERN VIRGINIA
GAS WELL LOCATION SOUTHERN ARKANSAS
FLARING OFF THE GAS – AIR DRILLING WITH LOTS OF 
WATER IN THE HOLE
GROUND LEVEL LOCATION 
AIR DRILLING - CBM - PENNSYLVANIA
MOUNTAIN TOP LOCATION 
NARROW MOUNTAIN TOP LOCATION IN VIRGINIA
CBM Location in Botswana, South Africa
Rigging up two rigs in Arkansas. 
Drilling in Fayetteville Shale
Questions? 
Thank you for your time and attention
Best Practice in CBM Drilling - ATLAS COPCO Indonesia  Presentation

More Related Content

What's hot

Caol bed methane
Caol bed methaneCaol bed methane
Caol bed methane
haresh rathore
 
Oil 101 - Introduction to Exploration
Oil 101 - Introduction to ExplorationOil 101 - Introduction to Exploration
Oil 101 - Introduction to Exploration
EKT Interactive
 
oil and gas traps
oil and gas traps oil and gas traps
oil and gas traps
Zanyar qaradaxe
 
Oil shale..New fossil fuel for century
Oil shale..New fossil fuel for centuryOil shale..New fossil fuel for century
Oil shale..New fossil fuel for century
Geology Department, Faculty of Science, Tanta University
 
Well Logging: 03 SP log 02
Well Logging: 03 SP log 02Well Logging: 03 SP log 02
Well Logging: 03 SP log 02
khaled Zidan
 
Q913 re1 w3 lec 11
Q913 re1 w3 lec 11Q913 re1 w3 lec 11
Q913 re1 w3 lec 11AFATous
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoirOmar Khorshed
 
Conventional and Unconventional Reservoirs
Conventional and Unconventional ReservoirsConventional and Unconventional Reservoirs
Conventional and Unconventional Reservoirs
Rimsha Rais
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInKhaled Sherif
 
COAL BED GAS GENERATION
COAL BED GAS GENERATIONCOAL BED GAS GENERATION
COAL BED GAS GENERATION
Haya Haroon
 
Ia final presentation
Ia final presentationIa final presentation
Ia final presentation
RAJESH KUMAR
 
Coal Bed Methane
Coal Bed MethaneCoal Bed Methane
Coal Bed Methane
Rupam_Sarmah
 
6 dynamics
6   dynamics6   dynamics
6 dynamics
amrhaggag
 
Introduction to petroleum Economics
Introduction to petroleum EconomicsIntroduction to petroleum Economics
Deep Sea Fan Systems
Deep Sea Fan SystemsDeep Sea Fan Systems
Deep Sea Fan Systems
William W. Little
 
Petroleum economics
Petroleum economicsPetroleum economics
Petroleum economics
Sadegh Yazdani
 
Unconventional Gas Reservoir
Unconventional Gas ReservoirUnconventional Gas Reservoir
Study for effectiveness of the exploration, transportation and distribution o...
Study for effectiveness of the exploration, transportation and distribution o...Study for effectiveness of the exploration, transportation and distribution o...
Study for effectiveness of the exploration, transportation and distribution o...Akhilesh Maurya
 
Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)
AbdallahKhames
 

What's hot (20)

Caol bed methane
Caol bed methaneCaol bed methane
Caol bed methane
 
Oil 101 - Introduction to Exploration
Oil 101 - Introduction to ExplorationOil 101 - Introduction to Exploration
Oil 101 - Introduction to Exploration
 
oil and gas traps
oil and gas traps oil and gas traps
oil and gas traps
 
Oil shale..New fossil fuel for century
Oil shale..New fossil fuel for centuryOil shale..New fossil fuel for century
Oil shale..New fossil fuel for century
 
Well Logging: 03 SP log 02
Well Logging: 03 SP log 02Well Logging: 03 SP log 02
Well Logging: 03 SP log 02
 
Q913 re1 w3 lec 11
Q913 re1 w3 lec 11Q913 re1 w3 lec 11
Q913 re1 w3 lec 11
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoir
 
Conventional and Unconventional Reservoirs
Conventional and Unconventional ReservoirsConventional and Unconventional Reservoirs
Conventional and Unconventional Reservoirs
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
 
COAL BED GAS GENERATION
COAL BED GAS GENERATIONCOAL BED GAS GENERATION
COAL BED GAS GENERATION
 
Ia final presentation
Ia final presentationIa final presentation
Ia final presentation
 
Coal Bed Methane
Coal Bed MethaneCoal Bed Methane
Coal Bed Methane
 
6 dynamics
6   dynamics6   dynamics
6 dynamics
 
Introduction to petroleum Economics
Introduction to petroleum EconomicsIntroduction to petroleum Economics
Introduction to petroleum Economics
 
Deep Sea Fan Systems
Deep Sea Fan SystemsDeep Sea Fan Systems
Deep Sea Fan Systems
 
Petroleum economics
Petroleum economicsPetroleum economics
Petroleum economics
 
Unconventional Gas Reservoir
Unconventional Gas ReservoirUnconventional Gas Reservoir
Unconventional Gas Reservoir
 
Shale Gas PPT
Shale Gas PPTShale Gas PPT
Shale Gas PPT
 
Study for effectiveness of the exploration, transportation and distribution o...
Study for effectiveness of the exploration, transportation and distribution o...Study for effectiveness of the exploration, transportation and distribution o...
Study for effectiveness of the exploration, transportation and distribution o...
 
Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)
 

Viewers also liked

Down the hole drilling
Down the hole drillingDown the hole drilling
Down the hole drilling
Anil Kilania
 
Technotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
Technotech Airflow Systems, Nagpur, HVAC & Clean Room SolutionsTechnotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
Technotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
IndiaMART InterMESH Limited
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation
RAJESH KUMAR YESO
 
Earth System History, Timeline of Earth Events, Geology Lesson PowerPoint
Earth System History, Timeline of Earth Events, Geology Lesson PowerPointEarth System History, Timeline of Earth Events, Geology Lesson PowerPoint
Earth System History, Timeline of Earth Events, Geology Lesson PowerPoint
www.sciencepowerpoint.com
 
Minerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPointMinerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPoint
www.sciencepowerpoint.com
 
Hydraulic drill jumbos an overview
Hydraulic drill jumbos  an overviewHydraulic drill jumbos  an overview
Hydraulic drill jumbos an overview
PINAKI ROY
 
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab ActivityProperties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
www.sciencepowerpoint.com
 
Minerals
MineralsMinerals
Minerals
Shuvo Roy
 
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesiasosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
Yogi andreansyah
 
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, MineralsName that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
www.sciencepowerpoint.com
 
Gejala sosial
Gejala sosialGejala sosial
Gejala sosial
sfuzaa
 
Paleozoic
PaleozoicPaleozoic
Paleozoic
txellrocaprevera
 
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPointName that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
www.sciencepowerpoint.com
 
Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Jamal Ahmad
 
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss, Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
www.sciencepowerpoint.com
 
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPointMinerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
www.sciencepowerpoint.com
 
Rock forming minerals
Rock forming mineralsRock forming minerals
Rock forming minerals
Mohammed Abd Elfattah
 
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic EventsPaleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
www.sciencepowerpoint.com
 

Viewers also liked (20)

Down the hole drilling
Down the hole drillingDown the hole drilling
Down the hole drilling
 
Technotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
Technotech Airflow Systems, Nagpur, HVAC & Clean Room SolutionsTechnotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
Technotech Airflow Systems, Nagpur, HVAC & Clean Room Solutions
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation
 
Excavation engineering handbook
Excavation engineering handbookExcavation engineering handbook
Excavation engineering handbook
 
Earth System History, Timeline of Earth Events, Geology Lesson PowerPoint
Earth System History, Timeline of Earth Events, Geology Lesson PowerPointEarth System History, Timeline of Earth Events, Geology Lesson PowerPoint
Earth System History, Timeline of Earth Events, Geology Lesson PowerPoint
 
Minerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPointMinerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPoint
 
Hydraulic drill jumbos an overview
Hydraulic drill jumbos  an overviewHydraulic drill jumbos  an overview
Hydraulic drill jumbos an overview
 
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab ActivityProperties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
 
Minerals
MineralsMinerals
Minerals
 
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesiasosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
 
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, MineralsName that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
 
Gejala sosial
Gejala sosialGejala sosial
Gejala sosial
 
Paleozoic
PaleozoicPaleozoic
Paleozoic
 
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPointName that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
 
Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Gejala sosial kpkm (2)
Gejala sosial kpkm (2)
 
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss, Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
 
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPointMinerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
 
Rock forming minerals
Rock forming mineralsRock forming minerals
Rock forming minerals
 
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic EventsPaleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
 

Similar to Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation

Bakri Final Presentation 2
Bakri Final Presentation  2Bakri Final Presentation  2
Bakri Final Presentation 2
ahmadbakri991
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PaulOkafor6
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
Communications Branding
 
Drilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdfDrilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdf
ssuserbfbf46
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
ref-iqhub
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
IsmailKatun1
 
General HydropowerPresentation
General HydropowerPresentationGeneral HydropowerPresentation
General HydropowerPresentationTongai Mundiya
 
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
PranayaKishoreRaycho
 
Presentation for Lean Symposium
Presentation for Lean SymposiumPresentation for Lean Symposium
Presentation for Lean Symposium
guestecf2fd
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Memphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryMemphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryJeffrey Harris
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
Elsayed Amer
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
Apollo Techno Industries Pvt Ltd
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
Apollo Techno Industries Pvt Ltd
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
Sigve Hamilton Aspelund
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)William Godwin
 
Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS) Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS)
Mantrac Group
 

Similar to Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation (20)

Bakri Final Presentation 2
Bakri Final Presentation  2Bakri Final Presentation  2
Bakri Final Presentation 2
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
Drilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdfDrilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdf
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 
General HydropowerPresentation
General HydropowerPresentationGeneral HydropowerPresentation
General HydropowerPresentation
 
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
 
Presentation for Lean Symposium
Presentation for Lean SymposiumPresentation for Lean Symposium
Presentation for Lean Symposium
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
FullDrift.ppt
FullDrift.pptFullDrift.ppt
FullDrift.ppt
 
Memphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryMemphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventory
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)
 
Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS) Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS)
 

Recently uploaded

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 

Recently uploaded (20)

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 

Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation

  • 1. Indo CBM 2014, Jakarta Best Practices in CBM Drilling Shane A. Lein, Product Manager Shallow Oil, Gas and CBM Drilling Equipment Garland, Texas
  • 2. Best Practices in CBM Drilling The key to a successful CBM Drilling Program is Safety, the Ability to “Quick Turn” the Wells, Quick Set up, Mobility and small Environmental Footprint – Safety = good reputation as a Contractor and Employer – More wells == mmoorree rreevveennuuee – Quick Set Up = more actual drilling time – Mobility = more actual drilling time – Small Environmental Footprint = “Green” Contractor, less $$ spent on location preparation
  • 3. Best Practices in CBM Drilling Drilling Method requirements are also a consideration – Amount of equipment required Mud System – Mud Pits, Water Tanks, Mud Pumps, Mud Cleaning EEqquuiippmmeenntt,, MMuudd aanndd Mud Treatment Chemicals Air System – Auxiliary Compressor, High Pressure Booster, A Few polymers/additives
  • 4. Unconventional Rigs vs. Conventional Rigs Overall Operating Cost Advantage of Unconventional Rigs – Less Crew – Fewer Loads to Move – Fast Rig Up-Hours, not Days – Reduces Non Drilling Time/Cost – Increases Drilling Performance – Higher Efficiency than Conventional Rigs designed to drill much deeper – Physical Size of Drilling Location – Less complicated to rig up providing for a safer environment
  • 5. CBM DRILLING Safety, Speed, Mobility, Footage Production, Less Environmental Impact
  • 6. TYPICAL CBM LOCATION MOBILE RIG DOG HOUSE MUD PUMP (NOT SHOWN) MUD TANK GEN Average Location Size 40m x 40m or smaller VAC TRUCK SET SUB STRUCTURE PIPE TUBS PIPE RACKS
  • 7. TYPICAL CBM LOCATION Average Location Size 40m x 40m or smaller SLUDGE ROLL-BACK TRUCK LOCATION OFFICE MUD TANK MUD PUMP TANK
  • 8. Conventional Oilfield Land Rigs Many Loads (average 15-25, costing tens of thousands of $$ per rig move) More components to assemble, set and rig up Larger drilling location required Standard crew of 5 (per shift) x 2-12 hour shifts or 3 x 8 hour shifts – 10-15 Crewmembers per shift plus supervisory ppeerrssoonnnneell oonn ssiittee – Driller – Derrick Hand – Motor Hand – 2 Floor Hands + Rig Supervisor/Tool Pusher
  • 9. Conventional Drilling Rig Package Rig-MaPst,i stub, draw works BOP’s Choke Manifold Degasser Mud System Pits/Cleaning Large Location Pad 107m x 107m Change House Tool House Pipe Racks Pipe,Collars, Casing Living Quarters and offices Diesel Engines Gen Sets Water Tank Diesel Tank Mud Pumps Mud Mixing House Mud/Chemicals Reserve Pit
  • 10. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location
  • 11. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr
  • 12. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive, better pipe control – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well
  • 13. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down
  • 14. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down Few loads to move – Saves time and money
  • 15. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements – Spud sooner High footage production –– TToopp DDrriivvee – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down Few loads to move – Saves time and money – Smaller Environmental Impact-Drilling Location Fewer Crewmembers – 3 Per shift typical Reduced Non Drilling Activity = More Rotating Hours
  • 16. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment
  • 17. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast
  • 18. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss
  • 19. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss Smaller scale equipment – More keen awareness of the Crew as to the whereabouts of others – Fewer Crew Members required to operate the rig
  • 20. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss Smaller scale equipment – More keen awareness of the Crew as to the whereabouts of others – Fewer Crew Members required to operate the rig Hands Free Pipe Handling – Safer working environment for Crew Members Remain clear of Rotating Pipe
  • 21. SETTING UP TO DRILL RAPID SET UP SAVES TIME MONEY Information from Actual Rig Moves AIR DRILLING - NO SUBSTRUCTURE 5 TRAILER LOADS - 4 PEOPLE 1/2 - 1 1/2 HR SET UP UNTIL DRILLING AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY
  • 22. SETTING UP TO DRILL RAPID SET UP SAVES TIME MONEY Information from Actual Rig Moves AIR DRILLING - NO SUBSTRUCTURE 5 TRAILER LOADS - 4 PEOPLE 1/2 - 1 1/2 HR SET UP UNTIL DRILLING AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY MUD DRILLING - FULL HEIGHT SUBSTRUCTURE 7 TRAILER LOADS - 6 PEOPLE 2 1/2 - 4 HR SET UP UNTIL DRILLING QUICK HOOK UP TO ON-BOARD MUD PIPING
  • 23. Drilling Methods Mud/Air Rotary Down Hole Hammer
  • 24. AIR VS. MUD DRILLING AIR FASTER MORE ECONOMICAL IF – ROCK FORMATIONS MUD FASTER MORE ECONOMICAL IF – UNCONSOLIDATED FORMATIONS – LESS WATER INFLUX – SMALLER HOLES – LOST CIRCULATION ZONES NOT A PROBLEM – LOW PRESSURE GAS DEPOSITS – LARGER WATER INFLUX – LARGER HOLES – NO LOST CIRCULATION ZONES – HIGH PRESSURE GAS DEPOSITS
  • 25. MUD ROTARY - AIR ROTARY - DTH SELECTION CRITERIA THE FORMATIONS TO BE DRILLED THE HOLE SIZES REQUIRED THE HYDRAULICS (WATER) IN THE FORMATIONS ECONOMICS
  • 26. FORMATIONS - DRILLING METHODS FORMATION TYPES SEDIMENTARY ROCKS METAMORPHIC ROCKS MEDIUM HARD IGNEOUS ROCKS UNCONSOLIDATED UNCONSOLIDATED SOFT VERY HARD EXAMPLES OF SCHIST QUARTZITE FORMATIONS VERY HARD GRANITE MASSIVE BASALT SAND, CLAY, GRAVEL SOFT SHALE MED. LIMESTOME SOFT SANDSTONE MED. SHALE GNEISS GRANITE SOFT LIMESTONE SOFT DOLOMITE MED. SANDSTONE AQUIFER CHARACTERISTICS OPTIMUM DRILLING FOAM METHODS ADDITIVES FOAM ADDITIVES LARGE WATER INFLUX WHILE DRILLING MODERATE TO LOW WATER INFLUX DRILLING AIR ROTARY DRILLING MUD VERY LOW WATER INFLUX OR NO WATER WHILE DRILLING AIR DHD DRILLING WHILE DRILLING
  • 27. HOLE SIZE GENERALLY, AS HOLE SIZE INCREASES BEYOND A CERTAIN POINT, AIR DRILLING WILL BECOME LESS ECONOMICAL – CLEANING THE BIT AND HOLE BECOMES A PROBLEM DRILLING SLOWS DOWN – ADDITIONAL AIR COMPRESSORS AARREE RREEQQUUIIRREEDD COSTS GO UP
  • 28. FORMATION HYDRAULICS WHEN FORMATIONS ARE SATURATED WITH WATER, AIR DRILLING WILL BECOME TOO SLOW TO BE ECONOMICAL – WHEN MORE WATER COMES INTO THE HOLE THAN THE AIR LIFT SYSTEM CAN EVACUATE, DRILLING RATE SLOWS DOWN AND EVENTUALLY STOPS – ADDING ANOTHER COMPRESSOR AND A BOOSTER COMPRESSOR WILL OVERCOME THE WATER PRESSURE BUT WILL ADD OPERATING COST
  • 29. ECONOMICS WHEN SUB SURFACE CONDITIONS SLOW DOWN THE DRILLING RATE WHEN ADDITIONAL EQUIPMENT REQUIREMENTS ADD COST AIR DRILLING WILL NOT BE ECONOMICALLY FFEEAASSIIBBLLEE
  • 30. TYPICAL AIR ROTARY OR DTH-PERCUSSION DRILLING SET UP
  • 32. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Alberta, CA) 800m Depth CBM Well (Water/Bentonite Flush) – Move on Location and Rig Up 4 Hours – Drill 100m of 9 7/8” Surface hole and set 7” Surface Casing 10 Hours – Drill 700m of 6 1/8“ Production hole and set 4 ½” Production Casing 18 Hours – Rig Down 2 Hours Total Well, 34 Hours (Excludes BOP Test at Rig Up and Logging Production Hole)
  • 33. MUD DRILLING LOCATION, ALBERTA CANADA
  • 34.
  • 35.
  • 36. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) China – Mud Drill 12 ¼” to 40m, set 9 5/8” casing – Air Drilling (DTH) to 350m set 5 ½” casing – Total Time-5 days
  • 39. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) India - Air Drilling – Conductor - Drill 17 ½” to 15m, set 13 3/8” casing – Surface - Drill 12 ¼” to 150m, set 9 5/8” casing – Production - 7” to 1000 m, set 5 ½” casing – Total Time-5 days
  • 40. Compact CBM Location in West Bengal, India
  • 41. Compact CBM Location in West Bengal, India
  • 42. Compact CBM Location in West Bengal, India
  • 43. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) Australia – Water Flush Drill and set 9 5/8” surface casing to 120m – Water Flush Drill to TD at 1000m and set 8 ½” production casing – Total Time-3 days
  • 44. CBM Location in Queensland, Australia
  • 45. CBM Location in Queensland, Australia
  • 46. CBM Location in Queensland, Australia
  • 47. Additional Photographs of Unconventional Rigs in CBM Application Safe, Mobile Equipment, Quick Moving, Quick Rig Up/Down Small Environmental Footprint
  • 48. CBM WELL IN WESTERN VIRGINIA
  • 49. CBM WELL IN WESTERN VIRGINIA
  • 50. GAS WELL LOCATION SOUTHERN ARKANSAS
  • 51. FLARING OFF THE GAS – AIR DRILLING WITH LOTS OF WATER IN THE HOLE
  • 52. GROUND LEVEL LOCATION AIR DRILLING - CBM - PENNSYLVANIA
  • 53. MOUNTAIN TOP LOCATION NARROW MOUNTAIN TOP LOCATION IN VIRGINIA
  • 54. CBM Location in Botswana, South Africa
  • 55. Rigging up two rigs in Arkansas. Drilling in Fayetteville Shale
  • 56. Questions? Thank you for your time and attention