Theohas more than 25 yearsof experience in construction- andturnaround planning,costcontrol and
reportinginthe petrochemical industry. Theoworkedasconstructionsupervisor,superintendent,senior
planningengineer/scheduler,constructionmanagerandsupervisorfieldprojectcontrol includingan
assignmentinSouthAfrica.Theo hasa no-nonsensewayof workingandpragmaticview.
Areas of Expertise
 ConstructionPlanningand Scheduling
 Turnarounds/shutdowns
 ConstructionSupervision
 ProgressMeasurementandReporting
 Primavera
 RoserConcys
Education
1984 - 1985 Technical CollegeMechanical Engineering,LOI
1967 - 1971 Lower Vocational Technical School (Car mechanical,Bemetel Nautical,Vapro-a-chemistry) LTS,
Zwijndrecht
Theo van den Berg
bergtheovanden202005master-201130093553 2
Experience Detail
WIMAP,Wingles,France
Client: INEOS STYROLUTION FranceSAS
Title: Lead Scheduler
Start/End Dates: June 2020 – Dec 2020
Scope/Description:responsible forintegratedscheduleandreporting
Marpol & Hutton projects,Europoort, The Netherlands
Client: BP Nederland Refinery
Title: Lead Scheduler
Start/End Dates: May 2019 – May 2020
Scope/Description:responsible forintegratedscheduleandreporting
Gasoline Terminal, Naphta MidDistillate,endseveral small projects,Europoort, The Netherlands
Client: Gunvor Nederland Refinery
Title: Scheduler
Start/End Dates: August 2018 – May 2019
Scope/Description:responsible forOSBLTie-inintegratedschedule andreporting
HAGO project,The Hague, The Netherlands.
Client: IrvingOil Ireland
Title: Scheduler
Start/End Dates: May 2018 – August 2018
Scope/Description: setupdetail constructionschedule forhandovertolocal scheduler.
Hycon Major Turn-around,Pernis,The Netherlands
Client: Shell Nederland Refinery
Title: Scheduler
Start/End Dates: August 2017–May 2018
Scope/Description:responsible forRoserplancardvalidationandmergingintoPrimaveraforscheduling
update andreporting
SolventDeasphalter(SDA), Pernis,The Netherlands
Client: Shell Nederland Refinery
Title: Scheduler
Start/End Dates: February 2016 – August 2017
Theo van den Berg
bergtheovanden202005master-201130093553 3
Scope/Description:responsible forOSBLTie-inintegratedschedule andreporting
Aromatics project, Pernis,The Netherlands
Client: Shell Nederland Refinery
Title: Scheduler
Start/End Dates: March 2015 – February 2016
Scope/Description:responsible forintegratedscheduleandreporting
SASOL program, Secunda,South Africa
Client: Sasol
Title: Planner
Start/End Dates: January 2014 – March 2015
Scope/Description:Programplannerforsmall projectsandschedulerforoverhaul andmodificationof 24
turbinesonclientlocation
TA2013, Rotterdam, The Netherlands
Client: KPE/Q8 Netherlands
Title: Supervisor Field ProjectControl
Start/End Dates: November 2012 – December 2014
Scope/Description:
 responsible forfieldscheduling.
 KPE/Q8 Netherlands:LeadforTA2013 integratedprojectandmaintenance schedule during
preparationandexecutionphase.
 1.2 milliondirectmanhoursestimatedduringexecutionphase of 8weeks.
 Focal pointfor workpreparationusingRoser-Consystool bycontractors
HMU, SRU500, CD5, Pernis,The Netherlands
Client: Shell Nederland Refinery
Title: Supervisor Field ProjectControl
Start/End Dates: October 2011 – November 2012
Scope/Description:responsible forfieldscheduling.Scheduleronbehalf of ShellPernis.Responsible for
integratedschedulesonvariousprojects.
TeflonClean-roomduringTA 2010, Dordrecht, The Netherlands
Client: Dupont Dordrecht
Title: Supervisor Field ProjectControl
Start/End Dates: June 2009 – October 2011
Theo van den Berg
bergtheovanden202005master-201130093553 4
Scope/Description:
 Responsible forfieldscheduling.
 Constructionmanageronbehalf of DupontDordrecht.
 C-DX01 Install ModifiedPolymerGraftExtruder.
 Several smallerprojectsandspecial projectactivitiesinTeflonClean-roomduringTA 2010
Client: several Clients
Title: Supervisor Field ProjectControl
Start/End Dates: April 2007 – June 2009
Scope/Description:
 As SupervisorFieldProjectControl responsible forfieldscheduling.
 AddedtoShell PernisteamadvisingforrevampGasfiringandCity-Heatingprojects
 Responsible forintegratedschedulesonvariousprojectsonShell,BP,DSM,Exxon.
 InvolvedinimplementationPrimavera-P6andRoser-ConsysonShell Pernis
PM Umbrella(Flexi CookerArea),Botlek,The Netherlands
Client: ExxonMobil
Title: Construction Manager
Start/End Dates: October 2006 – April 2007
Scope/Description:responsible forprojectexecution
Kraton, Glazingand Lexan,Bergenop Zoom
Client: GE Plastics Europe
Title: Construction Manager
Start/End Dates: June – October 2006
Scope/Description:responsible forprojectexecution
Title: Senior PlanningEngineer
 Shell Pernis,The Netherlands - (8-2005 -2006)
As senior PlanningEngineer responsiblefor the structureand control of reporting of CD-6 TA2006 and follow
up after the analysis.DuringTA preparation and executing actingand steering as directright hand of the
Construction Manager
 GE PlasticsEurope,Lexan Shutdown Project - (2005)
As senior planningengineer responsiblefor planning,structureand reporting. Duringthis project a new WBS
and code structure was determined. Shutdown was leaded by operations,duringshutdown acted as
Construction Manager under supervision of operations
 Alstom, Utrecht, The Netherlands (2005)
As senior planningengineer involved in:
Theo van den Berg
bergtheovanden202005master-201130093553 5
Maintain the overall and detail planning
Contribute development of the organization structureof sector projects
Recourse- and time planning
Writingprocedures for internal useof Sector projects regardingreview, action plans and risk analyses.
 Bouwcombinatie Eurotrax, Hoogvliet, The Netherlands - (2005)
Responsiblefor the implementation planning,costcontrol,redesign of the execution plan and startinga
management reporting structure to the project management
 Heerema Zwijndrecht, Extended Tension Leg PlatformKizomba-A
As senior planningengineer responsiblefor hook-up and integrated commissioningschedule.Production
platformwas fabricated in two parts 6000 tons each at Heerema yard Zwijndrecht . Hull was produced in
Korea, Derrick and Livingquarters in the US.
Hook-up and commission is been done on the Calland canal atRotterdam
 Solvay,Antwerp, Belgium - (2001 – 2002)
As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning
for a new to build petrochemical plant.
Acting as troubleshooter between the Technip ProjectManager, Client and Contractors.
Direct involved due to steering and control construction.
 Afval Verwerking Rijnmond, The Netherlands - (2000 – 2001)
As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning
for maintenance shutdowns.
 Lyondel - (2000)
Responsiblefor the maintenance of the integrated planningsystemand preparation of a shutdown.
 Hogenboom, Rotterdam, The Netherlands - (1999)
As senior planningengineer responsiblefor the development, implementation, followup and reporting of the
planningfor a new telecom cableconnection.
 NBM Leidingbouw, The Netherlands - (1999)
As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning
for a new drinkingwater pipingsystem
 Nerefco, Europoort, The Netherlands - (1999)
Support at the implementation of the planningsystemfor maintenance on the petrochemical installationsin a
alliance.
 Verolme montage, IJsselmonde, The Netherlands - (1999)
As senior planningengineer responsiblefor the development, implementation, followup and reporti ng of the
planningfor Shell CC2 revamp
 Afval Verwerking, Rijnmond,The Netherlands - (1997)
As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning
for maintenance shutdowns.
 GTI Mechanical,Rotterdam, The Netherlands - (1997)
Theo van den Berg
bergtheovanden202005master-201130093553 6
As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning
regardinga turn-around
 Visser en Smit Hannab, Delfzijl,The Netherlands - (1997)
Planningengineer for the builtof a compressor station on the NAM gas fields
 Air Products, Pernis,The Netherlands - (1996)
As superintendent responsiblefor the coordination of tasks by all construction partiesduringturnaround.
 Kemira Agro, Rozenburg, The Netherlands - (1996)
Supervisor for Mourik Mechanical duringthe Turnaround.
 Kemira Agro, Pernis,The Netherlands - (1995 – 1996)
Supervisor pipingmechanical turnaround
 Nerefco, Europoort, The Netherlands - (1994 – 1995)
As mechanical engineer involved in diverse activities for several TA’s.
 N.B.M., Amstelland,The Netherlands - (1988 -1993)
As Mechanical engineer involved in the coordination of several turnarounds.
 Esso Botlek, Flexicoker Project,The Netherlands -
As PlanningEngineer involved in this project.
 Shell,Pernis,Hycon Project The Netherlands -
 Hercules B.V., Zwijndrecht, The Netherlands -
Languages
Dutch, native
English,fair
Publications/Presentations
[YYYY] [Add Title]
Registrations/Affiliations
[YYYY] [Add Title]
Awards/Honors
Special training
 Primavera for Windows
 P3 Enterprise
 P5
 P6
Theo van den Berg
bergtheovanden202005master-201130093553 7
 Roser Consys
 VCA VOL
Employment History
From - To Company Position
2006 - till date Worley Nederland B.V. The Hague, The
Netherlands
Scheduler / PlanningEngineer
1994 - 2005 Primaplan,The Netherlands PlanningEngineer
1988 - 1993 NBM Amstelland, The Netherlands Mechanical / Planningengineer
1973 - 1992 Various companies,The Netherlands Piping& Mechanical

More Related Content

What's hot

Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
Mohamed Shipl , PMP
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
Eric Nager
 
Mohamed elhady arafa taha
Mohamed elhady arafa tahaMohamed elhady arafa taha
Mohamed elhady arafa taha
Mohamed Arafa
 
new version for CV (3)
new version for CV (3)new version for CV (3)
new version for CV (3)
Ahmad Nazzal
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
 
Vera Ho CV - 2016
Vera Ho CV - 2016Vera Ho CV - 2016
Vera Ho CV - 2016
Vera Ho
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016
Armien Fredericks
 
CV:Resume
CV:ResumeCV:Resume
CV:Resume
Mohammed Shamma
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Ahmed Naeim
 
Russia_automotive
Russia_automotiveRussia_automotive
Russia_automotive
Roman Fedorov
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
Ronald Coventry
 
Sesar the european atm programme mai 2013 bonnefous
Sesar   the european atm programme mai 2013 bonnefousSesar   the european atm programme mai 2013 bonnefous
Sesar the european atm programme mai 2013 bonnefous
P. K. Mwangi
 
CV mohamed
CV mohamedCV mohamed
IC-12, Phase-1 Static Diversion layout (2 off 2)
IC-12, Phase-1 Static Diversion layout (2 off 2)IC-12, Phase-1 Static Diversion layout (2 off 2)
IC-12, Phase-1 Static Diversion layout (2 off 2)
Amarnath Acharya
 
Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
aaupcfira
 
RESUME
RESUMERESUME
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
mohamed abuelenin
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
RAO YAGITILA
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
Douglas Tobin
 
EC Barnes-CV
EC Barnes-CVEC Barnes-CV
EC Barnes-CV
Emelita Barnes
 

What's hot (20)

Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
 
Mohamed elhady arafa taha
Mohamed elhady arafa tahaMohamed elhady arafa taha
Mohamed elhady arafa taha
 
new version for CV (3)
new version for CV (3)new version for CV (3)
new version for CV (3)
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Vera Ho CV - 2016
Vera Ho CV - 2016Vera Ho CV - 2016
Vera Ho CV - 2016
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016
 
CV:Resume
CV:ResumeCV:Resume
CV:Resume
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
 
Russia_automotive
Russia_automotiveRussia_automotive
Russia_automotive
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Sesar the european atm programme mai 2013 bonnefous
Sesar   the european atm programme mai 2013 bonnefousSesar   the european atm programme mai 2013 bonnefous
Sesar the european atm programme mai 2013 bonnefous
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
IC-12, Phase-1 Static Diversion layout (2 off 2)
IC-12, Phase-1 Static Diversion layout (2 off 2)IC-12, Phase-1 Static Diversion layout (2 off 2)
IC-12, Phase-1 Static Diversion layout (2 off 2)
 
Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
 
RESUME
RESUMERESUME
RESUME
 
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
 
EC Barnes-CV
EC Barnes-CVEC Barnes-CV
EC Barnes-CV
 

Similar to Berg theo van_den_2020_05_master

lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
Trevor Lucas
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
Maurice Strachan PMP
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
Eugene van Brakel
 
Chris Lee CV doc.
Chris Lee CV  doc.Chris Lee CV  doc.
Chris Lee CV doc.
Chris Lee
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
Tony Van Grembergen
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
Graham Cox
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
ignitetribes
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
Robert Schroedter
 
CV EPETIN eng nov 2015
CV EPETIN eng nov 2015CV EPETIN eng nov 2015
CV EPETIN eng nov 2015
Emmanuel Petin
 
Cv for brian cole including punj lloyd
Cv for brian cole including punj lloydCv for brian cole including punj lloyd
Cv for brian cole including punj lloyd
Brian Cole
 
Cv mathieu schutters
Cv mathieu schuttersCv mathieu schutters
Cv mathieu schutters
Mathieu Schutters
 
CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)
Jose Carlito Rebello
 
cv_overview 2016
cv_overview 2016cv_overview 2016
cv_overview 2016
Damon Hughes
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
Dines Haslund
 
Ian Entwistle CV
Ian Entwistle CVIan Entwistle CV
Ian Entwistle CV
Ian Entwistle
 
KHALED ALHAMZI CV
KHALED ALHAMZI CVKHALED ALHAMZI CV
KHALED ALHAMZI CV
Khaled Al-Hamzi
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
NITIN AGGRAWAL
 

Similar to Berg theo van_den_2020_05_master (20)

lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
Chris Lee CV doc.
Chris Lee CV  doc.Chris Lee CV  doc.
Chris Lee CV doc.
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
 
CV EPETIN eng nov 2015
CV EPETIN eng nov 2015CV EPETIN eng nov 2015
CV EPETIN eng nov 2015
 
Cv for brian cole including punj lloyd
Cv for brian cole including punj lloydCv for brian cole including punj lloyd
Cv for brian cole including punj lloyd
 
Cv mathieu schutters
Cv mathieu schuttersCv mathieu schutters
Cv mathieu schutters
 
CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)
 
cv_overview 2016
cv_overview 2016cv_overview 2016
cv_overview 2016
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
 
Ian Entwistle CV
Ian Entwistle CVIan Entwistle CV
Ian Entwistle CV
 
KHALED ALHAMZI CV
KHALED ALHAMZI CVKHALED ALHAMZI CV
KHALED ALHAMZI CV
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 

Recently uploaded

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 

Recently uploaded (20)

Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 

Berg theo van_den_2020_05_master

  • 1. bergtheovanden202005master-201130093553 Theo van den Berg SupervisorFieldProjectControl Summary Theohas more than 25 yearsof experience in construction- andturnaround planning,costcontrol and reportinginthe petrochemical industry. Theoworkedasconstructionsupervisor,superintendent,senior planningengineer/scheduler,constructionmanagerandsupervisorfieldprojectcontrol includingan assignmentinSouthAfrica.Theo hasa no-nonsensewayof workingandpragmaticview. Areas of Expertise  ConstructionPlanningand Scheduling  Turnarounds/shutdowns  ConstructionSupervision  ProgressMeasurementandReporting  Primavera  RoserConcys Education 1984 - 1985 Technical CollegeMechanical Engineering,LOI 1967 - 1971 Lower Vocational Technical School (Car mechanical,Bemetel Nautical,Vapro-a-chemistry) LTS, Zwijndrecht
  • 2. Theo van den Berg bergtheovanden202005master-201130093553 2 Experience Detail WIMAP,Wingles,France Client: INEOS STYROLUTION FranceSAS Title: Lead Scheduler Start/End Dates: June 2020 – Dec 2020 Scope/Description:responsible forintegratedscheduleandreporting Marpol & Hutton projects,Europoort, The Netherlands Client: BP Nederland Refinery Title: Lead Scheduler Start/End Dates: May 2019 – May 2020 Scope/Description:responsible forintegratedscheduleandreporting Gasoline Terminal, Naphta MidDistillate,endseveral small projects,Europoort, The Netherlands Client: Gunvor Nederland Refinery Title: Scheduler Start/End Dates: August 2018 – May 2019 Scope/Description:responsible forOSBLTie-inintegratedschedule andreporting HAGO project,The Hague, The Netherlands. Client: IrvingOil Ireland Title: Scheduler Start/End Dates: May 2018 – August 2018 Scope/Description: setupdetail constructionschedule forhandovertolocal scheduler. Hycon Major Turn-around,Pernis,The Netherlands Client: Shell Nederland Refinery Title: Scheduler Start/End Dates: August 2017–May 2018 Scope/Description:responsible forRoserplancardvalidationandmergingintoPrimaveraforscheduling update andreporting SolventDeasphalter(SDA), Pernis,The Netherlands Client: Shell Nederland Refinery Title: Scheduler Start/End Dates: February 2016 – August 2017
  • 3. Theo van den Berg bergtheovanden202005master-201130093553 3 Scope/Description:responsible forOSBLTie-inintegratedschedule andreporting Aromatics project, Pernis,The Netherlands Client: Shell Nederland Refinery Title: Scheduler Start/End Dates: March 2015 – February 2016 Scope/Description:responsible forintegratedscheduleandreporting SASOL program, Secunda,South Africa Client: Sasol Title: Planner Start/End Dates: January 2014 – March 2015 Scope/Description:Programplannerforsmall projectsandschedulerforoverhaul andmodificationof 24 turbinesonclientlocation TA2013, Rotterdam, The Netherlands Client: KPE/Q8 Netherlands Title: Supervisor Field ProjectControl Start/End Dates: November 2012 – December 2014 Scope/Description:  responsible forfieldscheduling.  KPE/Q8 Netherlands:LeadforTA2013 integratedprojectandmaintenance schedule during preparationandexecutionphase.  1.2 milliondirectmanhoursestimatedduringexecutionphase of 8weeks.  Focal pointfor workpreparationusingRoser-Consystool bycontractors HMU, SRU500, CD5, Pernis,The Netherlands Client: Shell Nederland Refinery Title: Supervisor Field ProjectControl Start/End Dates: October 2011 – November 2012 Scope/Description:responsible forfieldscheduling.Scheduleronbehalf of ShellPernis.Responsible for integratedschedulesonvariousprojects. TeflonClean-roomduringTA 2010, Dordrecht, The Netherlands Client: Dupont Dordrecht Title: Supervisor Field ProjectControl Start/End Dates: June 2009 – October 2011
  • 4. Theo van den Berg bergtheovanden202005master-201130093553 4 Scope/Description:  Responsible forfieldscheduling.  Constructionmanageronbehalf of DupontDordrecht.  C-DX01 Install ModifiedPolymerGraftExtruder.  Several smallerprojectsandspecial projectactivitiesinTeflonClean-roomduringTA 2010 Client: several Clients Title: Supervisor Field ProjectControl Start/End Dates: April 2007 – June 2009 Scope/Description:  As SupervisorFieldProjectControl responsible forfieldscheduling.  AddedtoShell PernisteamadvisingforrevampGasfiringandCity-Heatingprojects  Responsible forintegratedschedulesonvariousprojectsonShell,BP,DSM,Exxon.  InvolvedinimplementationPrimavera-P6andRoser-ConsysonShell Pernis PM Umbrella(Flexi CookerArea),Botlek,The Netherlands Client: ExxonMobil Title: Construction Manager Start/End Dates: October 2006 – April 2007 Scope/Description:responsible forprojectexecution Kraton, Glazingand Lexan,Bergenop Zoom Client: GE Plastics Europe Title: Construction Manager Start/End Dates: June – October 2006 Scope/Description:responsible forprojectexecution Title: Senior PlanningEngineer  Shell Pernis,The Netherlands - (8-2005 -2006) As senior PlanningEngineer responsiblefor the structureand control of reporting of CD-6 TA2006 and follow up after the analysis.DuringTA preparation and executing actingand steering as directright hand of the Construction Manager  GE PlasticsEurope,Lexan Shutdown Project - (2005) As senior planningengineer responsiblefor planning,structureand reporting. Duringthis project a new WBS and code structure was determined. Shutdown was leaded by operations,duringshutdown acted as Construction Manager under supervision of operations  Alstom, Utrecht, The Netherlands (2005) As senior planningengineer involved in:
  • 5. Theo van den Berg bergtheovanden202005master-201130093553 5 Maintain the overall and detail planning Contribute development of the organization structureof sector projects Recourse- and time planning Writingprocedures for internal useof Sector projects regardingreview, action plans and risk analyses.  Bouwcombinatie Eurotrax, Hoogvliet, The Netherlands - (2005) Responsiblefor the implementation planning,costcontrol,redesign of the execution plan and startinga management reporting structure to the project management  Heerema Zwijndrecht, Extended Tension Leg PlatformKizomba-A As senior planningengineer responsiblefor hook-up and integrated commissioningschedule.Production platformwas fabricated in two parts 6000 tons each at Heerema yard Zwijndrecht . Hull was produced in Korea, Derrick and Livingquarters in the US. Hook-up and commission is been done on the Calland canal atRotterdam  Solvay,Antwerp, Belgium - (2001 – 2002) As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning for a new to build petrochemical plant. Acting as troubleshooter between the Technip ProjectManager, Client and Contractors. Direct involved due to steering and control construction.  Afval Verwerking Rijnmond, The Netherlands - (2000 – 2001) As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning for maintenance shutdowns.  Lyondel - (2000) Responsiblefor the maintenance of the integrated planningsystemand preparation of a shutdown.  Hogenboom, Rotterdam, The Netherlands - (1999) As senior planningengineer responsiblefor the development, implementation, followup and reporting of the planningfor a new telecom cableconnection.  NBM Leidingbouw, The Netherlands - (1999) As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning for a new drinkingwater pipingsystem  Nerefco, Europoort, The Netherlands - (1999) Support at the implementation of the planningsystemfor maintenance on the petrochemical installationsin a alliance.  Verolme montage, IJsselmonde, The Netherlands - (1999) As senior planningengineer responsiblefor the development, implementation, followup and reporti ng of the planningfor Shell CC2 revamp  Afval Verwerking, Rijnmond,The Netherlands - (1997) As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning for maintenance shutdowns.  GTI Mechanical,Rotterdam, The Netherlands - (1997)
  • 6. Theo van den Berg bergtheovanden202005master-201130093553 6 As senior planningengineer responsiblefor the start,implementation, followup and reporting of the planning regardinga turn-around  Visser en Smit Hannab, Delfzijl,The Netherlands - (1997) Planningengineer for the builtof a compressor station on the NAM gas fields  Air Products, Pernis,The Netherlands - (1996) As superintendent responsiblefor the coordination of tasks by all construction partiesduringturnaround.  Kemira Agro, Rozenburg, The Netherlands - (1996) Supervisor for Mourik Mechanical duringthe Turnaround.  Kemira Agro, Pernis,The Netherlands - (1995 – 1996) Supervisor pipingmechanical turnaround  Nerefco, Europoort, The Netherlands - (1994 – 1995) As mechanical engineer involved in diverse activities for several TA’s.  N.B.M., Amstelland,The Netherlands - (1988 -1993) As Mechanical engineer involved in the coordination of several turnarounds.  Esso Botlek, Flexicoker Project,The Netherlands - As PlanningEngineer involved in this project.  Shell,Pernis,Hycon Project The Netherlands -  Hercules B.V., Zwijndrecht, The Netherlands - Languages Dutch, native English,fair Publications/Presentations [YYYY] [Add Title] Registrations/Affiliations [YYYY] [Add Title] Awards/Honors Special training  Primavera for Windows  P3 Enterprise  P5  P6
  • 7. Theo van den Berg bergtheovanden202005master-201130093553 7  Roser Consys  VCA VOL Employment History From - To Company Position 2006 - till date Worley Nederland B.V. The Hague, The Netherlands Scheduler / PlanningEngineer 1994 - 2005 Primaplan,The Netherlands PlanningEngineer 1988 - 1993 NBM Amstelland, The Netherlands Mechanical / Planningengineer 1973 - 1992 Various companies,The Netherlands Piping& Mechanical