Monitor construction activities, ensuring the safety of all personnel on site as the top priority;
Oversee total field construction effort to ensure project is constructed in accordance with design, budget, safety and schedule requirements;
Perform routine quality audits to ensure that work is progressing per the TransCanada specifications and initiate corrective actions where appropriate;
Document incidents using the Incident and Issues Tracking (IIT) system and participate in incident investigations;
Guide and direct proper project completion, including commissioning, close out of punch list, and training where appropriate;
Coordinate and ensure the timely completion of project documentation;
Ensure Company environmental policies and safety standards and local regulations are followed by all construction and inspection personnel;
Provide leadership for issue resolution during project construction and commissioning phases;
Ensure site inspections are carried out in a timely and efficient manner to avoid delays to the construction progress;
Review contractors’ request for changes and make recommendations to the Project Manager regarding necessity, effect, cost, and schedule implications;
Ensure scope changes are managed in accordance with contract terms and conditions;
Monitor construction progress and initiate corrective action when the contractor deviates from project specifications, requirements, or schedule;
Address any construction non-conformance issues;
Ensure design deviations are properly red lined and drawings are included in the project record file;
Coordinate plans with field engineering to overcome any inconsistencies;
Provide detailed direction of construction specifications;
Collaborate with Company Safety Representatives to promote awareness and understanding of safety performance on projects;
Provide construction management support for emergency repair and restoration activities on both oil and natural gas pipeline systems;
Other tasks as required.
Monitor construction activities, ensuring the safety of all personnel on site as the top priority;
Oversee total field construction effort to ensure project is constructed in accordance with design, budget, safety and schedule requirements;
Perform routine quality audits to ensure that work is progressing per the TransCanada specifications and initiate corrective actions where appropriate;
Document incidents using the Incident and Issues Tracking (IIT) system and participate in incident investigations;
Guide and direct proper project completion, including commissioning, close out of punch list, and training where appropriate;
Coordinate and ensure the timely completion of project documentation;
Ensure Company environmental policies and safety standards and local regulations are followed by all construction and inspection personnel;
Provide leadership for issue resolution during project construction and commissioning phases;
Ensure site inspections are carried out in a timely and efficient manner to avoid delays to the construction progress;
Review contractors’ request for changes and make recommendations to the Project Manager regarding necessity, effect, cost, and schedule implications;
Ensure scope changes are managed in accordance with contract terms and conditions;
Monitor construction progress and initiate corrective action when the contractor deviates from project specifications, requirements, or schedule;
Address any construction non-conformance issues;
Ensure design deviations are properly red lined and drawings are included in the project record file;
Coordinate plans with field engineering to overcome any inconsistencies;
Provide detailed direction of construction specifications;
Collaborate with Company Safety Representatives to promote awareness and understanding of safety performance on projects;
Provide construction management support for emergency repair and restoration activities on both oil and natural gas pipeline systems;
Other tasks as required.
working skills :
o Preparation of a 3D PDMS model for all plant areas within the contract Scope,
o The 3D model is showing the plant and the integration into the existing. The
Model includes:
i. Plant co-ordinates and elevations
ii. All equipment items acc. to equipment list.
iii. Clearances for disassembly, maintenance and operation.
iv. Clearances for pipe- and cable runs.
v. Requirements for steel structure (buildings & pipe racks).
vi. Pipe routing for major process piping (main process route).
vii. Equipment Arrangement according the layout standard & safety gaps
viii. The required steel structure Develop and issue isometric drawings including pipe
Supports for construction using 3D Model.
o Preparing complete design of piping general arrangement layouts and key plans using P&ID's and vendor data.
o Design Review for lines, equipment and structure in Navisworks, & PDMS Reviews for completeness (routing feasibility and requirements of process and accessibility).
o Prepare piping Daily & weekly reports.
o Attend hazed kick of meeting
o Follow up tenders
o Attend engineering weekly meetings to review progress & schedule
o Field Technical support.
o Site verification on isometric Drawing & layouts for new lines/tie in's.
o Developing AS BUILT Drawing.
o Testing procedures as applicable to Fabricated Equipment & Piping with knowledge of Isometric drawings and P& ID's
o Prepare transmittal report
And now i am working a piping design engineer at UNEPP
You can find my resume attached below as i will gladly provide any further information may be required
thank you
Best Regards
Mohamed osama
working skills :
o Preparation of a 3D PDMS model for all plant areas within the contract Scope,
o The 3D model is showing the plant and the integration into the existing. The
Model includes:
i. Plant co-ordinates and elevations
ii. All equipment items acc. to equipment list.
iii. Clearances for disassembly, maintenance and operation.
iv. Clearances for pipe- and cable runs.
v. Requirements for steel structure (buildings & pipe racks).
vi. Pipe routing for major process piping (main process route).
vii. Equipment Arrangement according the layout standard & safety gaps
viii. The required steel structure Develop and issue isometric drawings including pipe
Supports for construction using 3D Model.
o Preparing complete design of piping general arrangement layouts and key plans using P&ID's and vendor data.
o Design Review for lines, equipment and structure in Navisworks, & PDMS Reviews for completeness (routing feasibility and requirements of process and accessibility).
o Prepare piping Daily & weekly reports.
o Attend hazed kick of meeting
o Follow up tenders
o Attend engineering weekly meetings to review progress & schedule
o Field Technical support.
o Site verification on isometric Drawing & layouts for new lines/tie in's.
o Developing AS BUILT Drawing.
o Testing procedures as applicable to Fabricated Equipment & Piping with knowledge of Isometric drawings and P& ID's
o Prepare transmittal report
And now i am working a piping design engineer at UNEPP
You can find my resume attached below as i will gladly provide any further information may be required
thank you
Best Regards
Mohamed osama
As a Mechanical Engineer in the Oil and Gas Industry, would like to continue to expose to the challenges and latest Technology in this industry and make the best use my education, acquired skills and experience for personal and Organization growth.
A post graduate of petroleum Engineer (from PME) with 10 years of experience in project engineering and project management from conception to commissioning of multi-discipline EPC contracts related to chemical, refinery, oil & gas and LNG sectors including Egypt, Qatar, Abu Dhabi and Oman.
Working in Arabian Industries (AI) LLC for nearly 6 years in feasibility, detailed engineering, EPC, EMC and IMC Projects for PDO (Petroleum Development Oman) and ORPIC.
I’m a petroleum Engineer with an Excellent experience In Oil & Gas Projects and industries such as exploration ,drilling ,work over , Oil & Gas well drilling & ALS Production services and Projects in oil & Gas Energy field section ,My experience in the Drilling , Well control & wellhead equipment Inspection ,Refurbishment , Maintenance , Testing , Recertification and Installation As per API(6A , 6D , 16A , 16D, 16C & 7K ) Specification. Oil & Gas artificial lift production technology and solution. Maintenance, Installation and Overhaul of well head and well control tools and equipment; furthermore, many projects for new rigs (on shore) and offshore rig (ST-Bahari1- Jack up), Prove leadership skills involving managing, developing and motivating teams to achieve their objectives. Reliable, trustworthy and meticulous, gained a good understanding of what is required of Oil & Gas engineering.
1. PERSONAL DETAILS
Mohammed Shamma
33 Street 12, Block 5,
Surra, Kuwait
45405
T: +965 25313835
M: +965 97952819
mohammed.shamma89
@gmail.com
DOB: 09.06.1989
Nationality: Egyptian
Military Status: Exempt
Driver License: Yes
ACADEMIC
QUALIFICATIOS
BSc in Mechanical
Power Engineering
Ain Shams University,
Cairo
2006-2013
IGCSE High School
Grad.
AS levels: Math (A),
Chemistry (A), Biology
(B)
New English School,
Kuwait
2001-2006
AREAS OF
EXPERTISE
AVEVA PDMS
Autodesk AutoCAD
Autodesk Revit MEP
Autodesk Inventor
DDS SolidWorks
Microsoft Office
Microsoft Project
CERTIFICATES IN
CAD/CAE SOFTWARE
• AVEVA PDMS – from
EVRMAC/AVEVA Egypt
• Autodesk AutoCAD –
from Autodesk
• Autodesk Inventor –
from Axon Global
• Autodesk Revit MEP –
from Autodesk
Mohammed Shamma
Mechanical engineer
PERSONAL SUMMARY
A highly efficient, hardworking and talented mechanical engineer with a
comprehensive understanding of construction, manufacturing methods
and design processes in the business. Possess good team spirit, deadline
orientated and acquire the ability to produce detailed technical
specifications from client requirements.
Keen to find a challenging & suitable engineering position with an
ambitious company that offers opportunities for career development
and advancement.
WORK EXPERIENCE
• Alghanim International General Trading & Contracting Co.
Project: Subiyah Open Cycle Gas Turbine (OCGT-24) F e b . 2016 - Present
Vendor/Equipment: SIEMENS, Gas Turbine, Frame: 4000 (SGT5-4000F)
Budget: 100,000,000 KWD
Duration: 8 months (construction scope related)
Designation: Power Block Engineer
Responsibilities:
• Coordinating with the engineering department regarding the SIEMENS
package erection drawings/documents
• Provide technical feedback on the submitted erection documentation of the
SIEMENS package (GT, GTG, Air Intake & Exhaust Stack systems)
• Arrange all necessary facilities to commence with the scope of erection
• Responsible for the complete alignment of SIEMENS gas turbine & generator
whilst coordinating with SIEMENS TFAs
• Complete erection of Air Intake system & Exhaust bypass stack, including
piping systems such as wet compression, evaporative cooling, pulse air and
anti-icing system, whilst communicating with FAIST & BRADEN TFAs.
• Alghanim International General Trading & Contracting Co.
Project: Subiyah Open Cycle Gas Turbine (OCGT-08) F e b . 2014 – Jan.2016
Vendor: SIEMENS, Gas Turbine, Frame: 4000 (SGT5-4000F)
Budget: 120,000,000 KWD
Duration: 24 months (construction, commissioning & punch item closing)
Designation: Entry-Level Site Mechanical Engineer
Responsibilities:
• Prepared all drawings & documentations prior to receiving the turbine on site
• Foundation surveying & leveling prior to turbine supports installation
• Erection of turbine supports & auxiliaries prior to turbine arrival
• Alignment of turbine as per SIEMENS specifications & in co-ordination with
SIEMENS TFA
• Prepared all drawings & documentations for the Air Intake system
• Complete erection of the air intake system including all the piping systems
such as wet compression, evaporative cooling, pulse air and anti-icing
systems.
• Commissioning & final start-up of all the air intake systems with GT.
• Was responsible for handling & closing the necessary punch items to issue
& clear the T.O.P from our client
2. TRAINING
CERTIFICATES
AVEVA PDMS – from
EVRMac Engineering,
Egypt
Heat Exchangers Design –
from AUC, Egypt
ASME SEC VIII, DIV 1 –
from AUC, Egypt
The Avenues Mall central
LPG system design &
erection – from The Green
Flame Co, Kuwait
HVAC system design &
implementation – from
Arabia Training Center,
Egypt
Hydraulic System design
& implementation – from
Jelecom, Egypt
KOC’s Ahmadi filling
plant facility – from
Kuwait Oil Tanker
Company KOTC
Automobile engine
maintenance – from
Kuwait Public Transport
company KPTC
PERSONAL SKILLS
& QUALITIES
Focused & determined.
Executes tasks with
precision & quality.
Generating new ideas.
Innovative.
Team leading
Languages
Arabic – Mother tongue
English – Fluent
French – Read/Write
with basic competence
SIGNIFICANT ACHIEVEMENTS & TRAINING PROGRAMS
EVRMac Engineering - AVEVA Plant Design & Management
Systems, PDMS (Egypt 2015)
Role: Trainee
Attended a 5-day intensive course in the well known plant design
software PDMS. Course included the design modules of equipment &
piping, as well as brief introduction to drafting and isometric drawings.
American University of Cairo, AUC – ASME Section VIII, DIV 1 –
Design & Fabrication of Pressure Vessels (Egypt 2015)
Role: Trainee
Attended a 5-day special course at AUC in ASME Section VIII, DIV 1.
Course included detailed design methods of pressure vessels in
accordance to the ASME code. An introduction to the well known
pressure vessel design software, PV Elite was also taken during the
course.
American University of Cairo, AUC – Heat Exchangers Design
(Egypt 2015)
Role: Trainee
Attended a 5-day intensive course at AUC in heat exchangers design.
Course included all heat transfer mechanisms in several types of HXs
such as Shell & Tube, and plate type, as well as the design procedure of
those HXs.
University graduation thesis – Cathodic Protection of carbon steel
tank. (Egypt 2013)
Role: Lead designer & team leader
Designed & manufactured a 2m3 carbon steel which was protected
against corrosion using an in-house designed impressed current &
galvanic system for both the inside & outside of the tank.
Green Flame Gas Co. – The Avenues Mall central LPG system
(Kuwait 2012)
Role: Trainee
Attended a two weeks training program in the erection process of The
Avenues Mall central LPG system. The system consisted of a state of
the art piping network, along with pumps, compressors and vaporizers
to accommodate for both phases of LPG during both season of the year
Jelecom – Hydraulics system design (Egypt 2012)
Role: Trainee
Course based on industry pioneers FESTO in understanding &
designing different types of hydraulic systems.
Kuwait Oil Tanker Company (Kuwait 2009)
Role: Trainee A training program that included observing the process of
filling tankers at the KOTC filling plant in Al-Ahmadi.